Loading...
HomeMy WebLinkAbout310102_Compliance Evaluation Inspection_20200407Division of Water Resources Facility Number , ' .� A Q Division of Soil and Water.Conservation. ` 0 Other,Agency . type of Visit: Q Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance 1eason for Visit: ® Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time: 11A cro ►e— I Departure Time: ® County: Farm Name: f Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Title: Phone: Onsite Representative: 1 _ ' r4 0 @r' rc —.s Integrator: Certified Operator: Back-up Operator: Location of Farm: k Latitude: Design Current Swine. Capacity Pop. Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Phone: Certification Number: Certification Number: ,Design Current `Wet'Poultry ,Capacity .Pop. Layer Non -Layer Design Current Dry Poultry Capacity 'Pop. Layers Non -Layers Pullets Turkeys Turkey Poults Other Longitude: Region: Design : Current Cattle . Capacity,. 'Pop,. a Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes ❑ No [NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes ❑ No NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes LJrNo ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes ERO�o ❑ NA ❑ NE of the State other than from a discharge? Page I of 3 21412015 Continued Facility Number: Date of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes E�KNo ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No F--.I'**NA ❑ NE Structure Structure Structure 3 Structure 4 Structure 5 Structure 6 Identifier:T Spillway?: Designed Freeboard (in).. Observed Freeboard (in):_ 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes To ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes E2'*No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes Flo ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes []— o ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes [:I1<o ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes [:Pdo ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes L , ° ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ENo ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes 2< ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes �No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? 18. Is there a lack of properly operating waste application equipment? Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check the appropriate box. ❑ Yes VNo ❑ NA ❑ NE ❑ Yes ❑ NA ❑ NE ❑ Yes 21V El Yes No ❑ NA ❑ NE ❑NA ONE ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ��No ❑ NA VNE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA Page 2 of 3 21412015 Continued Facility Number: �� - /�_j Date of Ins ection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes . to ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ YesE-No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes L-l<c ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No [/ AA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes 414o 2/NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: ❑ Yes No ❑�/ NA ❑ NE ❑ Yes ❑ No ❑ NA al' 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes 34. Does the facility require a follow-up visit by the same agency? ❑ Yes Zr-No, ❑ NA ❑ NE ❑NA ❑NE No ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (use additional pages as necessary). lII Iz1 t>,n +AA-tSe, Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 S. -4C,jeC9 y�c.4 Phone: `6 S 2,y 0 Date: 6h12--o 21412015