HomeMy WebLinkAbout20200564 Ver 1_JNX Drainage Improvements Plan Set_20200423DRAINAGE IMPROVEMENTS 90% DESIGN PROGRESS SET JOHNSTON REGIONAL AIRPORT PROJECT NO. 193716-01 JOHNSTON COUNTY CONTRACT NO. TBD 90% PROGRESS SET - 09/06/2019 LOCATION MAP PREPARED FOR: • � I ti� W 1"r rj� 'Ti6.0*,. Y 1: PROJECT LIMITS ,)OH N STON JNX- CONTROL POINTS NO. DESCRIPTION NORTHING EASTING ELEVATION 1 NAIL 654419.21 2181168.34 153.72 2 NAIL 654068.37 2181150.44 150.40 5 NAIL 653929.99 2181186.94 147.43 6 NAIL 653823.01 2181422.79 157.06 PROJECT AREA _: :T.1111 11_� PREPARED BY: AIRPORT INFORMATION: FAA IDENTIFIER: JNX LATITUDE: 35' 32' 40.0" N LONGITUDE: 78' 23' 25.2" W UNICOM FREQUENCY: 122.725 MAXIMUM EQUIPMENT HEIGHT = 15 FT AIRPORT OWNER: JOHNSTON COUNTY AIRPORT AUTHORITY 3149 SWIFT CREEK RD SMITHFIELD, NC 27577 (919) 934-0992 AIRPORT MANAGER: MR. PHIL LANIER (919) 934-0992 434 Fayetteville St Suite 1500 Raleigh, NC 27601 (919) 836-4040 www.wsp.com PRELIMINARY NOT RELEASED FOR CONSTRUCTION NC License # F-0165 J Q z 0 U) z LLI 2 LLI O a LLI (D z REVISIONS O Q Oar � N U Q U Z � �CY) rn� z�� D �U) O U z O z O PROJECT #: 193716-01 DATE: 09/06/2019 DRAWN BY: JMT CHECKED BY: TMS TITLE COVER SHEET 0.0 INDEX LEGEND ABBREVIATIONS PAGE NUMBER SHEET NUMBER SHEET TITLE 1 0.0 COVER 2 0.1 INDEX, LEGEND OF SYMBOLS AND ABBREVIATIONS 3 1.01 CONSTRUCTION SAFETY AND PHASING PLAN OVERVIEW 4-5 1.02 - 1.03 CONSTRUCTION SAFETY AND PHASING PLAN NOTES 6-9 1.04 - 1.07 CONSTRUCTION SAFETY AND PHASING PLANS 10 2.0 EXISTING CONDITIONS & DEMOLITION 11 3.0 PROPOSED DRAINAGE PLAN 12 3.1 PROPOSED GRADING PLAN 13 4.0 PROPOSED STORM DRAINAGE PROFILE 14 5.0 EROSION CONTROL PLAN 15-16 6.1 - 6.2 STORM DRAINAGE DETAILS 17 6.3 MISCELLANEOUS DETAILS 18 6.4 EROSION CONTROL DETAILS SUMMARY OF QUANTITIES ITEM DESCRIPTION QUANTITY UNIT CONTRACT MOBILIZATION (MAXIMUM 5% OF TOTAL BASE BID) 1 LS CONCRETE WASHOUT STRUCTURE 1 EA DISPOSAL OF EXISTING ARCH STRUCTURE 1 LS PIPE REMOVAL AND DISPOSAL (30-INCH DIAMETER) 440 LF BORROW EXCAVATION 570 CY REMOVAL OF EXISTING ASPHALT PAVEMENT 560 SY SILT EXCAVATION 110 CY POLYACRYLAMIDE (PAM) 30 LB SEDIMENT CONTROL STONE 48 TON STONE FOR EROSION CONTROL, CLASS B 96 TON TEMPORARY SILT FENCE 172 LF 1 /4" HARDWARE CLOTH 180 LF SEEDING AND MULCHING 2 AC FERTILIZER TOPDRESSING 0.75 TON MOWING 2 AC 30" RC PIPE CULVERTS, CLASS III 23 LF 42" RC PIPE CULVERTS, CLASS III 49 LF 48" RC PIPE CULVERTS, CLASS III 193 LF 48" RC PIPE CULVERTS, CLASS IV 62 LF 54" RC PIPE CULVERTS, CLASS III 378 LF 54" RC PIPE CULVERTS, CLASS IV 307 LF MASONRY DRAINAGE STRUCTURE - CONCRETE JUNCTION BOX 4 EA MASONRY DRAINAGE STRUCTURE - CONCRETE GRATED DROP INLET (TYPE A) 6 EA MASONRY DRAINAGE STRUCTURE - EXTRA DEPTH 24 LF REINFORCED ENDWALL 7 CY PIPE COLLARS 3 CY FRAME WITH TWO GRATES, STD 840.24 6 EA RIP RAP, CLASS 1 35 TON GEOTEXTILE FOR DRAINAGE 60 SY ASPH CONC SURF CRS S9.513 54 TON ASPH CONC INTR CRS 119.013 46 TON AGGREGATE BASE COURSE 233 TON GENERIC GRADING ITEM (SWALE FINE GRADING) 4000 SY GENERIC FENCING ITEM (REMOVE AND RESET EXISTING METAL FENCE) 245 LF SAFETY FENCING 60 LF SUPPLEMENTAL FIELD SURVEYING 16 HR EXISTING CONDITION R11"E , DESCRIPTION SILT FENCE EROSION INLET PROTECTION EROSION CONTROL STORM STRUCTURE SAW CUT LINE DITCH FLOW LINE FENCE RIP RAP TAXIWAY EDGE LIGHT LIGHT POLE CONTROL POINT FIRE HYDRANT CONCRETE SANITARY SEWER UTILITY DRAIN UNKNOWN UTILITY WATER UTILITY POINT UTILITY DRAIN LINE TELEPHONE UTILITY CABLE SANITARY SEWER MANHOLE SIGNAGE POINT TREE OVERHEAD WIRE BUILDING OUTLINE PIPE SECTION DETAIL TITLE SCALE: IDENTIFIES DETAIL # XX XX IDENTIFIES SHEET CAN BE FOUND ON xx DETAIL TITLE XX SCALE: PROPOSED CONDITION xx SECTION XX AOA AIRCRAFT OPERATIONS AREA OPS OPERATIONS APPROX APPROXIMATE OFA OBJECT FREE AREA 434 Fayetteville St AVE ASPHALT OFZ OBJECT FREE ZONE ASPH AVENUE QTY QUANTITY Suite 1500 BLVD BOULEVARD R RADIUS Raleigh, NC 27601 CSPP CONSTRUCTION SAFETY & PHASING PLAN RCP REINFORCED CONCRETE PIPE DEMO DEMOLITION OR DEMOLISH REQD REQUIRED 919 836-4040 DI DUCTILE IRON ROFA RUNWAY OBJECT FREE AREA www.wsp.com DWG DRAWING RPZ RUNWAY PROTECTION ZONE E EAST/EASTING RSA RUNWAY SAFETY AREA EA EACH RT RIGHT EL ELEVATION RW RUNWAY EX/EXIST EXISTING S SOUTH FAA FEDERAL AVIATION ADMINISTRATION SCH SCHEDULE FES FLARED END SECTION SE SOUTHEAST FOD FOREIGN OBJECT DEBRIS SF SQUARE FEET GP GENERAL PROVISION SIDA SECURITY IDENTIFICATION DISPLAY AREA H HEIGHT OR HORIZON SP SPACES OR SPECIAL PROVISION HAZMAT HAZARDOUS MATERIAL SQ IN SQUARE INCH HORIZ HORIZONTAL ST STREET INV INVERT STD STANDARD JNX JOHNSTON REGIONAL AIRPORT SW SOUTHWEST L LENGTH SWPPP STORMWATER POLLUTION PREVENTION PLAN LF LINEAR FEET TEMP TEMPORARY LS LUMP SUM TOFA TAXIWAY OBJECT FREE AREA PRELIMINARY NOT LT LEFT TSA TAXIWAY SAFETY AREA MAX MAXIMUM TW TAXIWAY RELEASED FOR MIN MINIMUM TYP TYPICAL CONSTRUCTION MPH MILES PER HOUR UG UNDERGROUND NC License # F-0165 MSL MEAN SEA LEVEL UIP USE IN PLACE NAVAID NAVIGATIONAL AID VAR VARIES N NORTH/NORTHING VERT VERTICAL NE NORTHEAST W WEST OR WIDTH NW NORTHWEST W/ WITH NTP NOTICE TO PROCEED W/O WITHOUT NTS NOT TO SCALE @ AT OC ON CENTER # NUMBER OFZ OBSTACLE FREE ZONE % PERCENT OHW OVERHEAD WIRE ± PLUS/MINUS (APPROXIMATE) J Q z 0 z 0 U) 3z LLI (D z REVISIONS O Q Oar a) N _ (1) Q U Z U rn� z�� D �U) O U z O U) O PROJECT #: 193716-01 DATE: 09/06/2019 DRAWN BY: JMT CHECKED BY: TMS TITLE INDEX, LEGEND OF SYMBOLS, QUANTITIE AND ABBREVIATIONS SHEET 0.1 O E GENERAL CONTRACT NOTES: 434 Fayetteville St ' = - Suite 1500 N 1. THE PROJECT CONSISTS OF REPLACING EXISTING DRAINAGE CONDITIONS WITH AN ENCLOSED PIPED STORM NETWORK. DRAINAGE IMPROVEMENT EFFORTS CONSIST OF Raleigh, NC 27601 g CONNECTING PROPOSED STORM PIPES TO EXISTING PIPES WITH PIPE COLLARS, REPLACING EXISTING OPEN CHANNELS WITH REINFORCED CONCRETE PIPES AND STRUCTURES, AND REMOVING AND REPLACING PAVEMENT ALONG THE PROPOSED STORM PIPE ROUTE AS NECESSARY. (919) 836-4040 www.wsp.com 2. THE CONTRACTOR WILL STRICTLY KEEP TO THE ACCESS ROADS AND THE WORK AREAS SHOWN IN THE PLANS. THE CONTRACTOR WILL NOT ACCESS ANY RUNWAYS OR TAXIWAYS FOR ANY REASON, UNLESS NOTED OTHERWISE. CONTRACTOR STAGING AREA 3. CONTRACTOR VEHICLES FOR PERSONNEL, MATERIALS AND/OR EQUIPMENT DELIVERY WILL USE LOAD COVERS AND WILL BE CHECKED TO CONFIRM LOAD AND EQUIPMENT ARE SECURE TO THE VEHICLE. ANY MATERIAL, PARTS OF EQUIPMENT, TOOLS, TRASH OR OTHER DEBRIS THAT FALL FROM THE VEHICLE ONTO THE ACCESS ROADS ARE CONSIDERED POTENTIAL FOREIGN OBJECT DEBRIS (FOD). ANY FOD DROPPED FROM THE CONTRACTOR VEHICLES ON THE ACCESS ROAD SHALL BE RETRIEVED AND CLEANED UP IMMEDIATELY AS FOD IS A SERIOUS DANGER TO AIRCRAFT AND CAN CAUSE SEVERE DAMAGE TO AIRCRAFT. 4. CONTRACTOR WILL ONLY UTILIZE THE CONTRACTOR STORAGE/STAGING AREAS AS DESIGNATED ON THIS SHEET, FOR MATERIAL AND EQUIPMENT STORAGE AND TO PARK EMPLOYEE VEHICLES. 5. AREAS DISTURBED BY THE CONTRACTOR'S OPERATIONS ARE TO BE COMPLETELY RESTORED BY THE CONTRACTOR AT THE CONTRACTOR'S EXPENSE TO THE SATISFACTION OF THE AIRPORT OWNER AND ENGINEER. PRELIMINARY NOT RELEASED FOR COORDINATION: CONSTRUCTION NC License # F-0165 1. THE CONSTRUCTION OPERATIONAL SAFETY AND PHASING PLAN (CSPP) ESTABLISHES THE AIRPORT AND PROJECT SPECIFIC REQUIREMENTS THAT ARE TO BE INCLUDED IN THE CONTRACTOR'S BID FOR MAINTAINING OPERATIONAL SAFETY AND SECURITY DURING CONSTRUCTION. - r 2. THE CSPP WILL BE FOLLOWED BY THE CONTRACTOR THROUGHOUT THE PROJECT DURATION AND CONSISTS OF THESE SHEETS AND THE CONTRACTOR'S SPCD (SEE -- BELOW). IF THE CONTRACTOR WANTS TO MAKE A CHANGE TO THE CSPP, THE CHANGE WILL BE APPROVED BY FAA AND THE AIRPORT OWNER PRIOR TO IMPLEMENTATION. / 3. CONTRACTOR WILL PROVIDE A WRITTEN SAFETY PLAN COMPLIANCE DOCUMENT (SPCD) TO THE ENGINEER FOR REVIEW AND APPROVAL 14 CALENDAR DAYS PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. THE SPCD WILL BE SUBMITTED PRIOR TO THE PRE -CONSTRUCTION MEETING SO THAT IT CAN BE DISCUSSED DURING THE MEETING AS AN AGENDA ITEM. CONSTRUCTION CANNOT PROCEED UNTIL THIS PLAN HAS BEEN ACCEPTED BY THE AIRPORT OWNER AND ENGINEER. THE SPCD WILL DEMONSTRATE \ , HOW THE CONTRACTOR WILL MEET THE SAFETY REQUIREMENTS OF THE CONTRACT AND CSPP, INCLUDING DETAILS ON TOOL BOX SAFETY MEETINGS, TYPES, LOCATIONS, ` AND MAINTENANCE OF BARRICADES, WORK ACCESS ROUTES, AND PROPOSED PROCEDURES USED BY THE CONTRACTOR TO MONITOR AIRCRAFT ACTIVITY. PROCEDURES UTILIZED BY THE CONTRACTOR TO ELIMINATE CONFLICTS BETWEEN CONSTRUCTION OPERATIONS AND AIRCRAFT TRAFFIC WILL BE INCLUDED IN THE SPCD. THE SPCD WILL BE UPDATED AND RESUBMITTED FOR REVIEW AND APPROVAL BY THE AIRPORT OWNER AND ENGINEER FOR EACH CHANGE IN CONDITION RELATED TO THE PROJECT. Cn • i 0 4. THE CONTRACTOR WILL PROVIDE THE AIRPORT AND ENGINEER WITH THE NAME OF THEIR SAFETY OFFICER AND FIELD FOREMAN WHO WILL BE IN CHARGE DURING i WORKING HOURS. ADDITIONALLY, THE CONTRACTOR WILL IDENTIFY THE 24-HOUR EMERGENCY RESPONSE TELEPHONE NUMBERS FOR THEIR SUPERVISOR(S) IN CHARGE. Z 5. THE CONTRACTOR WILL BE FULLY AWARE AND CONTINUOUSLY MONITOR ALL REQUIREMENTS AND ACTIVITIES FOR COMPLIANCE WITH THE CONTRACT DOCUMENTS AND ADVISORY CIRCULAR 150/5370-2G "OPERATIONAL SAFETY ON AIRPORTS DURING CONSTRUCTION" AS ATTACHED AS AN APPENDIX TO THE SPECIFICATIONS. THE Uj >- CONTRACTOR'S SPCD WILL ADDRESS ALL SAFETY CONSIDERATIONS IN ACCORDANCE WITH THE ADVISORY CIRCULAR. 6. CONTRACTOR WILL OBEY THE INSTRUCTIONS OF THE FAA, AIRPORT OWNER OR ENGINEER AT ALL TIMES. CONTRACTOR WILL CONTACT THE AIRPORT OPERATIONS AT THE START OF EACH DAY AND AT THE END OF EACH DAY TO INFORM THE OPERATIONS OF THEIR ACTIVITIES.Uj _ 7. IN ADDITION TO THE WORK SHOWN ON THESE PLANS, CONTRACTOR WILL BE AWARE THAT OTHER AIRFIELD CONSTRUCTION PROJECTS MAY AFFECT THIS WORK. PRIOR TO < > Q BIDDING ON THE WORK, CONTRACTOR WILL BE THOROUGHLY ACQUAINTED WITH THE REQUIREMENTS OF THE OTHER PROJECTS AND THEIR POTENTIAL IMPACTS TO THIS PROJECT. THE SUCCESSFUL CONTRACTOR WILL BE REQUIRED TO COORDINATE THIS WORK WITH THESE OTHER PROJECTS. ANY DISPUTES AS TO WORK AREAS, z 0 / CLOSURES, OR ANY OTHER ISSUES WILL BE SETTLED BY THE AIRPORT OWNER. THERE WILL BE NO ADDITIONAL COMPENSATION FOR ANY EFFORT NECESSARY TO ACCOMMODATE THE WORK WITH THESE OTHER PROJECTS. O O N F U Q z 8. CONTRACTOR WILL PROVIDE THE AIRPORT OWNER A FOURTEEN (14) DAY ADVANCE NOTICE OF ANY REQUIRED FACILITY SHUTDOWN FOR THE IMPLEMENTATION OF THE WORK. U) 9. THE CONTRACTOR WILL PROVIDE FAA ATO TECHNICIANS UNENCUMBERED ACCESS TO FAA FACILITIES AND UNDERGROUND CABLES WITHIN OR ADJACENT TO THE PROJECTUj z �, cE LOCATION AT ALL TIMES. � O Uj U 10. WEEKLY PROGRESS MEETINGS WITH STAKEHOLDERS WILL BE HELD THROUGHOUT PROJECT DURATION. o m w z (D z JAMk PHASING:0� 0F__ J O < co 1. ENGINEER WILL REVIEW AND APPROVE CONTRACTOR'S PROPOSED SCHEDULE PRIOR TO ISSUANCE OF NTP. RESUBMITTALS MAY BE REQUIRED FOR REVIEW AND FINAL a z Z = ti APPROVAL. CONTRACTOR TO NOTIFY ENGINEER IN WRITING IF A CHANGE TO SCHEDULE IS PROPOSED PRIOR TO THE SCHEDULED COMPLETION DATE. w O 2. CONTRACTOR TO SUBMIT PROPOSED MEANS/METHODS AND EQUIPMENT FOR STORM SEWER INSTALLATION FOR EACH PHASE. � 0 z - 3. PHASE 1 CONSTRUCTION CONSISTS OF REDIRECTING EXISTING DRAINAGE; REMOVING EXISTING ASPHALT, CULVERT AND FLARED END SECTION; INSTALLING THE z PROPOSED HEADWALL, PROPOSED 48" REINFORCED CONCRETE PIPE (RCP) AND PROPOSED CATCH BASIN; AND REPLACING THE FULL DEPTH HEAVY DUTY ASPHALT SECTION. THIS WORK WILL BE PARTIALLY COMPLETED INSIDE THE OBJECT FREE AREA OF TAXIWAY A. Lo 3z Q �. � w a0 • 4. PHASE 2 CONSTRUCTION CONSISTS OF REDIRECTING EXISTING DRAINAGE; REMOVING EXISTING ASPHALT, CULVERT AND RIPRAP; INSTALLING THE 48" RCP AND CATCH o BASIN DIRECTLY UPSTREAM FROM PHASE 1 CONSTRUCTION; CONNECTING EXISTING PIPE TO THE PROPOSED CATCH BASIN; AND REPLACING FULL DEPTH HEAVY DUTY a •. r r �� ;_ ASPHALT SECTION. 0 5. PHASE 3 CONSTRUCTION CONSISTS OF REDIRECTING EXISTING DRAINAGE; REMOVING EXISTING ASPHALT, CULVERT AND RIPRAP; INSTALLING PIPES AND CATCH BASINS; z CONNECTING EXISTING PIPES TO THE PROPOSED CATCH BASINS; AND REPLACING FULL DEPTH LIGHT DUTY ASPHALT SECTION. w 0 o - - 6. PHASE 4 CONSTRUCTION CONSISTS OF REDIRECTING EXISTING DRAINAGE; REMOVING EXISTING RIPRAP; INSTALLING PROPOSED PIPE COLLARS, JUNCTION BOXES, PIPES, AND CATCH BASINS; CONNECTING EXISTING PIPES; REMOVING AND REINSTALLING THE SALVAGED PERIMETER FENCE; AND GRADING. o LU - AREAS AND OPERATIONS AFFECTED BY CONSTRUCTION: Co w REVISIONS 1. CONTRACTOR PERSONNEL WILL CONTROL THEIR EQUIPMENT, VEHICLES AND PERSONNEL SO AS TO NOT IMPOSE AN INCURSION WITH AIRCRAFT OPERATIONS. AIRCRAFT, 0 0 AIRPORT VEHICLES, AIRLINE VEHICLES, FUEL TRUCKS AND EMERGENCY VEHICLES WILL HAVE THE RIGHT-OF-WAY AT ALL TIMES. THE PROJECT HAS WORK WITHIN THE 0 MOVEMENT AREA OF THE AIRCRAFT OPERATIONS AREA (AOA). COORDINATION WITH THE AIRPORT OWNER IS REQUIRED PRIOR TO CONSTRUCTION IN THESE AREAS. THE H 0 CONTRACTOR WILL STRICTLY ADHERE TO SPEED RESTRICTIONS ON ACCESS ROADS AND WILL NOT DEVIATE FROM THE DESIGNATED ROUTE. of W 2. AIRCRAFT ACCESS TO THE T-HANGARS, VIA TAXIWAY E, WILL BE CLOSED FOR THE DURATION OF PHASE 1 DUE TO ASPHALT REPLACEMENT. PORTIONS OF THE NORTH AND a EASTERN T-HANGAR TAXILANES WILL BE CLOSED DURING PHASE 2 DUE TO ASPHALT REPLACEMENT. DIRECT VEHICLE ACCESS TO THE T-HANGARS FROM LANDSIDE TO Co AIRSIDE WILL BE CLOSED FOR THE DURATION OF PHASE 3 DUE TO ASPHALT REPLACEMENT. Uj 0 a Aft 3. CONTRACTOR'S STORAGE/STAGING AREA AND PARKING FOR EQUIPMENT IS LOCATED AS SHOWN ON THE PLANS. THE CONTRACTOR WILL PARK ALL CONSTRUCTION } Q PROJECT #: 193716-01 DATE: 09/06/2019 EQUIPMENT AT THIS LOCATION AT THE COMPLETION OF EACH WORK DAY. NO INDIVIDUAL EMPLOYEE VEHICLE WILL HAVE ACCESS TO ANY SECURE AREAS, INCLUDING THE o - - - - AIRPORT RUNWAYS/TAXIWAYS/APRONS. ALL VEHICLES WILL BE PARKED AT THE DESIGNATED CONTRACTOR PARKING AREAS. > w DRAWN BY: KR CHECKED BY: TMS U) of TITLE Q CONSTRUCTION Co SAFETY AND PHASING 0 50' 100' - PLAN OVERVIEW HORIZONTAL SCALE J z_ SHEET Q Co D IL 1. 1 0 PROTECTION OF NAVAIDS: LAWS AND ACCORDING TO MANUFACTURER'S DIRECTIONS. CONSTRUCTION FUEL WILL NOT BE STORED AT THE SITE. EXCESS SPECIAL CONDITIONS: MATERIAL FROM THE EXISTING SYSTEM REMOVAL WILL BE LEGALLY DISPOSED OF OFF AIRPORT PROPERTY. 1. CONTRACTOR WILL NOT DAMAGE IN ANY WAY THE PHYSICAL CONDITION OF AIRPORT NAVIGATIONAL AIDS OR NAVAIDS OR ALTER OR AFFECT IN ANY WAY THEIR FUNCTION DURING THIS PROJECT. NAVAIDS ON THE AIRPORT INCLUDE: REIL, PAPI-4, MALSR, ROTATING BEACON, NDB, VOR/GPS, GLIDESLOPE, LOCALIZER AND AWOS. CONTRACTOR WILL NOTIFY THE ENGINEER AND AIRPORT OPERATIONS OF ANY DAMAGE, IMPACT OR ALTERATION OF THESE NAVAIDS OR THEIR FUNCTIONS, CAUSED BY THE CONTRACTOR. FOLLOWING NOTIFICATION, THE CONTRACTOR WILL, AT THE CONTRACTOR'S COST, IMMEDIATELY CORRECT TO THE SATISFACTION OF THE ENGINEER AND THE AIRPORT OWNER ANY DAMAGE, IMPACT OR ALTERATION AS PREVIOUSLY NOTED. 2. THE CONTRACTOR MUST COORDINATE WITH THE AIRPORT OWNER AND ENGINEER IN ADVANCE OF ANY WORK WITHIN A NAVAID CRITICAL AREA. THERE IS NO ANTICIPATED WORK WITHIN ANY OF THE NAVAID CRITICAL AREAS. 3. THE CONTRACTOR WILL BE RESPONSIBLE FOR LOCATING, MARKING AND PROTECTING NAVAID CRITICAL AREAS, EXISTING UNDERGROUND NAVAID AND LIGHTING CABLES PRIOR TO CONSTRUCTION. THE CONTRACTOR WILL CONTACT AIRPORT OWNER AND ENGINEER IN ADVANCE TO ALLOW SUFFICIENT TIME TO LOCATE AND MARK NAVAID CRITICAL AREAS AND EXISTING FIELD CABLES AND TO AVOID UNSCHEDULED SYSTEM OUTAGES. 4. THE CONTRACTOR WILL MAINTAIN ACCESS TO ALL FAA NAVAID FACILITIES ADJACENT TO THE WORK AT ALL TIMES. ACCESS REQUIREMENTS MUST BE COORDINATED WITH THE CONSTRUCTION MANAGEMENT TEAM AND AIRPORT OWNER. CONTRACTOR ACCESS: 1. STOCKPILES WILL NOT PENETRATE THE FAR PART 77 IMAGINARY SURFACES OR PRESENT FOD PROBLEMS. THE CONTRACTOR IS RESPONSIBLE FOR THE SECURITY OF THEIR MATERIALS. THE STOCKPILE AND STAGING LOCATIONS ARE SHOWN ON THE CONSTRUCTION SAFETY & PHASING PLAN. ANY APPROVED STORAGE OF EQUIPMENT WILL NOT PRESENT A LINE OF SIGHT PROBLEM WITH VEHICLE TRAFFIC OR AIRCRAFT. 2. EACH MOTORIZED VEHICLE OPERATING WITHIN THE AOA WILL HAVE A 3-FOOT SQUARE FLAG CONSISTING OF INTERNATIONAL ORANGE AND WHITE SQUARES IN FULL VIEW ABOVE THE VEHICLE AND/OR A FLASHING YELLOW BEACON. FOR FABRIC COLOR SPECIFICATIONS, SEE CURRENT FAA ADVISORY CIRCULAR 150/5210-5D, APPENDIX A. EACH VEHICLE WILL HAVE THE CONTRACTOR'S NAME CLEARLY IDENTIFIED ON BOTH SIDES OF THE VEHICLE. THE CONTRACTOR WILL PROVIDE A DAILY LIST, PRIOR TO START OF WORK, OF THE EXPECTED CONSTRUCTION AND MATERIAL DELIVERY VEHICLES TO THE CONSTRUCTION GATE GUARD. CONTRACTOR VEHICLES WILL YIELD RIGHT-OF-WAY TO AIRCRAFT AND EMERGENCY VEHICLES. CONTRACTOR WILL ENSURE THAT UNDER NO CIRCUMSTANCES WILL ANY CONTRACTOR OR SUBCONTRACTOR OR OTHER VEHICLE ASSOCIATED WITH THE JOB PASS BENEATH ANY PART OF AN AIRCRAFT OR BLOCK THE ACCESS TO ANY GATE OR DELAY ANY AIRCRAFT MOVEMENT. VEHICLES WILL REMAIN WITHIN ESTABLISHED HAUL ROUTES. IT IS PROHIBITED TO USE RUNWAYS OR TAXIWAYS OR ADJACENT FIELD AREAS UNLESS SPECIFICALLY AUTHORIZED. 3. ALL INCOMING VEHICLES TO THE AOA ARE SUBJECT TO INSPECTION. IF THE UNITED STATES DEPARTMENT OF HOMELAND SECURITY RAISES THE NATIONAL TERRORISM ADVISORY SYSTEM SECURITY THREAT LEVEL TO "ELEVATED" OR "IMMINENT", OR IF OTHERWISE REQUIRED AT ANY TIME BY THE AIRPORT OWNER, FAA OR THE TRANSPORTATION SECURITY ADMINISTRATION, TRAINED CONTRACTOR -SUPPLIED SECURITY GUARD PERSONNEL, APPROVED AND ACCEPTED BY THE AIRPORT OWNER, WILL SEARCH ALL VEHICLES ENTERING THE AOA. 4. VEHICLES AND EQUIPMENT MAY ONLY ENTER THE AOA THROUGH IDENTIFIED ACCESS GATES. CONTRACTOR'S SUPERVISOR(S) AND PERSONNEL, OPERATING VEHICLES OR EQUIPMENT, WILL BE REQUIRED TO SUCCESSFULLY COMPLETE THE AIRPORT'S SAFETY AND SECURITY TRAINING COURSE AND DRIVER'S TRAINING PROGRAM BEFORE BEING ALLOWED TO DRIVE WITHIN THE ACTIVE AOA. TIME AND EXPENSES FOR SAFETY, SECURITY AND DRIVING CLASSES WILL BE AT THE CONTRACTOR'S EXPENSE. 5. CONTRACTOR WILL MAINTAIN AIRFIELD SECURITY AND GATE SECURITY AT ALL TIMES. NO ACCESS GATES WILL REMAIN OPEN WITHOUT CONTRACTOR PROVIDED GATE GUARD. 6. ESCORTS ARE ONLY ALLOWED TO MONITOR TWO VEHICLES AT A TIME, UNLESS OTHERWISE APPROVED BY AIRPORT OWNER. 7. THE CONTRACTOR STAGING AREA, AS DEPICTED ON THE CONTRACT DRAWINGS, WILL BE USED TO STORE ALL IDLE EQUIPMENT, SUPPLIES AND CONSTRUCTION MATERIALS. STORAGE WILL NOT INTERFERE WITH OPERATIONAL AREAS. WHEN NOT IN USE DURING WORKING HOURS, AND AT ALL OTHER TIMES, ALL MATERIAL AND EQUIPMENT WILL BE STORED AT THE STORAGE SITE INDICATED ON THE DRAWINGS UNLESS PRIOR APPROVAL IS PROVIDED BY THE AIRPORT OWNER. NO MATERIALS MAY BE STORED ON THE AOA UNLESS AUTHORIZED BY THE AIRPORT OWNER. 8. SPEED LIMIT ON HAUL ROUTES AND ACTIVE APRONS IS 10 MPH UNLESS OTHERWISE POSTED. 9. THE CONTRACTOR'S EQUIPMENT, VEHICLES AND MATERIALS ARE STRICTLY RESTRICTED TO THE STORAGE/STAGING AREAS DURING NON -WORKING HOURS UNLESS OTHERWISE APPROVED BY THE AIRPORT OWNER. WILDLIFE MANAGEMENT: 1. THE CONTRACTOR WILL OBSERVE STRICT ADHERENCE TO SITE CLEANLINESS. THE CONTRACTOR WILL MAINTAIN A CLEAN WORKSITE, CLEAR OF EXCESS DEBRIS AND TRASH, FOOD GARBAGE OR OTHER NUISANCE ATTRACTANTS. TRASH IS CONSIDERED A HAZARD IN THAT IT MAY BECOME WINDBLOWN AND BECOME FOREIGN OBJECT DEBRIS (FOD); OR IT MAY ATTRACT UNWANTED WILDLIFE WHICH MAY PRESENT SERIOUS HAZARDS TO AIRCRAFT IN THE AOA. 2. DURING CONSTRUCTION, THE CONTRACTOR WILL ENSURE THAT THERE IS NO STANDING WATER WITHIN THE WORK SITE AND WITHIN THE STAGING AREAS. 3. THE AIRPORT IS REGULARLY MAINTAINED FOR VEGETATION (MOWING, WEED REMOVAL, ETC.). THESE MAINTENANCE ITEMS ARE REGULARLY SCHEDULED AND THE AIRPORT WILL CONTINUE THEM INDEFINITELY. ANY AREA THAT HAS BECOME DISTURBED BY THE CONTRACTOR WILL BECOME THE RESPONSIBILITY OF THE CONTRACTOR UNTIL VEGETATION HAS BEEN ESTABLISHED AND ACCEPTED. ONLY THE SEED INDICATED IN THE PROJECT DOCUMENTS WILL BE ALLOWED FOR USE IN AND AROUND THE AIRPORT THE MAINTENANCE OF THE TURF AREAS WILL BE COORDINATED WITH THE ENGINEER AND AIRPORT OWNER AT THE PROGRESS MEETINGS. 4. THE CONTRACTOR WILL BE REQUIRED TO MAINTAIN IN GOOD WORKING ORDER ANY GATE USED FOR SITE ACCESS. ADDITIONALLY, THE CONTRACTOR WILL BE REQUIRED TO STRICTLY FOLLOW AIRPORT SECURITY PROTOCOLS FOR KEEPING THE AIRFIELD SECURE AT ALL TIMES AS WELL AS FOR ENTERING/EXITING THE AOA. 5. NO KNOWN HABITAT DISRUPTION SHOULD OCCUR AND NO KNOWN ISSUES ARE ANTICIPATED. FOREIGN OBJECT DEBRIS (FOD) MANAGEMENT: n 1. ANY FOD ON THE ACTIVE AOA SURFACES OR PUBLIC ROADWAYS WILL BE IMMEDIATELY CLEANED BY THE CONTRACTOR TO THE SATISFACTION OF THE AIRPORT OWNER AND ENGINEER. THE CONTRACTOR WILL UTILIZE WHATEVER EQUIPMENT IS NECESSARY TO KEEP THESE ROUTES FREE AND CLEAR OF DUST, DEBRIS, MUD, ETC. THE CONTRACTOR WILL MAINTAIN ON -SITE A FULL WATER TRUCK FOR WETTING DOWN DUST -BLOWN PRONE AREAS AT ALL TIMES. ALL EQUIPMENT AND LABOR NECESSARY TO MAINTAIN A CLEAN ROUTE WILL BE CONSIDERED INCIDENTAL TO THE CONTRACT. FAILURE TO KEEP THE ACTIVE AOA SURFACES o FREE OF DEBRIS COULD RESULT IN THE STOPPAGE OF THE PROJECT. THE CONTRACTOR IS RESPONSIBLE FOR ALL DAMAGE TO a`I AIRPORT PROPERTY OR AIRCRAFT AS A RESULT OF FOD IN THE CONSTRUCTION AREAS �� 2. THE CONTRACTOR WILL KEEP THE PROJECT SITE AND VEHICLES CLEAN, USING A "CLEAN AS YOU GO" APPROACH THROUGHOUT NI THE DURATION OF THE PROJECT. THIS WILL INCLUDE TAKING AN INVENTORY OF TOOLS BEFORE ENTERING THE AOA AND AFTER o LEAVING THE AOA TO ENSURE NO TOOLS ARE UNACCOUNTED FOR OR INADVERTENTLY LEFT WITHIN THE AOA. a Xp1 HAZARDOUS MATERIAL MANAGEMENT: 1. THE CONTRACTOR WILL BE REQUIRED TO SUBMIT A SAFETY AND HEALTH PLAN, WHICH DETAILS HOW THEIR COMPANY MANAGES 2. IF HAZARDOUS MATERIALS ARE ENCOUNTERED ON THE SITE WHICH ARE IMPACTED BY THE WORK, THE CONTRACTOR MUST NOTIFY THE AIRPORT OWNER AND THE ENGINEER IMMEDIATELY OF THEIR PRESENCE. NOTIFICATION OF CONSTRUCTION ACTIVITIES: 1. THE NOTICE TO PROCEED WILL NOT BE ISSUED UNTIL THE CONTRACTOR HAS SUBMITTED TO THE ENGINEER FOR APPROVAL, AND WHICH HAS BEEN APPROVED IN WRITING, THE FOLLOWING ITEMS: A SPCD, A SCHEDULE WITH CRITICAL PATH IDENTIFIED, EMERGENCY CONTACT INFORMATION (SUPERVISOR, FOREMAN, PROJECT MANAGER), AND SCHEDULE OF VALUES FOR LUMP SUM WORK ITEMS. 2. THE AIRPORT OWNER WILL GENERATE AND MAINTAIN "NOTICE TO AIRMEN" (NOTAMS) PRIOR TO CLOSURES AS REQUIRED. CONTRACTOR WILL PROVIDE NOTICE TO THE AIRPORT OWNER AND HANGAR TENANTS A MINIMUM OF TEN (10) DAYS PRIOR TO ANTICIPATED ACTIVITY THAT REQUIRES A NOTAM TO BE ISSUED. 3. IN THE EVENT OF AN EMERGENCY, THE CONTRACTOR WILL CALL THE AIRPORT OWNER IMMEDIATELY. THE AIRPORT OWNER WILL COORDINATE EMERGENCY RESPONSE. 4. THE CONTRACTOR WILL IDENTIFY A QUALIFIED, DEDICATED SAFETY AND SECURITY POINT OF CONTACT THAT IS APPROVED BY THE AIRPORT OWNER. 5. THE CONTRACTOR WILL PRODUCE AN EMERGENCY CONTACT LIST WITHIN SEVEN (7) DAYS FOLLOWING THE PRE -CONSTRUCTION MEETING. AT A MINIMUM, THE FOLLOWING EMERGENCY CONTACTS FOR THE AIRPORT WILL BE INCLUDED ON THE CONTACT LIST: DIRECTOR OF AVIATION: PHIL LANIER 919-934-0992 DEPUTY DIRECTOR OF AVIATION: AIRPORT ENGINEER: AIRPORT MAINTENANCE MANAGER: AIRFIELD TECHNICAL OPERATIONS: AIRPORT POLICE: FIRE PROTECTION DISTRICT: CONTRACTOR'S MAIN OFFICE: CONTRACTOR'S PROJECT MANAGER: CONTRACTOR'S SAFETY OFFICER: CONTRACTOR'S SITE SUPERINTENDENT: INSPECTION CONTRACTOR'S MAIN OFFICE: INSPECTION CONTRACTOR'S FIELD OFFICE: 6. MAXIMUM HEIGHT OF CONTRACTOR'S VEHICLES AND EQUIPMENT WITHIN THE AOA SHALL BE 15-FT ABOVE THE GROUND SURFACE. IF THE CONTRACTOR CHOOSES TO USE EQUIPMENT IN EXCESS OF THIS HEIGHT, THEY WILL BE RESPONSIBLE FOR SUBMITTING A REVISION TO THE AIRSPACE ANALYSIS (FAA FORM 7460-1). THE CONTRACTOR IS ADVISED THAT THE FAA REVIEW MAY TAKE UP TO 60 DAYS FROM TIME OF SUBMITTAL. THE CONTRACTOR WILL BE RESPONSIBLE FOR ALL COSTS AND TIME DELAYS ASSOCIATED WITH THE 7460-1 APPLICATION. 7. AN INCURSION WITH AN AIRCRAFT IS A SERIOUS SAFETY INFRINGEMENT AND IS A FEDERAL VIOLATION THAT WILL SUBJECT THE CONTRACTOR TO THE MAXIMUM FINE ALLOWED BY FEDERAL AVIATION ADMINISTRATION. INSPECTION REQUIREMENTS: 1. THE CONTRACTOR WILL PROVIDE UNENCUMBERED ACCESS TO THE FAA, AIRPORT OWNER, AND THE ENGINEER OF THE WORK AREAS AT ALL TIMES. 2. THE CONTRACTOR WILL IDENTIFY, IN WRITING TO THE AIRPORT OWNER AND ENGINEER, THE INDIVIDUALS RESPONSIBLE FOR CONDUCTING INSPECTIONS PRIOR TO THE INSPECTION TAKING PLACE. 3. THE CONTRACTOR WILL COMPLETE A DAILY INSPECTION OF THE WORK SITE FOR SAFETY BY COMPLETING THE FAA CHECKLIST IN AC 150/5370-2G, APPENDIX D. THE CONTRACTOR WILL INCLUDE SUFFICIENT TIME WITHIN THE ALLOWABLE CLOSURE REQUIREMENTS TO ACCOMMODATE INSPECTIONS AND ACCEPTANCE OF WORK BY THE AIRPORT OWNER, FAA AND ENGINEER. 4. FINAL INSPECTIONS: ANY DAMAGE ALONG THE HAUL ROUTES, DUE TO THE CONTRACTOR'S VEHICLES OR EQUIPMENT, WILL BE REPAIRED BY THE CONTRACTOR PRIOR TO THE COMPLETION OF THE PHASE FOR WHICH THE ROUTE IS USED. UNDERGROUND UTILITIES AND EXISTING PAVEMENTS: 1. THE CONTRACTOR WILL BE RESPONSIBLE FOR THE PROTECTION OF EXISTING PAVEMENTS, TURFED AREAS, UNDERGROUND PIPES AND UTILITIES, AND ALL OTHER EXISTING FEATURES UNLESS OTHERWISE NOTED ON THESE PLANS. THE CONTRACTOR WILL REPAIR TO ORIGINAL CONDITIONS ALL FEATURES INCLUDING EXISTING PAVEMENTS AND TURFED AREAS DISTURBED BY THEIR ACTIVITIES TO THE SATISFACTION OF THE AIRPORT OWNER AND ENGINEER. THIS REPAIR WILL BE CONSIDERED INCIDENTAL TO THE WORK AND NO ADDITIONAL COMPENSATION SHALL BE MADE FOR IT. PENALTIES: 1. IN THE EVENT AN EMPLOYEE OF THE CONTRACTOR VIOLATES A SAFETY PROVISION, THEY WILL BE PROHIBITED FROM RETURNING TO WORK ON THE AOA WITHOUT REMEDIAL SAFETY TRAINING AND THE APPROVAL OF THE AIRPORT OWNER. VIOLATIONS MAY BE DEEMED AS JUST AND SUFFICIENT CAUSE TO REQUIRE THE EMPLOYEE BE PERMANENTLY REMOVED FROM THE JOB SITE. FOR THE CONTRACTOR'S VIOLATION OF THE SECURITY IDENTIFICATION DISPLAY AREA (SIDA), THE CONTRACTOR WILL BE RESPONSIBLE FOR ALL PENALTIES ISSUED BY THE TRANSPORTATION SECURITY ADMINISTRATION (TSA). 2. THE CONTRACTOR WILL BE RESPONSIBLE FOR ALL COSTS AND DELAYS CAUSED BY SAFETY VIOLATIONS. CONSTRUCTION PERSONNEL DRIVING ERRATICALLY ON THE AIRPORT OWNER, EXCEEDING THE 10-MPH SPEED LIMIT, OR VIOLATING ANY OTHER AIRPORT DRIVING RULE OR SAFETY REGULATION, AT A MINIMUM, WILL BE REMOVED FROM THE PROJECT PERMANENTLY. AIRPORT OPERATIONS CAN REMOVE ANY CONTRACTOR PERSONNEL, AT ANY TIME, FOR ANY DURATION, DUE TO A SAFETY VIOLATION. AIRPORT OPERATIONS SHALL REPORT ANY OCCURRENCES TO THE CONTRACTOR AND THE AIRPORT OWNER. 3. NON-COMPLIANCE BY THE CONTRACTOR WITH AIRPORT RULES AND REGULATIONS OR FAILURE TO COMPLY WITH THE APPROVED CSPP AND SPCD, AIRPORT SECURITY REGULATIONS, VEHICLE SPEED RESTRICTIONS AND ANY OTHER APPLICABLE AIRPORT REGULATION MAY RESULT IN FINES AS ALLOWED BY LAW AS WELL AS THE REMOVAL OF THE CONTRACTOR PERSONNEL FROM THE WORK SITE. 4. REFER TO SECTION 80-08 OF THE PROJECT SPECIFICATIONS (GENERAL PROVISIONS) FOR DETAILED LIQUIDATED DAMAGES AND REQUIREMENTS ASSOCIATED THEREWITH. 1. EMERGENCY SITUATIONS: SHOULD A LIFE -THREATENING INJURY OCCUR ON SITE, WHETHER IT BE TO THE CONTRACTOR'S WORKFORCE OR THE AIRPORT'S INSPECTION CREW OR OTHERS, THE AIRPORT OWNER WILL BE IMMEDIATELY NOTIFIED, AND THEY WILL NOTIFY THE APPROPRIATE AIRPORT DEPARTMENTS. THE CONTRACTOR WILL FOLLOW ALL INSTRUCTIONS BY THE AIRPORT OWNER, AIRPORT OPERATIONS AND AIRPORT/FAA OFFICIALS OR THEIR DESIGNEES. 2. THE CONTRACTOR WILL YIELD TO ALL SAFETY PERSONNEL. IN THE EVEN OF A WORK STOPPAGE DUE TO AIRCRAFT EMERGENCY, THE CONTRACTOR WILL, IF POSSIBLE, MAKE SAFE THE CONSTRUCTION SITE AND VACATE THE AREA UNDER ESCORT. 3. THE CONTRACTOR WILL TAKE FULL RESPONSIBILITY OF THE SAFETY OF PERSONNEL THROUGHOUT THE CONSTRUCTION SITE AND FOR THE ENTIRE DURATION OF THE PROJECT. IN PARTICULAR, THE CONTRACTOR WILL BE AWARE OF AIRCRAFT ACTIVITY ON THE AIRPORT AND FULL BECOME ACQUAINTED WITH THE DANGERS OF JET BLAST AND ITS EFFECT ON WORK IN ADJACENT AREAS, ESPECIALLY IN NON -MOVEMENT AREAS. MATERIALS CAPABLE OF BEING DISPLACED WILL NOT BE STOCKPILED OR STORED WITHOUT BEING SECURED IN WORK AREAS ADJACENT TO ACTIVE AIRCRAFT OPERATIONAL AREAS. RUNWAY AND TAXIWAY VISUAL AIDS: 1. CLOSURES WILL BE NOTED WITH THE USE OF LOW -PROFILE BARRICADES AT TAXIWAY E AND ALONG THE T-HANGAR TAXILANES AFFECTED BY ASPHALT REPLACEMENT. BARRICADES WILL BE SECURED TO PREVENT MOVEMENT FROM JET BLAST. THE AIRPORT OWNER WILL PROVIDE NOTAMS FOR CLOSURES AND THE CONTRACTOR WILL BE REQUIRED TO PROVIDE, PLACE AND MAINTAIN TEMPORARY BARRICADES AT CLEARLY VISIBLE LOCATIONS TO KEEP PILOTS FROM ERRANTLY TAXIING DOWN A CLOSED TAXIWAY. LOW PROFILE BARRICADES ARE TO BE PLACED AT THE TSA BOUNDARY, OUTSIDE THE SAFETY AREAS. MARKINGS AND SIGNS FOR ACCESS ROADS: 1. CONTRACTOR MUST CLEARLY MARK ALL ACCESS AND HAUL ROUTES AND INSTALL SIGNAGE IN ACCORDANCE WITH THE CURRENT FAA AC 150/5345-44K "SPECIFICATION FOR RUNWAY AND TAXIWAY SIGNS", AC 150/5340-18F AND THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) AND AS APPROVED BY THE AIRPORT OWNER. HAZARD MARKING AND LIGHTING: 1. THE CONTRACTOR IS RESPONSIBLE FOR REPLACING IN -KIND ANY MARKINGS DESTROYED, OBLITERATED, OR OTHERWISE RENDERED UNUSABLE BY CONSTRUCTION ACTIVITIES. CONTRACTOR WILL ENSURE CONTINUITY OF SERVICE FOR LIGHTING SYSTEMS NOT ASSOCIATED WITH THIS PROJECT. 2. ALL CONSTRUCTION VEHICLES AND EQUIPMENT SHALL HAVE A FLASHING YELLOW BEACON OR 3 FEET BY 3 FEET CHECKERED ORANGE AND WHITE FLAG ATTACHED TO VEHICLES/EQUIPMENT AS SPECIFIED IN AC 150/5210-5D "PAINTING, MARKING, AND LIGHTING OF VEHICLES USED ON AN AIRPORT". 3. BARRICADES WILL BE LOW -PROFILE WITH RED BATTERY OPERATED LIGHTS. WORK ZONE LIGHTING FOR NIGHTTIME CONSTRUCTION: 1. LIGHTING EQUIPMENT MUST ADEQUATELY ILLUMINATE THE WORK AREA IF CONSTRUCTION IS TO BE PERFORMED DURING NIGHTTIME HOURS. IT IS RECOMMENDED THAT ALL SUPPORT EQUIPMENT, EXCEPT HAUL TRUCKS, BE EQUIPPED WITH ARTIFICIAL ILLUMINATION TO SAFELY ILLUMINATE THE AREA IMMEDIATELY SURROUNDING THEIR WORK AREAS. 2. LIGHT SHOULD BE POSITIONED TO PROVIDE THE MOST NATURAL COLOR ILLUMINATION AND CONTRAST WITH A MINIMUM OF SHADOWS. THE SPACING MUST BE DETERMINED BY TRIAL. LIGHT TOWERS WILL BE POSITIONED AND ADJUSTED TO AIM AWAY FROM ACTIVE RUNWAYS TO PREVENT BLINDING EFFECTS. SHIELDING MAY BE NECESSARY. LIGHT TOWERS WILL BE REMOVED FROM THE CONSTRUCTION SITE WHEN THE AREA IS REOPENED TO AIRCRAFT OPERATIONS. PROTECTION OF RUNWAY, TAXIWAY SAFETY AREAS AND OBJECT FREE AREAS: RUNWAY SAFETY AREA (RSA) THIS PROJECT CONTAINS NO WORK WITHIN THE RSA. THE CONTRACTOR IS NOT PERMITTED TO WORK WITHIN THE RSA OF AN ACTIVE RUNWAY. RUNWAY OBJECT FREE AREA (ROFA) THIS PROJECT CONTAINS NO WORK WITHIN THE ROFA. THE CONTRACTOR IS NOT PERMITTED TO WORK WITHIN THE ROFA OF AN ACTIVE RUNWAY. TAXIWAY SAFETY AREA (TSA) TAXIWAY E WILL BE CLOSED WHILE WORK IS PERFORMED INSIDE ITS TSA. CONTRACTOR WILL COORDINATE CLOSURE WITH THE AIRPORT OWNER AND HANGAR TENANTS FOURTEEN (14) DAYS IN ADVANCE OF START OF WORK IN THIS AREA. ALL CONTRACTOR EQUIPMENT WILL BE REMOVED FROM THE TSA WHEN NOT IN USE, AND MATERIAL WILL NOT BE STOCKPILED IN THE TSA. NO CONSTRUCTION ACTIVITIES MAY OCCUR WITHIN THE TSA WHILE THE TAXIWAY IS OPEN FOR AIRCRAFT OPERATIONS. THE TSA DIMENSIONS MAY BE TEMPORARILY ADJUSTED IF THE TAXIWAY IS RESTRICTED TO AIRCRAFT OPERATIONS REQUIRING A TSA THAT IS EQUAL TO THE TSA WIDTH AVAILABLE DURING CONSTRUCTION. THE AIRPORT OWNER MUST COORDINATE THE ADJUSTMENT OF THE TSA WIDTH AS PERMITTED ABOVE WITH THE APPROPRIATE FAA AIRPORTS REGIONAL OR DISTRICT OFFICE AND THE FAA AIR TRAFFIC MANAGER AND ISSUE A NOTAM. NO OPEN TRENCHES OR EXCAVATIONS ARE PERMITTED WITHIN THE TSA WHILE THE TAXIWAY IS OPEN. BACKFILL TRENCHES BEFORE THE TAXIWAY IS OPENED. IF BACKFILLING EXCAVATIONS BEFORE THE TAXIWAY MUST BE OPENED IS IMPRACTICAL, COVER THE EXCAVATIONS APPROPRIATELY. COVERING FOR OPEN TRENCHES MUST BE DESIGNED TO ALLOW THE SAFE OPERATION OF THE HEAVIEST AIRCRAFT OPERATING ON THE TAXIWAY ACROSS THE TRENCH WITHOUT DAMAGE TO AIRCRAFT. SOIL EROSION MUST BE CONTROLLED TO MAINTAIN TSA STANDARDS, THAT IS, THE TSA MUST BE CLEARED AND GRADED AND HAVE NO POTENTIALLY HAZARDOUS RUTS, HUMPS, DEPRESSIONS, OR OTHER SURFACE VARIATIONS, AND CAPABLE, UNDER DRY CONDITIONS, OF SUPPORTING SNOW REMOVAL EQUIPMENT, ARFF EQUIPMENT, AND THE OCCASIONAL PASSAGE OF AIRCRAFT WITHOUT CAUSING STRUCTURAL DAMAGE TO THE AIRCRAFT. TAXIWAY OBJECT FREE AREA (TOFA) THERE WILL BE WORK WITHIN AN ACTIVE TOFA. FOR WORK WITHIN THE OBJECT FREE AREA OF TAXIWAY E AND TAXIWAY A, NOTAMS WILL BE ISSUED BY THE AIRPORT OWNER ADVISING PILOTS OF THE HAZARD AND RECOMMENDING REDUCED TAXIING SPEEDS ALONG THE TAXIWAY WHILE WORK IS BEING PERFORMED INSIDE THE TOFA. THE CONTRACTOR WILL COORDINATE TEMPORARY TAXIWAY CLOSURES AND/OR RESTRICTED TAXIING OPERATIONS WITH THE AIRPORT OWNER AS PART OF THIS WORK. OBSTACLE FREE ZONES (OFZ) THIS PROJECT CONTAINS NO WORK WITHIN THE OFZ. THE CONTRACTOR IS NOT PERMITTED TO WORK WITHIN THE OFZ. RUNWAY APPROACH/DEPARTURE SURFACES THERE WILL BE NO WORK WITHIN ANY ACTIVE RUNWAY APPROACH/DEPARTURE AREAS OR CLEARWAYS. 434 Fayetteville St Suite 1500 Raleigh, NC 27601 (919) 836-4040 www.wsp.com PRELIMINARY NOT RELEASED FOR CONSTRUCTION NC License # F-0165 O Q Oar Q) N U Q U Z U) ).1 5 rn� zItE D co U) O U z O z O REVISIONS PROJECT #: 193716-01 DATE: 09/06/2019 DRAWN BY: KR CHECKED BY: TMS TITLE CONSTRUCTION SAFETY AND PHASING PLAN OVERVIEW z SHEET Q a T AND HANDLES HAZARDOUS MATERIALS, FOR CIRCUMSTANCES WHICH MAY OCCUR ON THIS PROJECT. ALL LUBRICATING LIQUIDS AND SOLIDS (OILS AND GREASES) WILL BE SECURED AND CONTAINED IN DRY AREAS UNTIL USED BY TRAINED PERSONNEL OR Y ., MECHANICS. ALL WASTE MATERIAL WILL BE PROPERLY DISPOSED OF IN ACCORDANCE WITH ALL APPLICABLE ENVIRONMENTAL T 1.02 OTHER LIMITATIONS ON CONSTRUCTION: THE FOLLOWING RESTRICTIONS WILL BE IN PLACE DURING THE CONSTRUCTION OF THIS PROJECT UNLESS OTHERWISE ACCEPTED BY WRITTEN AUTHORIZATION: • NO USE OF TALL EQUIPMENT (CRANES, CONCRETE PUMPS, AND SO ON) UNLESS A 7460-1 DETERMINATION LETTER IS USED FOR SUCH EQUIPMENT. • NO USE OF OPEN FLAMES WELDING OR TORCHES UNLESS ADEQUATE FIRE SAFETY PRECAUTIONS ARE PROVIDED AND APPROVED IN WRITING BY THE AIRPORT OWNER. • NO USE OF FLARE POTS WITHIN THE AOA AT ANY TIME. • NO USE OF ELECTRICAL BLASTING CAPS ON OR WITHIN 1,000 FEET OF AIRPORT PROPERTY. • NO SMOKING WITHIN THE AIRPORT FACILITIES OR WITHIN 20 FEET OF ENTRANCES, OPERABLE WINDOWS, OR OUTDOOR AIR INTAKES. • NO DISRUPTION OF UTILITIES SERVING THE FACILITIES OCCUPIED BY THE AIRPORT OR THEIR TENANTS, UNLESS PERMITTED IN WRITING (WITH PROVISIONS FOR TEMPORARY UTILITIES IN THEIR PLACE). NOTIFY THE AIRPORT OWNER A MINIMUM OF 48 HOURS IN ADVANCE OF PROPOSED UTILITY DISRUPTIONS AND DO NOT PROCEED WITH UTILITY INTERRUPTION WITHOUT WRITTEN PERMISSION. • USE OF FLOOD LIGHTING FOR NIGHT-TIME WORK MUST BE LIMITED TO NON -DIRECTIONAL LIGHT. LIGHTS CANNOT BE POINTED TOWARD THE AIRFIELD OR RUNWAY APPROACHES. LIGHTS THAT CAUSE GLARE OR BLIND SPOTS TO PILOTS WILL NOT BE ALLOWED. • CONTRACTOR SHOULD BE AWARE OF JET BLAST AT ALL TIMES, ESPECIALLY WHILE AROUND ACTIVE RUNWAYS, TAXIWAYS AND APRONS. BARRICADES WILL BE FIXED TO THE GROUND OR PAVEMENT TO PREVENT MOVEMENT DUE TO JET BLAST. STOCKPILES AND CONSTRUCTION EQUIPMENT SHOULD BE KEPT AWAY FROM PLACES WHERE JET BLAST IS LIKELY TO OCCUR (RUN-UP APRONS, TAXIWAY CORNERS, ETC.) • CONTRACTOR'S WORKING DAYS OR TIMES MAY BE LIMITED AT THE AIRPORT OWNER'S DISCRETION FOR VIP AIRCRAFT, SPECIAL OPERATIONS, OR SPECIAL EVENTS. BARRICADE NOTES FLASHERS TO BE BATTERY OPERATED AND FULLY OPERATIONAL AT ALL TIMES. FLASHERS TO MEET THE LUMINARY REQUIREMENTS OF THE NORTH CAROLINA'S DEPARTMENT OF TRANSPORTATION. LENS TO BE RED AND BE ABLE TO ROTATE 90 DEGREES. 2. SUPPORT BRACES TO BE SECURELY ATTACHED TO 2" x 8". SAND BAGS TO BE PLACED ON EACH SUPPORT BRACE. 3. FACING OF 2" x 8" TO BE COVERED WITH REFLECTIVE TAPE OR PAINT. (ALTERNATE WHITE/ORANGE) 4. PLACE AT MAXIMUM 12' CENTER TO CENTER INTERVALS (MAXIMUM 4' GAP) 5. THE BARRICADE IS INTENDED FOR VISUAL DIRECTIONAL GUIDANCE AND HAZARD WARNING FOR TRAFFIC ADJACENT TO THE WORK AREA. IT IS NOT INTENDED FOR USE AS A PHYSICAL BARRICADE OF TRAFFIC. ALTERNATE EVERY OTHER LENS gSHER (RED) SAFETY ORANGE V-6" 1'-6" 8'-0" 2" UNI-STRUT OR SIMILAR (TYP.) SIDE VIEW F1 2" X 8" LOW PROFILE FLASHER BARRICADE DETAIL NTS: 434 Fayetteville St Suite 1500 Raleigh, NC 27601 (919) 836-4040 www.wsp.com PRELIMINARY NOT RELEASED FOR CONSTRUCTION NC License # F-0165 J Q z 0 LLI 0� z LLI 7> LLI O a LLI (D z ry r") REVISIONS O Q �)Lr) a) N (1)U Q U Z rn� z�� D U) O U z O U) O PROJECT #: 193716-01 DATE: 09/06/2019 DRAWN BY: KR CHECKED BY: TMS TITLE CONSTRUCTION SAFETY AND PHASING PLAN OVERVIEW 6. ALL BARRICADES, AS REQUIRED BY THE STATE, ENGINEER, AND AIRPORT OWNER, SHALL BE INCLUDED IN THE COST OF THE PROJECT. U z Q IL U) 0 SHEET 1.03 0 20' 40' 80' HORIZONTAL SCALE 1 "=40' PHASE 1 NOTES: 1. PRIOR TO START OF CONSTRUCTION, CONTRACTOR TO IDENTIFY TAXIWAY E EDGE LIGHT CIRCUITRY PLACEMENT. TAXIWAY EDGE LIGHTS NOT TO BE DISTURBED DURING CONSTRUCTION. IF DISRUPTION IS UNAVOIDABLE, CONTRACTOR AND AIRPORT OWNER/ ENGINEER TO AGREE ON TEMPORARY ELECTRICAL PLAN. 2. PHASE 1: 2.1. REDIRECT EXISTING DRAINAGE DIRECTLY UPSTREAM OF CONSTRUCTION. 2.2. REMOVE EXISTING TAXIWAY E ASPHALT PAVEMENT (BETWEEN SAW CUT LINES), EXISTING CULVERT AND ASSOCIATED FLARED END SECTION. 2.3. INSTALL PROPOSED PIPE, CATCH BASIN AND HEADWALL. 2.4. PLACE FULL DEPTH HEAVY DUTY ASPHALT AFTER INSTALLATION OF PIPE, CATCH BASIN, HEADWALL IS COMPLETE. 2.5. AFTER PLACEMENT OF ASPHALT, LEAVE A 1.5" DROP OFF THE EDGE OF PAVEMENT AND GRADE EXISTING GROUND AWAY FROM TAXIWAY CENTERLINE. 3. PLACEMENT OF BARRICADES SHALL BE APPROVED BY AIRPORT OWNER AND/OR ENGINEER. CONTRACTOR SHALL PROVIDE AMPLE MATERIALS, EQUIPMENT AND PERSONNEL TO FURNISH, PLACE, MAINTAIN, AND MODIFY BARRICADE LOCATIONS AS DIRECTED. PLACE BARRICADES, JUST OUTSIDE THE TSA, SUCH THAT THEY ARE CLOSEST TO NEAREST OPEN INTERSECTIONS WHERE NECESSARY. 4. WORK WITHIN THE TAXIWAY OFA SHALL BE SUBJECT TO EXTRACTION OF ALL PERSONNEL, EQUIPMENT, AND VEHICLES TO ALLOW FOR THE SAFE, UNINHIBITED PASSAGE OF AIRCRAFT ON THE ADJACENT OPEN TAXIWAY AT THE DIRECTION OF THE AIRPORT OWNER, ENGINEER OR GROUND CONTROL. THE CONTRACTOR SHALL PROVIDE A FLAGMAN AT THE OFA OF TAXIWAY A FOR THE DIRECTING OF AIRCRAFT ON TAXIWAY A DURING THIS PHASE. 5. CONTRACTOR TO ACCESS THE PHASE 1 WORK AREA VIA THE IDENTIFIED ACCESS GATE AND HANGER TAXILANES TO TAXIWAY E. THE CONTRACTOR SHALL MAINTAIN HANGAR TAXILANES AND TAXIWAY E CLEANLINESS AND HAVE AT LEAST ONE WORKING VACUUM TRUCK AND/OR MOTORIZED BROOM ON -SITE DURING ALL WORKING HOURS TO CLEAN THE TAXIWAYS AND TAXILANES FROM ANY MUD, ROCKS, DEBRIS TRACKED ONTO ITS SURFACE FROM CONTRACTOR HAUL ROUTE. PAVEMENT SURFACES SHALL BE INSPECTED FOR FOD PRIOR TO REOPENING TO TRAFFIC. 6. A CLEAN HAUL ROUTE ON ACTIVE TAXIWAYS AND/OR APRONS SHALL BE CONSIDERED INCIDENTAL TO THE CONTRACT AND NO ADDITIONAL PAYMENT WILL BE MADE FOR THIS EFFORT. PHASING LEGEND \\\W PROJECT WORK AREA CONTRACTOR STAGING AREA / CONTRACTOR STOCKPILE AREA ACCESS/HAUL ROUTE LOW PROFILE BARRICADE \ JURISDICTIONAL WETLANDS �\ \\o co � III I � �Y✓ I I I EXISTING PAVEMENTS \ \ b \ -- 13 \ I \ \ 17 _135- — - JJURISDICTIONAL WATERS OF THE US — /VC o / RGF `3l AR. w Q X / / 39.50 �� ^�� TAXIWAY A REDUCED TO ADG II FOR THIS PHASE �O I I 160 I r/ 150 O r RIGHT OF WAY LIMITS \� —151-- 151� �\ —150 \ \ \ \ \ \ ISO- \'R oo O —152— M / / M / CONTRACTOR TO ACCESS I `� ; ' ' s �•' , , PHASE 1 THROUGH THIS GATE —GO160 � � I r ••r-. � ' I � � CO IICDIII FIBER \ 1\ I I J III ) I a I / .759 ,t l J \ \ !�<0 I I I 10 A \ � DO NOT DISTURB — -� ITSA \ \ EXISTING EDGE LIGHTS 1�4FJ� N Rn��/ _C1FA — TAXIWAY A NOTE TO REVIEWER: CONSTRUCTION ADJACENT TO TAXIWAY A TO AVOID CONSTRUCTION IN REDUCED TAXIWAY A TOFA WILL BE DISCUSSED WITH AIRPORT DIRECTOR. TOFA TSA � _153— V CO yW 154— — \ \ by � \\ FIBER 0 / /N / N TOFA TSA 434 Fayetteville St Suite 1500 Raleigh, NC 27601 (919) 836-4040 www.wsp.com PRELIMINARY NOT RELEASED FOR CONSTRUCTION NC License # F-0165 H O� az Uj Q� J Uj ZO O� LLI� LLJ z c� oz cn Q z� =o O REVISIONS 0 Q Oar a) N Q U Z zItE �CoU) 0 U z 0 U) 2 O PROJECT #: 193716-01 DATE: 09/06/2019 DRAWN BY: KR CHECKED BY: TMS TITLE CONSTRUCTION SAFETY AND PHASING PLANS - PHASE 1 z SHEET Q a 1.04 �L KEYMAP 0 20' 40' 80' HORIZONTAL SCALE 1 "=40' PHASE 2 NOTES: 1. PHASE 2: 1.1. REDIRECT EXISTING DRAINAGE DIRECTLY UPSTREAM OF CONSTRUCTION. 1.2. REMOVE NECESSARY HANGAR TAXILANE PAVEMENT, EXISTING CULVERT AND RIP RAP. 1.3. INSTALL PROPOSED PIPE AND CATCH BASIN. 1.4. CONNECT EXISTING PIPE TO THE PROPOSED CATCH BASIN. 1.5. PLACE FULL DEPTH HEAVY DUTY ASPHALT AFTER INSTALLATION OF PIPE AND CATCH BASIN IS COMPLETE. 1.6. AFTER PLACEMENT OF ASPHALT, LEAVE A 1.5" DROP OFF THE EDGE OF PAVEMENT AND GRADE EXISTING GROUND AWAY FROM TAXILANE CENTERLINE. 2. PLACEMENT OF BARRICADES SHALL BE APPROVED BY AIRPORT OWNER AND/OR ENGINEER. CONTRACTOR SHALL PROVIDE AMPLE MATERIALS, EQUIPMENT AND PERSONNEL TO FURNISH, PLACE, MAINTAIN, AND MODIFY BARRICADE LOCATIONS AS DIRECTED. PLACE BARRICADES, JUST OUTSIDE THE TSA OF THE HANGAR CENTERLINE AND/OR AS DIRECTED BY THE AIRPORT OWNER/ENGINEER. 3. WORK WITHIN THE TAXIWAY OFA SHALL BE SUBJECT TO EXTRACTION OF ALL PERSONNEL, EQUIPMENT, AND VEHICLES TO ALLOW FOR THE SAFE, UNINHIBITED PASSAGE OF AIRCRAFT ON THE ADJACENT OPEN TAXIWAY AT THE DIRECTION OF THE AIRPORT OWNER, ENGINEER OR GROUND CONTROL. THE CONTRACTOR SHALL PROVIDE A FLAGMAN AT THE OFA OF TAXIWAY A FOR THE DIRECTING OF AIRCRAFT ON TAXIWAY A DURING THIS PHASE. 4. CONTRACTOR TO ACCESS THE PHASE 1 WORK AREA VIA THE IDENTIFIED ACCESS GATE AND HANGER TAXILANES TO TAXIWAY E. THE CONTRACTOR SHALL MAINTAIN HANGAR TAXILANES AND TAXIWAY E CLEANLINESS AND HAVE AT LEAST ONE WORKING VACUUM TRUCK AND/OR MOTORIZED BROOM ON -SITE DURING ALL WORKING HOURS TO CLEAN THE TAXIWAYS AND TAXILANES FROM ANY MUD, ROCKS, DEBRIS TRACKED ONTO ITS SURFACE FROM CONTRACTOR HAUL ROUTE. PAVEMENT SURFACES SHALL BE INSPECTED FOR FOD PRIOR TO REOPENING TO TRAFFIC. 5. A CLEAN HAUL ROUTE ON ACTIVE TAXIWAYS AND/OR APRONS SHALL BE CONSIDERED INCIDENTAL TO THE CONTRACT AND NO ADDITIONAL PAYMENT WILL BE MADE FOR THIS EFFORT. PHASING LEGEND PROJECT WORK AREA CONTRACTOR STAGING AREA / CONTRACTOR STOCKPILE AREA ACCESS/HAUL ROUTE LOW PROFILE BARRICADE 1 \� \ JURISDICTIONAL WETLANDS \ 170 I i �C 135� I I I y I I I w L/ I < \ I X \ —\ b /� -- \ 1,3\ \ \ \ I i _ -140— - JJURISDICTIONAL WATERS OF THE US — / /39.50' 14, TAXIWAY A REDUCED TO ADG II FOR THIS PHASE TOFA — TSA �o BARRICADE PLACEMENT TO BE DICTATED BY THE AIRPORT OWNER AND/OR ENGINEER J-7 Lj PLACE IN LINE WITH FRONT OF HANGAR EL = _J&r 150 r 150 RIGHT OF WAY LIMITS J ~ v\ \ —151-- 151� �\ —150 \ \ \ \ \ \ �'So — \ \ �p Ioo I I FF I I NOTE TO REVIEWER: PROPOSED GRADES IN THIS AREA EXCEED ALLOWABLE LIMITS WITHIN THE TSA, PER THE CURRENT AC. THIS IS AN EXISTING SITUATION AS WELL. DISCUSSIONS ON THIS TOPIC WITH AIRPORT DIRECTOR WILL BE NEEDED. SAWCUT EXISTING PAVEMENT TOFA — — h� TAXIWAY A r� 0 h O M / \ CONTRACTOR TO ACCESS \ PHASE 2 THROUGH THIS _. GATE � mow• _ ._•• F• ❑ r• t• / 155 —aO .•. K'A Co FIBER � Ilj l ��• 111 \ 1\ I I III � I I a / o0 � C DO NOT DISTURB EXISTING EDGE LIGHTS 769 766 . TOFA TSA 152 153 CO oy �— \ C 2" . . FIBER I O 53 hR TOFA TSA 434 Fayetteville St Suite 1500 Raleigh, NC 27601 (919) 836-4040 www.wsp.com PRELIMINARY NOT RELEASED FOR CONSTRUCTION NC License # F-0165 H O� az Uj Q2 J LJJ ZO O0� 0 LLI� Uj cn Q z� =o O REVISIONS PROJECT #: 193716-01 DATE: 09/06/2019 DRAWN BY: KR CHECKED BY: TMS TITLE CONSTRUCTION SAFETY AND PHASING PLANS - PHASE 2 z_ SHEET Q Co 1.05 IL U) mtY KEYMAP 0I 0 20' 40' 80' HORIZONTAL SCALE 1 "=40' PHASE 3 NOTES: 1. PRIOR TO START OF CONSTRUCTION, CONTRACTOR TO IDENTIFY APRON EDGE LIGHT CIRCUITRY PLACEMENT. EDGE LIGHTS NOT TO BE DISTURBED DURING CONSTRUCTION. IF DISRUPTION IS UNAVOIDABLE, CONTRACTOR TO AND AIRPORT OWNER/ ENGINEER TO AGREE ON TEMPORARY ELECTRICAL PLAN. 2. PHASE 3: 2.1. REDIRECT EXISTING DRAINAGE DIRECTLY UPSTREAM OF CONSTRUCTION. 2.2. REMOVE EXISTING ROAD ASPHALT PAVEMENT (BETWEEN SAW CUT LINES), EXISTING CULVERT AND ASSOCIATED RIPRAP AND METAL WING WALLS. 2.3. INSTALL PROPOSED PIPES AND CATCH BASINS. 2.4. TIE IN EXISTING PIPES FROM THE EAST. 2.5. PLACE FULL DEPTH LIGHT DUTY ASPHALT AFTER INSTALLATION OF PIPES AND CATCH BASINS IS COMPLETE. 2.6. AFTER PLACEMENT OF ASPHALT, LEAVE A 1.5" DROP OFF THE EDGE OF PAVEMENT AND GRADE EXISTING GROUND. 3. PLACEMENT OF BARRICADES WILL BE APPROVED BY AIRPORT OWNER AND/OR ENGINEER. CONTRACTOR WILL PROVIDE AMPLE MATERIALS, EQUIPMENT AND PERSONNEL TO FURNISH, PLACE, MAINTAIN, AND MODIFY BARRICADE LOCATIONS AS DIRECTED. PLACE BARRICADES, JUST OUTSIDE THE TSA, SUCH THAT THEY ARE CLOSEST TO NEAREST OPEN INTERSECTIONS WHERE NECESSARY. 4. CONTRACTOR TO ACCESS THE PHASE 3 WORK AREA VIA THE IDENTIFIED ACCESS GATE. THE CONTRACTOR WILL HAVE AT LEAST ONE WORKING VACUUM TRUCK AND/OR MOTORIZED BROOM ON -SITE DURING ALL WORKING HOURS TO CLEAN THE ROAD FROM ANY MUD, ROCKS, DEBRIS TRACKED ONTO ITS SURFACE FROM CONTRACTOR HAUL ROUTE. PAVEMENT SURFACES SHALL BE INSPECTED FOR FOD PRIOR TO REOPENING TO TRAFFIC. 5. A CLEAN HAUL ROUTE WILL BE CONSIDERED INCIDENTAL TO THE CONTRACT AND NO ADDITIONAL PAYMENT WILL BE MADE FOR THIS EFFORT. PHASING LEGEND PROJECT WORK AREA CONTRACTOR STAGING AREA / CONTRACTOR STOCKPILE AREA .00-41111- ACCESS/HAUL ROUTE LOW PROFILE BARRICADE \ JURISDICTIONAL WETLANDS / 1 \170 00 135� 30 h 10 \ \ 1,3\ I \ \ \ I CL �140 i -140— JURISDICTIONAL ^ URISDICTIONAL — — WATERS OF THE US / 0 N C ¢ onr-n �n/on 11� ERM w Q X T/ 1A r RIGHT OF WAY LIMITS \� —151-- 16, \ �\ —150 \ \ \ \\ �15o,\� \ \ oo BARRICADE PLACEMENT TO BE DICTATED BY THE AIRPORT OWNER AND/OR ENGINEER SAWCUT EXISTING--�� PAVEMENT I I 1 I I I �I PLACE IN LINE WITH ♦\� I FRONT OF HANGAR / TOFA \ / TOF / TSA - Ir_1:4Aacvi_l 150 h \ M / / CONTRACTOR TO ACCESS -PHASE 3 THROUGH THIS TI/ GATE _ 155 —_ —Co - , �( 160 I Co II I FIBER - I I o � J e / TOFA rn J TSA �S \ 152 CO oy 154 — \ 152 -� \ C 2" FIBER I O / 53 el TSA TOFA 434 Fayetteville St Suite 1500 Raleigh, NC 27601 (919) 836-4040 www.wsp.com PRELIMINARY NOT RELEASED FOR CONSTRUCTION NC License # F-0165 O Q Oar n/ N ) � Q U Z �c rn� z�� ::) �U) O U z O U) 2 O REVISIONS PROJECT #: 193716-01 DATE: 09/06/2019 DRAWN BY: KR CHECKED BY: TMS TITLE CONSTRUCTION SAFETY AND PHASING PLANS - PHASE 3 z_ SHEET Q 1.06 IL KEYMAP 0 20' 40' 80' HORIZONTAL SCALE 1 "=40' PHASE 4 NOTES: 1. PHASE 4: 1.1. REDIRECT EXISTING DRAINAGE DIRECTLY UPSTREAM OF CONSTRUCTION. 1.2. REMOVAL OF EXISTING RIPRAP. 1.3. INSTALL PROPOSED PIPES, JUNCTION BOXES AND PIPE COLLARS. 1.4. TIE IN EXISTING PIPES FROM THE NORTH. 1.5. REMOVE AND REPLACE EXISTING FENCE. 2. CONTRACTOR TO ACCESS THE PHASE 4 WORK AREA VIA THE IDENTIFIED ACCESS GATE. PAVEMENT SURFACES SHALL BE INSPECTED FOR FOD PRIOR TO REOPENING TO TRAFFIC. 3. A CLEAN HAUL ROUTE ON ACTIVE TAXIWAYS AND/OR APRONS SHALL BE CONSIDERED INCIDENTAL TO THE CONTRACT AND NO ADDITIONAL PAYMENT WILL BE MADE FOR THIS EFFORT. PHASING LEGEND PROJECT WORK AREA CONTRACTOR STAGING AREA / CONTRACTOR STOCKPILE AREA ACCESS/HAUL ROUTE \ JURISDICTIONAL WETLANDS 70 I J � r I I I I I I I LLI I � X 30 10 n J — —135- / 140 F �_ —_—_ i — -140— TSA — - JJURISDICTIONAL —_— — _ _ — WATERS OF THE US / 4001 T \ \ 'ems.Ilk ER m 150 RIGHT OF WAY LIMITS —152— � M / CONTRACTOR TO ACCESS v \ PHASE 4 THROUGH THIS I -• GATE 1 / 155, — --00 160 Co 160 / A / ' ❑� CO II' (�� / r�= I I I FIBER Co � I � I / / :�• 1 1 1 � I � I o TOFA TSA 7159 Co / 150 TOFA — TOF \ TSA — I tS TAXIWAY A S6, >�153— V CO yW 154— `152 -� \ \2"�\\ FIBER O r '4D TSA TOFA 434 Fayetteville St Suite 1500 Raleigh, NC 27601 (919) 836-4040 www.wsp.com PRELIMINARY NOT RELEASED FOR CONSTRUCTION NC License # F-0165 0 Q Oar � N Q U Z J rn Z E ::)�U) 0 U Z 0 U) 2 0 REVISIONS PROJECT #: 193716-01 DATE: 09/06/2019 DRAWN BY: KR CHECKED BY: TMS TITLE CONSTRUCTION SAFETY AND PHASING PLANS - PHASE 4 z_ SHEET Q 1.07 IL KEYMAP 0 20 40' 80' HORIZONTAL SCALE 1 "=40' GENERAL NOTES: 1. TOPOGRAPHICAL SURVEY INFORMATION PROVIDED BY WSP USA, INC. (LICENSE #F-0165). INFORMATION PROVIDED FOR ENGINEERING DESIGN PURPOSE ONLY. NOT FOR RECORDATION. 2. JURISDICTIONAL DELINEATION PERFORMED BY WSP USA, INC. 3. CONTRACTOR SHALL VERIFY ALL EXISTING OVERHEAD AND UNDERGROUND UTILITIES BEFORE COMMENCING CONSTRUCTION. PIPE INV:147.33' RIM:150.24' IN(NW):142.94' IN(NE):142.64' OUT:142.54' %yT PIPE INV:147.17' BRICK SIGN OA- ` DI GRAVE F/eFR IN(SW):146.98' l'FQJ 7S7 �� IN(NW):146.99' OH OUT:146.94'\- W � > RIGHT OF WAY LIMITS SM RETAIN PIPE INV.146.08' /-PIPE INV:146.05' / 434 Fayetteville St Suite 1500 Raleigh, NC 27601 j'15o / DOUBLE DI (919) 836-4040 UQ www.wsp.com /IRIM:150.51' N(SW):146.51' IN(NW):146.21' Ica IN(NW):146.21' RETAIN IN(NE):146.51 OUT(SE):146.01' RCp __� OUT(SE):146.0 ' PIPE INVA47.90' \ oyy /:147.15' \ \ FES INV:14o-7r- 152- PIPE INV 148 7171 '\ PIPS V:144.37' �\ �` RC / FES INV: 47.14' NN �K r o o 41) v' ASPH 8 INSTALL SAW CUT LINE 20' FROM CENTER REMOVE EX. OF PIPE I \ CHANNEL ' C REMOVE AND STORE CUL RT INV:145.61' �,� c APPX. 220 LF OF FENCE UILDING j � �1�0 r IbN FIBER MARKINGS WA -15 \ RETAIN \ V � � r PIPE INV:143.89' ` REMOVE EX. CULVERT: 104"X30"PH ARCH CULVERT AREA RAIN / `CMP DOME AND ENDWALLS �OUT:147.55' RETAIN METAL WING WALL CULVERT INV:145.61' I 1 VC ~AMBULANCE ~ I I 15" RCP . jT••;. PIPE INV:147.02' j '' x 'CHARGING STATIONS'-% IPIPE INV:147.27' �O =r PROPANE TANK- - I ASPH r II � � � I PIPE ENDS t. I 160 / / _NOT FOUND Co ' J ILo) I I FIBER / I I PIPE INV-148.83' I BUILDING IN SLABINLET WE JURISDICTIONAL REMOVE 19' OF EX. / /12" P/C INV INACCESSIBLE \� LANDS 18" RCP & II l r ` ` OXY GEN TANIN IN COLLAR RETAIN SEE DETAIL 6.1 2 PIPE INV144.55' I �\/ / I CONCRETE FLUME I % \ \ RO \ I BUILDING \ \ \ \ \ \ I I I PIPE INV:144.21' I/ / / /INN/IN BUILDING / l I REMOVE EX. I 1 BUILDING CHANNEL SAW CUT EX. ASPH DI 1 I I \ �Y✓ PAVEMENT / RIM:159. 7' ASPH J � ASPH 18" RCP DI / I REMOVE EX. FES i RETAIN RIM:158.53' IN:145.63' I I I I I I I SAW CUT EX. \ p r OUT:145.66' I I I PAVEMENT 20' FROM / /�� ASPH \ W CENTER OF PIPE REMOVE EX. `,S9 30 RCP 13s \ \ I \ / 'K-PIPE INV:141.28' I l ri l \ FES INV:136.18' rn � � SPHOD 150- J e \ �_\� I / PIPE INV:139.56' / l JS U - �140 �// J / 0" RCP �_ a�/ REMOVE EX. \ _ / / CHANNEL \ - _140 =40 JURISDICTIONAL -_� jj� / r - / TAXIW Y E� / / REMOVE EX. / I m WATERS OF THE US // � / � \ \ 30 RCP a ASPH h O `) \SQH S ,"S �\ ASPH ASPH TAXIWAY A R ASPH 0 a m RETAIN 153' PVC CO OUT:14.31' FES INV:149.14' h OUT:44.81 PIPE INV:149.10,-15 - PIPE INV:149.98' `1 \ w 152 \2"FIBER PIPE END NOT FOUND / 3 -1 BUILDING RETAIN w U U_ w O WOOD DECK GAS TANK PRELIMINARY NOT RELEASED FOR CONSTRUCTION NC License # F-0165 H OU) � Z LLJ Q� J W z 0 O(D w� O�w z (D oz U)< Z� =o O 1 REVISIONS O Q IY Lo Q U U z C/)� zIt Z)(y) Cl) O U z O C0 z O PROJECT #:193716-01 DATE: 09/06/2019 DRAWN BY: VMK CHECKED BY: ECG TITLE EXISTING CONDITION & DEMOLITION z SHEET a a Co 2.0 a WIIIIIIIIIIIIIIIIII INSET \ \\ CONNECT PROP. PIPE CONNECT PROP. PIPES W/2° COLLAR- 4SEE DETAIL SEE DETAIL 2�\ \ 6.1 20' of 42" @ 3.00%� PIPE INV:147.33' S RIM:150.24' PIPE INV:146.08' / Aso % IN(NW):142.94' PIPE INV:146.05' 434 Fayetteville St IN(NE):142.64' OUT:142.54' Suite 1500 �7G6y 1 OPIPE I 47.17' BRICK SIGN ,� �'qy Fje RIM:149.84I Raleigh, NC 27601 �yL GRAVE FR IN(SW):146.98' (919) 836-4040 Fps 7S7 IN(NW):146.99' Uy150 / OH OUT:146.94' Q DOUBLE DI www.wsp.com �2 vRIM:150.51' \ \ T Q /IN(SW):146.51' lg., �G IN(NW):146.21' p RCp Ica v� IN(NW):146.21' RIGHT OF WAY LIMITS IN(NE):146.51 FIBER MARKINGS 24„ OUT(SE):146.01' 0 20' 40' 80' RCp OUT(SE):146.01' 151- T N:654129.0609 \ WATER LINE HORIZONTAL SCALE 1 "=40' E:2180913.1957 -15 \ 18"RCp PIPE INV:147.90' INSTALL SALVAGED _ S EXISTING FENCE \ \ \ °� ` oQ \ oy SEE INSET, IN PROPOSED �w LOCATION \ \ \�50, �Lq �\ PIPE INV THIS SHEET FES 148 ' 152- 0P PIPE INV 4 PIPE NV:143.89' ••F'' g• / PIPE NV:144.37' 15 S pVC CO OUTRIM:: 4.31' 8' RCp FES INV:149.14' h �- OUT:44.81 i \i\ 8 PIPE INV:149.10'-154- -- FES \\ \\ RCp PIPE INV:149.98' CB-1 / INV:147.14' RIMA47.76 V / / ` by _ (NW) INV INA40.24 / J 52 �� INV OUTA40.24 SEE DETAIL 3 NN N 6.1 V � I �\ CONNECT TO EXISTING / �` I O \ 2", FIBER GATE POST PE END I / / PI\\\i\\ \\\� INSTALL SAW CUT ` N ASPH @ NOT FOUND LINE 20' FROM CENTER V \ / �� I 1bb / I / OF PIPE I � -TZ2� of 48" RCP @�- INSTALL LIGHT DUTY ASPHALT PAVEMENT INSIDE SAWCUT LINES � CUL RTI :145.61' ' 3 71' of 48" RCP SEE DETAI CI, 6.3 UIL G @ 0.50% EXTEND EX. 12" PVC CB-2 i� .`'�tK WITH 45° BEND TO RIM:147.00 51 / CATCH BASIN (NW) INV IN:139.89 CB -3 META INc W L INV OUT: 139.89_ RIM:147.25 SEE DETAIL, fi 1 / / / WOOD D (NW) INV IN:139.58 ULVERT: PH AREA DRAIN 104"X30" M/ i\ (NE) INV IN:142.83 CM OE ASPH �OUT:147.55' / ASPH Uj U WOOD DECK INV OUT:139.58 ® 62' of 48" RCP / / / o SEE DETAIL ,METAL WING WALL @ 0.50/° / EXTEND EX. 15" RCP -- -_ 6 1 I Z, PVC W/ (1) 45° ELBOW CULVERT I I> TO CATCH BASIN • A/C P I / 15" RCP : ~4 AMBULANCE ` RAVEL CB-4 I PIPE INV:147.02' j 'CHARGING STATIONS'"' GRAVEL 11 of 15' RCP RIM:146.50 ( (NW) INV IN:139.15 I PIPE INV:147.27' 44.30 / j �, . / 5_ -GO GAS TANK INV OUT:139.15 87' of 5 " RCP /' / 1 PROPANE TANK-// / SEE DETAIL @ 3 0.50% ( r - PIPE ENDS f 160 V _NOTFOUND I 0 CO 1 I /Lo )'I J I } I I FIBER EXTEND EX. 121, PVC PIPE INV:1 II / I I BUILDING BUILDING TO CATCH BASIN PRELIMINARY NOT RELEASED FOR CONSTRUCTION NC License # F-0165 0 z - LLJ O LLJ T_ z 0 0 tY Lp � N Q U Z rn� I (D W SLABINLET REMOVE 19' OF EX. \ / / /12" PVC `,• LIQUID INV INACCESSIBLE O 18" RCP & INSTALL I / / ' ' OXYGEN TANKS Uj U 3° COLLAR I // % I CONCRETE FLUME STORM DRAINAGE PIPE & GRADING NOTES: w Z SEE DETAIL 2 PIPE INV:144.55' - I / // � / O w 6.1 II S I (t = z 69 of 54 RC / 1. PROJECT TOPOGRAPHY AND EXISTING CONDITIONS GROUND - CONTROLLED SURVEY o @ 0.50% 'll /// PROVIDED BY WSP USA, INC. } U) Rc INSTALL HEAVY DUTY BUILDING PIPE INV:144.21' %' h / C O z BUILDING ASPHALT PAVEMENT I I( / // ) 2. PROPOSED PIPE INVERT ELEVATIONS HAVE PRECEDENCE OVER SLOPES. HOWEVER, w _ \ \ BUILDINGISIDE SAWCUT LINES / I / / / �o SLOPES SHALL NOT BE DECREASED FROM THOSE SHOWN ON THE PLANS WITHOUT PRIOR w Q I \ \ \ 1 I SEE DETAIL / / APPROVAL FROM THE ENGINEER. 0_ �%� \ I I I 6.3 �/ \ I SAW CUT EX. / ASPH / co a PAVEMENT DI 3. ALL STORM DRAINAGE PIPE TO BE CLASS III REINFORCED CONCRETE UNLESS OTHERWISE Q ASPH / DI 0 J \ 1 NOTED. PIPE LENGTHS INDICATED ON PLANS ARE APPROXIMATE. o \ ASPH / / / % ��. / NOTED. � J//- z 4. NO SOIL DISTURBANCE OR COMPACTION, CONSTRUCTION MATERIALS, TRAFFIC, o Q,/ // ® ' TRENCHING, OR OTHER LAND DISTURBING ACTIVITY SHALL BE PERMITTED BEYOND THE CO HW-1 / / Vic' / -\ 1$" RCP LIMITS OF DISTURBANCE WITHOUT PRIOR APPROVAL FROM THE PROJECT ENGINEER. w / l o o ( RIM:140.56 o O J 5. THE CONTRACTOR SHALL IMMEDIATELY REPORT TO THE ENGINEER ANY DISCREPANCIES / c (NE) INV IN.136.18 , 0� SEE DETAIL FOUND BETWEEN THE ACTUAL CONDITION AND CONSTRUCTION DOCUMENTS AND SHALL / 6RIM: RIM:158.5„ IM:146.75 .1 i DI WAIT FOR INSTRUCTION FROM THE ENGINEER PRIOR TO PROCEEDING. o � � = IN:145.63' (NW) INV I IN:138.81 I I I SAW CUT EX. \ 222' of 54" RCP / OU�5.66' (E) INV IN:141.82 6. ALL PROPOSED GRADES ARE FINISHED GRADES. z \ I I I I I PAVEMENT 20' FROM - @ 0.50% / / /// ASPH \ INV OUT:138.81LU CENTER OF PIPE \ /ll l� SEE DETAIL 1 CONSTRUCTION NOTES: ° _ / PIPE INSTALLATION TO co � / � � PIPE INV:141.28' / / ( 19 of 18 RCP co 307' of 54" RCP BE PERFORMED WITHOUT ° \ \ r \ \ I I @ 0.50% \ \ \ \ ^°`/ IMPACTING EDGE LIGHTING @ 17.07 /0 1. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH JOHNSTON COUNTY AND/OR NCDOT "o - FES INV.136.18' I I > STANDARDS AND ADHERE TO PERMIT CONDITIONS FROM THE ARMY CORPS OF LU \ sPH \ \ \ \ / I ENGINEERS, NCDEQ, OR ANY OTHER APPLICABLE PERMITTING AGENCY. I = REVISIONS 150 l I a / PIPE INV:13956' I 2. THE CONTRACTOR SHALL CONDUCT THE WORK IN A SAFE MANNER AND WITH A MINIMUM o _ STORE AND REPLACE 1 - _ ' /�h�� ( \ EX. SIGN AMOUNT OF INCONVENIENCE TO TRAFFIC. Z -135 _ JJ ' 30" RCP /�/ I I \ 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TRAFFIC CONTROL AND SHALL o 1 / U - INSTALL RIPRAP 14 I �/ //l ` a � % I I ADHERE TO THE PROVISIONS OF THE MUTCD (MOST CURRENT EDITION). o _140= = OUTLET PROTECTION " /^ / / / / I \ a LENGTH= 29 FT - _,// / TAXIW Y Fi / / I 4. THE CONTRACTOR SHALL OBTAIN A RIGHT-OF-WAY OBSTRUCTION PERMIT FOR ANY WORK WIDTH 20-33.5 FT - - - / / J \ \ WHICH REQUIRES THE TEMPORARY CLOSURE OF A STREET, TRAVEL LANE, PARKING o CLASS I RIPRAP �/ / CB-6 SPACE OR SIDEWALK FROM RIGHT-OF-WAY SERVICES AT LEAST 48 HOURS IN ADVANCE. SEE DETAIL 5 i' / RIM:146.00 I w / 6./ _� / / (NW) INV IN:137.70 / 5. PRIOR TO CONSTRUCTION BEGINNING, ALL SIGNAGE AND TRAFFIC CONTROL SHALL BE IN o / INV OUT:137.70 / ASPH PLACE. z SEE DETAIL o Q �/ ��� / \� G PROJECT #:193716-01 DATE: 04/23/2020 \SPH �� ° R' 6.1 S 6. THE CONTRACTOR SHALL REPAIR ALL DAMAGED INFRASTRUCTURE AND RESTORE IT TO o ASPH ChM TAXIWAY A ��h PREVIOUS OR BETTER CONDITION. Uj �StQ 7Rv\ G \ \ \ ASPH INSTALL HEAVY DUTY ASPH / ` DRAWN BY: VMK CHECKED BY: ECG \ ASPHALT PAVEMENT 7. THE CONTRACTOR SHALL REPAIR ANY DAMAGES TO ADJACENT PROPERTIES AND w of TITLE INSIDE SAWCUT LINES RESTORE IT TO PREVIOUS OR BETTER CONDITION. a PROPOSED DRAINAG SEE DETAIL" = PLAN 6.3 8. ALL SIDEWALKS MUST BE ACCESSIBLE TO PERSONS WHO ARE VISUALLY IMPAIRED AND PEOPLE WITH MOBILITY DISABILITIES. PEDESTRIAN EXISTING ROUTES AND ALTERNATE PEDESTRIAN ROUTES DURING CONSTRUCTION WILL BE REQUIRED TO BE COMPLIANT Q WITH THE PUBLIC RIGHTS OF WAY ACCESSIBILITY GUIDELINES (PROWAG), 2010 ADA z SHEET STANDARDS FOR ACCESSIBLE DESIGN AND THE MANUAL ON UNIFORM TRAFFIC CONTROL W DEVICES (MUTCD). U) 3.0 0 A �e��C C Ricy TO qy ��FpJ �7S PIPE INV:147.33' RIM:150.24' PIPE INV:146.08' IN(NW):142.94' PIPE INVA46.05' IN(NE\ OUT:1 2.54'4' 434 Fayetteville St OUT:142.54' Suite 1500 N'N P/e RIM:149.84 PIPE 147.17' BRICK SIGN I Raleigh, NC 27601 AVE FR IN()8Q /` (919) 836-4040 (NW):146.99' \ / 150 OUT:146.94' Q� DOUBLE DI www.wsp.com RIM:150.51' \ T �� Q /IN(SW):146.51' 1,9" �O OIN(NW):146.21' / \ 0 RCA �� IN(NW):146.21' RIGHT OF WAY LIMITS �6 IN(NE):146.51 FIBER MARKINGS OUT(SE):146.01' 2q -151- RCp OUT(SE):146.01' \ 1S1 0 20' 40' 80, -150 \� WATER LINE T BEGIN SURFACE SWALE 'I-,\ Q RCp PIPE INVA47.90' HORIZONTAL SCALE 1 "=40' INV:147.78so� p�\PIPE INV:147.15' \ `79 _ NV 148� 152- P PI STORM DRAINAGE PIPE & GRADING NOTES: \ \ \� FES I ' pPE INV:14\' PIP I V:143.89' 153' s8 !'VC CO RIM:154.31' 1. PROJECT TOPOGRAPHY AND EXISTING CONDITIONS GROUND - CONTROLLED SURVEY / 'E� NV:�7' �` 1 V i\ 8"RCp FES INVA49.14' h �- OUT:144.81 PROVIDED BY WSP USA, INC. PROPOSED LIMITS \�\ PIPE INV:19.14' _ OF GRADING (TYP) -- \\�\ 18"RC PIPE INV:149.98' 154- 2. PROPOSED PIPE INVERT ELEVATIONS HAVE PRECEDENCE OVER SLOPES. HOWEVER, I G DC% 1�0 INV� 7.14' \ \ SLOPES SHALL NOT BE DECREASED FROM THOSE SHOWN ON THE PLANS WITHOUT PRIOR V V APPROVAL FROM THE ENGINEER. / I / w I / 00 GT4 152 -\\� 3. ALL STORM DRAINAGE PIPE TO BE CLASS III REINFORCED CONCRETE UNLESS OTHERWISE N� NOTED. PIPE LENGTHS INDICATED ON PLANS ARE APPROXIMATE. r Vv V 12_� 4. NO SOIL DISTURBANCE OR COMPACTION, CONSTRUCTION MATERIALS, TRAFFIC, `so I I II\PE\END \\\\ \2\\�\�\\i FIBER I / TRENCHING, OR OTHER LAND DISTURBING ACTIVITY SHALL BE PERMITTED BEYOND THE I !Y / / N ASPH g NOTFOUND LIMITS OF DISTURBANCE WITHOUT PRIOR APPROVAL FROM THE PROJECT ENGINEER. INLET TOP / � 5. THE CONTRACTOR SHALL IMMEDIATELY REPORT TO THE ENGINEER ANY DISCREPANCIES EL:147.76 B GIN SURFACE SWALV �o FOUND BETWEEN THE ACTUAL CONDITION AND CONSTRUCTION DOCUMENTS AND SHALL I ��I I IN :149.00 / WAIT FOR INSTRUCTION FROM THE ENGINEER PRIOR TO PROCEEDING. I I� GT ' 6. ALL PROPOSED GRADES ARE FINISHED GRADES. CULVERT INV:145.61' INLET TOP BUILDING EL:147.00 1 .15 METAL WING WALL / WOOD DECK', INLET TOP CULVERT: PH / / ASPH AREA DRAIN / \\\ "X30" CMP DOME I /OUT:147.55' / ASPH \i\ v EL:147.25 ® / WOOD DECK LL METAL ING WALL j 12" PVC CULVER NV:145.6/ I 1 15" RCP ~` AMBULANCE ^^ . RAVEL I PIP INV:1 02' - / I 'CHARGING STATIONS' GRAVEL IPIF�E INV:147.27' - I ! J / �14 5 5 - _CO GAS TANK yy ( t// - -PROPANE TANK- f / / ASPH I v y I PIPE END f / 160- I d S I 160 _ NOT FOUND 0 CO CONSTRUCT SWALE BETWEEN I J I II r '1 III FIBER PROPOSED INLETS P14 INV:148.83' / `^' I I BUILDING BUILDING / ^• ~ J I I I SLAB INLET ' 12" PVC . ^+ LIQUID INV INACCESSIBLE I OXYGEN TANK \ PIPE IN�/:144.55 v0) Lo __1' / / I CONCRETE FLUME Q GTD " I p I � BUILDING 0" \ \ \ CD I BUILDING BEGIN SURFACE SWALE II �' / ) I \ \ Co \ BUILDING INLET TOP ,✓ / / �� \ I I I I EL:146.75 RIM:159 / .27' ASPH 1 1 J ASPH / / -'mac?, / / OUT:148.76' CONSTRUCT / / Colo SURFACE SWALE / Q, BEGIN SURFACE SWALE 0 1a" RCP INVA47.00 aQ) _ / DI RIM:158.53' SLOPE FROM FENCELINE GXDOUT:145.66' TO PROPOSED SWALE GRADE GAI ASPH \ 7S9 '40 / \� PIPE INV:141.28' / I INLET TOP I \ / / \ FES INV:136.18' EL:146.00 o I I / -135 j 0" RCP J I \ \ \ a TAXIW Y E_- C ASPH \ o \SPH 7 o As �� ASPH ChM TAXIWAY A i BRA AS \ \ ASPH / ASPH PRELIMINARY NOT RELEASED FOR CONSTRUCTION NC License # F-0165 OU) � Z LLJ Q� J LLI z 0 O� CD � LLI� O�w z cD oz I_ cn Q Z � =o 0 m I REVISIONS O Q 0� Lo r` � N Q U U z ��U) O CU Z O U) 2 O o PROJECT #:193716-01 DATE: 04/23/2020 LU w DRAWN BY: VMK CHECKED BY: ECG of TITLE w PROPOSED GRADING PLAN J J Q z_ SHEET a Cl) U) 3.1 0 Main Pipe Alignment 156 152 • 144 HW-1 TOP:140.56 STA. 0+54.47 --- (NE) INV INA36.18 140 136 132 0-f B-3 TOP:149.32 P OPOSE FGROUND ( YP) B-2 (NW) INV IN:14 .45 EX GROUND CB 4 CB-3 OP:147. 0 C -1 (NE) INV INA .23 CB-6 - STA. 6+50. 7 STA. 36.58 TA.7+9 NW) INV •92 N:139.89 T STA. P:147.76 8+68. 7 I OUT:14 .85 COL TOP:146.00 (NW) IN IN:139.15 (N )INV IN: 39.58 INV OUT: 139.89 N INV I :140.24 EX. R NV OUT: 39.58 IN OUT:14).24 STA. 3+60.86 - (NW) INV I N: 13 7.70 CB-5 STA 5+82.02 NW) INV N:138.81 INV O T:138.81 71' 0 48" RCP 122' of 48" RCP - 18' of 42" R „ 12% 50 9 of 54 RCP of @ 0.5 0. ° 222' of 5 " RCP- - @ 0.50 ° 0% 307' o 54" RCP IV - - - 0.50% 62' 0 48" RCP IV @ 0. 0% R+Inn �n+nn 4 a+Inn 1n-f nn +nn 9+nn i+nn 4+nn �+nn n+nn 7+Inn Side Pipe Alignment - West JB-2 152 _ 152 RIM:149.27 COLLAR TO STA. 9+90.93 X. RCP (NW) INV IN:143.31 JB-3 INV OUT:143.31 RIM:149.32 STA. 9+89.60 148 148 �(NW) INV IN:143.45 EX. 42" RCP / (NE) INV IN:143. (SW) INV IN:143.1.11 @ 3.21% INV OUT:140.85 20' of 42" RCP @ 3.00% 6' of 42" RCP @ 3.51 % 140 0+00 144 �,,_122' of 48" RCP @ 0.50% 140 0+50 Side Pipe Alignment - East J B-4 RIM:149.45 STA. 9+89.60 (NW) INV IN:143.43 INV OUT:143.43 EX. 30" RCP @ 0.06% JB-1 RIM:150.89 STA. 10+12.19 (N) INV IN:147.14 INV OUT:143.54 152 152 148 JB-3 148 RIM:149.32 STA. 9+89.60 �(NW) INV INA43.45 (NE) INV IN:143.23 (SW) INV IN:143.11 144 INV OUT:140.85 144 23' of 30" RCP @ 0.49% 140 �-- 0+00 5' of 42" RCP @ 4.03% 4' VERTICAL 2' SCALE 1'=4' 0 122' of 48" RCP @ 0.50% 140 0+75 0 20' 40' 80' HORIZONTAL SCALE 1 "=40' STRUCTURE TABLE STRUCTURE NAME: DETAILS: PIPES IN: PIPES OUT NORTHING EASTING J13-1 RIM = 150.89 30" INV IN=147.14 30" INV OUT=143.54 654212.00 2181018.97 J13-4 RIM = 149.45 30" INV IN=143.43 42" INV OUT=143.43 654192.65 2181030.07 J13-3 RIM = 149.32 42" INV IN=143.45 42" INV IN=143.23 42" INV IN=143.11 48" INV OUT=140.85 654188.91 2181024.21 J13-2 RIM = 149.27 42" INV IN=143.31 42" INV OUT=143.31 654185.51 2181017.32 C13-1 RIM = 147.76 48" INV IN=140.24 48" INV OUT=140.24 654084.75 2181086.42 CB-3 RIM = 147.25 48" INV IN=139.58 15" INV IN =142.83 54" INV OUT=139.58 653993.92 2181175.90 C13-2 RIM = 147.00 48" INV IN=139.89 48" INV OUT=139.89 654024.50 2181122.73 C13-5 RIM = 146.75 54" INV IN=138.81 18" INV IN=141.82 54" INV OUT=138.81 653917.52 2181310.27 C13-4 RIM = 146.50 54" INV IN=139.15 54" INV OUT=139.15 653951.16 2181250.77 C13-6 RIM = 146.00 54" INV IN=137.70 54" INV OUT=137.70 653729.07 2181426.03 HW - 1 RIM = 140.56 54" INV IN=136.18 653448.48 2181302.85 156 152 4R TO .P 148 --EX. 42" RCP @ 2.48% 144 140 136 132 50 434 Fayetteville St Suite 1500 Raleigh, NC 27601 (919) 836-4040 www.wsp.com PRELIMINARY NOT RELEASED FOR CONSTRUCTION NC License # F-0165 1 REVISIONS 1 PROJECT #:193716-01 DATE: 09/06/2019 1 DRAWN BY: VMK CHECKED BY: ECG TITLE PROPOSED STORM DRAINAGE PROFILE O1. N1 z a U) SHEET 4.0 0 20 40' 80' HORIZONTAL SCALE 1 "=40' EROSION CONTROL NOTES: 1. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED AND MAINTAINED IN ACCORDANCE WITH THE NCDOT GUIDELINES. 2. ALL CONSTRUCTION ACTIVITIES MUST TAKE PLACE WITHIN THE LIMITS OF THE DISTURBANCE, INGRESS/EGRESS EASEMENTS, OR TEMPORARY CONSTRUCTION EASEMENT ONLY. ACTIVITIES OUTSIDE OF THESE SPECIFIC AREAS ARE STRICTLY PROHIBITED. 3. NO STOCKPILING OF SOIL IS ALLOWED ONSITE. ALL WASTE MATERIAL AND CONSTRUCTION DEBRIS SHALL BE DISPOSED OF BY THE CONTRACTOR AT A CONSTRUCTION AND DEMOLITION LANDFILL OR OTHER FACILITY IN POSSESSION OF AN EROSION AND SEDIMENT CONTROL PERMIT AS WELL AS ANY/ALL OTHER APPLICABLE PERMITS. 4. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING THE CONSTRUCTION SITE IN A SAFE AND ORDERLY CONDITION AND ADHERING TO THE EROSION CONTROL PLAN AS SET FORTH HEREIN. DEVIATION FROM THE EROSION CONTROL PLAN IS NOT ALLOWED WITHOUT PRIOR WRITTEN APPROVAL FROM THE DESIGNER. 5. CONTRACTOR IS RESPONSIBLE FOR REGULAR INSPECTION AND MAINTENANCE OF ALL EROSION CONTROL MEASURES. ALL MEASURES SHALL BE INSPECTED IMMEDIATELY FOLLOWING ANY MEASURABLE STORM EVENT. ANY REQUIRED MAINTENANCE OR REPAIRS SHALL OCCUR AS SOON AS FEASIBLE. 6. CONTRACTOR IS RESPONSIBLE FOR MONITORING WEATHER CONDITIONS, AND FOR TAKING ACTION AS NECESSARY TO STABILIZE THE CONSTRUCTION SITE PRIOR TO FORECASTED/FORESEEABLE STORM EVENTS. 7. CONTRACTOR TO MINIMIZE TRACKING EQUIPMENT AND ASSOCIATED SEDIMENT/DEBRIS FROM THE CONSTRUCTION SITE ONTO THE PUBLIC RIGHT OF WAY. 8. IF IT IS DETERMINED DURING CONSTRUCTION THAT SIGNIFICANT SEDIMENT IS LEAVING THE SITE, DESPITE PROPER IMPLEMENTATION AND MAINTENANCE OF THE EROSION CONTROL MEASURES, THE CONTRACTOR IS OBLIGATED TO TAKE ADDITIONAL CORRECTIVE ACTION. THE CONTRACTOR SHALL CONTACT THE ENGINEER TO DISCUSS ADDITIONAL MEASURES. 9. CONTRACTOR SHALL ESTABLISH GROUND COVER ON DISTURBED AREAS WITHIN 7 OR 14 CALENDAR DAYS AFTER COMPLETION OF ANY PHASE OF GRADING OR INACTIVITY (AS DISPLAYED ON SHEET 6.3). 10. INSTALL TEMPORARY SILT/TREE PROTECTION FENCING AS SHOWN ON THE APPROVED PLAN. INITIAL CLEARING SHALL OCCUR ONLY AS NECESSARY TO INSTALL THESE DEVICES. THE REMAINDER OF CLEARING AND SITE PREP SHALL OCCUR AFTER SILT FENCING HAS BEEN INSTALLED. 11. REMOVE TEMPORARY SEDIMENT AND EROSION CONTROL MEASURES ONCE SITE IS FULLY STABLE. CONTACT THE ENGINEER TO ASSIST ORGANIZING A SITE WALK-THROUGH PRIOR TO REMOVING ANY TEMPORARY SEDIMENT AND EROSION CONTROL DEVICES. 12. THE ENGINEER SHALL BE CONTACTED WITH ANY ISSUES OR CONCERNS REGARDING CONSTRUCTION OR MAINTENANCE OF EROSION CONTROL PRACTICES. 13. THE LANDOWNER, THE FINANCIALLY RESPONSIBLE PARTY, OR THE AGENTS THEREOF SHALL PERFORM AN INSPECTION OF THE AREA COVERED BY THE PLAN AFTER EACH PHASE HAS BEEN COMPLETED AND AFTER ESTABLISHMENT OF TEMPORARY GROUND COVER. 14. NO STAGING OF MATERIALS WITHIN 50 FEET OF OPEN DRAINAGE STRUCTURE. 15. PLACE A LAYER OF SAND, SCREENINGS, OR FINES ON PAVED SURFACES BEFORE DEPOSITING ANY EXCAVATION MATERIALS. 16. CONTACT THE OWNER'S REPRESENTATIVE (PHIL LANIER) AT 919-934-0992 WITH ANY CONCERNS DURING CONSTRUCTION OR ANY SPECIFIC MAINTENANCE ISSUES. 17. TOTAL DISTURBED AREA (ENCOMPASSED BY LOD): 2.1 ACRES. l \ \ \ O \ \ \ I I BUILDING ASPH PIPE INV:147.33' RIM:150.24' PIPE INV:146.08' IN(NW):142.94' PIPE INVA46.05' IN(NE\ OUT:1 2.54'4' 434 Fayetteville St OUT:142.54' PIPE 147.17' BRICK SIGN RIM:149.84I Suite 1500 Raleigh, NC 27601 AVE FR IN():146.98 NW ' Q (919) 836-4040 OUT:146.94' �y150 DOUBLE DI www.wsp.com �ro vQ RIM:150.51' \ \ T �� Q /IN(SW):146.51' 1,9" �O OIN(NW):146.21' / \ 0 RCp �� IN(NW):146.21' �6 RIGHT OF WAY LIMITS IN(NE):146.51 FIBER MARKING\ OUT(SE):146.01' 2q -151 RCp OUT(SE):146.01' 1Sj� T WATER LINE Q \ UQ S RCp PIPE INVA47.90' p�\PIPE INV:147.15' \ FES INV:148. 152- X \ / t GP \ PIPE INV 1\' PIPE INV:143.89' � , g• oL - 153� S F'VC RIM:154.31' J / PIPE INV:144.37' I 1g' FES INV:149.14' y CO �l / / RCp OUT:144.81 PIPE INV:149.10'�154_ _ FES\\��� RCp PIPE INV:149.98' INV:1 14' / \ / U 2 \_\\� o / LOD 0 N VI r VV �?\_ \o _ Q \\ �a �2"��� FIBER I / PIPE END As 8 NOT FOU� VI V \/ \ r I 1g'S \ / O n INSTALL TEMP. ROCK INSTALL GRAVEL �o INSTALL TEMP. ROCK l SILT CHECK C&G CONSTRUCTION_ ENTRANCE SILT CHECK C&G ` C a \ SEE DETAIL � SEE DETAIL T�� (TYP.) % 1kg (TYP.) 6.4 (TYP.) 6.4 INSTALL INLE CULVERT INV:145.61' PROTECTION / BUILDING SEE DETAIL ^ ' (TYP.) 6.4 METAL WING WALL I / / WOOD DECK INSTALL INLET VEME PH / / ASPH AREA RAIN 104"X3 "` MP DOME I �OUT:147.55' / ASPH PROTECTION / (TYP.) \ .® META ING WALL j 12" PVC CULVEINV:145.61' 15" RCP ~� ~� w�AMBULANCE PI E INV:147.02' 'CHARGING STATIONS' " INSTALL TEMP. ROCK ' ` I '. : ' SILT CHECK C&G (TYP.) IPE INV:147.27' - I I //�� 5�- _ _ - _ __Go � PROPANE TANK- - - ASPH ( ( _ 1 y PIPE ENDS f � 160 r NOTFOUND I 0 CO II FIBER INSTALL INLET PROTECTION PI E INV:148.83' (/ I BUILDING (TYP.) 2" PVC I I I SLAB INLET ' ~' ° ' LIQUID INV INACCESSIBLE OXYGEN TANK INSTALL TEMP. ROCK I I IJ ' SILT CHECK C&G PIPE I V:144.55' �� / / I CONCRETE FLUME (TYP.) III ` a I J BUILDING �NV:144 I/ / h BUILDING INSTALL INLET PROTECTION ASPH DI (TYP.) / p RIM:159.27' ASPH / % - -S;l OUT:148.76' CIO \ oz / TEMPORARY SILT FENCE / 1 1 SEE DETAIL 3 /o6 DI RIM:158.53' / TEMPORARY SILT FENCE I '� / \ IN:145.63' ^ \ OU� 5.66' I LOD O` /� ASPH \ `, I S PIPE INV:141.28' I \ \ \ \ NV:136.18' SPH 150 PIPE INV:139 56' 3 �$ 40 i 0.. RCP a TAXIWAY E - , d01 ool \ � I INSTALL TEMP. ROCK SILT CHECK C&G (TYP,) ASPH \ TAXIWAY A INSTALL INLET SAS s \ ASPH �h �`° PROTECTION \ x A ASPH / �11A \ ASPH (TYP.) A �e��C C Ricy TO qy ��FpJ �7S BUILDING w v LL WOOD DECK LL GAS TANK ADDITIONAL SITE INFORMATION: 1. ON -SITE SOILS INCLUDE: -BIBB SANDY LOAM (VERY POORLY DRAINED) -TOISNOT LOAM (POORLY DRAINED) 2. RECEIVING WATER COURSE: SWIFT CREEK 3. ALL AREAS OUTSIDE OF PROPOSED PAVEMENT TO BE STABILIZED WITH VEGETATION. TYPE OF VEGETATION SHALL MATCH THE PRE -CONSTRUCTION SITE CONDITIONS. AREA OF VEGETATIVE ESTABLISHMENT: -2.0 ACRES. FOR SEEDING OF GRASSES, SEE SCHEDULE AND NOTES ON SHEET 6.3. SAME DAY STABILIZATION: AREAS OF MINOR GRADING, WITH THE INTENT OF CONVEYING STORMWATER, SHOULD BE STABILIZED AT THE END OF THE DAY. THESE AREAS INCLUDE GRADING DIRECTION ADJACENT TO YARD INLETS. THE STABILIZATION WILL ENSURE MINIMAL EROSION, AND PREVENT SEDIMENT FROM ENTERING THE PROPOSED STORMWATER SYSTEM. ADDITIONALLY, ANY PROPOSED EARTHWORK, CONSTRUCTED FOR USE AS A TEMPORARY EROSION CONTROL PRACTICE, SHOULD BE STABILIZED AT THE END OF THE DAY. SAME DAY STABILIZATION SHOULD CONSIST OF SEEDING AND COVERING WITH STRAW OR ANOTHER APPROVED TEMPORARY MEASURE. SEQUENCE OF CONSTRUCTION: 1. PRIOR TO INITIATING ANY CONSTRUCTION ACTIVITIES, SCHEDULE A PRE -CONSTRUCTION MEETING WITH THE OWNER, AND ANY EROSION CONTROL PERSONNEL TO DISCUSS THE PROJECT. 2. INSTALL SEDIMENT CONTROL MEASURES AS SHOWN ON THE APPROVED PLANS. LIMIT LAND DISTURBANCE TO ONLY WHAT IS NECESSARY TO INSTALL THESE DEVICES 3. COMMENCE PHASE 1 CONSTRUCTION ACTIVITIES AS DETAILED ON THE APPROPRIATE PHASING PLAN. 4. STABILIZE DISTURBED AREAS IN ACCORDANCE WITH THE SOIL STABILIZATION TABLE. 5. INSTALL INLET PROTECTION AS DRAINAGE SYSTEMS ARE CONSTRUCTED. 6. INSPECT ALL EROSION CONTROL MEASURES AS SPECIFIED ON THE PLAN AND AFTER EVERY RAINFALL EVENT. 7. REPEAT STEPS 3 THROUGH 6 FOR THE PHASES 2-4 OF CONSTRUCTION. 8. STABILIZE ALL REMAINING DISTURBED AREAS AND SCHEDULE A POST -CONSTRUCTION EROSION CONTROL INSPECTION. 9. REMOVE ALL EROSION CONTROL MEASURES AND STABILIZE ANY RESULTANT DISTURBANCES AS NEEDED. PRELIMINARY NOT RELEASED FOR CONSTRUCTION NC License # F-0165 O� Z LLJ Q� J LLI z 0 O� CD � LLI� O�w z cD oz I_ cn Q Z � =o 0 REVISIONS O I- D Q 0 04 � N Q m U U z W rn� D It ch U) O U z O U) _ O o LU w of PROJECT #:193716-01 DRAWN BY: VMK DATE: 04/23/2020 CHECKED BY: ECG TITLE w Q EROSION CONTROL PLAN J J Q z_ SHEET a Cl) Z) 5.0 U) 01 u� W1 (FT. 1-0" 11 LI LIl I V VI 1/'lll 1 FOR BAR SIZE ELEVATION W2 (FT.) PRECAST CONCRETE ENDWALL DETAIL 1 SCALE: NOT TO SCALE 6.1 1 PLAN FLOW LINE TOP ELEVATION 33" MIN. ALL SIZES DITCH GRADE 8 13" MIN. 61, J 6„ "G" BARS Co @ 6 CTS Fl "H" BARS 411 MIN @ 6 CTS. 2" 11,2„ L o SEE NOTE �I SECTION X-X 6„ 8" O.C.(TYP.) REFER TO CHART FOR BAR SIZE SIDE z oU) �__ Q NOTES: < �_ * THIS PRECAST ENDWALL MAY BE USED FOR THE FOLLOWING H OC = U STANDARDS: 838.01, 838.11, 838.21, 838.27, 838.33, LL J - H Z 838.39, 838.51, 838.57, 838.63 AND 838.69. O OCn = ^ z * INSTALL PRECAST ENDWALLS WITH WINGS AND PAY LU Q LL = FOR IN ACCORDANCE WITH SPECIFICATION SECTION 838. ~Q U 0 H * USE 4000 PSI CONCRETE. _ ~ Z LLJ * PROVIDE ALL REINFORCING STEEL WHICH MEETS ASTM A615 Cc LL O J FOR GRADE 60 AND WELDED WIRE FABRIC CONFORMING 0 0 U TO ASTM A185 WITH 2" MIN. CLEARANCE. Z H * PLACE LIFT HOLES OR PINS IN ACCORDANCE WITH pp H OSHA STANDARD 1926.704. r LU0 * PIPE TO BE GROUTED INTO HEADWALL AT JOB SITE BY 0 CONTRACTOR * ALL ELEMENTS PRECAST TO MEET ASTM C913. * WELDED WIRE FABRIC MAY BE SUBSTITUTED FOR REBAR AS LONG AS THE SAME AREA OF STEEL IS PROVIDED. * CHAMFER ALL CORNERS 1" OR HAVE A RADIUS OF 1" W NOTE: THE MINIMUM BAR SIZE SHALL BE #5 BARS J AT 8" CTS.THE CONTRACTOR WILL HAVE THE OPTION = �Y O J TO INCREASE THIS BAR SIZE AS NEEDED. Q o ENDWALL DIMENSIONS FT. MINIMUM MIN./MAX. MIN./MAX. MIN./MAX. MIN./MAX. MIN./MAX. PIPE DIA. BAR SIZE H1(FT.) H2(FT.) D (FT.) W1 W2 1.0 #5 @ 8" 1.25/2.00 2.00/3.75 1.25/1.75 3.00/3.75 5.50/6.00 1.25 #5 @ 8" 1.25/2.00 3.00/3.75 1.25/2.00 3.50/3.75 6.50/6.75 1.50 #5 @ 8" 1.25/2.00 3.00/4.25 1.50/2.50 3.50/3.75 6.50/6.75 2.0 #5 @ 8" 1.50/2.50 4.00/4.75 1.75/2.50 4.00/4.25 7.50/8.25 2.5 #5 @ 8" 2.50/3.50 4.00/6.00 2.00/3.00 4.50/5.50 10.00/11.50 3.0 #5 @ 8" 3.00/3.50 5.00/6.00 2.75/3.50 5.25/5.75 11.50/11.75 3.5 #5 @ 8" 3.25/4.50 6.00/6.75 3.25/3.50 6.00/6.75 12.00/13.25 4.0 #5 @ 8" 3.50/4.50 6.50/7.00 3.25/3.50 6.50/6.75 13.00/13.25 4.5 #5 @ 8" 4.00/5.00 6.50/8.50 3.25/4.00 7.00/9.25 13.50/15.75 5.0 #5 @ 8" 4.50/5.00 7.00/8.50 3.25/4.00 7.25/9.25 13.75/15.75 5.5 #5 @ 8" 4.50/5.00 7.50/8.50 3.25/4.00 7.25/9.25 14.00/15.75 6.0 #5 @ 8" 4.50/5.00 7.50/8.50 3.25/4.00 7.75/9.25 14.75/16.75 #4 BAR N 6 "�►I DOWEL -A 30 0 z G 1 H Z Q W a_ h-1 0 LU 1-- 0 W N Q 1� 0 V ZQ Z O U)V = N T J 0 Q 0 z 0 W _ U) 0 IL SHEET 1 OF 1 838.80 z O GENERAL NOTES: I- Q USE CLASS "B" CONCRETE THROUGHOUT. Q � U H PROVIDE ALL GRATED DROP INLETS OVER 3'-6" IN DEPTH WITH STEPS 12" O C='3 ON CENTER. USE STEPS WHICH COMPLY WITH STD. DRAWING 840.66. L J LH Z 00U= OPTIONAL CONSTRUCTION - MONOLITHIC POUR, 2„ KEYWAY, OR #4 BAR DOWELS AT z 12" CENTERS AS DIRECTED BY THE ENGINEER. LL1 Q LL = Q U O USE FORMS FOR THE CONSTRUCTION OF THE BOTTOM SLAB. H IF REINFORCED CONCRETE PIPE IS SET IN BOTTOM SLAB OF BOX, ADD TO SLAB _ ~ Z W AS SHOWN ON STD. NO. 840.00. U) LL 0 J CONSTRUCT WITH PIPE CROWNS MATCHING. Cc F-A 0 Q ) U °C z H USE STANDARD FRAMES AND GRATES 840.22 (SHOWN), 840.24(SHOWN), 840.20 (NOT SHOWN) OR 840.29 (NOT SHOWN) 110 h>-I r 0 SEE STANDARD DRAWING 840.25 FOR ATTACHMENT OF FRAMES AND GRATES. LLI T CHAMFER ALL EXPOSED CORNERS 1". DRAWING NOT TO SCALE. MAX. DEPTH OF THIS STRUCTURE FROM TOP OF BOTTOM SLAB TO TOP ELEVATION IS 12 FEET. Q ELEVATION (L DITCH CONCRETE SEE DETAIL APRON 411 K 2" "E" BARS 3„ @ 6" CTS. F "` 00 BARS _ / 2 3 �11 � � "F" BARS / @ 6 CTS. 611 M 1 611 4„ STEP STD. 840.66 DOWEL "A" SEE NOTE 3 11 SECTION Y-Y DITCH GRADE _II II II I N GRATED D.I. I , CONCRETE APRON SEALANT 611 CL. B„� \ 111 CONCRETE yI 0 CONIC. ANCHOR - BAR CONC. WALL 411 1/ " EXP. MAT. DETAIL (APRON SUPPORT NOTCH) 0 (D W z J LU Z H Q ~ _ 0 a ; 0 Q CV 0 Z = a o F- W Q CV T 0 V Q W _ W cc z V SHEET 1 OF 2 40.17 E Q� E E ��<� E If ELEVATION GENERAL NOTES: � - - - - - - - - - - I I 11 V EXIST. PIPE USE PIPE COLLAR FOR EXTENDING EXISTING CONCRETE PIPE CULVERTS AT LOCATIONS SHOWN ON PLANS OR AS DIRECTED BY THE ENGINEER. THIS INCLUDES EXTENDING EXISTING PIPES WITH PIPES OF DIFFERENT MATERIALS. CONSTRUCT THE PIPE COLLAR WITH CLASS "B" OR BETTER CONCRETE. OBSERVE ALL REQUIREMENTS OF SECTION 840 OF THE STANDARD SPECIFICATIONS. * USE 12 INCH DIAMETER VALUES FOR PIPE DIAMETERS LESS THAN 12 INCH. PIPE COLLAR DETAIL 2 SCALE: NOT TO SCALE 6.1 SEE DETAIL OF APRON SUPPORT NOTCH - SEE STD. 840.17 SHEET 1 TOP ELEVATION DITCH GRADE I N Co II _I 3' 8" OPENING IN WALL FOR TROUGH DOWEL"C" PART SECTION V - V DOWEL B1 , B2 OR B3 I DOUBLE FRAME & GRA- 1'-311 DOWEL-C 183 11101/ /4// 7'-8" SIDE ELEVATION D E F CU. YD. 12" 12" 12" 0.3528 15" 1211 12" 0.3990 18" 12" 1211 0.4465 241' 1211 12" 0.5526 30" 1211 12" 0.6560 36" 12" 12" 0.7640 42" 1211 12" 0.8856 48" 1211 12" 1.0126 54" 1811 18" 2.5793 6011 1811 18" 2.8506 6611 18" 1811 3.1307 72" 18" 18" 3.4176 N- I � 1 4 PERMISSIBLE CONSTRUCTION JOINT PART SECTION U-U 3 0 11 I #4 BAR DOWEL-B1 FOR 15" THRU 36" INLET 1'-0" ri,l C° #4 BAR DOWEL-B2 FOR 42" INLET 1' 6" --'-F7#4 BAR DOWEL-B3 QUANTITY TO BE ADDED FOR EACH 2' INCREMENT INLET OPENING DDITIONAL INLETS 2 -0 4 -0 6 -0 8 -0 If 10 1 -0 If 12 f -0 It ONCRETE CU. YDS. 0.191 0.417 0.665 0.897 1.145 1.380 DNCRETE APRON CU. YDS. 0.074 0.148 0.222 0.296 0.370 0.444 V VIV VIIL I L /"11 IIVIV MIN. DIMENSIONS AND QUANTITIES FOR CONCRETE GRATED DROP INLET(BASED ON MIN. HEIGHT, H) DIMENSIONS OF BOX AND PIPE REINFORCING STEEL - NO. 4 BARS CU YDS CONIC. IN BOX DEDUCTIONS FOR PIPE SPAN WIDTH SPAN WIDTH HEIGHT BARS E BARS F BARS G BARS H TOTAL BOTTOM H H PER APRON TOTAL ONE PIPE DJ K L M H NO. LENGTH N0. LENGTH NO. LENGTH NO. LENGTH LBS. SLAB TOTAL FT HT C.S. R.C. 12„ 3 It -8 2 -0 3 II 8 2 f -0 It 3'- 9 - - - - - - - - - 0.362 0.926 0.247 0.395 1.683 0.015 0.024 ' " 0.395 1.745 15 3 -8 2 -0 3 -8 " 2 -0 4 -0 - - - - - - - - - 0.362 0.988 0.247 0.023 0.036 18" 2'-0" 4'-3" - - - - - - - - - 0.362 1.050 0.247 1.807 0.033 0.049 24" 2'-10" 4'-9" 8 1'-5" 6 4'-9If - - - - 27 0.444 1.362 0.278 2.201 0.059 0.085 11 2 .541 30 3 - g If 351I 5 " 3 II 8 2O II 7 4 9 11 II 33 0.502 1 .644 0.288 0.092 0. 127 36 4-0 4'- 0 5'- 9 8 2'- 5 8 4'- 11 4 of -9 2 4'-1147 0.560 1.931 0.321 2.920 0.132 0.178 42" 4'-10" 4'-10" 6'-3" 10 3'-1" 9 5'-7" 1'-511 3 5'-7" 67 0.704 2.500 0.370 3.677 0.180 0.243 48" 5'-4" 5'-4" 6'-9" 11 3'-7" 10 6'-1" 1' 11" 4 6'-1" 87 0.823 3.013 0.407 4.315 0.235 0.317 54" W-0" 6'-0" 7'-3" 12 4'-1" 11 6'-7" 2'-5" 5 6'-7" 107 0.951 3.589 0.444 5.072 0.297 0.401 6011 6- 6 11 6- 6 7- 3 31 - 1 6 70.367 0.495 / 9 13 4 9 12 7 It - 3 135 1 .31 1 4.539 0.494 6. 1 70 66 71 2 " 71 211 831I 14 5'- 4 14 7'-10" 3 - 7 7 7 -10 168 1 . 136 5. 061 0. 537 6.901 0.444 0.599 72 3- 8 2- 0 7- 8 7- 8 81 - 9 15 5'- 11 15 8- 5 4 4- 3 8 8- 5 199 1 1.500 5. 860 0. 580 0. 395 7. 868 0.528 0.713 z 000 H Q Q H = CID U ILL J0i--iz 00fr C0= wQQLL= Q U = 0 H H �= zw cl)H- =O J cr OOc!)� z H � � H LU 0 0 _ O LL H Q m Q 0 J J 0 O IY V 0 z W Q a U) a 0 0 _ SHEET 1 OF 1 840.72 z 0 Q Q H V ooCf)= LU Q Q LL _ Q U = 0 H �= 2: LU Cn F- O J o0U)Q LLI Q LU O o W Z J LU ~ Z < ~ 0 a 0 Q CV Z = a o e- W Q CV T Q W = H W V z 0 SHEET 2 OF 2 840.17 434 Fayetteville St Suite 1500 Raleigh, NC 27601 (919) 836-4040 www.wsp.com PRELIMINARY NOT RELEASED FOR CONSTRUCTION NC License # F-0165 H O� �z LU Q� J Uj ZO O(D Uj� Uj mzcD Z o �Q Z� =o O REVISIONS IPROJECT #:193716-01 DATE: 09/06/2019 I DRAWN BY: VMK CHECKED BY: ECG TITLE STORM DRAINAGE DETAILS N STANDARD DROP INLET 1 OF 2 to DETAIL 3 O1 SCALE: NOT TO SCALE N 6.1 STANDARD DROP INLET 2 OF 2 DETAIL 4 SCALE: NOT TO SCALE 6.1 L) SHEET a In a O 6.1 u� 0 o a In Do FLOW LINE TOP ELEVATION rl � DITCH GRADE 12 MIN. 6rr J 6rr "Go' BARS 00 @ 6 of CTS . Ir "H" BARS 4 @ 6 CTS . 2fl I 1 %2 of I L o I I � I I SEE NOTE SECTION X-X SHALLOW DROP INLET 1 OF 2 DETAIL 1 SCALE: NOT TO SCALE 6 2 #4 BAR i N 6".-I DOWEL -A z OC/) GENERAL NOTES: Q USE CLASS "B" CONCRETE THROUGHOUT. Q F-. 9 U H PROVIDE ALL GRATED DROP INLETS OVER 3'-6" IN DEPTH WITH STEPS 12" CD ON CENTER. USE STEPS WHICH COMPLY WITH STD. DRAWING 840.66. LL J H Z 0 0 OPTIONAL CONSTRUCTION - MONOLITHIC POUR, 2" KEYWAY, OR #4 BAR DOWELS AT 0 •, 12" CENTERS AS DIRECTED BY THE ENGINEER. ILL]Z ILL = Q Ucc O USE FORMS FOR THE CONSTRUCTION OF THE BOTTOM SLAB. Q H ~ IF REINFORCED CONCRETE PIPE IS SET IN BOTTOM SLAB OF BOX, ADD TO SLAB H 2 Z W AS SHOWN ON STD. NO. 840.00. Cn H W O J O Q CONSTRUCT WITH PIPE CROWNS MATCHING. 00 (j Cr z H USE STANDARD FRAMES AND GRATES 840.22 (SHOWN), 840.24(SHOWN), 840.20 (NOT SHOWN) OR 840.29 (NOT SHOWN). Q SEE STANDARD DRAWING 840.25 FOR ATTACHMENT OF FRAMES AND GRATES. W 0 CHAMFER ALL EXPOSED CORNERS 1". DRAWING NOT TO SCALE. MAX. DEPTH OF THIS STRUCTURE FROM TOP OF BOTTOM SLAB TO TOP ELEVATION IS 12 FEET. a TOP ELEVATION DITCH CONCRETE SEE DETAIL APRON I I i 411 3 "E" BARS K 2 @ of L 00 BARS- 2" 4 = 3 �11 \ 'IF" BARS @@ 6 CTS. 6„ M 611 4„ STEP STD. 840.66 DOWEL "A" SEE NOTE _3 f c0 SECTION Y-Y DITCH GRADE Lr--- --- II II II F--GRATED D.I. II �i 4►-o►► 3/ ►► 3/ ►► Y N x �\NrX_ CV A"- N-L N N-1 T `° N� -2 l N N1 ++ 1� Y 1 �2 ►► L N PLAN GRATE SECTION Y-Y 1►► 1►► N Cnt T - 1 11►► GRATE SECTION X-X rCV C0 T 3 10 /2 4►_off FRAME SECTION X-X 1 ►► 1 /► N T 1 11 GRATE SECTION X-X � T\ N (� r 1 1 1 1/ /4 2►-03/►► FRAME SECTION X-X CONCRETE APRON SEALANT 611 CL. IIB"-\ 1rr CONCRETE CONC. ANCHOR - BAR CONC. WALL 411 �1,4rr EXP. MAT. DETAIL (APRON SUPPORT NOTCH) Nf FOR 3/8►► DIA. BOLT FRAME SECTION Y-Y 2►-03/►► 3/ ►► 3/ ►► �Y n -] n 1 �I PLAN a O z H J Z = W CL QM r H CL o CL W 0 N W H 0 W Z Cj) a�N H W- i-- J o C'3 W LU Uj 0 SHEET 1 OF 2 840d17 z O Cn QQ H0C-D LLJ�HZ o0C/5= WQzLL= Q U O H H C/) U- 0 o0c~nQ z .>� 1 � H Q 0 NOTE: SEE STD. DWG. 840.25 SHEET 1 of 1 FOR FRAME ANCHORAGE. 840.24 SEE DETAIL OF APRON SUPPORT NOTCH - SEE STD. 840.17 SHEET 1 TOP ELEVATION DITCH GRADE 00 N as 31-811 OPENING J IN WALL FOR DOWEL"C" TROUGH PART SECTION V - V DOWEL B1 ,B2 OR B3 I DOUBLE FRAME & GRA- 1'-3" c0 T DOWEL-C 7'-8r' VVIY VIIL I L /"II IIVIY 13'- 83/4" 11'-8" PERMISSIBLE CONSTRUCTION JOINT PART SECTION U-U 3r-Off #4 BAR DOWEL-B1 FOR 15 THRU 36 INLET 1'-Orr (0 #4 BAR T DOWEL-B2 FOR 42" INLET 1 ' - 6 " �o r #4 BAR DOWEL-B3 QUANTITY TO BE ADDED FOR EACH 2' INCREMENT INLET OPENING DDITIONAL INLETS 2 -0 of 4 -0 6 -0 of 8 -0 10 -0 12 -Ofr ONCRETE CU. YDS. 0.191 0.417 0.665 0.897 1.145 1.380 ONCRETE APRON CU. YDS. 0.074 0.148 0.222 0.296 0.370 0.444 MIN. DIMENSIONS AND QUANTITIES FOR CONCRETE GRATED DROP INLET(BASED ON MIN. HEIGHT, H) DIMENSIONS OF BOX AND PIPE REINFORCING STEEL - NO. 4 BARS CU YDS CONC. IN BOX DEDUCTIONS PIPE SPAN WIDTH SPAN WIDTH HEIGHT BARS E BARS F BARS G BARS H TOTAL LBS . BOTTOM SLAB H TOTAL H PER FT HT APRON TOTAL FOR ONE PIPE D J K L IM H No. LENGTH NO. LENGTH NO. LENGTH NO. LENGTH C.S. R.C. 12" 3 -8 11 3- 2 -0 II II 3'- 8 II 2'- 0 2 -3 or - - - - - - - - 0.362 0.926 0.247 0.395 1.683 0.015 0.024 „ 15 1 II 3 -8 I II 2 -0 I „ 3 -8 I „ 2 -0 I II 2 -5 - - - - - - - - - 0.362 0.988 0.247 0.395 1.745 0.023 0.036 18" 2'-0" 2'-8" - - - - - - - - - 0.362 1.050 0.247 1.807 0.033 0.049 24" 2'-10" 3'-3" 8 1'-5" 6 4'-9" - 27 0.444 1.362 0.278 2.201 0.059 0.085 II 30 „ 3'- 8 1I 3'- 5 1I 3'- 10 8 I 11 2 -0 7 I 11 4 -9 - - - - 33 0.502 1.644 0.288 2.541 0.092 0.127 3611 4r-Off 4'-0" 41-411 8 2'-511 8 4'-1111 4 0'-9" 2 4'-11" 47 0.560 1.931 0.321 2.920 0.132 0.178 42" 4'-1011 4'-1Off 5'-0" 10 3'-1 of 9 51-7r1 1'-5" 3 5'-7rr 67 0.704 2.500 0.370 3.677 0.180 0.243 4811 5'-411 51-4" 5'-6" 11 3'-7" 10 6'-111 1'-1111 4 6'-111 87 0.823 3.013 0.407 4.315 0.235 0.317 54" 6'-Orr 6'-0of 6'-O" 12 4'-1 of 11 6'-7" 2'-5" 5 6r-7" 107 0.951 3.589 0.444 5.072 0.297 0.401 rr 60 , Ir 6 - 6 r Ir 6 - 6 r 11 6 - 7 13 r of 4 - 9 12 r ,r 7 - 3 r 11 3 -1 6 r Ir 7 - 3 135 1 .31 1 4.539 0.494 6.170 0.367 0.495 II 6614 I II 7 - 2 I 11 7 - 2 I 11 7 -1 I II 5 - 4 14 I II 7 -10" I II 3 7 7 I II 7 i 10 168 1 . 136 5.061 0.537 6.901 0.444 0.599 72 3- 8 1 2- 0 7- 8 7- 8 7- 8 15 5'- 11 15 8- 5 4 4/ 11 - 3 8 8- 5 199 1.500 5.860 0.580 0.395 7.868 0.528 0.713 SHALLOW DROP INLET 2 OF 2 DETAIL 2 SCALE: NOT TO SCALE 6 2 F PLAN %L MANHOLE E C Q= (.00 ?CO So LL t� I I' * II m -4. v U) 1 ♦ �r •• II 3" If .0.54 C FOR MANHOLE COVER & FRAME #4 BARS "A" OPTIONAL SPACED 6" C. TO C. BRICK MAY BE USED TO ADJUST FRAME & COVER TO SURFACE ELEVATION MAX. 1' - - L OUTLET PIPE .� A INLET PIPE 61 SECTION X-X 6" 1/ „ X 6,1 p . / EXP. JOIN 1/ rr 9 rr 6" o �- 6 SEE NOTE of 3 DOWEL SECTION Y-Y 61r E OR F 11/2 of SECTION C-C OR D-D GENERAL NOTES: CHAMFER ALL EXPOSED CORNERS 1". USE CLASS "B" CONCRETE THROUGHOUT. OPTIONAL CONSTRUCTION - MONOLITHIC POUR, 2" KEYWAY, OR #4 BAR DOWELS AT 12" CENTERS AS DIRECTED BY THE ENGINEER. USE FORMS TO CONSTRUCT THE BOTTOM SLAB. IF REINFORCED CONCRETE PIPE IS SET IN BASE SLAB OF BOX, ADD TO BASE AS SHOWN ON STANDARD NO. 840.00. PROVIDE ALL JUNCTION BOXES OVER 3'-6" IN DEPTH WITH STEPS 12" ON CENTERS IN ACCORDANCE WITH STD. NO. 840.66. ADJUST THE STEEL, CONCRETE AND BRICK MASONRY QUANTITIES TO INCLUDE THE ADDITION OF THE MANHOLE (I.E. DIAGONAL BARS SHORTENED AROUND OPENING IN TOP SLAB, ADDITIONAL VARIABLE HEIGHT BRICK MASONRY, OPENING IN TOP SLAB.) MAX. DEPTH OF THIS STRUCTURE FROM TOP OF BOTTOM SLAB TO TOP ELEVATION IS 12 FEET. T #4 BAR NI 61, DIMENSIONS AND QUANTITIES FOR CONCRETE JUNCTION BOXES DIMENSIONS OF BOX AND PIPE REINFORCEMENT BARS "A" TOP SLAB DIMENSIONS CUBIC YARDS IN BOX TOTAL QUANTITIES BOX AND SLABS DEDUCTIONS FOR ONE PIPE CU.YDS. PIPE SPAN WIDTH HEIGHT D A B H N0. LENGTH E F TOP SLAB BOTTOM SLAB WALL/ FT. OF HT. LBS. REINF CU. YDS. MIN. "H C.S. R.C. 12 2 -0 2 -0 2 -3 12 2 -9 3 -0 3 -0 0.167 0.167 0.185 22 0.750 0.015 0.024 15rf2 -3 2 -3 to 2 -6 to 12 31-Olf 3 f -3 of 3 -3 to 0.196 0.196 0.204 24 0.902 0.023 0.036 18" 2'-6" 2'-611 2'-9" 14 3'-3'r 3'-6" 3'-6" 0.227 0.227 0.222 30 1.065 0.033 0.049 24" 3'-011 31-0" 3'-311 16 3'-9'r 4'-0" 4'-0'r 0.296 0.296 0.259 40 1.434 0.059 0.085 30" 3'-6" 3'-61r 3'-9r' 18 4'-3'r 4'-6" 4'-6" 0.375 0.375 0.296 51 1.860 0.092 0.127 36" 4'-0" 4'-0" 4'-3" 20 4'-9'r 5'-O" 5'-0'r 0.463 0.463 0.333 64 2.341 0.132 0.178 42" 4'-6" 4'-61' 4'-91' 22 5'-311 5'-6" 5'-6" 0.560 0.560 0.370 77 2.878 0.180 0.243 48" 5'-4" 5'-4" 5'-3" 26 6'-3" 6'-411 6'-4" 0.743 0.743 0.407 111 3.623 0.235 0.317 54" 5' -10" 5'-10" 5' 9 r' 28 6' - 7" 6'- 10 of 6' -10" 0.865 0.865 0.444 126 4.283 0.297 0.401 60" 6'-6" 6'-6" 6'-3" 30 7'-3" 7'-6" 7'-6" 1.042 1.042 0.481 145 5.090 0.367 0.495 66" 7'-1" 7'-1" 6'-9" 32 7'-10" 8'-111 8'-1r' 1,210T 1.210 0.518 169 5.917 0.444 1 0.589 z 000 H >- Q Q �p~CCD LLJ�HZ 00Cf)= W Q Q ILL 2 Q�°CoH CnF-WO27- J o O Cl) z •� � H W 0 a a ~ oC O (D Z H J Z = ` W r H a. W ; N I- o Q W Z U) N H T 0 W LU V iHEET 2 OF 2 840d17 Z O Cn QQ H = V ILL JCLHZ 00�= Cr LUaz'LL_ Q U 0 H H CnHOJ W ooU)Q z H� CL H Q 0 O X U- O -1 OO-j zCL O W H Z 0 z < H Q V J CO 0 Z O a� ZD z 0 O �1-4 z ~ ~/1 � o v ) = cv �W V H T p Z - o 0 SHEET 1 OF 1 840.31 %%% I ) 434 Fayetteville St Suite 1500 Raleigh, NC 27601 (919) 836-4040 www.wsp.com PRELIMINARY NOT RELEASED FOR CONSTRUCTION NC License # F-0165 REVISIONS PROJECT #:193716-01 DATE: 09/06/2019 i DRAWN BY: VMK CHECKED BY: ECG TITLE STORM DRAINAGE DETAILS DROP INLET FRAME AND GRATES DETAIL 3 SCALE: NOT TO SCALE g 2 CONCRETE JUNCTION BOX DETAIL r4 SCALE: NOT TO SCALE g 2 z SHEET CD 6.2 a J� Z TOP OF FILL TOP OF FILL TOP OF FILL O W H QQ GROUND LINE H GROUND LINE H GROUND LINE H IZ—Ip~C0U 0 ILL. F-11z ---------------- OOU)_ < it Tit��� �� HU�OU 11 rn COMPACT AFTER - - in iu I�� = COMPACT AFTER Q ~ ~ z ! _ — '" PIPE IS PLACED I ! - — - - '�� ! _ — '' PIPE IS PLACED _ W C/) f— O J ILL. n1 Ill & PRIOR TO PLACEMENT OF TI ru T,i & PRIOR TO — = TYPE 2 PLACEMENT OF Cc O ~ Q GEOTEXTILE f u FILL — �ii L111 FILL I --I in_u ni_ ni I D. /6 MIN. ,,, _ NOT LESS H CL I.D./6 MIN. I.D./6 MIN. NOT LESS THAN 6" O.D. + 3' NOT LESS THAN 6" Ill- n=ili= IU=ii�-uI= ip='i,_�n— THAN 6" ��,==in=u�_ i�i-ili_ni= �d=iu='n— EARTH 1112" PER FOOT OF r W M r BUT NOT LESS THAN 12" ROCK O.D. + 3' NOR MORE THAN 24" O.D. + 3' NORMAL EARTH FOUNDATION ROCK FOUNDATION AS DIRECTED BY ENGR. UNSUITABLE MATERIAL FOUNDATION PIPE IN TRENCH TOP OF FILL TOP OF FILL TOP OF FILL O O H H H W Q — J O Z GROUND LINE GROUND LINE Q MIN. O.D. MIN. O.D. GROUND LINE - - -- - j.j MIN. O.D. MIN. O.D. MIN. O.D. TYPE 2 -- --- -- j•j GEOTEXTILE -- -----� �./ y �11 < W Z n COMPACT AFTER —PIPE IS PLACEDCL I.D./6 MIN. _ _ & PRIOR TO PLACEMENT OF Q W NOT LESS THAN 6" IIi_IIi=_�U=i��_ui= �u_'n=ui FILL ni_iii=_iu_ii�_u�- Iu=u�=ni 0 a 1--I COMPACT AFTER O.D. + 2' I.D./6 MIN. I.D./6 MIN. AS DIRECTED NOT LESS THAN 6" MIN. O.D. MIN. O.D. BY ENGINEER Z ~ 0 PIPE IS PLACED NOT LESS THAN 6 O.D.+ 2 Q a H & PRIOR TO 1/2" PER FOOT OF 'H' cc PLACEMENT OF NORMAL EARTH FOUNDATION ROCK FOUNDATION NOR NOT LESS THAN 12 " LL FILL UNSUITABLE MATERIAL FOUNDATION PIPE ABOVE GROUND Q O GENERAL NOTES: C DO NOT OPERATE HEAVY EQUIPMENT OVER ANY PIPE CULVERT UNTIL THE PIPE CULVERT HAS Q O I.D. = THE MAXIMUM HORIZONTAL INSIDE DIAMETER DIMENSION. BEEN PROPERLY BACKFILLED AND COVERED WITH AT LEAST 3 FEET OF APPROVED MATERIAL. O O.D. = THE MAXIMUM HORIZONTAL OUTSIDE DIAMETER DIMENSION. — - — - — SPRINGLINE OF PIPE H = THE FILL HEIGHT MEASURED VERTICALLY AT ANY POINT SELECT BACKFILL MATERIAL CLASS III OR CLASS II, CWC G ALONG THE PIPE FROM THE TOP OF THE PIPE TO THE TOP ® BELOW SPRINGLINE. OF THE EMBANKMENT AT THAT POINT. APPROVED SUITABLE LOCAL MATERIAL ABOVE SPRINGLINE. TAKE CARE TO FULLY COMPACT HAUNCH ZONE OF PIPE BACKFILL. UNDISTURBED EARTH MATERIAL LOOSELY PLACED SELECT MATERIAL CLASS III OR CLASS II, TYPE 1 FOR PIPE BEDDING. LEAVE SECTION DIRECTLY BENEATH PIPE SELECT MATERIAL CLASS V OR VI FOR FOUNDATION CONDITIONING. ENCAPSULATE SHEET 2 OF 3 UNCOMPACTED AS PIPE SEATING AND BACKFILL WILL WITH TYPE 2 GEOTEXTILE AS DIRECTED BY THE ENGINEER. 300.01 ACCOMPLISH COMPACTION. METHOD OF PIPE INSTALLATION DETAIL 1 SCALE: NOT TO SCALE 6.3 TACK COAT BETWEEN UFTS -[ NC DOT PRIME COAT Sf --O.56 (2 LIFTS) 13" NcDo,r CRUSHED AGOREOATE BASE COWSE (CA.BC) PRCW0SE a SUBGRADE (COMPACTED TU 95 ; OF M ODI FIE& PROCTOR MAX DRY DENSITY) , TACK COIN PRIME COAT B" NCWT CRUS"ED AGGREGATE BASE COURSE (CA�BC) SEEDING AND MULCHING FOR LATE WINTER AND SOILAMENDMENTS: FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB/ACRE GROUND AGRICULTURAL LIMESTOME AND 750LB/ACRE 10-10- EARLY SPRING: 10 FERTILIZER. SEEDING MIXTURE: MULCH: RYE(GRAIN) - 120 LB/ACRE APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH (OMIT ANNUAL LESBEDEZA WHEN DURATION OF BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. TEMPRORARY COVER IS NOT TO EXTEND BEYOND JUNE) MAINTENANCE: REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, FERTILIZE, AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER SEEDING DATES: DAMAGE. JAN.1 - MAY 1 FOR SUMMER: SOILAMENDMENTS: FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB/ACRE GROUND AGRICULTURAL LIMESTOME AND 750LB/ACRE 10-10- 10 FERTILIZER. SEEDING MIXTURE: GERMAN MILLET-40 LB/ACRE MULCH: (A SMALL -STEMMED SUDANGRASS MAY BE APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH SUBSTITUTED AT A RATE OF 50 LB/ACRE) BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. SEEDING DATES: MAINTENANCE: MAY 1- AUG. 15 REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, FERTILIZE, AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. FOR FALL: SOIL AMENDMENTS: FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB/ACRE GROUND AGRICULTURAL LIMESTOME AND 750LB/ACRE 10-10- 10 FERTILIZER. SEEDING MIXTURE: RYE (GRAIN) - 120 LB/ACRE MULCH: APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH SEEDING DATES: BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. AUG. 15 - DEC. 30 MAINTENANCE: REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, FERTILIZE, AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. SEEDBED INCORPORATE FERTILIZER AND LIME INTO TOP 4'-6" OF SOIL. REMOVE ALL STOMES LARGER THAN 3" ON ANY SIDE, STICKS, ROOTS, AND OTHER EXTRANEOUS MATERIALTHAT PREPARATION: SURFACE DURING BED PREPARATION. RECOMPACT AREA TO BE SEEDED UTILIZING A CULTIPACKER ROLLER. FINISHED GRADES SHALL BE A SMOOTH SOIL SURFACE WITH A LOOSE, UNIFORMLY FINE TEXTURE. ALL RIDGES AND DEPRESSIONS SHALL BE REMOVED AND FILLED TO PRODUCE POSITIVE DRAINAGE AS INDICATED ON THE PLANS. SEEDING SHALL BE DONE IMMEDIATELY AFTER FINISHED GRADES ARE OBTAINED AND SEED BE PREPARATION IS COMPLETED. SEEDING: APPLY SEEDING OF TYPE AND AT RATES INDICATED ABOVE WITH A CYCLONE SEEDER, PROP TYPE SPREADER, DRILL, OR HYDROSEEDER ON AND/OR INTO THE PREPARED BED. CULTIPACK THE SEEDBED AND MULCH IMMEDIATELY. FOR ADDITIONAL INFORMATION, REFER TO NCDEQ EROSIONA ND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL (ESCPDM), SECTION 6.10. FOR PERMANENT SEEDING SPECIFICATIONS, INCLUDING SEED BED PREPARATION, SEASONAL LIMITATIONS FOR SEEDING OPERATIONS, THE KINDS OR GRADES OF FERTILIZERS, THE KINDS OF SEED, AND THE RATES OF APPLICATION OF LIMESTONE, FERTILIZER, AND SEED, REFER TO NCDEQ ESCPDM SECTION 6.11. SEEDING AND MULCHING DETAIL 2 SCALE: k6.3 NOTES: 1. CLASS OR MEDIAN SIZE OF RIPRAP AND LENGTH, WIDTH AND DEPTH OF APRON TO BE DESIGNED BY THE ENGINEER. 2. REFER TO THE NCDEQ EROSION AND SEDIIVIENT CONTROL DESIGN MANUAL FOR RIPRAP APRON DESIGN STANDARDS. 3. RIPRAP SHOULD EXTEND UP BOTH SIDES OF THE APRON AND AROUND THE END OF THE PIPE OR CULVERT AT THE DISCHARGE OUTLET AT A MAXIMUM SLOPE OF 2:1 AND A HEIGHT NOT LESS THAN TWO THIRDS THE PIPE DIAMETER OR CULVERT HEIGHT. 4. THERE SHALL BE NO OVERFLOW FROM THE END OF THE APRON TO THE SURFACE OF THE RECEIVING CHANNEL. THE AREA TO BE PAVED OR RIPRAPPED SHALL BE UNDERCUT SO THAT THE INVERT OF THE APRON SHALL BE AT THE SAME GRADE (FLUSH) WITH THE SURFACE OF THE RECEIVING CHANNEL. THE APRON SHALL HAVE A CUTOFF OR TOE WALL AT THE DOWNSTREAM END. 5. THE WIDTH OF THE END OF THE APRON SHALL BE EQUAL TO THE BOTTOM WIDTH OF THE RECEIVING CHANNEL. MAXIMUM TAPER TO RECEIVING CHANNEL 5:1. 6. ALL SUBGRADE FOR STRUCTURE TO BE COMPACTED TO 95% OR GREATER. 7. THE PLACING OF FILL, EITHER LOOSE OR COMPACTED IN THE RECEIVING CHANNEL SHALL NOT BE ALLOWED. 8. NO BENDS OR CURVES IN THE HORIZONTAL ALIGNMENT OF THE APRON WILL BE PERMITTED. 9. FILTER FABRIC SHALL BE INSTALLED ON COMPACTED SUBGRADE PRIOR TO PLACEMENT OF RIP RAP. 10. ANY DISTURBED AREA FROM END OF APRON TO RECIEVING CHANNEL MUST BE STABILIZED. RIP RAP SUMMARY CHART OUTLET La W1 W2 T* H HW-1 29' 33.5' 20' 2.25' 3 * d50 (see fig 8.06 aft "NC SEDIMENT AND EROSION CONTROL MANUAL" dmax = 1.5 x d50 T = 1.5 X dmax. DETAIL r 3 DETAIL 4 RIP RAP APRON AT PIPE OUTFALLS SCALE: lsli3 SCALE: 6.3 DETAIL 5 SCALE: 6.3 i 5 3 0 NATURAL GRADE W2 END OF FLARED SECTION PLAN (IF NEEDED) ELEVATION NOTE; LAYER OF FILTER FABRIC MINIMUM H=2/3 PIPE DIAMETER SECTION B—B RIP RAP APRON AT PIPE OUTFALLS T (THICKNESS) MIN. w W U) Q U z W Z) 0- U) 0 434 Fayetteville St Suite 1500 Raleigh, NC 27601 (919) 836-4040 www.wsp.com PRELIMINARY NOT RELEASED FOR CONSTRUCTION NC License # F-0165 O� Z Q� o J LLI 'a z Q � C Yc6 LLI G Z'E N LLJ O�� /� U z V P OQU) Z o U)Q Z ry =o 0 I REVISIONS I PROJECT #:193716-01 DATE: 04/23/2020 DRAWN BY: VMK CHECKED BY: ECG TITLE MISCELLANEOUS DETAILS SHEET 6.3 0 0 a Co Co GRAVEL CONSTRUCTION ENTRANCE DETAIL SCALE: NOT TO SCALE 6.4 TOP AND BOTTOM S' SHALL BE 10 GAUGI INU 1 tJ USE GEOTEXTILE A MINIMUM OF 36 IN WIDTH AND FASTEN ADEQUATELY TO THE POSTS AND WIRE AS DIRECTED. USE WIRE A MINIMUM OF 32" IN WIDTH AND WITH A MINIMUM OF 5 LINE WIRES WITH 12" VERTICAL SPACING. PROVIDE 5'-0" STEEL POST OF THE SELF -FASTENER ANGLE STEEL TYPE. FOR MECHANICAL SLICING METHOD INSTALLATION, GEOTEXTILE SHALL BE A MAXIMUM OF 18" ABOVE GROUND SURFACE. z OC/) H QQ H 0 V NOTES 0 0 0- 1. PROVIDE TURNING RADIUS SUFFICIENT TO ACCOMMODATE LARGE Q Cr z < < o H TRUCKS. LU 2. LOCATE ENTRANCES TO PROVIDE FOR UTILIZATION Cl) LL0 BY ALL CONSTRUCTION VEHICLES. 0 0C~n 3. MUST BE MAINTAINED IN A CONDITION WHICH WILL PREVENT z •j TRACKING OR DIRECT FLOW OF MUD ONTO STREETS. PERIODIC TOPDRESSING WITH STONE WILL BE NECESSARY. LLJ 4. ANY MATERIAL TRACKED ONTO THE ROADWAY MUST BE r o CLEANED UP IMMEDIATELY. 5. LOCATE GRAVEL CONSTRUCTION ENTRANCE AT ALL POINTS OF INGRESS AND EGRESS UNTIL SITE IS STABILIZED. PROVIDE FREQUENT CHECKS OF THE DEVICE AND TIMELY MAINTENANCE. 6. NUMBER AND LOCATION OF CONSTRUCTION ENTRANCES TO w BE DETERMINED BY THE ENGINEER. 7. USE CLASS 'A' STONE OR OTHER COARSE AGGREGATE APPROVED O Z BY THE ENGINEER. 8. INSTALL CONSTRUCTION ENTRANCES IN A WAY TO PREVENT VEHICLES FROM BYPASSING CONSTRUCTION ENTRANCE LEAVING PROJECT SITE. z Z LLJ I--1 Q Z O � V 0 z � y Cl) Z O a v 0 J 0 W Q NOTE: PLACE GEOTEXTILE FOR DRAINAGE BENEATH STONE 8' MAX. WITH WIRE (6' MAX. WITHOUT WIRE) %-A L V I L. /\ I .L I— L GEOTEXTILE COMPACTED FILL I I � , I 4„ STEEL POST - o'-n�� nGDTu I I I I I I I I 1 - - - - EXTENSION OF GEOTEXTILE AND WIRE INTO TRENCH SHEET 1 OF 1 1607.01 z oCf) H Q Q Hcc0 -) ILL J a- H z 00 U)_ w<<LL Q U rr 0 H H Cl-0J nw OIr OWQ z EL ' ' w� I Q IY o W LL V cD z z W H U_ � J H c o z Q Q U } O a 0 Q W 0 ~ SHEET 1 OF 1 1605.01 SEDIMENT CONTROL STONE A L STRUCTURAL STONE I •'I A'I A'I A'I A'I A'I A'I A'I A'I A'I A'I A'I o MEN "m 'mown I 'i.. 1-6. MIN. 2, �o O O O� 7'-611 ROCK INLET SEDIMENT TRAP TYPE A DETAIL 2 SCALE: NOT TO SCALE 6.4 SEDIMENT CONTROL STONE STRUCTURAL STONE 2' MIN. TREATED WATER SECTION A -A a FLOW 2/3 CHANNEL WIDTH 1' MIN o 0 0 o o�oo Do OD O OD p CJOD p O �^OoG�^OoG� SECTION A -A NOTES A CLEAN SEDIMENT WHEN 1/2 FULL AND AS DIRECTED. USE NO. 5 OR NO. 57 STONE FOR SEDIMENT CONTROL STONE. USE CLASS B STONE FOR STRUCTURAL STONE. CONSTRUCT TOP OF BERM A MINIMUM OF ONE FOOT BELOW THE SHOULDER OR ANY DIVERSION POINT. NOTES USE CLASS B EROSION CONTROL STONE FOR STRUCTURAL STONE. USE NO. 5 OR NO. 57 STONE FOR SEDIMENT CONTROL STONE. 1' MIN 12" 0 0 0 H = 2' MIN �D o spa O O� O� O� O� O� �',o-p I - I I-M III -III - SECTION B-B z oC/) F -I QQ H U LLJ0I—Iz O 0 Cr U- _ wQzLL2 QU�OH �= zw U) U_ 0 J 0 CC/) Z H D I —I wM 0 I :1 O H LL CL CD z Q F -I Q r Z W C z 0 Q W Cf) 0 p J O IZ-I V SHEET 1 OF 1 1632.01 z oU) h-I Q zU —I 0 CD I LLJ�I—Iz o0u= LU < LL QUmOH H H 2 Z w CnwOJ 0O)Q U D � H w0 0 O �e cD V z W Q V Cr J Q N 0 z � I C� U O Q � O Q E a LU H SHEET 1 OF 1 1633.01 434 Fayetteville St Suite 1500 Raleigh, NC 27601 (919) 836-4040 www.wsp.com PRELIMINARY NOT RELEASED FOR CONSTRUCTION NC License # F-0165 J Q z 0 (D z 0 U) Z O Z Uj Uj O LLJ (D z Q 0 REVISIONS PROJECT #:193716-01 DATE: 09/06/2019 1 DRAWN BY: VMK CHECKED BY: ECG TITLE EROSION CONTROL DETAILS �Ln TEMPORARY SILT FENCE DETAIL 3 SCALE: NOT TO SCALE 6.4 TEMPORARY ROCK SILT CHECK- TYPE A DETAIL 4 SCALE: 6.4 SHEET 6.4