HomeMy WebLinkAbout20181598 Ver 2_R-1015 Revised Individual Modification Craven May 1 2020_20200501STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
Roy COOPER
GOVERNOR
May 1, 2020
US Army Corps of Engineers
2407 West 5th Street
Washington, North Carolina 27889-1000
Attention: Mr. Tom Steffens
NCDOT Coordinator
Dear Sir:
J. ERIC BOYETTE
SECRETARY
Subject: Revised Modification Request for the Section 404 Individual Permit and Section
401 Water Quality Certification for the proposed Havelock Bypass in Craven
County. TIP No. R-1015. Debit $ 570 from WBS 34360.1.2
The North Carolina Department of Transportation (NCDOT) submitted a modification request on
March 12, 2020 for revisions to the project permits. Based on further coordination with the NC
Division of Water Resources, further revisions need to be made to this request. This letter is a
revised version of the March 12, 2020 request, showing additional and modified information
highlighted in red.
Wetland and Stream Impacts:
These changes reflect both roadway design changes and changes in accommodations for Duke
Energy. Coordination with Duke Energy resulted in a reduction in the number of access points to
their transmission lines, and a reduction in impacts.
• Detail sheets updated (permit drawings 2 & 3)
• Site 1 (permit sheets 17& 18) added riprap in the excavation area due to riprap pads at two
pipes. A driveway was added, which did increase the impacts from fill, but decreased the
mechanized clearing and excavation. The permitted total (1.16 acre) did not change.
• Site 3: (permit sheets 28 & 29) a driveway was relocated and an error found in the
original permit total from 4/9/2019. Fill increases by 0.12 acre. Mechanized Clearing
decreased by 0.03 acre. Total difference a 0.09 increase in permanent impacts.
o Actual new Fill Impacts — 26.034 acre, Total old Fill impacts=25.906 acre; actual
difference 0.128 acre, rounded difference (26.03-25.91) = 0.12 acre as reported
• Site 7: omitted in 3/12/20 modification request, (permit sheets 35 & 36). Access
driveway was removed. Fill in wetlands reduced by 0.04 acre. Mechanized Clearing
reduced by 0.01 ac.
• Update to permit sheets 124 & 125. Changes were outside of impacted areas
• Update to permit sheets 130 & 131. Changes were outside of impacted areas
Mailing Address: Telephone: (919) 707-6000 Location:
NC DEPARTMENT OF TRANSPORTATION Fax: (919) 250-4224 1000 BIRCH RIDGE DRIVE
ENVIRONMENTAL ANALYSIS UNIT Customer Service: 1-877-368-4968 RALEIGH, NC 27610
1598 MAIL SERVICE CENTER
RALEIGH, NC 27699-1598
Website: www.ncdot.gov
• Site 21 (permit sheets 148 &149) pipe outlet shifted, fill increased, excavation
decreased, no change to total impacts permitted for site (0.85 acre).
• Site 26: omitted in 3/12/20 modification request, (permit sheets 93 & 94). Slope stake
lines were updated due to error in cross slope reported on plan sheets versus cross -
sections. Fill in wetlands reduced by 0.01 acre. Hand Clearing increased, but the reported
amount did not change.
o Fill decreased by 0.0098 acre, Hand Clearing increased by 0.0076 acre (new
=0.1139 acre, old 0.1063 acre)
• Site 27: omitted in 3/12/20 modification request (permit sheets 93 & 94). Access drive
was removed. Fill in wetlands reduced by 0.04 acre. Excavation in Wetlands increased by
0.03 acre. Hand Clearing reduced by 0.01ac.
o Actual Excavation in Wetlands increase by 0.0265 acre (new = 0.079 acre, old
=0.053 acre)
• Site 31: omitted in 3/12/20 modification request (permit sheets 102 & 103). Access drive
was removed. Fill in wetlands reduced by 0.01 acre. Excavation in Wetlands reduced, but
the reported amount did not change.
o Fill in Wetlands (new=2.2231 acre, old 2.2289 acre)
o Excavation in Wetlands (new = 0.068 acre, old 0.072 acre)
• Site 47, (permit sheets 142 & 143) pipe shortened to eliminate easement on property, HW
added. "Temporary Impacts in Surface Water" reduced by 0.01 ac. "Existing Channel
Impacts Temp." reduced by 10'.
• Summary sheets are updated to reflect changes to impacts and date (permit sheets 165,
166 & 167).
• Permanent fill in wetlands is increased slightly from 98.66 to 98.74 acres. Mechanized
clearing is reduced from 11.43 to 11.38 acres. Changes at Site 47 caused reductions in
temporary surface water and temporary channel impacts.
• Total permanent impact from hydraulics and roadway changes increased by 0.03 acre.
• Additional sheets have been prepared for the underground utility which requires
additional impacts in wetland Sites 1, 2 and 3. The permit drawings showed underground
utilities through these sections, but with no splice pits or hand holes, which are required.
These supplemental drawings were revised by Division 2 to show the permanent hand
holes and temporary splice pits with the total impacts required. Impacts shown on the
supplemental permit drawings are as follows:
= NE-03 (Site 1), 409 s.f, for splice pits and 15 s.f, for hand holes
= NE-04 (Site 2), 518 s.f. for splice pits and 30 s.f. for hand holes
= NE-05 (Site 3), 600 s.f. for splice pits and 30 s.f, for hand holes
= Additional total impacts needed = 1,602 s.f. (0.037 acre) of excavation and
handclearing for bore splice pits and hand holes. Additional coordination with Division 2
staff indicated this work should be counted as permanent impacts. Five utility impact
sheets and the utility impact summary sheet have been updated. These three additions can
be seen listed at the bottom of the site list as excavation impacts.
The net increase in permanent wetland impacts from these changes is 0.07 acre. An updated
mitigation acceptance letter will be forwarded as soon as it is available.
Buffer Impacts:
• Site 7 (buffer sheet 13) reduced Allowable Zone 1 impacts by 282 s.f. The pipe was
shortened to eliminate easement on a property, and a headwall added.
• Summary updated (buffer sheet 18 & 19). Allowable Zone 1 impacts are reduced from
42,810 s.f. to 42,529 s.f. due to the changes at Site 7.
A copy of this modification request and its distribution list will be posted on the NCDOT website
at: hgs:Hxfer.services.ncdot.gov/l)dea/PennApps/
Thank you for your assistance with this project. If you have any questions or need additional
information, please contact Gordon Cashin at gcashin@ncdot.gov or (919) 707-6107.
Sincerely,
DocuSigned by:
EH,,,
k C. lzzvtf G" III
D1248B309416_.
for Philip S. Harris III, P.E., C.P.M., Unit Head
Environmental Analysis Unit
cc: Mr. Garcy Ward, NC Division of Water Resources
li SHEET NO.
DETAIL A
SPECIAL CUT BASE DITCH
IN- ro Scale)
urol 3.� \ or FmM
Groun r / D 3\0�a1 DircM1
I ° Q Slope
UI Min. D= 2.0 F.
B= 8 Fr.
DETAIL F
LATERAL 'V' DITCH
IN- ro xole)
1 b Fill
Ground ./ D 1"iFr. Slope
Min. D= 0.5 F.
b= 5 Ft.
FROM -L- STA. 150+50 TO STA. 154+76 (RT)
DETAIL M
LATERAL BASE DITCH
(Norro xole)
b
NI -
Groun ,7./ D 3.� FillSlope
Min.
B= 2FI.
b= 5F.
FROM STA. 60+31 TO STA. 64+79 -Y3- (RT)
FROM STA. 250+09 TO STA. 253+89 -L- (RT)
DETAIL B
FALSE SUMP
( Not to Scale)
Median Ditch
9" 2'
ea Chan Below) � 20' GI
S - etc.
S=Ditch Slope CL Proposed Ditch
SEE PLANSHEETS FOR LOCATIONS
DETAIL G
STANDARD 'V' DITCH
(N.. Scale)
Norurol � r I
roan 3. D ,6.1
Groun
Min. D= Varies
FROM -L- STA. 247+15 TO STA. 247+24 (RT)
DETAIL N
STANDARD BASE DITCH
INof io Scala)
Noruml N.-I
.oun ./ D 3,\ roan
Min. D=r. Varies
B= 3F
FROM STA .50+30 TO STA. 51+45 -Y3- (RT)
FROM STA. 52+76 TO STA. 53+50 -Y4- LT)
FROM STA. 56+71 TO STA. 56+83 -Y4- ( T)
Details
DETAIL C
SPECIAL CUT DITCH W/EARTHEN BERM
( Not to Scale)
Natural E17 39
Ground BB r D 3\.\o6.1 Front
Ditch
Min. D= 2.0 Ft. u slope
B= 8 F,
.
1,_ 5 Ft.
FROM STA. 79+50 TO STA. 86+87 -L- (LT)
DETAIL H
LATERAL DITCH
I Norro Scale)
Norurol b Fill
Ground/ D 1"iFr. Slope
Min. D= 1 Ft.
b= 5 F1.
FROM STA. 165+23 TO STA. 169+60 -L- (RT)
FROM STA.219+40 TO STA. 223+55 -L- LT)
FROM STA.363+57 TO STA. 364+30 -L- RT)
DETAIL O
LATERAL BASE DITCH
(Notro Scale) b
Norurol
un 3,./ D FIII
Slope
Min.'F 1.OF1. B Fill above N.G. as
8= 3Fr. L.".! needed to de
6= SFr. provi
min. d=2.OF.
FROM STA. 47+45 TO STA. 50+30 -Y3- (RT)
DETAIL D
SPECIAL CUT BASE DITCH
I No to Scalel
onr
urol
Groun ! °+.1 Hat DRch
°D� F\o Slope
Min. D= 1.0 F,.
B= 8 Ft.
-KUM SIA. 33U+I/ IU
FROM STA.356+50 TO
DETAIL I
STANDARD 'V' DITCH
INor ro Scolel
Noruml N
/ Groun
roan J. D ,6.1
Min. D= 1.0 Ft.
FROM STA. 169+60 TO STA. 170+50 -L- (RT)
FROM STA. 550+75 (-213') TO STA. 551+46 (-182') -L- (LT)
DETAIL P
LATERAL BASE DITCH
( Nor ro Scala)
b
N r r
Groun Fill
Slope
e Min. D=r. 3H.
B= 3F
b= 5Ft.
FROM STA. 53+03 TO STA. 60+30 -Y3- (LT)
WETLAND AND SURFACE WATER IMPACTS
DETAIL S
SPECIAL LATERAL 'V' DITCH
I Norro Scole)
r l Fill
Ground 3;/ D S10
Min. D= 1.5Ft.
FROM STA. 65+16 TO STA. 73+89 -Y3- (RT)
FROM STA. 65+00 TO STA. 67+86 -Y3- (LT)
FROM STA. 63+00 TO STA. 65+86-RP2AC- �RT)
FROM STA. 53+50 TO STA. 58+30-RF2AC- R�T1)
FROM STA.37+45 TO STA.42+50 -SERVR0. (RT)
FROM STA. 48+90 TO STA. 53+92 -SERVR0. (RT)
DETAIL Y
SPECIAL CUT BASE DITCH
IN- ro Scale)
Norurol 3. Front
Groan / D DircM1
I °� I F\dot Slope
l� Min. D= 1.5 Ft.
B= 6 Ft.
FROM STA. 310+00 -L- TO STA. 313+00 -L- (LT)
DETAIL EE
SPECIAL LATERAL BASE DITCH
(Norro Scole) E..
Norurol
Ground D
Fill
Min. D= 1.0 Ft. SIuP
B= 3 Ft.
FROM STA. 464+23 TO STA. 464+54 -L- (LT)
FROM STA. 464+83 TO STA. 465+29 -L- (LT)
DETAIL T
LATERAL BASE DITCH
I Norro Sm1a)
b
N r r l
Groun 3./ D 31"iFt. FIII
Slop
e Min. D= 1.5Ft.
l.".! B= 2Ft.
6= S,
r.
FROM STA.41+56 TO STA. 45+65 -Y3- (LT)
FROM STA. 37+00 TO STA. 43+34 -Y4- (LT)
FROM STA. 38+00 TO STA. 43+50 -Y4- (RT)
FROM STA. 10+52 TO STA. 12+00 -Y4DR- (LT)
FROM STA. 45+26 TO STA. 49+73 -Y4- (RT)
FROM STA. 48+30 TO STA. 49+74 -Y4- (RT)
DETAIL Z
SPECIAL CUT BASE DITCH
(Norro Scale)
Norurol 3. From
Groan / D 3'� oc D'ncn
I °O I F\dot Slope
l� Min. D= 1.0 Ft.
B= 6 Ft.
FROM STA. 313+00 TO STA. 319+50 -L- (LT)
FROM STA. 329+67 TO STA. 330+40 -L- (LT)
FROM STA. 361+50 TO STA. 372+10 -1 (LT)
DETAIL FF
STANDARD 'V' DITCH
I Norro Scalel
Gral J_ NaNr
oun q./ 3.\ Ground
D
Min. D= 0.5F.
FROM STA. 153+37 TO STA. 153+63 -L- (LT)
FROM STA. 486+30 TO STA. 486+76 -1 (LT)
FROM STA. 21+18 (137') TO STA. 22+52 (117.3')-RP2CD- (RT)
DETAIL U
LATERAL BASE DITCH
IN- Ixale))
Nar rol �-
Groun D 1"Fr. FIII
MTSlope
B . D= 211.
3F.
b= SFt.
FROM STA. 60+30 TO STA. 62+00 -Y3- (LT)
FROM STA. 47+50 TO STA. 51+00 -Y3- (LT)
DETAIL AA
SPECIAL CUT BASE DITCH
I Nar ro Scale)
N rural 3. Front
Groan 3'� ct Ditch
D t\mot Slope
B= 3 F.
FROM STA. 342+60 TO STA. 345+56 -L- (RT)
FROM STA. 352+35 TO STA. 356+50 -L- (LT)
DETAIL GG
LATERAL BASE DITCH
(Norro Scole)
b
Norurol
FIII 'b' D .6.1 Ground
Slope
Min. D= e
b= 5 Ft.
FROM STA. 71+92 TO STA. 74+75-RP2AC- (FIT)
FROM STA. 519+38 TO STA. 520+10 -L- (LT)
DETAIL V
STANDARD BASE DITCH
( Nor ro Scale)
Naotural Nroural
Min. D= Varies
B= 2Ft.
FROM STA. 249+74 TO STA. 250+09 -L- (RT)
FROM STA. 10+20 TO STA. 10+71 -Y3- (LT)
FROM STA. 379+47 TO STA. 380+98.5 -L- (RT)
DETAIL BB
STANDARD BASE DITCH
I Nor ro Scale)
NaNral Nrouml
Groun
Min. D=1'
B=6 Ff.
STA. 402+97 -L- (143' RT) 5=0.245 %
STA. 403+42 -L- (120' RT) 5=0.213 %
STA. 21+17-RP2CD- (133' RT) 5=0.200 %
DETAIL HH
STANDARD BASE DITCH
(Norro Scale)
rural Noru�al
Groun ,�.\ ou
D
Min. D= 1.5 Ft. Bj
B= 4 F.
FROM STA. 8+75 TO STA.9+00-RP2CD- (LT)
+UU -L-
+50 -L-
DETAIL E
STANDARD BASE DITCH
I- ro Scale)
Noiural Norurol
Grounr �,� Groun
D p Bop
ro TB 1* TB
Georexrile g
Min. D=3.5 Ft.
B=12 Ff.
DETAIL J
TOE PROTECTION
I N. xale)
Grmo.nd b �3S\o9
d
d=2 Fr.
FROM STA. 214+74 TO STA. 218+15 -L- (RT)
FROM STA. 16+60 TO STA. 19+49-Y3RPB- (LT)
FROM STA.271+00 TO $TA. 273+10 -L- (RT)
FROM STA. 292+34 TO STA. 293+00 -L- (LT)
FROM STA. 470+00 TO STA. 471+20 -L- LT
FROM STA.470+00 TO STA. 471+00 -L- R
DETAIL Q
STANDARD BASE DITCH
I Norro Sc)
Norurol Natural
roan D ,6.� roan
Min. D= 2.5F1.
B- 3F.
FROM STA. 52+60 TO STA. 52+92 -L- (LT)
PERMIT
DETAIL W
LATERAL 'V' DITCH
�DlSF,
lope
FROM STA. 269+75 TO STA. 278+50 -L- (LT)
DETAIL CC
SPECIAL LATERAL DITCH
(Norro Scalel /�(\/
Noruml ill F D `
G.ound 3./ D o' o Fill
FROM STA. 10+50 TO STA. 13+50 -DRI- (LT)
DETAIL II
STANDARD BASE DITCH
Nor ro Scole)
Natural N.-I
Groana d D .� - Graand
B M.-D- 111.
Mox.d- 1Ft.
'When B is < 6.0' B= SFr.
IT . of Liner= PSRM
FROM STA. 512+94 TO STA. 514+35 -L- (RT)
ENGINEER ENGINEER
INCOMPLE / E PLANS
DO NOT USE FOR W ACQUISITION
PERMIT DRAWING I
SHEET 2 OF 167
DETAIL L
LATERAL 'V' DITCH
(Norro Scolel
Natural 6 Fill
Ground ./ D 1"iFr. Slope
Min. D= Varies
FROM STA. 13+31 TO STA. 16+56-Y3RPB- (LT)
FROM STA. 267+67 TO STA. 271+88 -L- (RT)
DETAIL R
SPECIAL LATERAL 'V' DITCH
IN- Scole)
of Fill
Ground 3.7 3.ot Slope
D
Min. D= 1.OFt.
FROM STA. 68+34 TO STA. 73+89 -Y3- (LT)
FROM STA. 246+22 TO STA. 248+00 -L- (LT)
FROM STA. 58+00 TO STA. 59+25 -Y4- (RTJ
FROM STA. 469+33 TO STA. 470+27 -L-(L
FROM STA. 529+15 TO STA. 530+50 -L- (L
FROM STA. 531+50 TO STA. 533+55 -L- (L
FROM STA. 526+50 TO STA. 530+14 -L- (R
FROM STA. 32+80.84 TO STA. 33+38 SERVRD- RT)
FROM STA. 35+17 TO STA. 37 +1 0
-SERVRD- (R
FROM STA. 91+56 TO STA. 92+95 -RP2A- (LT)
FROM STA
. 42+50 TO STA. 48+90 -SERVRD- (R
FROM STA. 53+92 TO STA. 56+47 -SERVRD- 1R
FROM STA. 558+00 TO STA. 559+00 -L- (LT)
FROM STA,
10+25 TO STA.14+50-SERVEXT- L
FROM STA. 53+92 TO STA. 56+47 -SERVR0. R
FROM STA. 552+25 TO STA. 556+50 -L- (LT)
FROM STA. 16+00 TO STA. 17+80-SERVEXT- (LT)
DETAIL X
SPECIAL CUT DITCH
( Nor ro Scale)
Front
Ditch
I 3'� o Slope
Goand 3./ D F\met
Min. D= 1 Ft.
FROM STA. 309+00 TO STA. 313+25 -L- (RT)
DETAIL DD
SPECIAL LATERAL 'V' DITCH
I Nor ro Scalel
Natural ��Fill
Ground 3 o6ot Slope
D
FROM STA. 40+50 TO STA. 41+63-RP2AC- (RT)
DETAIL JJ
LATERAL GRASS SWALE
(No I. Scale)
b
NoNral ��
Ground 3./ D 3.� r"hr. Fill
Slope
I e I Min. D= 1.5 Fr.
F.
FROM STA. 509+37 TO STA. 517+00 -L- (LT)
PW SHEET NO.
DETAIL KK
SPECIAL LATERAL BASE DITCH
(Not to Scole)
Nat rol \ of Fill
Ground :7 D 3"� < Slope LBJ
F\o e
Min. D=1.5 H.
B=4 Ff.
FROM STA. 9+00 TO STA.11+65-RP2CD- (LT)
FROM STA. 563+25 TO STA. 565+50 -L- (LT)
DETAIL QQ
SPECIAL LATERAL BASE DITCH
(Not to Smle)
NaNral \ o< Fill
Ground D '��'\ Ne< Slope
F
B Min. D= 1.5 H.
B= 2 Ft.
FROM STA. 544+00 TO STA. 552+25 -L- (LT)
FROM STA. 562+50 TO STA. 563+25 -L- (LT)
DETAIL YY
PIPE OUTLET CHANNEL
(Not to Scale)
roan e't'�� roue
CHANNEL BED
(18 Hl
Length= 3OFt.
Est.= 100 Tons of Class I Rip -Rap
DETAIL FFF
STANDARD BASE DITCH
I NotN Scale)
Nafuml Noluml
Groum ,6.\ Groan
d D
Gemeaile B Min. D= Vori-
Max.d= 1Ff.
'when B is < 6.0' B= 2Ff.
Type of Liner= CLASS I Rip -RP
FROM STA. 34+12 TO STA. 34+47 -Y4 (RT)
D e t ciis (ccnto)
DETAIL LL
STANDARD 'V' DITCH
IN o110 Smle)
Natural N f r
Ground 3./ 3.\ Ground
D
Min. D= 1.5 Ft.
STA. 90+41 -RP2A- (LT)
FROM STA.12+15 TO STA 12+89-RP2CD- (RTI
FROM STA. 534+65 TO STA. 535+02 -L- (LT)
FROM STA. 536+53 TO STA. 536+74 -L- (LT)
FROM STA. 536+83 TO STA. 537+43 -L- (LT)
DETAIL RR
LATERAL BASE DITCH
(Nof to Scale)
b
Natural ~-
Ground 3.7 D 3.� 1?1. Fill
slope
" Min. 1 1.5F1.
3
B= F1.
6= 5,
t.
FROM STA. 53+50 TO STA. 54+50 -Y4 (LT)
STA. 11+00 -SERVEXT- S=0.286 %
DETAIL MM
STANDARD 'V' DITCH
IN- Swle)
NmVral � Noluml
m n .7 A.\ Ground
D
Min. D=1 Ff.
STA. 11+66 to 12+05-RP2CD- (LT)
DETAIL SS
SPECIAL LATERAL BASE DITCH
(Nato Scala)
NaNral \ F'll
Ground 4'/ D Slope
oryor
B MI..D= 1R.
B= 2F.
FROM STA. 34+57 TO STA. 41+17 -Y3- (LT)
FROM STA. 543+00 TO STA. 544+00 -L- (LT)
DETAIL NN
MEDIAN V DITCH
(Nm t. Scale)
Shoulder T Shoulder
mf 3.7 I OF' Poem
FI�OR
F
MIN D=1.0'
FROM STA. 162+00 TO STA. 167+00 -L- (MED)
FROM STA. 224+00 TO STA. 226+26 -L- (MED)
FROM STA. 434+50 TO STA. 450+50 -L- (MED)
FROM STA. 530+14 TO STA. 536+00 -L- (RT)
FROM STA. 537+00 TO STA. 579+00 -L- (RT)
FROM STA. 555+00 TO STA. 559+50 -L- IMED�
FROM STA. 566+47 TO STA. 575+00 -L- MED
FROM STA. 575+00 TO STA. 579+17.51 -L- (MED)
DETAIL TT
SPECIAL LATERAL BASE DITCH
IN- Smle)
Natural \ Fill
Ground :/ D 3' Slope
B Min. D= 1H.
8= 3Ft.
FROM STA. 34+57 TO STA. 37+79 -Y3- (RT)
DETAIL 00
STANDARD 'V' DITCH
I Nof fo Scale)
Natu.1 1 Nafurol
ro n 47 A.\ Ground
D
Min. D=1.25 k.
STA. 533+55 -L- (LT) S=6.8 %
DETAIL UU
SPECIAL LATERAL BASE DITCH
( Nof ro Scale)
NaNral \ Fill
Ground :I D %' Slope
° er
B Min. D= 111.
6= 3Ft.
FROM STA. 38+60 TO STA. 41+50 -Y3- (RT)
DETAIL PP
SPECIAL LATERAL'V' DITCH
I- Scale)
Fill
Ground p.'pc slope
D
FROM STA. 559+00 TO STA. 562+50 -L- (LT)
DETAIL WW
SPECIAL LATERAL BASE DITCH
I Not fo Scale)
Nafurol \ Fill
Ground D oa' Slope
Dyer
u Min. D= 1.5Ff.
B= 2k.
FROM STA.34+23 TO STA.37+00 -Y4 (LT)
FROM STA. 34+47 TO STA. 38+00 -Y4- (RT)
FROM STA.12+00 TO STA. 15+70 -Y4DR- (LTI
FROM STA.12+00 TO STA.15+70 -Y4DR-(LTT
DETAIL ZZ DETAIL AAA DETAIL CCC DETAIL DDD DETAIL EEE
DITCH BLOCK SPECIAL LATERAL 'V' DITCH SPECIAL CUT BASE DITCH LATERAL BASE DITCH STANDARD BASE DITCH
(NO} to $COI¢) (Nof N Scolel IN- N Scale) I Notro Scale) I NM
to Scale)
6' m b
HS• Elevation=11.0' shdr�. Jwidth Nafuml \ Front -� Noluml Noluml \ Natural
Dirch ?. 3.7 D 3.\ Groan
0/ Servim Rd 3.y °',o ac sl°P. D SIoPe Slope
D o Min. D= 1.0 Ff. e Min. D=Varies
Dlxh Eint piLBN EOT �". Min. D= 1.0 Ft. B= 5 Ff. _.�
p B= 8 Ft. b= 5 Ft. B=5 Ft.
°Y""°I I STA. 6+14 to 7+27 -RP2C-
STA. 58+77 -Y4 (LT) FROM STA. 41+63 TO STA. 48+50-RP2AC(RT) FROM STA. 341+50 -L- TO STA. 347+63 -L- (LT) FROM STA. 7+27 TO STA. 8+36 -RP2C- (RT) STA. 72+02 to 72+50-RP2AC- (RT)
-
DETAIL GGG DETAIL HHH DETAIL MMM
SPECIAL LATERAL BASE DITCH SPECIAL LATERAL BASE DITCH SPECIAL CUT BASE DITCH
(Natty Scale) (Not to 5m1e) (Naha Swle)
Ground Sllope Ground 3� Drat Slope Gmun 3'� oft Ditch
D D f� oyo D Pia Slope
Min. D= 1.5Ft. L B= Min. D= 0.5F1. U Min. D= 2.5 Ft.
B= 3H. B= 3Ft. B= 5 H.
FROM STA. 54+50 TO STA. 58+66 -Y4- (LT) FROM STA. 56+83 TO 58+00 -Y4 (RT) FROM STA. 33+48 TO STA. 36+78-RP1CD- (RT)
DETAIL PPP DETAIL QQQ DETAIL RRR DETAIL SSS
SPECIAL CUT BASE DITCH MEDIAN V DITCH SPECIAL CUT BASE DITCH SPECIAL LATERAL BASE DITCH
IN- ro 5-16) ( Not N Smle) (Nol m scale) (Not ro Scale)
Noluml 3Front Shoulder Shoulder N t \ oc m 6�7 F, Point Noluml .37 \ 01 Front r Fill
3' Yrc DBch Fo O \O roan 3' �e1 Dirch Ground .7 Slope
.Dun eep P° a sop. 7ryarR D nF del (4II eeDII F\o slope D
4BJ Min. D= 1.5 FI. " Min. D=Varies " Min. D= 2Ff.
B= 8 FI. MIN D=1.0 Ft B= 8 H. B= 3Ft.
-RP1AB- FROM STA. 20+50 TO STA. 22+70-RP1AB- (MED) FROM STA. 7+50 TO 12+50-RP1CD- (RT) FROM STA. 32+60 TO STA. 74+26 -L- (RT) FROM STA. 62+00 TO STA. 65+00 -Y3- (LT)
DETAIL T3
TEMP. SPECIAL LATERAL 'V' DITCH
( Not to Scolel
Nafuml \ Fill
Ground 3'y 3o8`g1 Slope
Fp ear D F
FROM STA. 68+42 TO STA. 69+16-Y3DET- LT
FROM STA. 66+50 TO STA. 69+16-Y3DET- RT
DETAIL T4
TEMP. SPECIAL LATERAL 'V' DITCH
(Not to Scolel
Noluml \ Fill
Ground 3'y 3p�``g1 slope
Foy 4 p
FROM STA. 53+10 TO STA. 54+50-Y3DET- (LTJ
FROM-Y3DET- STA. 61+00 TO STA. 67+93 LT)
DETAIL T7
SPECIAL LATERAL BASE DITCH
(No1 fo Scale)
Nafuml 3,\ Fill
Ground/ D Slope
� �
LBJ Min.D= lH.
B= 2F1.
FROM STA. 36+29 TO STA. 40+50-Y3DET- (LT)
WETLAND AND
DETAIL T8
TEMP. SPECIAL LATERAL 'V' DITCH
(Nof la Scale)
-Y4- Y4DET-
Exizt. -Y4
\ � NAG.
Min. D= V.I.
FROM STA. 55+00 TO STA. 55+75-Y4DET- (LT)
DETAIL NNN
SPECIAL CUT BASE DITCH
I Nof ro Scale)
Nof ml
roa D
iP 9oP om
N T Dixh
Geotextile B Slope
Min, 13=2.5 FL
B=5 Ff.
DETAIL T1
TEMP. SPECIAL LATERAL 'V' DITCH
IN- S.Iy)
N-
Ground `?'/0 3So ac Slope
Fj�lr p
FROM STA.42+50 TO STA.51+13-Y3DET- (RT)
FROM STA. 55+00 TO STA. 59+50-Y3DET- (RT)
FROM STA. 38+25 TO STA.40+25-Y4DET-'Ln
FROM STA. 54+00 TO STA. 55+00-Y4DET- LTT
DETAIL T10
TEMP. SPECIAL LATERAL 'V' DITCH
IN-. Scale)
_Y - FIo:7 A- Exist.�3-
Min. D= 1.0 Ft.
FROM STA. 61+21 TO STA.64+50-Y3DET- (RT)
DETAIL T2
TEMP. SPECIAL LATERAL 'V' DITCH
(No1M _I.)
Natur 1 Fill
Ground 3'/ 30 0l Slope
Fury or p
FROM STA. 50+50 TO STA. 52+99-Y3DET- (LT)
FROM STA.54+50 TO STA.61+00-Y3DET- (LT)
FROM STA. 34+52 TO STA. 38+78-Y4DET- (RT)
SURFACE WATER IMPACTS PERMIT
ENGINEER ENGINEER
INCOMPLE E PLANS
DO NOT USE FOR 1/VI ACQUISITION
PERMIT DRAWING I
SHEET 3 OF 167
DETAIL XX
PIPE INLET CHANNEL AND BANK STABILIZATION
IN- N Smle)
CHANNEL BED
varies: 8'm 16')
Length= 25Ft.
Est.= 20 Tons of Class I Rip -Rap
(Not to Scale)
Nrol 3,.7 \ 01 Fmnl
DFo dal
Gmun '6' pitch
'FBI Slope
U Min. D= 2.5 Ft.
8= 8 F,
.
2+50 TO 33+48 -
0+00 TO 0+55 -
+04.84 TO 28+50
DEPARTMENT OF AGRICULTURE
CROATAN NATIONAL FOREST
\ ' /
DENOTES EXCAVATION
Em IN WETLAND
PW SHEET NO.
ROADWAY DESIGN
HYDRAULICS
ENGINEER
ENGINEER
Bp��ry9'p
��
83�
.•`�2G�� ES S
�l;
P`�2�p�FE S/ON :�9 �''.
jQ
SEAL _
.•'y �'t
_ SEAL
015869
`• 032581
GIR
/E
50' 0' 50' 100' 150'
GRAPHIC SCALE
DENOTES FILL IN DENOTES MECHANIZED
WETLAND CLEARING
DEPARTMENT OF AGRICULTURE
CROATAN NATIONAL FOREST
O
LLu
Ln
H
---_J� I--
1
Q10= 26cfs i
V10 =1.1 fps
PW SHEET NO.
ROADWAY DESIGN
HYDRAULICS
ENGINEER
ENGINEER
Bp��ry9'p
��
83�
.•`�2G�� ES S
P`�2�p�FE S/ON :�9 �''.
jQ Yl;
SEAL _
.•'y �'S.
_ SEAL
015869
`• 032581
GIR
/E
,,,,moffatt & nichol Uzi
PERMIT DRAWING
SHEET 18 OF 167
SPECIAL' CUT `8' BA$E PITCH
SEE DETAIL \
��✓� \V A Q��O 6cfs A\\ VAAA ��1� VAS ii ps�
DEPARTMENT OF AGRICULTURE
CROATAN NATIONAL FOREST \
O
50' 0' 50' 100' 150'
GRAPHIC SCALE
DEN INE WETLAND TION DENOTESWETLANDL IN DENOTCLEARING MECHANIZED
DEPARTMENT OF AGRICULTURE
CROATAN NATIONAL FOREST
PrW SHEET NO.
ROADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
.............wPInAIp
FESS/p�!9 � �� 2•4pEE55/0,�;f9 �'�.
SEAL SEAL '?
SMlSslory f45FMFN \ p1 015869 .1�1; 03258P o
}1 FICINEE� o'.NGME�..O,,�. r7Fe W
w ..._ I �,E wo.o.-,T.
„"moffaff & nlchol .aWr
NO Dense NO., r o os
4 I _-
/ PERMIT D RAW I N G
tpt SHEET 29 OF 167
SITE
\ \ \ \\ 1G18- POT SIM ld+OU6P \~, , \ \ \ �\ -- ---
\ 47 POT §TA /7+5000� \ \ — — \ / ' i \ �� — — — 4
00
'SST. 1 TON
LEST. RITONP EST. 5 SY GF
\ /
EST. S;Y GF
W-
2 \CL 6 RIPAAP
(Allr \ EST. 2 TON3
� SK-GF \ iE 3E � =
Lu 3F 3F aF * it it E
LuTB 2GI�."1 /� \ \ /
V)
/Ppr 1&12pz 10 v
ZF / F =� T 2GIec
_ \c R
LEST. iINRAP
\ \
✓ / \\ \ I / / \ — ( \\ \�i / \E;T.5 SY GF \\ / / / \ ��\ \�7ON
-/ % li — -� 11_ —� \\`— �/ 5 SY Gik L /i
%�7
\ i� I � ��� � \ � )� -\�� �// < ✓i,� J/ zIT
\ 11)1��� \ / I I l \ J + o � �\ � / � I I � \ \✓/�'" � \ // \ \ _ III ��I \ \ — '/ /�\� � ��/
Jll\v / /Ise I���/— If�(��I�,/•� I��\ �_\_ / // // I — �°ll1 �%�� _ � \—� ,—,_\;�,� '—\ /�,//��� /
— —� L L c
0w�
/
/
DEPARTMENT OF AGRICULTURE
CROATAN NATIONAL FOREST DENOTES MECHANIZED
CLEARING
\ DENOTES FILL IN
WETLAND
O
Lu
Lu
2
N
Lu
W
V)
O
O
00
N
a
V)
Lu
Z
2
V
50' 0' 50, 100, 150'
GRAPHIC SCALE
a
a
I-
LL
LL
v
u
u
V
C
391w-a
n
\ U—FI[ I MLI'1I U� NURIWL I URL
CROATAN NATIONAL FOREST
O
DENOTES MECHANIZED F F DENOTES FILL IN
CLEARING WETLAND
RNJ SHEET NO.
ROADWAY DESIGN
HYDRAULICS
ENGINEER
ENGINEER
:o •
9i
o N
v� 9�
••
v� SEAL
' •'
SEAL
- 015869N
032581 i
•''F'�C
�`•.
c7
so'•. FNGINF�i`y°��
INEE�:'.
,,'o: ••
f A�aO�p
,,,,moffatf & nlchol
Uzi
PERMIT DRAWING
SHEEN 35
OF 167
50' 0' 50' 100' 150'
GRAPHIC SCALE
PROJECT REFERENCE NO. 1 SHEET NO.
Wu)
I.—
I
g�"
�0� Le
J¢ J�
¢jWIQ
¢OQO
ti
IUW")U
2WU=
pOJ_W
Lu2QU2��
W=oUo�
�UQ
I 113
NNN�
J Q
UUUVW
INN SHEET NO.
ROADWAY DESIGN
HYDRAULICS
ENGINEER
ENGINEER
F�,2�RSEESSApoli,�����''
`C,2°�?EESS�p���s''..
`
SEAL
— SEAL ;
015869 i
i 032581 i
e.
\ \ ,,,,moffatt & n!Choi 09 ..
\O \\ NC L-- NO.: F-O- r
DRAWING
$HEEL- 360F 167
\\\
CHpAp \ \ // \ \ \ ` \ \\��\\\\\\`�\�\ �� �\ \ ANt4EL EXIST L -
- - - v — _ _ �a� / 1 I � � / A V A — — — ( \ \�� v A � � A 1aE�_� —
alaFaFaFaF \e\ (V
F� F F F 1 CHo/ \ \ \ \ —�
— — — x W
F
W
W
N
W
W
to
O
O
CV
Q
cAll
W
J
1
U
G
Z
L\��
WOODS
\
iF iF iF iF iF -.
\\ CL B RIy•�°�, P
\\E 7 TO CHORD "kr /
W6
CL RIP RAC � —�_ � \ � \ ._
W
\ \ G. \ � �i Z
XF
/ \I
�� ��uj
W
-L-
CL III RIP RAP
EST.2 TO
EST`7\SY
E �
RiE iE iE iE 9F �
_ � CHORD
CL B RIPIRAP /
\ EST.-1 TONS/
BEST. 7 S"F /
\\ / I I\ N
-IV WOODS
O
O
2 N 63'29 33.7'W \ 2GI \I %D
— /
15" RCP -IV TB 2GI % �+ N
CIL l / \Lu
�6y0 $- / )EST. ISIPTONS \\\\ \ \ Z
/ � /EST. $Y GF \\\\
" . DITCH TO \@ \ ,�
\ EXISTING DITCF� \ `%
LATERAL'V' DITCH \ 44
\ i SEE DETAIL F — \ ESt\lRI ?RA S
DDE = 346 CY
/ FAST. 3\SY_GF — \� _
DEPARTMENT OF AGRICULTURE
CROATAN NATIONAL FOREST
O
SITE 7
50' 0' 50' 100' 150'
DENOTES MECHANIZED F F DENOTES FILL IN
CLEARING WETLAND GRAPHIC SCALE
z
Z
0
LARRY S. PpUL
/ O WOODS
/ CELL TOWER AND BUILDING
LOCATION APPROXIMATE WITHIN FENCE
RNO SHEET NO.
ROADWAY DESIGN
ENGINEER
HYDRAULICS
ENGINEER
1 NAD 83
.'
�?:•pEE55%p^;•.,9 �'�.�
,.?.:oEESS%pN..w'.--
9"
�.
9�•';
14� SEAL
i.4� SEAL
015869
'• 032581 E =
•••''O'I'CINE�R:'•
--o •. F,yGIN' a°p••
-•o;�ash,,
,, T•..........a �,
.E..i
A 1
Q10=100cfs —1
/ V10 = 3.2 cfs 1 (n
I TE 27\ JME XR 1 ffaii & Oichol
SEE PROJECT COMMITMENTS ♦/♦1mo p<CE
—� ► DEPARTMENT OF AGRICULTURE FOR SPECIAL CLEARING FOR
N� ���e„se NO.. F olds
_ 1 — CROATAN NATIONAL FOREST
S-1 w 1 —L— STA.338+00 TO 393+00 PERMIT DRAWING
1 c w000s
/ EDWARD J. CIESZKO (ESTATE) 1 p 1► O SHEET 94 OF 167
Q10 = 2 cfs
VIO — fps
HAND CLEARING
--
FILI) PONDlTO \�
NA, U L GRQUND \
L
WOODS
N o 5
/ d — —BUCXFlEAD
7
�EE-DF,TAIL B�
//
p
/
O NIuT C T
M C1iORD� / I I/ �� L�'SI E
V / 1/
M
_ FEN E
uj
\ \ 1
= LJI
r
w000s
RETAIN PIPES 1 1 �l e� K- WOODS ./
SPECIAL CUT 8' BASE DITCH
SEE DETAIL CCC ( II i >•z P
1 I T i GII� WW FENCE % ///, ��
I wlv
w0�0 5 ND FENCE
ASE gTQH
D- GLEAM SEEAET41rCCC` DlTcri
_ \
�
Lo
EDWARD J. CIESZKO (ESTATE) I
av2020
mgberry
R:\Hydm,lics\PERMITS_Environmental\Drawings\Wetland & Stream\r-1015_Hyd_prm wetysh24.dgn
�— / W
ILWOOIhL WET �`% �/ �. �.t — — —� Lu
e ooDS / GREU IL-3 uj
8s W
O
_ _ _ ac r3 +
L ITPO P �� E 71 LN
B
///BEG NEE �ST / NP / / � � � _ m
ORD
—FFhrl N W ETLANLu
—
r —
yy IJj / / !/ was __�_ \� _ _
\) \ SrgCIA CUT 9' gAS TC E \ I ► €R ISTIN�AG \ / J ST.I
SEE DETAIL AA ULTC.
V
o
o
o
28A
1
►
1
1
► 1,
11[► 1
LARRY S. PAUL !►Il 111' DEPARTMENT OF AGRICULTURE
M CROATAN NATIONAL FOREST
50' 0' 50' 100, 150'
GRAPHIC SCALE
DENOTES EXCAVATION
IN WETLAND
® DENOTES HAND DENOTES FILL IN
CLEARING WETLAND
SEE SHEETS 61 FOR PROFILE -L-
SEE SHEETS 2D-I THRU 2D-2 FOR DRAINAGE DITCH DETAILS
\f
\ DEPARTMENT OF AGRICULTURE
CROATAN NATIONAL FOREST
L \
\ Sfryfryr \
SEE PROJECT COMMITMENTS
RW SHEET NO.
ENGINEER
ENGINEER
CA
ti9 `:
,,
Nyl:
:• ��
.v
; 4�o
SEAL
f SEAL
015869
.•'F'VGINE�P'••
032581 i E
T•......... .
° ..FN FQ'•o�
'�., off•. GINS: iSJ•
,,,, Moffatt & nichol ,s,
PERMIT DRAWING
SHEET 102 OF 167
11
50' 0' 50' 100, 150,
DEPARTMENT OF AGRICLLTLIRE
CROATAN FOREST
GRAPHIC SCALE
1�NAATIO`JNAL
l
DENOTES EXCAVATION
020 IN WETLAND
DENOTES HAND
CLEARING
F F WETLAND DENOTES FILL IN
SEE SHEETS 62 FOR PROFILE -L-
SEE SHEETS 2D-ITHRU 2D-2 FOR DRAINAGE DITCH DETAILS
mgberry
R:\Hydraulics\PERMITS Environmental\Drawings\Wetland d St,—\r-1015 Hyd prm wet psh26.dg,
\ \ PROJECT REFERENCE NO. SHEET NO.
R-1015 26
\ \ RNSHEET NO.
\ F\ ROADWAY DESIGN
IGN HYDRAULICS
ENGINEER ENGINEER
SS%pl",•s
Y�
F\ \ DEPARTMENT OF AGRICULTURE _ SEAL _ _ SEAL
CROATAN NATIONAL FOREST 015869 032581
\F ••'F'�;CINEE�'• � �o•'F;vGINE��'`•�'°:�
F\ \ L \\\\ „"moffaff & nicholPERM
sf"f"F S H EIT 10O F DRAWING6I \ SEE PROJECT COMMITMENTS
\ \ FOR SPECIAL CLEARING FOR
\ -L- STA. 338+00 TO 393+00
F \
Ln
+ r
I \LATERAL 2' BAS I CH M N
SEE DETAIL M
D DI GH_ ODDS
12-0
V1 / �''�. \\ \ I \ \ \ \ IE TO\ExISTII�G\DIrdH W
LLj
EXISDN=DRCH \\�\ ` \� ���22
�wooDs / ' PECIAL, CUT 6' BASE DITCH \ \ \ / i / \ \ \ -i
SEE DETAIL Z
vi \ \ \ _ \ \� Eco
ST.
Q:Q: , \ \ _ ~ \ \ \CL B RIP RAP O
mil^ 0 `� \ EST 75YO GF WORDS—
000w,n titipR%0
* `O
MMM, I -�
D IL
F U
-[- — —
�� 11 n \ C
W4jl,.,,6-Zk
WOODS
F __CLj RIP RAP —e—
\ \ \ \ \ I \
EST. 15 TORS
\ �,
NNNNN \ \ —\_— — —:,— _� _ \ \ I r ` ` \ \ M_SiANQARD 2' BASE-M CH`
EE DETAl"O
i=
\ / /
50' 0' 50' 100' 150'
�o NNAT
IONAL
AGRICULTURE
\ // /
/ GRAPHIC SCALE
w� 2SEE SHEETS 62
22N1020 DENONE WETLAND TION ® DENOTESCLEARING WETLAND
DENOTESWETLANDL IN SEE SHEETS 2D-1 �HRUR�D/2 FOR DRAINAGE DITCH DETAILS E�Z
MM mgberry
�� R:\Hydraulics\PERMITS Environmental\Drawings\Welland & Stream\r-1015_Hyd_prm wel_psh26.dgn
— SPECIAL LATERAL 3' BASE DITCH
SEE DETAIL EE RW SHEET NO.
S-0.0017ff4f ROADWAY DESIGN HYDRAULICS
DDE-14 c.y. B3 ENGINEER ENGINEER
PA NORi�( RTME \ OF RAWeORfATION � —
\ // / / _ / _ �_ -� \\ \ \ \�K_ _ \ \ \ \ \ \ \ / SEAL _ _ ' 4 SEAL f
015869 `• 032581 S
\ � \ \ it / / / / ��/� /_ / � \,\\ � \\ \\ _ — — — — > \ \ � �'� � ��\ \\ _ •''F'�CINEE�'• � sp o•'F;vGINF�i`�y°��
r
/Q,1 2 s / ,,�_v v
�10�'J I $
A\11/11 moffaff & nlchol n'OrvcaecNao9raono
5 ECIAL LATERAL 3' BASE DTCH
S E DETAIL EE PERMIT DRAWING
00�L30 A SHEET 125 OF 167
,r n.
V\ \
\ EXCIAV, jTl O
IL N
\.. \ Q10 — 6.10t cps
\ \ Vl I.�FT�$ / /. ` r l / SPECI%�% ALATERAL I'V' VI
\4EE DFfR IETO E IST.\
I\\\\ \ \ \\ {\ \
� ' <
/D45 y TE- /
7
co
A;
I
J
F
/1IlIl l.1
�1
/
CLB RI
EST. 1 E9 I
EST. 5 GF
S \T
\/\/\ �
EJ3 \
YI`-1¢L.IRIE PROTCCTION
—s�15IL
l
//\���`v\_— • \—v_ a//—_�
—�/'\\_�� �_— `_�— \1=, •q � —\ \ �—
a\ �
�\—
\ \
— —
\ TIF
T3L\
X�
\\
\
/
� z
wti
7l
/ �
J' FILN�WETLANDSte
5 Z
v�Q_
ycv
IIII IIII
I
lI
I
I
_
\
\
\
\
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION
50' 0' 50' 100, 150'
GRAPHIC SCALE
DENOTES MECHANIZED SEE SHEET 65 FOR PROFILE —L—
DENOTES EXCAVATION DENO$ F4IElE71N20—/THRU 2D-2 FOR DRAINAGE DITCH DETAILS
mgberry IN WETLAND �E CLEARING F F WETLAND
mgberry
R:\Hydraulics\PERMIT$_Environmenfal\Drawings\Wetland & Stream\r-1015 Hyd prm wet psh33.dgn
R
o6
E
Z
0
Mr�
OLn
2O
Rph
koo
In,z
I tn
,L,I
0-
2
�o
ol,
W�
�W
W
�pW
�Q
I I
MM
Q.Q.
I
N
DEPARTMENT OF AGRICULTURE
CROATAN NATIONAL FOREST
O
a
UNKNOWN OWNER h
n
00
M
Wu
SPECIAL LATERAL
'V' DITCH
SEE DETAIL PP
N 5'
38.7' W
L
N
-- —
—
u.j
Lu
-
�—
SPECIAL LATERAL 2' BASE DITCH
------c--_SEE DETAIL (.T-
3E
O
Q
Lo
H
N
---------
-L--SERVEXT-
Pt Sto 555+33.32 Pls Sto 56/+69D3 Pl Sto 18+96.44
A = 10' 16' 02.6 (LT) 9s = 0' 38 46l A = 8' 19' 25.Y (LT)
D = 0' 52 23.3' Ls = M&W D = 1' 54' 355'
L = lj759Y LT = 96.67' L = 435BY
T = 58953' ST = 49.33' T = 21830'
R = 6.56200' R = 3,000.00'
SE = OD25 SE = NC
RO = 14800' DS = 30 mph
DS = 60 mph
q
t
V t0
O �cT
n
I
u
a
C
u UNKNOWN OWNER
-L- ST Sto. 562+67.69F—/
DE 7
ZSR 1162 1111,-
_— 36" CP-III
U RETAIN PIPE r I RETAIN PIPE
MEDIAN 'V' DITCH I ml I
a — SEE DETAIL NN
ICI , I 1
- II
GR
ISFD
II
• / I
CLYDE BELANGIA
SHIRLEY BELANGIA POWELL
yX, _ SPECIAL LATERAL 4' BASE DITCH
— — y SEE DETAIL KK —
- HW7T _ FO
EMMA C. HARTFORO
39
MEDIAN 'V' DITCH
INN
7 rc-
RETAIN PIPE FOETAIN PIPE I
kO'CHL
I,
REMOVE
RETAIN PIPE
m
DALE WAYNE MAGEE
I RIP RAP
R-1015 39
R,W SHEET NO.
ROADWAY DESIGN HYDRAULICS
NA 3�,
ENGINEER ENGINEER
�. 2;aFESS/p�;':9 �: .• ?; �EESS/pN .;9''%
: 4� 9! •:
'v
SEAL SEAL
015869 _ `• 032581 f
ROBERT B.HARDISON
''••NCINE �.` 0a•••NGINEE• `y,�
e
ups '��QbnpW�
,,,,moffaft & nichol of
PERMIT DRAWING
tn
RAYMOND W. HARDISON
SHEET 142 OF 165
1
tN�
N
1
11
Ln
11
I I
I I�IBARBARA H. GIBBLE
J
lal O
1I
RETAIN EXIST RW
W
T= - — Lu
-- BV® — \ —-- 2
-- — -- -- — —
— — -- — —
— — — ---- N
Q
LJJ
Lu
N
MEDIAN 'V' DITCH
-T - - = L—
RETAIN T RNY RETAIN PIPE -
MEDIAN 'V' DITCH
O
SEE DETAIL NN
-- --
+
2G1-D
Lri
LA
LLJ
- =T-- ___- �--fi
Z
— — — — —T— —
— — T
—T— — —T--
--- U
>E
I_
=o
II �
SAMMY E.EBRON
�
SFD
Ll
I 1
I �
WI W
JACK SON OWE
R.L. BEL ANGIA / /
R.L. BELANGIA NANCY C. BAREFOOT
DEN ES IMPACTS IN DENOTES EMPORARY
SURFA E WATER IMPACTS I SURFACE WATER
SEE SHEETS 69 F R PROFILE -L-
SEE SHEETS 93 OR PROFILE-SERVEXT-
SEE SHEETS 2D-I THRU 2D-2 FOR DRAINAGE Dl CH DETAILS
PROJECT REFERENCE NO, SHEET NO.
m
-L--SERVEXT- R-1015 39
° P1 Sto 555+33.32 Pis Sto 561+69.03 P/ Sto /8+96.44 RMSHEET NO.
A = l0' 16' 02S' (LT) 6s = 0' 38 46.r p = 8' 19 25.Y (LT I ROADWAY DESS IGN HYDRAULICS
NA 3ENGINEER ENGINEER
D = 0' 52 23.3' Ls = 148DU D = l' 54' 35.5' �
L = 1J75.9/' LT = 98.67' L = 435.83' ,. 2;'FESS/p''•.s•.� �. 2,:OFESSIpN :9''%�
T = 58953' ST = 49.33' T = 218.30 ;: �o N9`• ; Q r ,
R = 6562A(Y R = 3OOOA0 SEAL 4 SEAL
DEPARTMENT OF AGRICULTURE SE = O.025 SE = NC ': 015869 032581 i
CROATAN NATIONAL FOREST RO = 148.00' OS = 30 mph ROBERT B. HARDISON
_ — — •'F�;CINE�O.'•'• oo•. F,yGINEa`�o?
PERMIT
I I I I SHEET 14 OFI165
� I I � I O NG
U I y RAYMOND W.HAR050N
I
t00
ip /I
u1 UNKNOWN OWNER W I W i I i I I i I I/ — _\ IfUWWWN
��
VPECIAL LATERAL -L- ST Sto. 56247.69 \ \ 3 i _ V' DIT�H \�
('„'t / \ �� i-� �— -� —. \ ✓ /\ —RETAIN-Ex+S�RroE--_ — — \�— I�I�(- .Q W
owo
W
f �.._ ..
LLJ So SPECfAL tATERAL-4' BASE DITCH
Z
— — ,_SEE-DETA�KI�_- _— _— — — Vi
— = ___ _— __=___ W
N
W —=__= — _—�__—�_� � =�_== ======_===_——=_=_=== — _=_ —=—_--
Lu
tP�p� 36" RCP- 2GI ---- —
DIAN 'V' DITCH MEDIAN 'V' DDCH— / O
M� O SEE DETAIL NN -�
REMOVE TE DETAIL NN / /
_ ---_-_ --_--
ti
Q � —__— 36"ICCP-RCP MEDIAN 'V' DITC — — � _ —� � � MEDIAN 'V' DITCH -- — —
_ — _ — — — — _ — — ——"
LLJ
ag LJJ -- - — — — -- _
—_=-�-- — — — — — J
Cn
ask
J= 2 RETAIN PIPE —R� PIPE
a Wp � � E I RETAN �I\ � ET N�PIPE � / �I � � RETA� T AIIV � / m �l� _,
�W U MEDYACI�V' ✓ i �, y/ / / / `, j s.- Q
�rAlrnlr� � \\ f \ \ I .I IP I'\ � �, g e � � ✓ � \ � / /I � � � � _ / S
'M1111 I`IR��y` \ J 1. .� I1/ \y\ \ ✓,
\IIIIII 114 II I I I \ �J o \I HTR `� I I \,X \�• I I ' \ \
�� — / \ice \ I III III I I i \ I \ \\$\\ \ / ` E
5 E. EBRON %
I \ \ \ ''`—
/ I
ISFo
I �ii� �� � It�l IIII� ! 11!I ���\ ''= �; = ���� � / •/ � . I I \ \ �
NGIA S_.�":::_ //
LYRE BELA
—� — — —-3i I I INS _ 1 1 /d --- \\� \!(_••./
EMMa aTON BELANGIA
e SHIRLEY BELANGIA POWELL _ z'
N EMMA C. HARTFORD �� - — A / �I I I i��/ / / /
£ _ _ _�� y
—_ -- DALE WAYNE MAGEE — - JACKSOFIAROWE
> e — -
� = R.L. BELANGIA
- I RIP RAP R.L. BELANGIA NANCY C. BAREFOOT
DENO ES IMPACTS IN DENOTES EMPORARY
SURFA E WATER IMPACTS ISURFACE WATER
SEE SHEETS 69 F R PROFILE -L-
�� SEE SHEETS 93 OR PROFILE-SERVEXT-
E �� SEE SHEETS 2DITHRU 2D-2 FOR DRAINAGE DETAILS
J
Jl l G
WEYERHAEUSER COMPANY
O
212 020
mgbeOw
R:\Hydraulics\PERMITS_Environmental\Drawings\Wetland & Stream\r-1015_Hydyrm_wet_psh44.dgn
FOREST OAKS
HARON D. THURSTON. et vI RLLIAM L.60 LUZADOER
SHIZUE HIROTA CLARK JUSTIN WAYNE STALLINGS
\
59
\ o
I * I DENOTES MECHANIZED
CLEARING
DENOTES EXCAVATION
IN WETLAND
RbENOTES TEMPORARY
FILL IN WETLAND
DENOTES FILL IN so' o• so• loo• Iso'
F WETLAND GRAPHIC SCALE
SEE SHEET 79 FOR PROFILE -Y3-
SEE SHEETS 2D-I THRU 2D-2 FOR DRAINAGE DITCH DETAILS
R,W SHEET NO.
ROADWAY DESIGN
HYDRAULICS
ENGINEER
ENGINEER
CA
o(/�9
2F ES S /p`��-v�'�.
4Qo 'I9�':
SEAL
i SEAL
015869
•'
+ 032581 i
FNG I NE�•P' •
o'•. i r'
•, ° •,FN �P' o
•. S. �5.`' GIN
o
"„moffatt & nichol
PERMIT DRAWING
SHEET 148 OF 167
..�e..e.onrue cur• -
9
I \ FOREST OAKS
\ SHARON O. THURSTON. et vl WILLIAM L. LUZADDER
I SHIZUE HIROTA CLARK JuSTM WAYNE STALLINGS
60
\ 59
I
O
LATE BASE BASE DITCH \
WEE DET4�IL U
Qto = k3cfs V10 Rs� \\ \
/ NROTA CLARKGREGORY D.KELLE7VSHIZUE
,u
l� \
LrNN wlLsav, et Dx 5.g
\\ \2 SPECIAL LATERA 'V' DITCH NiR
I \\ \ \ JEAN E. SANBORN _
SEE DETAIL R
r 57 EST2
/
/ .
V I d EST 2RIT NS / I t\ / I I I J J r\\ / /\\ �\ \ I\I Y3 SfO — F \ L D
\ BEST. 7SY GF I 417 �\\�4
/ SP CITCLAT L\I I\ II
bF \\ I '.I I\ � � I�QI
TiJ�iSE DITCH
\ I
\NC,
SITEI
I20
WEYERHAEUSER COMPANY w I
I
0 d I
I
225,2020
mg""
R.\Hydraulics\PERMITS_Environmental\Drawings\Wetland & Stream\,-1015_Hydyrm_wet_psh44.dgn
DIVE 7 �/
LE. p {3
LATERAL 2' BASE DITCH
SEE DETAIL M
15'y'
11
0 0 W\R / J
/ SPECIAL f RAL ' ' DI�I I\ II I IIN I
SEE DETAIL 1
f�
ONLY IMPACTS DUE TO CONSTRUCTION OF
PERMANENT ALIGNMENT ARE SHOWN ON THIS
SHEET. FOR ADDITIONAL IMPACTS DUE TO
DETOUR SEE PSH 213-3 (PERMIT DRAWING
SHEETS 7 OF 167).
pU�
RAN SHEET NO.
ROADWAY DESIGN
HYDRAULICS
ENGINEER
ENGINEER
0 ES .....
/
'•4 SEAL
'v SEAL f'
- 0158t59�`•.
032581 i
•''F'.�CINEE�:'. ,`,
so'•. F'1'GINF�i`•y°��
........
,,'�:
f
„"moffatt & nichol Uzi
PERMIT DRAWING
SHEET 149 OF 167
O
pUE
DENOTES MECHANIZED
CLEARING
DENOTES EXCAVATION
IN WETLAND
/
/ � 1
' c
/gam \ r II
/ V \
B�K W PLL
Rdo.N-E3t15101-8
F/
4L, RK, 8t ux
DENOTES TEMPORARY
IZIFILL IN WETLAND
DENOTES FILL IN 50' 0' 50' 100' 150'
F WETLAND GRAPHIC SCALE
SEE SHEET 79 FOR PROFILE -Y3-
SEE SHEETS 2D-I THRU 2D-2 FOR DRAINAGE DITCH DETAILS
Revised 5/1/2020
WETLAND AND SURACE WATER IMPACTS SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
Site
No.
Station
(From/To)
Structure
Size / Type
Permanent
Fill In
Wetlands
(ac)
Temp.
Fill In
Wetlands
(ac)
Excavation
in
Wetlands
(ac)
Mechanized
Clearing
in Wetlands
(ac)
Hand
Clearing
in
Wetlands
(ac)
Permanent
SW
impacts
(ac)
Temp.
SW
impacts
(ac)
Existing
Channel
Impacts
Permanent
(ft)
Existing
Channel
Impacts
Temp.
(ft)
Natural
Stream
Design
(ft)
1
42+12 TO 54+15 -L- RT
ROADWAY FILL
0.59
0.32
0.25
2
57+70 TO 76+06 -L- RT
ROADWAY FILL
2.68
1.65
0.73
0+00 TO 33+68-RP 1CD- RT
3
70+94 TO 122+68 -L- RT/LT
ROADWAY FILL
26.03
0.32
3.07
22+61 TO 29+63-RP1AB- LT
4
127+97 TO 132+42 -L- LT/RT
ROADWAY FILL
1.53
0.09
5
136+88 TO 140+23 -L- LT/RT
ROADWAY FILL
0.10
0.06
0.07
0.08
6
138+19 TO 149+15 -L- LT/RT
ROADWAY FILL
5.17
0.37
7
154+60 TO 163+94 -L- LT/RT
ROADWAY FILL
2.52
0.32
8
167+89 TO 168+21 -L- LT/RT
ROADWAY FILL
0.02
< 0.01
9
170+05 TO 197+19 -L- LT/RT
Dual Bridges; 12@ 135', 72" MBT
4.90
0.64
3.95
10
197+45 TO 210+28 -L- LT/RT
ROADWAY FILL
6.69
0.55
11
211+31 TO 218+97 -L- LT/RT
ROADWAY FILL
2.82
0.21
12
218+39 TO 224+77 -L- LT/RT
ROADWAY FILL
2.46
< 0.01
0.16
13
229+73 TO 238+69 -L- LT/RT
ROADWAY FILL
6.85
0.37
14
7+87 TO 11+18-Y3RPB- LT/RT
72" RCP, BURIED
0.83
0.16
0.05
< 0.01
337.9
56.1855
15
12+60 TO 13+72-Y3RPB- LT/RT
ROADWAY FILL
0.32
0.03
16
237+79 TO 244+33 -L- LT/RT
72" RCP, BURRIED 1'
2.42
0.22
0.03
< 0.01
200.9
58.8936
17
52+61 TO 53+18-Y3DET- LT/RT
72" RCP, BURRIED 1'
0.04
0.01
0.01
0.03
0.02
129.7
88.99
17A
52+61 TO 53+18-Y3DET- LT/RT
60" TEMP PIPE
0.05
0.01
18
20+55 TO 24+91-Y3RPD- LT/RT
ROADWAY FILL
0.98
0.02
0.10
18A
55+30 TO 57+16-Y3DET- LT/RT
TEMP DETOUR
0.15
0.03
19
16+94 TO 17+92-Y3RPD- LT/RT
84" RCP, BURIED 1'
0.09
0.05
0.06
< 0.01
261.2
44.1
TOTALS*:
j 67.06
j 0.20
j 2.38
j 7.41
j 4.07
j 0.16
j 0.04
j 930
j 248
j 0
*Rounded totals are sum of actual impacts
NOTES:
Bridge Impacts at Site 9: 0.02 acres for Temporary Bents, <0.01 acres for all permanent bents.
2016 09 09
Revised 5/1/2020
WETLAND AND SURACE WATER IMPACTS SUMMARY
SURFACE
Site
No.
Station
(From/To)
Structure
Size / Type
Permanent
Fill In
Wetlands
(ac)
Temp.
Fill In
Wetlands
(ac)
Excavation
in
Wetlands
(ac)
Mechanized
Clearing
in Wetlands
(ac)
Hand
Clearing
in
Wetlands
(ac)
Permanent
SW
impacts
(ac)
Temp.
SW
impacts
(ac)
Existing
Channel
Impacts
Permanent
(ft)
Existing
Channel
Impacts
Temp.
(ft)
Natural
Stream
Design
(ft)
20
57+34 TO 62+48 -Y3- RT
ROADWAY FILL
1.46
0.10
0.18
21
58+29 TO 63+51 -Y3- RT
ROADWAY FILL
0.56
0.21
0.08
21A
58+89 TO 64+03Y3DET- LT/RT
TEMP DETOUR
0.25
0.11
0.12
22
267+83 TO 273+90 -L- LT/RT
84" RCP, BURIED 1'
0.86
0.12
0.05
0.01
583.6
61.1099
23
280+57 TO 293+27 -L- LT/RT
Dual Bridge; 7 @ 135', 72" MBI
1.03
0.15
3.05
24
308+19 TO 314+60 -L- LT/RT
42" RCP
0.74
0.04
0.06
25A
328+41 TO 336+80 -L- LT/RT
2@ 72" RCP, BURIED 1'
1.80
0.10
0.12
25B
325+13 TO 325+48 -L- RT
ROADWAY FILL
< 0.01
< 0.01
26
337+97 TO 342+81 -L- RT
72" RCP, BURRIED 1'
0.47
< 0.01
0.11
27
340+63 TO 344+93 -L- LT
72" RCP, BURRIED 1'
0.75
0.08
0.05
28A
348+96 TO 349+65 -L- RT
ROADWAY FILL
0.01
0.02
28B
351+33 TO 352+19 -L- RT
ROADWAY FILL
< 0.01
0.02
29
355+33 TO 357+51 -L- LT
ROADWAY FILL
0.03
0.07
0.04
30
355+83 TO 357+47 -L- RT
ROADWAY FILL
0.27
0.04
31
373+16 TO 380+23 -L- LT/RT
ROADWAY FILL
2.22
0.07
0.32
32
392+99 TO 399+33 -L- LT/RT
ROADWAY FILL
0.56
0.15
33
408+22 TO 408+87 -L- LT
ROADWAY FILL
< 0.01
0.01
34
409+25 TO 409+75 -L- RT
ROADWAY FILL
0.18
< 0.01
35A
432+62 TO 449+72 -L- LT/RT
ROADWAY FILL
5.49
0.77
35B
450+94 TO 454+47 -L- LT/RT
ROADWAY FILL
0.71
0.11
36A
456+65 TO 461+70 -L- LT/RT
84" RCP, BURIED 1'
0.79
0.15
36B
462+57 TO 464+60 -L- LT/RT
ROADWAY FILL
0.50
0.02
0.05
37
468+85 TO 486+94 -L- LT/RT
ROADWAY FILL
3.43
0.01
0.50
SUB TOTALS THIS SHEET":
21.89
0.25
0.80
2.47
3.77
0.05
0.01
584
61
0
*Rounded totals are sum of actual impacts
NOTES:
Bridge Impacts at Site 23: 0.04 acres for Temporary Bents, <0.01 acres for all permanent bents.
Revised 5/1/2020
WETLAND AND SURACE WATER IMPACTS SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
Site
No.
Station
(From/To)
Structure
Size / Type
Permanent
Fill In
Wetlands
(ac)
Temp.
Fill In
Wetlands
(ac)
Excavation
in
Wetlands
(ac)
Mechanized
Clearing
in Wetlands
(ac)
Hand
Clearing
in
Wetlands
(ac)
Permanent
SW
impacts
(ac)
Temp.
SW
impacts
(ac)
Existing
Channel
Impacts
Permanent
(ft)
Existing
Channel
Impacts
Temp.
(ft)
Natural
Stream
Design
(ft)
38A
489+64 TO 493+80 -L- LT/RT
ROADWAY FILL
0.49
0.03
38B
496+92 TO 498+23 -L- LT/RT
ROADWAY FILL
0.30
0.06
39
507+39 TO 518+70 -L- LT/RT
2 @ 10'X8' RCBC
2.99
0.07
0.20
0.22
0.03
984.87
116.37
40
RP2AC/RP2A/LP2A
ROADWAY FILL
5.38
0.12
0.78
41
41+40 TO 47+97-RP2AC- LT/RT
EXTEND 3@ 9'X7' RCBC
0.03
0.12
0.05
0.08
48.71
56.79
42
34+08 TO 37+91 -Y4- LT
72" RCP, BURIED 1'
0.01
0.04
0.06
< 0.01
< 0.01
20.43
11.6
43
33+80 TO 35+02 -Y4- RT
72" RCP, BURIED 1'
< 0.01
0.01
0.04
< 0.01
< 0.01
41.75
10.35
44
51+17 TO 53+70 -Y4- LT
2 @ 84" RCP, BURIED1'
0.24
0.02
0.09
0.02
< 0.01
121.5
10.7
45
50+49 TO 57+08-Y4DET- LT/RT
2 @ 84" RCP, BURIED1'
0.35
0.12
0.04
0.02
116.4
98.9
45A
50+47 TO 57+03-Y4DET-
TEMP DETOUR
0.51
0.19
46
533+11 -L- RT
30" RCP
< 0.01
< 0.01
10.0
16.0
47
563+36 -L- RT
36" RCP
< 0.01
12.0
SUB TOTAL THIS SHEET:
9.79
0.51
0.27
1.50
0.19
0.34
0.13
1356
321
SUB TOTAL SHEET 1:
67.06
0.20
2.38
7.41
4.07
0.16
0.04
930
248
SUB TOTAL SHEET 2:
21.89
0.25
0.80
2.47
3.77
0.05
0.01
584
61
TOTALS*:
98.74
0.96
3.45
11.38
8.03
0.55
0.18
2869
630
0
*Rounded totals are sum of actual impacts
NOTES:
At Site 45/45A, 0.03 acre of Temporary Fill in Wetlands in the Hand Clearing area for erosion control measures.
Revised 2016 09 09
Revised 5/1 /2020
PROJECT REFERENCE NO. SHEET NO.
R-1015 NE
y -L- RW SHEET NO.
PI StO 58+2l.81 ROADWAY DESIGN HYDRAULICS
0 = 38' 01' 15.2" (LT) ENGINEER ENGINEER
D = P 53' S4.5"
DEPARTMENT OF AGRICULTURE L = 2,002.71' NAD ' $gi
CROATAN NATIONAL FOREST T = 1,039.80'
DB 336 - PG 9 R = 3,018.00'
DB 336 - PG 72 SE = 0.06
7375.2 AC (DEED) RO = 300.00'
OOS = 65 mph
1 �
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
,,,, mOffOit & niChol ..
LCl
Ln
vl
/
O
+82.02 -lt V
+00.00 -L- 125.00' L
O
R
LT 25.00 1:
35.00LT v 850' LANE DROP TAPER
..
+
..
I E/oCID
.. +50.00 -Lt
R
Z
140 00 LT
S� a
-
�-
_ ��
air" /E/ SPECIAL CUT BASE DITCH
R _
S—
'� R C
-- it i
a
v
�. .. C s�sN+ai SEE DETAIL AB _sue �
�
<-- < E 5
e
`
Lu
—N _ -- _ _ --�
~•
N
_Z
o n -B!-
_ _ _ _ _ _ _ _ _ _ _ _ _ _ sr����'��'�� 75'BST
=-� �- — _— _
" RCP -IV
U
---- SST- ----�_
♦_BY-3
2
— — __—___—__
2GI 245• Bsr
�
75'BST
�,
l
N h
2GI _� _- �—F� 506
502 36 BST --------- SEE DETAIL B 2GI
FO
8. > BY-2 SEE DETAIL B 504--
F
�Q
o 35' B.ST 35' BST
2GI
_ us 7o
4' BST
---rc-- 507
— ---- �� _ _ -
— _
c C_�5 <
P pue
— c c — c — - —
BMI
B RIP RAP _ ouir — PUE
.3 TONS - a u
Sta
EST. 10 SY GF PUE B NP RAP ..
.�7+7`B
'
CL B R P 2 TONS
EST. 2 ONS SPECIA CUT B' BASE DIT H -!r . 7 SY GF +50.00
"
EST. SY GF SEED AIL RRR 130RT .00' RT
125.00
+12502 _L_ sta.52+52
- A1= 0. 006
sta.44+00
-L- RT 25.°°LT
UNDERGROUND COMMUNICATION sta.52+48
Sta 58+00
LINE splice pits
A2=0.663 AC OVERHEAD POWER AND sta.53+78 -L- R
COMMUNICATION LINES
m
z
PERMANENT FILL IN WETLAND
-o
DEPARTMENT OF AGRICULTURE
SITE 1 CROATAN NATIONAL FOREST FOR THE PROP. SPLICE PITS= 0. 02AC
DB 336 - PG 9
m
DB 336 - PG 72
7375.2 AC (DEED)
PERMANENT FILL IN WETLAND O DENOTES HAND
FOR THE PROP.
Q
POWER POLE= 4 X.0001AC=0.0004AC CLEARING
w
a:�
ma
m �z
o��
SEE SHEET 50 FOR PROFILE -L-
Revised 5/l/2020
(n
Z
O
W
z
i
C
L
a�
C
C
w
<n
rn�
00
N N
I �
U O
W L
On
to e o
O::D
W
z
J
r-
cn CD
BMI
I C, /
/
\
C~'o
\ N
DEPARTMENT OF AGRICULTURE
CROATAN NATIONAL FOREST
DB 336 — PG 9
DB 336 — PG 72
7375.2 AC (DEED)
0
L
PI Sta 58 +21.81
Z� =
38° 0/" 15.2" (LT)
D =
/* 53" 54.5"
L =
2,002.71"
T =
1,059.80"
R =
3,018.00"
SE
= 0.06
RO
= 300.00/
PUE PUE PUE — PUE PUE B RIP RAP — I I P��
I ICL B RIP RAP —� 2 To
I u, Q
r- = EST. 2 TONS I — SPECIAL CUT 8' BASE DITCH 7 SY GF (D
I cn Z ZEST. 7 SY GF �cwl�� F
SEE DETAIL RRR
I I I Cn 0 I \ I
I qCD
�Q \
I o
o /
DEPARTMENT OF AGRICULTURE
CROATAN NATIONAL FOREST
DB 336 -PG 9
DB 336 - PG 72
7375.2 AC (DEED)
(j)
PROJECT REFERENCE NO
R-1015
P/W SHEET NO.
ROADWAY DESIGN
ENGINEER
SHEET NO.
NE -03
HYDRAULICS
ENGINEER
DOCUMENT NOT CONSIDERED FINAL I
UNLESS ALL SIGNATURES COMPLETED
47ppg FALLS OF SUITE 300
gR6NO.IAR0LIMA",?'
moffatt & nichol ig, 6cV0CE 9 ) -4869FAX
NC License
NO.: F-0105
SEE SHEET 50 FOR PROFILE -L -
Revised 5/1/2020
POWER TRANSMISSION EASEMENT -L
Pl Sta 581,21.81
0 = 38' 01' 15.2' (LT)
D = /' 53' 54.5"
_E L = 2,002.71'
T = 1,0 .80'
R = 3,0
18.00'
/E SE = 0.06
RO = 330' (339')
DS = 65 mph
�-�`v,�.y.E�q�:��e�.®!��!��1:!®m00%ice®�A`!i•���
• R_
ENZ
p5E1!
tPP SMSSON
Tv �3
DEPARTMENT OF AGRICULTURE
-
CROATAN NATIONAL FOREST
Pls
St0 1+27.66
Pl Ste
6+71.71
DB 336 - PG e
6s
- 2' l5' 20.7"
4 =
28' 46' 49.2" (LT)
DB 336 PG 72
es
- 5' 55' 48.1"
D =
3° 2/' 30.6"
7375.2 AC (DEED)
Ls =
234.00'
L =
856.94'
O
LT
ST
= 127.66'
= 106.56'
T =
R =
437.71'
1,706.00'
SE
= 0.06
RO
= 234.00'
DS
= 50 mph
s�
r
N
35T N 37° 34 25.1" W Q
'P-IV 601-------- ---- REMOVE SYSTEM
602 -L- -BY-5�
15" RCP -IV 606 2 _� US 10 245'EST
2GI-D 2GI-D FS FOg 65T�
-BY-4 SEE DETAIL B _
—— _-- -- --- _ - _ —
__ __ o + }
REM
Sta.58+00 -L-
/
M
LL
\
/
q
0
C-)
oQD
g) L
I-
+
n
�o
I`
�' / +iao oo" u
ES B RIP RAP
EST. I4 TSY GF
CHORD
m
D,
al
SPECIAL CUT 8' BASE DITCH
SEEE DETAIL A
I \
Cl-
J + 00.00 -RP1B-
100.00' L7
+34.00 -RP1B-
ABANDON 1
S�
— -C 1
REMOVE SYSTEM _C_
<
------------
-
—
----
--=
Of
Or
law
NAP
Emm �"W . 0"wo
PERMANENT FILL' SPEC IAL CUT 8' BASE DITCH
SEE DETAIL RRR
0.0002 AC splice pits ABANDON
DENOTES HAND
CLEARING UNDERGROUND
COMMUNICATION LINE
/ OVERHEAD POWER�ANDCOMMUNICATION DEPARTMENT OF AGRICULTURE z // CROATAN NATIONAL FOREST A_ O . 560 AC
DB 336 - PG 9
j' DB 336 - PG 72
(D
O�y 7375.2 AC (DEED)
�z PERMANENT FILL 5 POWER POLES = .0005 AC
�w
PERMANT FILL
/ 0.0002AC
Sta.72+00
SEE SHEET 5IFOR PROFILE -L-
SEE SHEET 71 FOR PROFILE -RPIB-
-
00
Revised 5/l/2020
N
Z
_O
W
z I
w
i
CV (n
O N
CV
00
(V N
U O 0
w L 0
Da- N
Q
� Q
OD +'
- �E
�E--
POWER TRANSMISSION EASEMENT —L
Pl Sto 58 +21.81
0 = 38° 0/' 15.2" (LT)
D = l° 53' 54.5"
E_ _ L = 2,002.7/'
-E T — 1,039.80'
R = 3,018.00'
SE = 0.06
/ RO = 330' (339')
/ DS = 65 mph ;
EPS�M /
cRPNSM\SS\oN F,
/ DEPARTMENT OF AGRICULTURE
CROATAN NATIONAL FOREST Pls Sto 1 +27.66
DB 336 - PG 9 es = 2` 15' 20.7°
/ DB 336 - PG 72 es = 3° 55' 48.1"
7375.2 AC (DEED) Ls = 234.00"
LT = 127.66'
1 ) ST = 106.56"
OF AGRICULTURE
NATIONAL FOREST
c7 6 +71.71
28° 46' 49.2" (LT)
T 21' 30.6"
856.94'
437.71"
1,706.00"
PROJECT REFERENCE NO
ROADWAY DESIGN
ENGINEER
SHEET NO.
DOCUMENT NOT CONSIDERED FINAL I
UNLESS ALL SIGNATURES COMPLETED
4700 FALLS OF NEUSE ROAD. SUITE 300
,,,, m o f fa tt & n i c h o l RAL EION. NORTH CAROLINA 1-486
(919) 781-4626 VOICE (919) 781-4869 FAx
NC License NO.: F-0105
(71
0,
N
c0
Revised 5/1/2020
PROJECT REFERENCE NO. SHEET NO.
R -1015 NE -05
Ln
=w
CV/
rn�
o+
CV -
I -
u
w
o=�
I �
Ln
o�
n
REVISIONS
/ E
711312018 - PARCEL I - ADDED TDE
STATION -RFICD- 5+5/ TO 11+00 RT /
/ E
E /
-RP/B - E
Pl Sto 6 +7/.7/
Pls
Sto 11 +68.98 Pls
Sto 14 +76.99 --P4-S-t-a- 19 +46.74
Pls
Sto 23 +98.64
A = 28° 46' 49.2" (LT)
6s
= T 55' 45.9" (9s
= 4° " A = 29° 52' 36.5" IRTI
(9s
= 4° 25' 3/.0"
D = 3° 21' 30.6"
Ls
= 234.00' L
.
28.00' D = 30 52' 54.6"
Ls
= 228.00"
L = 856.94"
LT
= 156. LT
= 152.05" L = 769.66"
LT
= 152.05'
T =
437.7/' ST - .03' ST
= 76.04'
T = 393.79' ST = 76.04'
R
= 1,706.00"
R = 1,476.00"
SE
-= .06E
SE = 0.06
- 234.00'
RO = 228.00'
SRO
DS
= 50 mph
DS = 50 mph s
E /
Pls Sto 78 +66.36
Pl Sto 89 +47.37
Pls
Sto 99 +69.02
(9s = 3° 42' 07.2"
A = 34° 58' 57.1"
l LT ) (9s
= 3° 42' 07.2"
Ls = 390.00'
D = 1° 53' 54.5"
Ls
= 390.00'
LT = 260.06"
L = 1,842.67"
LT
= 260.06'
ST = 130.05'
T = 951.07"
ST
= 130.05'
R = 5,018.00'
SE = 0.07
RO = 350.00'
DS = 70 mph
0
0
N
N�
W
Z
J
cy`
&5�
Pls Sto 1+28.02
(9s = /0 48' 34.4"
(9s = 280 25' 38.6"
Ls = 195.00"
LT = 128.02"
ST = 70.92'
-LPIB -
Pl Sto 9+18.76
PIS
Z� =
149" 32' 49.5" (RT )
(9s
D =
29° 05' 02.9"
Ls
L =
5/4.19'
LT
T =
723.76"
ST
R =
197.00"
SE
= 0.075
RO
= 135.00'
DS
= 25 mph
Sto 7 +75.74 Pls Sto 4 +74.02
= 28° 2/' 25.4" (9s = l° 50' 0/.2"
= 195.00' Ls = 231.00"
_ l3/.7/' LT = 154.01"
= 66.56' ST = 77.0/'
DEPARTMENT OF AGRICULTURE
CROATAN NATIONAL FOREST
DB 336 - PG 9
DB 336 - PG 72
7375.2 AC (DEED)
(j)
-RFICD -
Pl Sto 9+36.75
PIS
=
12° 12' 05.4" (LT)
(9s
D =
l° 35' 15.3"
Ls
L =
768.56"
LT
T =
385.74"
ST
R =
3,609.00"
SE
= 0.03
RO
= 23/.00' 1108'l
DS
= 50 mph
Sto 13 +96.57
= l° 50' 0/.2"
= 23/.DO'
= 154.0/'
77.0/'
CHORD
05
C,
I Y
12
I I
I No I
+�
I o° I
I � I
1\ I
I o (DI
1
Zt
1 ;o
��
1 0 I
\
� I
DEPARTMENT OF AGRICULTURE
CROATAN NATIONAL FOREST
DB 336 - PG 9
DB 336 -PG 72
7375.2 AC (DEED)
N
h
0
SEE
SHEETS 5/ AND
52 FOR
PROFILE -L-
SEE
SHEET
71 AND 72 FOR PROFILE -RPIB-
SEE
SHEET
72 FOR
PROFILE
-RPIAB-
SEE
SHEET
76 FOR
PROFILE
-RPICD-
SEE
SHEET
77 FOR
PROFILE
-LPIB-
GRAPHIC SCALE
0 5.0 100
PLANS
LOCATION:
RW SHEET NO.
ROADWAY DESIGN
ENGINEER
HYDRAULICS
ENGINEER
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
,,,,moffatt & nichol
,ti
4700 FALLS OF NEUSE ROAD. SUITE 300
RALEIOH, NORTH CAROLINA 27609
(919) 781-462 VOICE (9 9) 781-4869 FAX
NC License NO.: F-0105
x
00
0
W
ZO
J `0
-f'
�UN
US 70 (HAVELOCK BYPASS)
FROM SOUTH OF CARTERET /CRAVEN COUNTY LINE
TO SOUTH OF SR 1176 (CAROLINA PINES BLVD)
TIP NO.:
R-1015
DESIGNED BY:
DGM
CHECKED BY:
TRR
COUNTY:
DATE:
CRAVEN
6 /18 /2018
Revised 5/1/2020
WETLAND AND SURACE WATER IMPACTS SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
Site
No.
Station
(From/To)
Structure
Size / Type
Permanent
Fill In
Wetlands
(ac)
Temp.
Fill In
Wetlands
(ac)
Excavation
in
Wetlands
(ac)
Mechanized
Clearing
in Wetlands
(ac)
Hand
Clearing
in
Wetlands
(ac)
Permanent
SW
impacts
(ac)
Temp.
SW
impacts
(ac)
Existing
Channel
Impacts
Permanent
(ft)
Existing
Channel
Impacts
Temp.
(ft)
Natural
Stream
Design
(ft)
1
44+00 TO 53+78 -L-
OWER LINE&POWER POLI
< 0.01
0.66
57+77 TO 58+00 -L-
POWER LINE
< 0.01
2
58+00 TO 72+00 -L-
OWER LINE & POWER POL
< 0.01
0.56
3
72+00 TO 89+04 -L-
OWER LINE & POWER POL
< 0.01
0.95
89+24 TO 92+37 -L-
POWER LINE
0.05
92+96 TO 96+80 -L-
POWER LINE
0.06
4
116+63 TO 120+51 -L-
POWER LINE
0.73
119+66 TO 121+28 -L-
POWER LINE
0.58
5
128+97 TO 136+09 -L-
POWER LINE
1.83
6
53+97 TO 55+60 -Y3-
OWER LINE&POWER POLI
< 0.01
0.09
59+17 TO 61+00 -Y3-
POWER LINE&POWER POLE
< 0.01
0.09
7
61+00 TO 62+82 -Y3-
110WER LINE&POWER POLI
< 0.01
0.04
8
35+14 TO 38+00 -Y4-
OWER LINE&POWER POLI
< 0.01
0.12
9
50+78 TO 51+05 -Y4-
OWER LINE&POWER POLI
< 0.01
< 0.01
52+17 TO 53+78.82 -Y4-
OWER LINE&POWER POLI
< 0.01
0.07
1
44+00 TO 58+00 -L-
SPLICE PITS & HAND HOLES
0.01
2
58+00 TO 72+00 -L-
3PLICE PITS & HAND HOLE
0.01
3
72+00 TO 16+22 -L-
3PLICE PITS & HAND HOLE
0.01
TOTALS:
< 0.01
0.04
5.84
1 0
To
1 0
*Rounded totals are sum of actual impacts
NOTES:
NOTES:Total Permanent Fill in the wetlands are for the power poles
#REF!
2016 09 09
0
H
Lu
L.0
t�
Lu
Lu
Ln
0
�I
T
r
LC)
Q
H
Ln
Lu
_Z
J
2 HET
U
Q
DEPARTMENT OF AGRICULTURE
CROATAN NATIONAL FOREST
O
UNKNOWN OWNER
SPECIAL LATERAL
V DITCH
SEE DETAIL PP
N 509' 38.7' W
TDE 7
f
F
3911
S A
lb*- BAS 0
EE DETAIL QQ
H ES . 5
ST. 14
36" RCP -III
2GI -
y
36" RCP -III
SR 1162
/75 ' SI
36" CP-III
CONC
IS- CONC
9
TWE
RETAIN PIPE
I
MEDIAN 'V' DITCH
l
1 1
SEE DETAIL NN
ry
m I
IW
RIPRAP HLL
B
INSTALLED LUSH WITH
I I
CHANN L
P
A
GI
I
�
I I
I I
I
1 I
CLYDE BELANGIA
SHIRLEY BELANGIA POWELL
MICHAEL D THORNSBURY
39
111
ALLOWABLE IMPACTS ZONE 1
- SPECIAL LATERAL 4' BASE DITCH
SEE DETAIL KK
MEDIAN 'V' DITCH
UNKNOWN OWNER
18' CONC 1 11' CONC 20' CONC
T
1 RETAIN PIPE RETAIN PIPE 1
1 1 11 1;
LI
�I
C�
EMMA CATON BELANGIA
8D 3�.
ROBERT B. HARDISON
BUFFER DRAWING
SHEET 13 OF 20
RAYMOND W.HARDI
RETAIN EXIST RW ♦ _
O O CL B RIP RAP O
-- — — --
------ — — — — — --
EST.2 TONS
EST. 7 SYEST. 7 Sy GF�3915�EST.2 TONS 3916TONS 3916
EST. 7 SY GF
EMMA CATON BELANGIA
DETAIL NN
MEDIAN 'V' DITCH
18' CONC 18• CONC
RETAIN PIPE 5 RE
DALE WAYNE MAGEE
R.L. BELANGIA
O
8' CONC
PIPE r m ETRR�PE m
I\hl al
I II
I I
I I
I I
❑I _
I
I �
I
I
I I
I�
/II
R.L. BELANGIA ,
R,W SHEET NO.
ROADWAY DESIGN
HYDRAULICS
ENGINEER
ENGINEER
.�a SEAL �
' 4 SEAL f'
- 015869
_
`• 032581 =
SON
I"„moffaff & nlchol
1 I�
1 ,
1 1
11
1 1
c
1BARBARA
111
H. GME
la I
11
0
7kAAk- 18' CONC
LU
BV1—i_—
T
_---
N
Lu
Lu
— F F F
-
O
-
L()
N
>—T
Lu
Z
J
V
o Q
L
SAMMY E.EBIM
1
i
JACu
K
NANCY C. BAREFOOT
so' o' i r,
GRAPHIC SCALE
SEE SHEETS 69 F R PROFILE -L-
SEE SHEETS 93 OR PROFILE-SERVEXT-
SEE SHEETS 2D-I THRU 2D-2 FOR DRAINAGE DI ,CH DETAILS
Revised 5/1/2020
BUFFER IMPACTS SUMMARY
IMPACT
BUFFER
REPLACEMENT
SITE NO.
STRUCTURE SIZE /
TYPE
STATION
(FROM/TO)
TYPE
ALLOWABLE
MITIGABLE
ROAD
CROSSING
BRIDGE
TEMP ROAD
CROSSING
ZONE 1
(ft)
ZONE 2
(ft)
TOTAL
(ft2)
ZONE 1
(ft)
ZONE 2
(ft)
TOTAL
(ft)
ZONE 1
(ft)
ZONE 2
(ft)
1
12 @ 135' Dual Bridge
-L- 170+00 to
X
11874
8173
20048
-L- 176+39
2
72" RCP-V, Buried 1'
-Y3RPB- 8+09 to
X
21342
12842
34184
-Y3RPB- 9+96
3
72" RCP-V, Buried 1'
-L- 242+20 to
X
20168
13088
33256
-L- 245+59
3
Temp. Detour
-L- 245+59 to
X
4312
2113
6425
-L- 246+42
4
84" RCP-V, Buried 1'
-Y3RPD- 16+26 to
X
17227
9603
26830
-Y3RPD-18+42
5
7@ 135' Dual Bridge
-L- 287+68 to
X
11674
7869
19544
-L- 290+04
6
2 @ 10'X8' RCBC
-L- 509+18 to
X
55373
29278
84651
-L- 511+11
7
36" RCP
-L- 563+14 to
X
135
-L- 563+54
8
72" RCP -IV, Buried 1'
-Y4- 33+67 to
X
3321
1827
5148
-Y4- 34+86
9
2@ 84" RCP, Buried 1'
-Y4- 51+04 to
X
12648
6275
18923
-Y4- 52+99
ESUBOTAL:
::31:3:1J719982
51164
126759
71086
197845
NOTE: Site 9: Zone 1 Mitigable Impacts include 331 sgft of Bank Stabilization.
Revised 5/l/2020
BUFFER IMPACTS SUMMARY
IMPACT
BUFFER
REPLACEMENT
SITE NO.
STRUCTURE SIZE /
TYPE
STATION
(FROM/TO)
TYPE
ALLOWABLE
MITIGABLE
ROAD
CROSSING
TEMP ROAD
CROSSING
PARALLEL
IMPACT
ZONE 1
(ft)
ZONE 2
(ft2)
TOTAL
(ft)
ZONE 1
(ft)
ZONE 2
(ft)
TOTAL
(ft)
ZONE 1
(ftZ)
ZONE 2
(ft2)
9
DETOUR
-Y4DET- 51+85 to
X
5555
4250
9805
-Y4DET- 54+45
10
3 @ 9'X7' RCBC
-RP2AC- 43+26 to
X
5656
2116
7773
-RP2AC- 46+15
SUB TOTAL FROM THIS SHEET:
11212
6366
17578
SUB TOTAL FROM SHEET 18 :
31317
19982
51164
126759
71086
197845
TOTAL:
42529
26348
68742
126759
71086
197845