Loading...
HomeMy WebLinkAbout20090992 Ver 1_Time Ext Request_20091123Chapman, Amy To: Dan.Clinton@townofcary.org Cc: Lucas, Annette Subject: RE: Buffer Authorization for Agassi Court (Project #2009-0992) Dan, You have the extension to respond to DWQ's request for additional information for project #09-0992 until December 14, 2009. Thanks. -Amy From: Dan.Clinton@townofcary.org [mailto:Dan.Clinton@townofcary.org] Sent: Monday, November 23, 2009 2:45 PM To: Chapman, Amy Cc: Lucas, Annette; Dan.Clinton@townofcary.org Subject: RE: Buffer Authorization for Agassi Court (Project #2009-0992) Amy and Annette, In a DWQ response to my buffer authorization request dated October 23, 2009, additional information was requested on the following project: Agassi Court Drainage Rehabilitation Project, Cary Long Branch (030402, 2743-2.8 WSIII, NSW) DWQ Project # 2009-0992 In that letter, I was asked to respond within 30 days of the above mentioned letter. I am formally asking for an extension to this submittal time to December 14, 2009. Please let me know if that an extension is possible. Thank you. Dan Clinton, PE, CFM Town of Cary Stormwater Engineering 316 North Academy Street P.O. Box 8005 Cary, NC 27512 (919) 380-2773 (919)833-6998 (cell) dan.clinton aCD,townofcary.orq "Chapman, Amy" <amy.chapman(rDncdenr.gov> To "Dan.Clinton(cD_townofcarv.org" <Dan.Clinton(a)_townofcarv.org> cc "Lucas, Annette" <annette.lucas(aDncdenr.gov> 09/14/2009 12:24 PM Subject RE: Buffer Authorization for Agassi Court Morning Dan. For any full buffer project reviews, we need three hardcopy submittals with all attachments. At the time we receive them the 60-day clock starts for us to do a full review and get comments back to you. I can't do a full review of what you submitted, but I can tell from the pictures that there is a serious flooding problem in this area, so there is definite potential for a buffer authorization in this scenario for protection of existing structures (the houses and roads). Annette and I both would be reviewing this project after it's submitted. Thanks. -Amy From: Dan.Clinton0)townofcary.org [mailto:Dan.Clinton(&townofcary.orgl Sent: Tuesday, September 08, 2009 1:24 PM To: Chapman, Amy Cc: Dan.Clinton@townofcary.orcl Subject: Buffer Authorization for Agassi Court Amy, Attached is a PCN for a drainage project I am doing here in Cary. Please review it and let me know if my proposed buffer impacts are allowable or not. Please call me if you have any questions. Attached is a cover letter, PCN form, and a plan sheet. Thanks Dan Clinton, PE, CFM Town of Cary Stormwater Engineering 316 North Academy Street P.O. Box 8005 Cary, NC 27512 (919) 380-2773 (919)833-6998 (cell) dan.clinton cD,townofcarv.org