Loading...
HomeMy WebLinkAboutEmail RE Construction Stormwater NOI Not Accepted - 24719 Morman, Alaina From: laserfiche@ncdenr.gov Sent: Tuesday, April 28, 2020 9:14 AM To: joe.heckman@duke-energy.com Cc: Morman, Alaina;joe.heckman@duke-energy.com; barksdalef@pondco.com Subject: Construction Stormwater NOI Not Accepted This email is to notify you that your application for FB Fort Bragg Drilling Mud Disposal Project was not accepted for the following reason: D5 - a blank NOI Certification Form was uploaded instead of the E&SC approval documentation. The correct documentation must be uploaded so the rest of the NOI can be verified. Please submit a new NOL Contact Alaina.Morman@ncdenr.gov with questions or to receive a PDF copy of this submission. Thank you. Please contact The Stormwater Program Administrative Assistant for more information at(919) 707- 3640. Please reference NOI application no. 24719 and Project ID NCC-CUMBE-2020-FB—Fort Bragg Drilling Mud Disposal Project. This email was automatically generated by Laserfzche. Please do not respond to this email address, as responses are not monitored. i