HomeMy WebLinkAbout20190752 Ver 2_DMF Comment memo_20200427Staff Review
Does this application have all the attachments needed to accept it into the review process?*
r Yes r No
ID#* Version* 2
20190752
Is this project a public transportation project?* r Yes
r No
Reviewer List:* Chad Turlington:eads\ccturlington
Select Reviewing Office:* Fayetteville Regional Office - (910) 433-3300
Does this project require a request for payment to be sent?*
r
Yes
r
No
Project Submittal Form
Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all
mandatory questions are answered.
Project Type: r
New Project
r
New Project w Existing ID
r
Pre -Application Submittal
r
More Information Response
r
Other Agency Comments
r
For the Record Only (Courtesy Copy)
r
Stream or Buffer Appeal
New Project - Please check the new project type if you are trying to submit a new project that needs an official approval
decision.
Pre -Application Submittal - Please check the pre -application submittal if you just want feedback on your submittal and
do not have the expectation that your submittal will be considered a complete application requiring a formal decision.
More Information Response - Please check this type if you are responding to a request for information from staff and
you have and ID# and version for this response.
Other Agency Comments - Please check this if you are submitting comments on an existing project.
Is this supplemental information that needs to be sent to the Corps?*
r Yes r No
Project Contact Information
Name: James Harrison
Vft is subaitting the inforrration?
Email Address: james.harrison@ncdenr.gov
Project Information
Existing ID #: Existing Version:
20190752 2
20170001(no dashes)
Project Name: Chemours Water Flow Monitoring
Is this a public transportation project?
r Yes
r No
Is the project located within a NC DCM Area of Environmental Concern (AEC)?
r Yes r No r Unknown
County (ies)
Bladen
Cumberland
Please upload all files that need to be submited.
Oickthe upload button or drag and drop files here to attach document
Comment memo.pdf 358.16KB
Only pdf or kr17 files are accepted.
Describe the attachments:
NCDMF comment memo. 15 Feb - 30 June moratorium for in -water work in Cape Fear River
Sign and Submit
P By checking the box and signing box below, I certify that:
• I have given true, accurate, and complete information on this form;
• I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the
"Uniform Electronic Transactions Act")
• I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes
(the "Uniform Electronic Transactions Act');
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written
signature; AND
• I intend to electronically sign and submit the online form."
Signature:
,TcrqYes Yc9YYS014
Submittal Date: Is filled in automatically.
MEMORANDUM:
TO: NC Division of Water Resources
FROM: James Harrison, NCDMF Fisheries Resource Specialist
SUBJECT: Chemours Water Flow Monitoring, Bladen and Cumberland Counties
DATE: April 27, 2020
A North Carolina Division of Marine Fisheries (DMF) Fisheries Resource Specialist has
reviewed the NC Division of Water Resources application for proposed actions that may
impact fish and fish habitats. The proposed project is will occur throughout eight streams
that flow into the Cape Fear River, located along the border between Bladen and
Cumberland Counties. DMF recommends avoiding any in-water work in the Cape Fear
River during the February 15 through June 30 moratorium period, due to the presence of
anadromous fish spawning area presence in the Cape Fear River. Please contact James
Harrison at james.harrison@ncdenr.gov or 252-948-3835. Thank you.