Loading...
HomeMy WebLinkAbout20170732 Ver 3_U-2827B Business 40 permit site 2 downstream end_20200422 (2) Wanucha, Dave From:Euliss, Amy Sent:Wednesday, April 22, 2020 2:09 PM To:Matthews, Monte K SAW; Wanucha, Dave Cc:James Meachum; Shaver, Larry B Subject:U-2827B Business 40 permit site 2 downstream end Attachments:U2827B_Permit_Modification_2_Package_051118.pdf; SAW-2009-01193 (signed GP31 verification) mod 2 404.pdf; US 421_I-40 Bridge Replacements, Improvements, Paving (U-2827B_C-5620A) mod 2 401.pdf Importance:High In May 2018, we modified our 404 and 401 permits to extend the culvert at site 2. This included additional piping, bank stabilization and temporary impacts. They are in the middle of the installation right now. There has been a lot of accumulation of materials in the channel. We need to extend our temporary impacts by 28’ feet in order to get the site to drain. Are you ok with us proceeding? I need to know today if possible. Thanks. Amy Euliss Division 9 Environmental Officer North Carolina Department of Transportation 336 747 7802 office aeuliss@ncdot.gov 375 Silas Creek Parkway Winston Salem, NC 27127-7167 Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 1