Loading...
HomeMy WebLinkAbout20160849 Ver 1_Upper Rocky PCN Revision 042320_20200423 April 23, 2020 US Army Corps of Engineers NC Division of Water Resources Charlotte Regulatory Field Office 401 and Buffer Permitting Branch Attn: Bryan Roden-Reynolds Attn: Mac Haupt & Erin Davis 8430 University Executive Park Drive 512 N. Salisbury Street Charlotte, NC 28262 Raleigh, NC 27604 RE: WLS Revisions to ePCN for the Upper Rocky Mitigation Project, USACE AID# SAW-2015- 01816, DWR Project #20160849, Yadkin River Basin, Cataloging Unit 03040105, Mecklenburg County, NC Dear Mr. Roden-Reynolds, Mr. Haupt, and Ms. Davis: Water & Land Solutions, LLC (WLS) submitted an ePCN for the Upper Rocky mitigation project on February 28, 2020 along with the accompanying fee payment to DWR. On March 17, 2020 WLS received an email from Todd Tugwell with additional comments on the final mitigation plan. One of those comments addressed the design location of Reach R3. On March 19, 2020 DWR put the PCN review on hold until the design revisions were finalized. Based on these additional comments and correspondence, WLS has redesigned sections of R3 and R5. This redesign has revised the stream and wetland impacts in the February 28th ePCN submittal. Please find summarized below the revisions to the ePCN: • Updated wetland and stream impact tables attached (wetland impacts remain the same) • Updated Figure 6 – PCN Impacts and Figure 7 – Forest Impacts • Revised Final Mitigation Plan (April 2020) has been uploaded to the Supplemental Information link • Revised IRT Response Letter (April 2020) has been uploaded to the Supplemental Information link Please contact me if you have any additional questions or comments. Sincerely, Water & Land Solutions, LLC Cara Conder Senior Project Manager Water and Land Solutions, LLC Mobile Phone: (843) 446-2312 Email: cara@waterlandsolutions.com Upper Rocky Stream and Wetland Impacts April 2020 Wetland Impacts 2a. Site # 2a1. Reason 2b. Impact Type 2c. Type of Wetland 2d. Wetland Name 2e. Forested 2f. Type of jurisdiction 2g. Impact Area W1 Excavation P Floodplain Pool W1 Yes Corps 0.039 W2 Excavation P Bottomland Hardwood Forest W2 Yes Corps 0.063 Stream Impacts 3a. Stream Impact number Permanent (P) or Temporary 3b. Impact Type 3c. Type of Impact 3d. Stream name 3e. Stream Type 3f. Type of jurisdiction 3g. Stream width (feet) 3h. Impact Length S1 Restoration Permanent Relocation R1 Perennial Corps 18 1916 S2 Greenway Crossing Permanent Culvert R2 Perennial Corps 8.5 24 S3 Enhancement Temporary Stabilization R2 Perennial Corps 8.5 549 S4 Restoration Permanent Relocation R3 Perennial Corps 15 1348 S5 Restoration Permanent Relocation R4 Perennial Corps 9 661 S6 Restoration Permanent Relocation R5 Perennial Corps 10 3059 S7 Enhancement Temporary Stabilization R5 Perennial Corps 10 265 S8 Enhancement Temporary Stabilization R5a Intermittent Corps 5 189 S9 Restoration Permanent Relocation R6 Perennial Corps 11 511 S10 Enhancement Temporary Stabilization R6 Perennial Corps 11 213 S11 Restoration Permanent Relocation R7 Perennial Corps 7.5 964 S12 Enhancement Temporary Stabilization R7a Perennial Corps 9 124 S13 Restoration Permanent Relocation R8 Intermittent Corps 8 79 Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CN ES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GISUser Community FIGURE6Upper Rocky Mitigaiton Project NAD 1983 2011 State PlaneNorth Carolina FIPS 3200 FT US PCN Impacts Map Leg en d Conservation EasementFuture Gree nway CorridorWetlands (verifie d)Prop osed Strea mWetland Impacts (~0 .1 02 acres)Stream Impacts (24 ft) 0 360 720Feet ±W3 W5 R1R8R3 R6 R4 R5 R5a R7a R7 R2W4 W2: 0.063 Acres Impacted W1: 0.039 Acres Impacted R2: Impact 24ft Culvert W6 Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GISUser Community FIGURE7Upper Rocky Mitigation Project NAD 1983 2011 State PlaneNorth Carolina FIPS 3200 FT US Forest Impacts Map Legend Conservation EasementFuture Greenway CorridorProposed StreamWetlands (verified)Permanent Forest Impacts (~1.85 acres)Temporary Forest Impacts (~6.35 acres) 0 360 720Feet ±W3 W5 R1R8R3 R6 R4 R5 R5a R7a R7 R2 W1 W2 W4 W6