Loading...
HomeMy WebLinkAboutNCC201691_ESC Approval Submitted_20200427City of Greensboro Sediment and Erosion Control GREENSBORO Grading Permit 14ORTH CAROLINA NOTICE Before beginning any utility or grading work within dedicated utility or street right-of-ways, contact the Engineering and Inspections Department, Engineering Division at (336) 373.2302 This certifies that a grading permit has been issued to: Canterbury School For the grading of: 1.90 acres Located at: I► M "111! . Date: April 17, 2020 5400 Old Lake Jeanette Rd. 2986 r Cass A. Heaton This notice must be posted in a conspicuous place on the site. REQUIRED INSPECTION Pre land -disturbing: Temporary measures: Date: y-",7/--a -e Date: Final Inspection: Date: Clearing and grading are not permitted until temporary sedimentation control measures have been installed and approved. Please call (336) 373-2158 to schedule an inspection. This permit has been issued as a result of meeting the minimum requirements of Section 30-12-6.12 SOIL EROSION AND SEDIMENTATION CONTROL PLANS GREENSBORO NORTH CAROLINA Letter of Approval Grading Permit: 2986 4/17/2020 Page 2 of 2 Also, this letter gives the notice required by G.S. 1 13A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal, State and local water quality laws, regulations, ordinances and rules. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. Your cooperation is appreciated. Sincerely, Cass A. Heaton Sediment and Erosion Control City of Greensboro Enclosures: NCG01 Fact Sheet City of Greensboro Grading Permit cc: Evans Engineering, Inc. File PO BOX 3136 • GREENSBORO NC 27402-3136 • WWW.GREENSBORO-NC.GOV • 336-373-CITY (2489) 640 GREENSBORO HORIH CAROLIHA LETTER OF APPROVAL April 17, 2020 Rhonda Youngdahl Canterbury School 5400 Old Lake Jeanette Rd. Greensboro, NC 27455 RE: Project Name: Canterbury School Library Admin Building Address: 5400 Old Lake Jeanette Rd. Greensboro, NC 27455 36.142198,-79.791669 Grading Permit: 2986 Disturbed Acreage: 1.90 Dear Ms. Youngdahl, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and that requirements have been met to issue a grading permit. The enclosed grading permit must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 413,0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCGO1 permit. however, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGOI permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. PO BOX 3136 . GREENSBORO NC 27402-3136 • WWW.GREENSBORO-NC.GOV • 336-373-CITY (2489) 640 Owner Responsibilities Pre -Construction Meeting City of Greensboro GREEN.BOR0 Sediment and Erosion Control NOR1" CAR ML A Responsibility The owner of any property within the City limits of the City of Greensboro where a land - disturbing activity is taking place, shall be solely responsible for any off -site damage to adjacent property or to city streets (mud and erosion in street), that may have been caused by the lack of erosion control measures or poor maintenance. The soil erosion measures detailed on your plans are the minimum required by the City of Greensboro. When conditions become apparent the owner/developer may be required by the City of Greensboro to have his/her engineers to design or redesign additional measures/devices to assure land protection. The approved sediment and erosion control plan may be and will be revised during construction when, in the opinion of the engineer or inspector, additional measures are necessary to prevent soil loss. 1. Erosion Control measures shall be installed prior to grading and according to plans or as directed by the City of Greensboro's Erosion Control Inspector. 2. The approval of the Erosion Control plan does not mean that additional measures may not be required to stop off -site sedimentation. 3. The Owner/Developer shall require the contractor to take every reasonable precaution throughout construction to prevent erosion of soil and sedimentation of streams, lakes, reservoirs, other water impoundments, ground surfaces or other property, as required by the City of Greensboro Development Ordinance. Chapter 30--Soil Erosion and Sedimentation Control. 4. The Owner/Developer is responsible for maintaining the erosion and sediment control devices for the duration of the construction. a. Inspection the site after each rain and periodically to ensure workmanship is according to plan and site is in compliance with the Erosion Control Ordinance. b. Repair or replace damaged or inoperative devices as directed by the Soil Erosion Inspector within a reasonable time or time set forth by the inspector. c. Keep mud off city streets. 5. If eroded soil from the site is deposited on adjacent property, City street or into a waterway, the Owner/Developer shall be responsible for returning the adjacent property, city street or waterway to its original condition in a matter satisfactory to the City or the owner of the property. 6. After placement of asphalt binder on newly constructed street the shoulder shall be seeded within fourteen (14) days according to the seeding specifications. 7. After fill cut slopes and other disturbed areas outside the construction limits are completed, the areas should be seeded within fourteen (14) calendar days, according to the seeding specifications. Perimeter dikes, swales, ditches and slopes, and all slopes steeper than 3:1 or greater than 50 feet in length should be stabilized within seven (7) calendar days. 8. The Owner/Developer must plan site work so stone placement on drive entrance, driveway and parking lot can start immediately after fine grading. 9. The Owner or Responsible Party is responsible for the long-term maintenance of the groundcover on the property. Groundcover must be maintained to a degree that prevents soil erosion and sedimentation at all times. The City of Greensboro has the authority to require changes in the owner's groundcover maintenance plan in order to stop soil erosion and sedimentation at any time. Investigations The City shall have the power to conduct such investigations as it may reasonably deem necessary to carry out its duties as prescribed in this Ordinance, and for this purpose to enter at reasonable times upon any property, public or private, for the purpose of investigating and inspecting the sites of any land -disturbing activity. No person shall refuse entry or access to any authorized representative or agent of the city who requests entry for purpose of inspection and who presents appropriate credentials, nor shall any person obstruct, hamper, or interfere with any such representative while in the process of carrying out his or her official duties. Owner: Agent: Engineer: Grading Contractor: General Contractor: Date: Date: Date: Date: Date: Fact Sheet on the New NCG41 Permit DE4 :� April 2019 .a ` Grp.t'sgM GA-.�afJ OY.lp� The NC Construction General Permit (also known as "NCGO1") was renewed on April 1, 2019. The updated permit does not significantly change the measures that are required to be implemented on construction sites. However, there are some organizational and technical updates to the permit as described below. Most notably, there is a new process in which construction sites will obtain official coverage under an NCG01 permit through an electronic process. DEMLR worked with a broad team of stakeholders to make all of these updates. If you have questions, contact Annette Lucas at Annette.lucas@ncdenr.gov or (919) 707-3539. Organizational Updates The new permit: Repeats state requirements for E&SC Plans and organizes them with federal construction activity requirements; Is clearly organized by topic; and Has less text and more tables. Technical Updates The new permit: • Requires that the E&SC Plan meet SWPPP requirements (p. 2); • Provides a list of items that must be included in the SWPPP, such as the construction sequence, plans, calculations, etc. (p. 2-4);' • Has updated language on bypasses and upsets that is tailored to construction activities (p. 10); • Puts all timeframes for inspections, record -keeping and reporting in "calendar days" for clarity and consistency (p. 11-14);2 • Changes the inspection frequency (during business hours) to at least once per 7 calendar days and after every storm > 1.0 inch (previously 0.5 inch);' and • Excludes weekends, state and federal holidays from normal business hours unless construction activities take place (p. 23). 1 This list is based on website guidance by the DEMLR Sediment Program. 2 The number of calendar days was selected to be as equivalent as possible with the previous permit. ' The intent is to provide predictability to the inspection schedule. Acronyms to Know COC: Certificate of Coverage, proof of coverage under an NCG01 permit DEMLR: NC Division of Energy, Mineral, and Land Resources E&SC: Erosion & Sedimentation Control e-NOI: Notice of Intent, application form for the NCG01 permit e-NOT: Notice of Termination, form for closing out the NCG01 permit SWPPP: Stormwater Pollution Prevention Plan, required by the NCG01 The NCG01 Process The new NC601 applies to permits approved on or after April 1, 2019, Permittees will no longer receive a copy of the NCGO1 permit in the mall with their E&5C Plan approvals and be considered as covered under the permit. Federal rules require that DEMLR receive an NOI on each construction project and issue each construction project its own COC. Under the new NCG01 process, construction sites will continue to receive approval for E&SC Plans from either DEMLR or the delegated local E&SC program just like before. After receiving E&SC Plan approval, permittees will officially obtain coverage under the NCG01 by completing an a-NOI (available at deq.nc.gov/NCG01). The e-NOI will only take about 20 minutes to fill out and submit on-line. Initially, there will be no charge associated with applying for an NCG01 permit but on or around June 1, 2019, DEMLR will begin charging a $100 annual general permit fee as required per §143-215.3D. DEMLR is working on creating a single application form that will allow an applicant to simultaneously apply for an E&SC permit and an NCG01 COC. That effort is part of a larger Permit Transformation project at DEMLR. Q&A About the New NCGO1 Permit Why do construction sites have to do this extra application step? DEMLR is required by the EPA to issue a specific COC to every construction site that disturbs one acre or more. DEMLR is working to create a form that combines the E&SC plan approval and a-NOI processes, but that will take more time. For now, DEMLR has created an efficient a-NOI process. If an E&SC Plan is approved before April 1, which permit applies? Projects with already approved E&SC Plans will automatically follow the new NCG01 permit, but will not need to fill out an a-NOI or pay an annual permit fee. However, the permittees should print the new permit and the two standard detail sheets and have them on site. Will DEMLR offer tools to help permittees comply with the new NCG01? Yes, DEMLR will provide two sample plan sheets at deg.nc.gov/NCG01 that can be placed into the E&SC plan set. The first covers the site stabilization and materials handling portions of the permit. The second sheet covers the inspection, record -keeping and reporting portions of the permit. How will the new a-NOI submittal and COC process work? Permittees will apply for E&SC Plan approvals from DEMLR or the local E&SC program like before. The E&SC approval letter will instruct the permittee to visit deg.nc.gov/NCG01 to submit an a-NOI form to DEMLR. The permittee may begin the construction activity after receipt of the COC (within three days*). The permittee must print and retain a copy of the permit and the COC on site. Initially, the COC will be issued for free but on or around June 1, 2019, a $100 annual general permit fee will be charged. Who is allowed to submit an a-NOI form? Submittal must be by a responsible corporate officer that owns or operates the activity, such as a president, secretary, treasurer, or vice president or a manager that is authorized in accordance with IV.8.6 of the NCGO1 permit. Additional signatory options are set forth in IV.B.6 of the permit. It is possible for consultant to prepare the a-NOI, save it as a draft, and email it to the responsible entity for signature & submittal. What happens to the COC when the construction activity is complete? When a project is complete, the permittees will contact DEMLR or the local delegated program to close out the E&SC Plan. After DEMLR or the local E&SC program inform the permittee of the project close out via inspection report, the permittee will visit dec1.nc.goy/NCG01 to submit an e-NOT. Will there be a grace period for adherence to the new process? DEMLR does not have the authority to grant a grace period from a federally mandated permit. Permittees will be informed of the new process via web site, E&SC Plan approval letters and list servs. If a construction activity disturbs one acre or more (or is part of common plan of development that disturbs one acre or more) fails to submit an a-NOI after approval of its E&SC Plan, this is a violation of federal permitting requirements and the permittee could be subject to a penalty assessment. How does the new NCG01 affect the delegated local E&SC Programs? Local programs will continue to review and approve E&SC plans. However, they will no longer send copies of the NCG01 with E&SC Plan approvals. DEMLR will provide sample language to use in local E&SC Plan approvals to advise permittees that they must submit an e-NOI to DEMLR, Local programs are not required to check if permittees have submitted e- NOls to DEMLR. However, if they wish to do this voluntarily, there will be a tool available on DEMLR's web site for them to view a list of construction projects that have submitted a-NOIs. When local programs close out an E&SC Plan, the close-out letter will advise permittees that they must submit an e- NOT. DEMLR will provide sample language. Local programs may approve E&SC plans that meet state sediment laws and rules even if those plans are not compliant with all of the NCG01 requirements. However, their permittees will be required to add two plan sheets (which will be provided by DEMLR) to their E&SC Plans to ensure that they fully comply with the ground stabilization, materials handling, and inspection, record -keeping and reporting portion of the NCGO1 permit. * Or 24 business hours for a project approved under the DEMLR Express review program.