HomeMy WebLinkAbout20200555 Ver 1_Union SR 1362 No Survey Required form REVISED_20200426Project Tracking No.
16-09-0016
oa NO ARCHAEOLOGICAL SURVEY REQUIRED FORM
This form only pertains to ARCHAEOLOGICAL RESOURCES for this project. It is not
o valid for Historic Architecture and Landscapes. You must consult separately with the ;.
;.� Historic Architecture and Landscapes Group.
PROJECT INFORMATION
Project No: U-5808 County: Union
WBSNo: 44381.1.1 Document: State Minimum Criteria Checklist
Federal Aid No: Funding: ® State ❑ Federal
Federal Permit Required? ® Yes ❑ No Permit Type:
Project Description:
Construct SR 1362 (Chestnut Lane Connector) on new location from SR 1367 (Matthews Indian
Trail Rd.) to SR 1368 (Gribble Rd.) in Union County. The Area of Potential Effects (A.P.E.) is
approximately 706 meters (2,316 ft.) long and 66 meters (219 ft.) wide. Design plans provided.
Project is State -funded and will require Federal permits (type unknown). Easements will be
required.
NOTE: This is an update of the 3/21/2017 No Survey Required form which includes design
plans submitted in January 2018. The A.P.E. is slightly different than the 2017 submittal, but the
recommendation has not changed.
SUMMARY OF CULTURAL RESOURCES REVIEW
Brief description of review activities, results of review, and conclusions:
The review included an examination of a topographic map, the Union County soil survey, an
aerial photograph, and listings of previously recorded sites, previous archaeological surveys, and
previous environmental reviews at the Office of State Archaeology (O.S.A.). The A.P.E. is
oriented northeast -southwest, but is considered north -south for this review.
The topographic map (Matthews, N.C.) shows the A.P.E. is located on a hill top. It crosses two
seasonal drainages near their heads. No structures are depicted in the A.P.E. The A.P.E. is
wooded in the drainages and cleared on the uplands. The A.P.E. crosses a railroad near the mid
point of the project. The landforms in the A.P.E. have a low to moderate potential for
archaeological sites.
The Union County soil survey shows the soils in the A.P.E. are Cid channery silt loam (1-5%
slopes). This soil is moderately well -drained to somewhat poorly -drained, and is found on nearly
level landforms like flats, ridges, and at the heads of drainages.
The aerial photograph shows the landuse in the A.P.E. is a mix of wooded and cleared. There
are no structures in the A.P.E.
A review of information at the O.S.A. shows there are no previously recorded archaeological
sites within or adjacent to the A.P.E. The A.P.E. has not been previously surveyed for
archaeological sites. The north half of the A.P.E. is within a parcel that has been reviewed by the
"No ARCHAEOLOGYSUR VEYREQUIRED " form for Minor Transportation Projects as Qualified in the 2015 Programmatic Agreement.
1 of 7
Project Tracking No.
16-09-0016
State Historic Preservation Office (HPO) (ER 15-1114). The project is "Construct Indian Trail
Town Hall, Intersection of Matthews Indian Trail Rd. and North Indian Trail Rd., Indian Trail."
No survey was recommended because the project had a low probability to impact any significant
archaeological sites. Project ER 13-1675 is located along SR 1367 and existing Chestnut Pkwy.
It is "Constructor Road from Highway 74 to Matthews Indian Trail Rd., Indian Trail." No
survey was recommended because the project had a low probability to impact any significant
archaeological sites.
Brief Explanation of why the available information provides a reliable basis for reasonably
predicting that there are no unidentified historic properties in the APE:
The landforms in the A.P.E. have a low to moderate potential for prehistoric archaeological sites.
The north half of the project is within a previously reviewed project for which no archaeological
survey was recommended by HPO.
SUPPORT DOCUMENTATION
See attached: ® Map(s) ❑ Previous Survey Info
❑ Photocopy of County Survey Notes
FINDING BY NCDOT ARCHAEOLOGIST
NO ARCHAEOLOGY SURVEYREQUIRED
Caleb Smith
NCDOT ARCHAEOLOGIST II
❑ Photos ❑Correspondence
Other: design plans
1/12/2018
Date
`No ARCHAEOLOGYSUR VEYREQUIRED" form for Minor Transportation Projects as Qualified in the 2015 Programmatic Agreement.
2 of 7
-CABARRl_l�!�
STANLY
-r ri B✓ llRlb
u�f i\BL06.
MEC�KLE.�..
Nua b i
% �s
"M re Yr
ANSDN
k
'k
`:4 I
-- S_pwees'Esr'1.-1 ERE. Gelo,v+e.'J SGS. Infer mep. 111a er+l PCorp. MRE . ESr I J open. MET E«i G nHcnp KofV En
•-y,-®-..,_..—.,_._.w,_T... ,..,..._�, ,.._.-....., 1nai�-6*,3 msrmrka4p�om'!r•PkricSa ■nd 2l- GIs U— nay
"No ARCHAEOLOGYSURVEYREQUIRED "form for Minor Transportation Projects as Qualified in the 2015 Programmatic Agreement.
3 of 7
No ARCHAEOLOGYSURVEYREQUIRED "form for Minor Transportation Projects as Qualified in the 2015 Programmatic Agreement.
4of7
• + ER 13-1675 • +
• fir. ' i `� 4 N • • ■ y,� * ,
Path
s,r
• \ N�.
t� ''•� •�\\� / ER 15-1114
so
•; SR 1362 connector �'�� '� -__ _, • ,-' .' .r • '� .'�
L
- ' � �. 'lam= � �*' �� :�� '# � � �•� r
■ • /ram ~•f\ � •rr � �*+� f � i { `*
-JAdian Trail
�-. �� • • �'. r ti, �- err �1 , z � � r' ' � + ,
r tea` ` /� off
�' �r - ' � .. ems• T � fy' � +
t� r r �� :��—,tit w • � � � _ ,7
\ r •
+� •• ,F �: '' V` {3� 1 r riphlO -. IValier _ �k'C�
"No ARCHAEOLOGYSURVEYREQUIRED "form for Minor Transportation Projects as Qualified in the 2015 Programmatic Agreement.
5 of 7
q t
1
t.
by
.�
+"
140 70 0 140 meters 500 250 0 500 Fret
"No ARCHAEOLOGYSURVEYREQUIRED "form for Minor Transportation Projects as Qualified in the 2015 Programmatic Agreement.
6of7
No ARCHAEOLOGYSURVEYREQUIRED "form for Minor Transportation Projects as Qualified in the 2015 Programmatic Agreement.
7of7