HomeMy WebLinkAbout20170732 Ver 3_U-2827B Business 40 permit site 2 downstream end_20200422 (3)
Wanucha, Dave
From:Matthews, Monte K CIV USARMY CESAW (USA)
<Monte.K.Matthews@usace.army.mil>
Sent:Wednesday, April 22, 2020 3:21 PM
To:Wanucha, Dave; Euliss, Amy
Cc:James Meachum; Shaver, Larry B
Subject:\[External\] RE: U-2827B Business 40 permit site 2 downstream end
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
report.spam@nc.gov
Sounds reasonable to me, please ensure that the additional impacts remain
temporary.
Please retain this email response for your records.
Monte Matthews
US Army Corps of Engineers
From: Wanucha, Dave <dave.wanucha@ncdenr.gov>
Sent: Wednesday, April 22, 2020 3:12 PM
To: Euliss, Amy <aeuliss@ncdot.gov>; Matthews, Monte K CIV USARMY CESAW (USA)
<Monte.K.Matthews@usace.army.mil>
Cc: James Meachum <JMeachum@kcaeng.com>; Shaver, Larry B <lbshaver@ncdot.gov>
Subject: \[Non-DoD Source\] RE: U-2827B Business 40 permit site 2 downstream end
As far as DWR is concerned, and as long as the Corps agrees, you are authorized to proceed with additional
temporary impacts for the reason stated below.
Dave W.
Division of Water Resources
401 & Buffer Transportation Permitting
NC Department of Envirionmental Quality
336-776-9703 office
336-403-5655 mobile
Dave.Wanucha@ncdenr.gov
NC DEQ Winston Salem Regional Office
450 West Hanes Mill Road, Suite 300
Winston Salem, NC 27106
1
Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has
adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or
are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to
appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your
requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging
time.
From: Euliss, Amy <aeuliss@ncdot.gov>
Sent: Wednesday, April 22, 2020 2:09 PM
To: Matthews, Monte K SAW <Monte.K.Matthews@usace.army.mil>; Wanucha, Dave <dave.wanucha@ncdenr.gov>
Cc: James Meachum <JMeachum@kcaeng.com>; Shaver, Larry B <lbshaver@ncdot.gov>
Subject: U-2827B Business 40 permit site 2 downstream end
Importance: High
In May 2018, we modified our 404 and 401 permits to extend the culvert at site 2. This included additional piping, bank
stabilization and temporary impacts. They are in the middle of the installation right now. There has been a lot of
accumulation of materials in the channel. We need to extend our temporary impacts by 28’ feet in order to get the site
to drain. Are you ok with us proceeding? I need to know today if possible. Thanks.
Amy Euliss
Division 9 Environmental Officer
North Carolina Department of Transportation
336 747 7802 office
aeuliss@ncdot.gov
375 Silas Creek Parkway
Winston Salem, NC 27127-7167