Loading...
HomeMy WebLinkAboutNCC201681_ESC Approval Submitted_20200427ROY COOPER Govenxm• MICHAEL S. REGAN secrerur)• BRIAN WRENN (Crini7 Utrcc rar NORTH CAROLINA Environmental Quality April 21, 2020 LETTER OF APPROVAL Wake Tech Community College ATTN: Jeffrey J. Carter, Vice President, Facilities 9101 Fayetteville Road Raleigh, NC 27603 RE: Project Name: WTCC ADA Accessibility Upgrades - Southern Campus Project ID: WAKE-2020-069 Approved Acres: 4.46 County: WAKE, City: Raleigh Address: Daffodil Drive River Basin: Neuse Stream Classification: Other Submitted By: The John R. McAdams Company, Inc. Date Received by LQS: March 27, 2020 Plan Type: New Dear Mr. Carter: The subject erosion and sedimentation control plan has been approved. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is received, you will receive the COC via email. You MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at dQq.n_c.gav/NCG01. Please direct questions about the eNOI form to Annette Lucas at Annette. Lucas a,ncdenngov_ or Paul Clark at Paul.Clark a,nederingov. If the ownerioperator of this project changes in the future, the new responsible party is required to apply for his/her own COC. Title 15A NCAC 4B .011 S(a) and the NCGO 1 permit require that the following documentation be kept on file at the jab site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO l permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. $—A Nash Carolina E)epartnunt of [nvEronmenutl Quality Uivisian of Energy. \line r aI and Land Resources Raleic)hitei)ional{.)Bice Iti28Mail Sevice Center 'I800Dari(:1IDtivc f.alrigh,N rtliCirolina'27�pe iwvatiria'�-esa�.\ � t)1t�,7tll.l..r(]f1 Letter of Approval Wake Tech Community College April 21, 2020 Page 2 of 2 Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. Title 15A NCAC 4B .0118(a) requires that a copy of the approved erosion control plan be on file at the job site. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is detennined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute I I3A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this pen -nit and would require a revised plan and additional application fee. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, Sally Castle, El Regional Engineering Associate Land Quality Section Enclosures: Certificate of Approval NPDES NCG01 Fact Sheet cc: James L. Eason Jr, PE (eason(-mcadamsco.com )—Electronic Copy Regional Office File