HomeMy WebLinkAbout20200581 Ver 1_PCN Form Submission_20200429DWR
Dlrlslon of Water Resources
Pre -Construction Notification (PCN) Form
April 11, 2020 Ver 3.1
Initial Review
Has this project met the requirements for acceptance
in to the review process?*
r Yes
r No
Is this project a public transportation project?*
G Yes r No
Change only if needed.
BIMS # Assigned *
Version#*
20200581
1
Is a payment required for this project?*
r No payment required
r Fee received
Reviewing Office*
r Fee needed - send electronic notification
Washington Regional Office - (252) 946-6481
Select Project Reviewer*
Garcy Ward:eads\gpward
Information for Initial Review
1a. Name of project:
Elizabeth City Regional Airport --New Aviation Facility
1a. Who is the Primary Contact?*
Laura Stevens
1b. Primary Contact Email:* 1c. Primary Contact Phone:*
Istevens@parrishandpartners.com (803)978-7611
Date Submitted
4/29/2020
Nearest Body of Water
Pasquotank River
Basin
Pasquotank
Water Classification
SB - primary recreation saltwater
Site Coordinates
Latitude:
Longitude:
36.2575
76.1755
A. Processing Information "
County (or Counties) where the project is located:
Pasquotank
Is this a NCDMS Project
r Yes r No
Is this project a public transportation project?*
r Yes r No
Is this a NCDOT Project?*
r Yes r No
(NCDOT only) T.I.P. or state project number
WBS # (?)
36237.14.14.2
1a. Type(s) of approval sought from the Corps:
W Section 404 Permit (wetlands, streams and waters, Clean Water Act)
r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act)
1b. What type(s) of permit(s) do you wish to seek authorization?
W Nationwide Permit (NWP)
r Regional General Permit (RGP)
r Standard (IP)
1c. Has the NWP or GP number been verified by the Corps?
r Yes r No
Nationwide Permit (NWP) Number: 18 - Minor Discharges
Nationwide Permit (NWP) Number: 12 - Utility Lines
NWP Numbers (for multiple NWPS):
1d. Type(s) of approval sought from the DWR:
V 401 Water Quality Certification - Regular
r Non-404 Jurisdictional General Permit
r Individual Permit
le. Is this notification solely for the record because written approval is not required?
For the record only for DWR 401 Certification:
For the record only for Corps Permit:
r 401 Water Quality Certification - E)press
r Riparian Buffer Authorization
1f. Is this an after -the -fact permit application?*
r Yes r No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
r Yes r No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
r Yes r No
Acceptance Letter Attachment
1h. Is the project located in any of NC's twenty coastal counties?
r Yes r No
1i. Is the project located within a NC DCM Area of Environmental Concern (AEC)?
r Yes r No r Unknown
1j. Is the project located in a designated trout watershed?
r Yes r No
B. Applicant Information
1d. Who is applying for the permit?
W Owner r Applicant (other than owner)
le. Is there an Agent/Consultant for this project?*
r Yes r No
2. Owner Information
2a. Name(s) on recorded deed:
Elizabeth City Pasquotank County Airport Authority
2b. Deed book and page no.:
Deed book 778; page 313
2c. Responsible party:
2d.Address
r Yes r No
r Yes r No
Street Address
1028 Consolidated Road
Address tine 2
PO Box1798
city
Elizabeth City
Postal / Zip Code
27909
2e. Telephone Number:
(252)335-5634
2g. Email Address:*
jlhouston6Q2@gmail.com
4. Agent/Consultant (if applicable)
4a. Name:
Laura Stevens
4b. Business Name:
Parrish and Partners, LLC
4c.Address
Street Address
PO Box7067
Address Line 2
City
Columbia
Postal / Zip Code
29202
4d. Telephone Number:
(803)978-7611
4f. Email Address:*
Istevens@parrishandpartners.com
Agent Authorization Letter*
Agent Authorization FOR PARRISH AND PARTNERS.pdf
Slate / Rmince / tegim
NC
Country
Pasquotank
2f. Fax Number:
State / province / ftim
SC
Country
United States
4e. Fax Number:
137.78KB
C. Project Information and Prior Project History O
1. Project Information
1b. Subdivision name:
(if appropriate)
1c. Nearest municipality/ town:
Elizabeth City
2. Project Identification
2a. Property Identification Number:
2b. Property size:
8932 255146
769.11
2c. Project Address
Street Address
1028 Consolidated Road
Address Line 2
city
Slate / Rmince / tegim
Elizabeth City
NC
Postal / Zip Code
Country
27909
United States
3. Surface Waters
3a. Name of the nearest body of water to proposed project:*
Pasquotank River
3b. Water Resources Classification of nearest receiving water:*
SB - primary recreation saltwater
3c. What river basin(s) is your project located in?*
Pasquotank
3d. Please provide the 12-digit HUC in which the project is located.
030102050708
4. Project Description and History
4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:*
Elizabeth City Regional Airport (ECG) is located southeast of Elizabeth City. The airport is served by a single 7,219-foot long by 150-foot wide runway, identified as Runway 10-28. The
airport is a joint -use facility, with the United States Coast Guard occupying the property north of Runway 10-28 and general aviation activity taking place south of Runway 10-28,
adjacent to Consolidated Road. The project site is bounded by the airfield to the north, airport hangars to the east, single family residential development and one gas station adjacent to
Consolidated Road to the south, and agricultural land adjacent to Weeksville Road to the west. The project site is a previously disturbed, mowed and maintained grass field on existing
airport property. A system of large maintained ditches form the southern and western site boundary. The ditch extends approximately 7,500 feet (1.4 miles) east to the Pasquotank
River. This drainage system is identified on USFWS National Wetland Inventory (NWI) mapping as Riverine (RSUBFx), which includes channels that are semipermanently flooded and
excavated by humans. These are the only wetlands identified within or adjacent to the project site.
4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?*
r Yes r No r Unknown
4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR)
USGS topo map.pdf
1.71 MB
4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR)
NRCS Soil Map.pdf
4f. List the total estimated acreage of all existing wetlands on the property:
366.03KB
4g. List the total estimated linear feet of all existing streams on the property:
1,130If (jurisdictional ditch)
4h. Explain the purpose of the proposed project:*
The purpose of the proposed project is to provide additional hangar space for existing Airport tenants, including Elizabeth City State Universtiy (Aviation Science Program).
41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:*
Phase 1 of the proposed project will include:
Grading of the site and addition of approximately three feet of suitable fill material
Erecting two newaircraft storage hangars, one maintenance hangar, and one office building
Construction of a service road to provide tenants with access to the new area
Paving of a parking area to provide access to the proposed hangars and apron
Widening of an existing T-hangar taxilane to allow for proper object free area clearance
Paving of a taxilane and apron for access from the new hangars to Taxiway G
• Installation of the needed electric, sewer, water, and stormwater infrastructure
The proposed Phase 1 structures and impervious surfaces include 48,560 square feet of apron, 50,540 square feet of parking area and roads, 24,000 square feet of hangar space,
and 3,035 square feet of office space. Construction of Phase 1 is anticipated to begin in late Spring 2020 and last approximately 6 months. At full build out, the newfacility would include
47,464 square feet of additional impervious surfaces, including 33,600 square feet of hangar space and 13,864 square feet of pavement (taxilane).
4j. Please upload project drawings for the proposed project.
ECG PCN_STRM-C-402.pdf 1.25MB
ECG PCN_UTIL-C-301.pdf 1.34MB
ECG PCN_EROS-C-501.pdf 1.22MB
5. Jurisdictional Determinations
5a. Have the wetlands or streams been delineated on the property or proposed impact areas?*
r Yes
Comments:
OHWM at 2' contour
r No
5b. If the Corps made a jurisdictional determination, what type of determination was made?*
r Preliminary r Approved r Not Verified r Unknown r N/A
Corps AID Number:
5c. If 5a is yes, who delineated the jurisdictional areas?
Name (if known):
Agency/Consultant Company:
Other:
5d1. Jurisdictional determination upload
6. Future Project Plans
r Unknown
6a. Is this a phased project?*
r Yes
7b. If yes, explain.
r No
The proposed Phase 1 structures and impervious surfaces include 48,560 square feet of apron, 50,540 square feet of parking area and roads, 24,000 square feet of hangar space,
and 3,035 square feet of office space. Construction of Phase 1 is anticipated to begin in late Spring 2020 and last approximately 6 months. At full build out, the newfacility mould include
47,464 square feet of additional impervious surfaces, including 33,600 square feet of hangar space and 13,864 square feet of pavement (taxilane).
Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity?
No
D. Proposed Impacts Inventory
1. Impacts Summary
1a. Where are the impacts associated with your project? (check all that apply):
r Wetlands W Streams -tributaries r Buffers
r Open Waters r Pond Construction
3. Stream Impacts
F
3a. Reason for impact (?)
3b.lmpact type *
3c. Type of impact*
3d. S. name *
3e. Stream Type *
3f. Type of
3g. S. width *
3h. Impact
(?)
Jurisdiction*
length*
S1
Construction of rip rap apron
Permanent
Rip Rap Fill
UT1 to Pasquotank River
Jurisdictional Ditch
Corps
11
Average (feet)
(linearfeet)
S2
Installation of water utility line
Temporary
Excavation
UT1 to Pasquotank River
Jurisdictional Ditch
Corps
11
5
beneath Ur1
Average (feet)
(linearfeet)
S3
Installation of water utility line
Temporary
Excavation
Ur1 to Pasquotank Rvier
Jurisdictional Ditch
Corps
11
5
beneath UT1
Average (feet)
(linearfeet)
Installation of sewer force
Tem orar
P Y
Excavation
UT1 to Pasquotank River
q
Jurisdictional Ditch
Corps
Pmain
h�][;;]
beneath Ur1
3i. Total jurisdictional ditch impact in square feet:
187
3i. Total permanent stream impacts:
3i. Total stream and ditch impacts:
17
3j. Comments:
E. Impact Justification and Mitigation
1. Avoidance and Minimization
3i. Total temporary stream impacts:
15
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:
Gravel infiltration trench to be constructed outside of jurisdictional limits of Ur1 to dissipate storm water runoff and improve water quality.
1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:
Two water utility lines were combined into one trench excavation to minimize temporary impacts. Installation of a turbidity curtain within Ur1 around the
limits of the basin discharge pipe and overflow weir will minimize potential water quality impacts during construction.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State?
r Yes
r No
u
2b. If this project DOES NOT require Compensatory Mitigation, explain why:
Impacts are to a jurisdictional ditch, are minimal, and entail construction of a rip rap dissipater at the dry detention basin's outflow pipe for long-term protection of Ur1.
F. Stormwater Management and Diffuse Flow Plan (required by DWR) u
1. Diffuse Flow Plan
1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules?
r Yes
If no, explain why:
r No
2. Stormwater Management Plan
2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?*
r Yes r- No
Comments:
G. Supplementary Information
1. Environmental Documentation
la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?*
r Yes r No
1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina)
Environmental Policy Act (NEPA/SEPA)? *
r Yes r- No
1c. If you answered "yes" to the above, has the document review been finalized bythe State Clearing House?*
r- Yes r No
Comments:*
NEPA document approved by NCDOT Division of Aviation and included as Miscellaneous Attachment
2. Violations (DWR Requirement)
2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or
Riparian Buffer Rules (15A NCAC 2B .0200)? *
r- Yes r No
3. Cumulative Impacts (DWR Requirement)
3a. Will this project result in additional development, which could impact nearby downstream water quality?*
r- Yes r No
3b. If you answered "no," provide a short narrative description.
Project is to be phased development but is being reviewed and permitted now in its entirety.
4. Sewage Disposal (DWR Requirement)
4a. Is sewage disposal required by DWR for this project?*
r- Yes r Nor N/A
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or habitat?*
r- Yes r No
5b. Have you checked with the USFWS concerning Endangered Species Act impacts?*
r- Yes r No
5d. Is another Federal agency involved?*
r Yes r No r Unknown
5e. Is this a DOT project located within Division's 1-8?
r Yes r No
5f. Will you cut anytrees in order to conduct the work in waters of the U.S.?
r- Yes r No
5g. Does this project involve bridge maintenance or removal?
r- Yes r No
5h. Does this project involve the construction/installation of a wind turbine(s)?'
r- Yes r No
51. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.?
r- Yes r No
5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?
USFWS - IPaC
Consultation Documentation Upload
Species List_ Raleigh Ecological Services Field Office.pdf 185.33KB
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as an Essential Fish Habitat?*
r Yes r No
Are there submerged aquatic vegetation (SAV) around the project vicinity?*
r Yes
Will this project affect submerged aquatic vegetation?*
r No
r Unknown
r Yes
r No
r Unknown
r Explain Total of 17 If (temp and perm) of impacts will occur to jurisdictional ditch (man-made feature) over 1.5 miles from Pasquotank River.
Site is not an Area of Concern per CAMA, nor is it considered jurisdictional by DWR.
6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?*
https://vmw.habitat.noaa.gov/application/efhmapper/index.html (Snapper/Grouper habitat identified)
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?*
r Yes r No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?*
Ground disturbance is not anticipated for construction of the aviation facility, instead area will receive apprommately 3 feet of clean fill.
7c. Historic or Prehistoric Information Upload
ECG_SHPO sites.pdf 216.24KB
ECG_SHPO info Selected Records.pdf 38.16KB
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain?*
r- Yes r No
8c. What source(s) did you use to make the floodplain determination?*
https://msc.fema.gov. See Figure 5 of ECG CatEx (Miscellaneous attachments)
Miscellaneous
Comments
Categorical Exclusion NEPA documentation approved by NCDOT Division of Aviation in December 2019. Document and Attachments included below.
Miscellaneous attachments not previously requested.
ECG CatEx New Aviation Facility 121919_FINAL.pdf
7.92MB
Signature U
W By checking the box and signing below, I certify that:
• I have given true, accurate, and complete information on this form;
• I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AGC);
• I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act');
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
• I intend to electronically sign and submit the PCN form.
Full Name:
Laura M. Stevens
Signature
L"fA' �_ J6 I+M
Date
4/29/2020