HomeMy WebLinkAbout20160849 Ver 1_Upper Rocky PCN Revision 042320_20200423
April 23, 2020
US Army Corps of Engineers NC Division of Water Resources
Charlotte Regulatory Field Office 401 and Buffer Permitting Branch
Attn: Bryan Roden-Reynolds Attn: Mac Haupt & Erin Davis
8430 University Executive Park Drive 512 N. Salisbury Street
Charlotte, NC 28262 Raleigh, NC 27604
RE: WLS Revisions to ePCN for the Upper Rocky Mitigation Project, USACE AID# SAW-2015-
01816, DWR Project #20160849, Yadkin River Basin, Cataloging Unit 03040105, Mecklenburg
County, NC Dear Mr. Roden-Reynolds, Mr. Haupt, and Ms. Davis: Water & Land Solutions, LLC (WLS) submitted an ePCN for the Upper Rocky mitigation project on February 28, 2020 along with the accompanying fee payment to DWR. On March 17, 2020 WLS received an email from Todd Tugwell with additional comments on the final mitigation plan. One of those comments addressed the design location of Reach R3. On March 19, 2020 DWR put the PCN review on hold until the design revisions were finalized. Based on these additional comments and correspondence, WLS has redesigned sections of R3 and R5. This redesign has revised the stream and wetland impacts in the February 28th ePCN submittal. Please find summarized below the revisions to the ePCN:
• Updated wetland and stream impact tables attached (wetland impacts remain the same)
• Updated Figure 6 – PCN Impacts and Figure 7 – Forest Impacts
• Revised Final Mitigation Plan (April 2020) has been uploaded to the Supplemental Information link
• Revised IRT Response Letter (April 2020) has been uploaded to the Supplemental Information link Please contact me if you have any additional questions or comments. Sincerely,
Water & Land Solutions, LLC
Cara Conder Senior Project Manager Water and Land Solutions, LLC Mobile Phone: (843) 446-2312 Email: cara@waterlandsolutions.com
Upper Rocky Stream and Wetland Impacts April 2020
Wetland Impacts
2a. Site # 2a1. Reason 2b. Impact
Type
2c. Type of Wetland 2d. Wetland
Name
2e.
Forested
2f. Type of
jurisdiction
2g.
Impact
Area
W1 Excavation P Floodplain Pool W1 Yes Corps 0.039
W2 Excavation P Bottomland Hardwood Forest W2 Yes Corps 0.063
Stream Impacts
3a. Stream Impact
number
Permanent (P) or
Temporary 3b. Impact Type
3c. Type of
Impact
3d.
Stream
name
3e. Stream
Type
3f. Type of
jurisdiction
3g. Stream
width (feet)
3h. Impact
Length
S1 Restoration Permanent Relocation R1 Perennial Corps 18 1916
S2 Greenway Crossing Permanent Culvert R2 Perennial Corps 8.5 24
S3 Enhancement Temporary Stabilization R2 Perennial Corps 8.5 549
S4 Restoration Permanent Relocation R3 Perennial Corps 15 1348
S5 Restoration Permanent Relocation R4 Perennial Corps 9 661
S6 Restoration Permanent Relocation R5 Perennial Corps 10 3059
S7 Enhancement Temporary Stabilization R5 Perennial Corps 10 265
S8 Enhancement Temporary Stabilization R5a Intermittent Corps 5 189
S9 Restoration Permanent Relocation R6 Perennial Corps 11 511
S10 Enhancement Temporary Stabilization R6 Perennial Corps 11 213
S11 Restoration Permanent Relocation R7 Perennial Corps 7.5 964
S12 Enhancement Temporary Stabilization R7a Perennial Corps 9 124
S13 Restoration Permanent Relocation R8 Intermittent Corps 8 79
Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CN ES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GISUser Community
FIGURE6Upper Rocky Mitigaiton Project
NAD 1983 2011 State PlaneNorth Carolina FIPS 3200 FT US
PCN Impacts Map
Leg en d
Conservation EasementFuture Gree nway CorridorWetlands (verifie d)Prop osed Strea mWetland Impacts (~0 .1 02 acres)Stream Impacts (24 ft)
0 360 720Feet
±W3
W5
R1R8R3
R6
R4
R5
R5a
R7a
R7
R2W4
W2: 0.063 Acres Impacted
W1: 0.039 Acres Impacted
R2: Impact 24ft Culvert
W6
Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GISUser Community
FIGURE7Upper Rocky Mitigation Project
NAD 1983 2011 State PlaneNorth Carolina FIPS 3200 FT US
Forest Impacts Map
Legend
Conservation EasementFuture Greenway CorridorProposed StreamWetlands (verified)Permanent Forest Impacts (~1.85 acres)Temporary Forest Impacts (~6.35 acres)
0 360 720Feet
±W3
W5
R1R8R3
R6
R4
R5
R5a
R7a
R7
R2
W1
W2 W4
W6