HomeMy WebLinkAboutEmail RE Construction Stormwater NOI Not Accepted - 24719 Morman, Alaina
From: laserfiche@ncdenr.gov
Sent: Tuesday, April 28, 2020 9:14 AM
To: joe.heckman@duke-energy.com
Cc: Morman, Alaina;joe.heckman@duke-energy.com; barksdalef@pondco.com
Subject: Construction Stormwater NOI Not Accepted
This email is to notify you that your application for FB Fort Bragg Drilling Mud Disposal Project was not
accepted for the following reason:
D5 - a blank NOI Certification Form was uploaded instead of the E&SC approval documentation. The correct
documentation must be uploaded so the rest of the NOI can be verified.
Please submit a new NOL Contact Alaina.Morman@ncdenr.gov with questions or to receive a PDF copy of this
submission. Thank you.
Please contact The Stormwater Program Administrative Assistant for more information at(919) 707-
3640. Please reference NOI application no. 24719 and Project ID NCC-CUMBE-2020-FB—Fort Bragg
Drilling Mud Disposal Project.
This email was automatically generated by Laserfzche. Please do not respond to this email address, as
responses are not monitored.
i