HomeMy WebLinkAbout20170732 Ver 3_U-2827B Business 40 permit site 2 downstream end_20200422 (2)
Wanucha, Dave
From:Euliss, Amy
Sent:Wednesday, April 22, 2020 2:09 PM
To:Matthews, Monte K SAW; Wanucha, Dave
Cc:James Meachum; Shaver, Larry B
Subject:U-2827B Business 40 permit site 2 downstream end
Attachments:U2827B_Permit_Modification_2_Package_051118.pdf; SAW-2009-01193 (signed GP31
verification) mod 2 404.pdf; US 421_I-40 Bridge Replacements, Improvements, Paving
(U-2827B_C-5620A) mod 2 401.pdf
Importance:High
In May 2018, we modified our 404 and 401 permits to extend the culvert at site 2. This included additional piping, bank
stabilization and temporary impacts. They are in the middle of the installation right now. There has been a lot of
accumulation of materials in the channel. We need to extend our temporary impacts by 28’ feet in order to get the site
to drain. Are you ok with us proceeding? I need to know today if possible. Thanks.
Amy Euliss
Division 9 Environmental Officer
North Carolina Department of Transportation
336 747 7802 office
aeuliss@ncdot.gov
375 Silas Creek Parkway
Winston Salem, NC 27127-7167
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.
1