Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20200486 Ver 1_More Info Received_20200423
Strickland, Bev From: Michael Brame <mbrame@pilotenviro.com> Sent: Thursday, April 23, 2020 2:00 PM To: Homewood, Sue Subject: [External] FW: FTCC stabilization Follow Up Flag: Follow up Flag Status: Completed External report.spam@nc.g1 FYI Sincerely, Michael T. Brame 336.708-4620 (c) 336.310.4527 (o) PO Box 128 Kernersville, NC 27285 P I L O T E N V I R p N M E N T A L, I N[ mbrame@pilotenviro.com From: Ravindra Bissram <rbissram@feiconsulting.com> Sent: Thursday, April 23, 2020 1:59 PM To: Michael Brame <mbrame@pilotenviro.com> Subject: RE: FTCC stabilization One thing, I uploaded an older version to the file where a couple sheets weren't sealed [having a little trouble with software this morning]. I was able to replace the file a few minutes ago; if you or Sue have problems retrieving the pdf, let me know and I'll reset the link. I tried it, and it seemed to work. Thanks, Rav Ravindra Biss ram, Senior Project Manager -. Civil Engineers and Lard Surveyors 8518 Triad Drive Colfax, PIC 27235 Phone-.(336)544-6426 Website [feiconsulting.coml I Vcard [drive.google.coml I Map [google.coml I Email From: Michael Brame <mbrame@pilotenviro.com> Sent: Thursday, April 23, 2020 1:56 PM 1 To: Ravindra Bissram <rbissram@feiconsulting.com> Subject: RE: FTCC stabilization Thanks Rav Sincerely, Michael T. Brame 336.708-4620 (c) 336.310.4527 (o) PO Box 128 Kernersville, NC 27285 www.pilotenviro.com fpilotenviro.com mbrame(@r)ilotenviro.com From: Ravindra Bissram <rbissram@feiconsulting.com> Sent: Thursday, April 23, 2020 1:13 PM To: Michael Brame <mbrame@pilotenviro.com> Subject: RE: FTCC stabilization Michael: Below is the dropbox link to the updated plan set. Let me know if you need anything else. https://www.dropbox.com/s/o3ifuyr6b9s8w13/2020-04-23%20-%20FTCC%20PIan%20Set.pdf?dI=0 fdropbox.coml Thanks, Rav u ul�ii Illlipill 8518 Triad Drive Colfax, NC 2723 Website ffeiconsulting.coml I Vcard fdrive.google.coml I Map [google.coml I Email From: Michael Brame <mbrame@pilotenviro.com> Sent: Thursday, April 23, 2020 9:24 AM To: Ravindra Bissram <rbissram@feiconsulting.com> Cc: Homewood, Sue <sue.homewood@ncdenr.gov> Subject: FW: FTCC stabilization Good Morning Rav, N Please remove the green ash from the planting list and send me a copy of an updated list and copy Sue. Thank -you. Sincerely, Michael T. Brame 336.708-4620 (c) 336.310.4527 (o) PO Box 128 Kernersville, NC 27285 www.pilotenviro.com fpilotenviro.coml mbrame(@r)ilotenviro.com From: Homewood, Sue <sue.homewood@ncdenr.gov> Sent: Wednesday, April 22, 2020 2:55 PM To: Michael Brame <mbra me@pilotenviro.com> Cc: Roden Reynolds, Bryan K CIV (US) <Bryan.K.Roden Reynolds@usace.army.mil>; Munzer, Olivia <olivia.munzer@ncwildlife.org> Subject: FTCC stabilization Hi Mike, WRC requested that you remove green ash from the planting list for this project. Thanks, Sue Homewood Division of Water Resources, Winston Salem Regional Office Department of Environmental Quality 336 776 9693 office 336 813 1863 mobile Sue. Homewood@ncdenr.gov 450 W. Hanes Mill Rd, Suite 300 Winston Salem NC 27105 3" x a :... 3 FORSYTH TECHNICAL COMMUNITY COLLEGE RETAINING WALL & STREAM RESTORATION CITY OF WINSTON-SALEM FORSYTH COUNTY NORTH CAROLINA DEVELOPER INFORMATION: FORSYTH TECHINICAL COMMUNITY COLLEGE MICHAEL BARNETTE 2100 SILAS CREEK PARKWAY WINSTON-SALEM, NC 27103-5197 SUITE #307A, ALLMAN CENTER (336) 734-7205 MBARN ETTE@FORSYTHTECH.EDU ENGINEERING CONTACT RAVINDRA BISSRAM, PE 8518 TRIAD DRIVE COLFAX, NC 27235 (336) 544-6426 RBISSRAM@FEICONSULTI NG.COM DATE: 04/14/2020 LAT: 36.067425 LONG:-80.271806 w J SILAS CREEK PKWY SITE 0 N-40 �J 0 0 VICINITY MAP 1 "=2000' Civil Engineers and Land Surveyors 8518 Triad Drive, Colfax, NC 27235 (336) 852-9797 AFE111 www.felconsulting.com License No. C-0950 TABLE OF CONTENTS Sheet Number Sheet Title 1 Cover Sheet 2 Abbreviations & Legend 3 Existing Conditions 4 Site Plan 5 Wall Structural Plans - Site Plan 6 Wall Structural Plans - Profile 7 Wall Structural Plans - Details 8 Wall Structural Plans - Specifications 9 Erosion Control - Stage 1 10 Erosion Control - Stage 2 11 Erosion Control - Stage 3 12 Erosion Control - Stage 4 13 Stream Restoration - Sections 14 Stream Restoration - Planting Schedule 15 Details O�W A SEAL 027436 4-23-20 FINAL - NOT RELEASED FOR CONSTRUCTION ABBREVIATIONS SYMBOLS & LINETYPE LEGEND PROPOSED EXISTING PROPOSED EXISTING ABAN ABANDONED LT LEFT OFFSET FROM CENTERLINE AC ACRES LP LIGHT POLE ADA ACCESSIBLE ROUTE BFP BFP BACKFLOW PREVENTER AGG AGGREGATE LF LINEAR FEET — CENTERLINE ® ® BENCHMARK ARV AIR RELEASE VALVE MH MANHOLE UC Uc COMMUNICATIONS (UNDERGROUND) BLOWOFF ASPH ASPHALT MAX MAXIMUM 0 o ABC ASPHALT BASE COURSE MBL MAXIMUM/MINIMUM BUILDING LINE __- aoa-- CONTOUR LINES 0 13 CATCH BASIN BC BACK OF CURB MJ MECHANICAL JOINT — — CREEK, STREAM OR WATER BODY f] © COMMUNICATION BOX OR MANHOLE BFP BACKFLOW PREVENTER MIN MINIMUM BEG BEGIN MON MONUMENT - — — — — — — — - CURB & GUTTER O O COMPUTED POINT BMP BEST MANAGEMENT PRACTICES NIC NOT IN CONTRACT DL DISTURBED AREA ® ® CURB INLET BOL BOLLARD NTS NOT TO SCALE DITCH 0 ® DRAINAGE MANHOLE BTM BOTTOM OC ON CENTER y y y DIVERSION BERM BLDG BUILDING OHP OVERHEAD UTILITIES O O ELECTRIC METER CIP CAST IRON PIPE PG PAGE b b b DIVERSION BERM (CLEAN) p 0 ELECTRIC PEDESTAL CB CATCH BASIN PED PEDESTRIAN DRAINAGE AREA FIBER OPTIC PEDESTAL OR MARKER CL CENTERLINE PB PLAT BOOK CO CLEANOUT PVC POLYVINYL CHLORIDE --- ACE - - - - - ACE --- --- ACE - - - - - ACE --- EASEMENT (ACCESS) FD FD FIRE DEPARTMENT CONNECTION CBU CLUSTER BOX UNIT PCC PORTLAND CEMENT CONCRETE --- BMPE----- BMPE -- --- BMPE - - - - BMPE -- EASEMENT (BMP) sm 1�3 FLARED END SECTION COMM COMMUNICATION PWR POWER --- DMUE----- DMUE--- --- DMUE----- DMUE--- EASEMENT (DMUE) © © GAS METER OR MARKER CONC CONCRETE PP POWER POLE CMON CONCRETE MONUMENT PL PROPERTY LINE EASEMENT (DRAINAGE) GAS VALVE CONST CONSTRUCTION PROP PROPOSED PssE - -- ESSE ----- ESSE --- EASEMENT (SANITARY) HEADWALL OR ENDWALL CMP CORRUGATED METAL PIPE R RADIUS PSTE --- ESTE ----- ESTE --- EASEMENT (STORM) ® ® HVAC CRK CREEK RR RAILROAD RPZ PWE -__ __- EWE _____ EWE EASEMENT (WATER) HYDRANT CY CUBIC YARDS REDUCED PRESSURE BACKFLOW C&G CURB AND GUTTER RCP REINFORCED CONCRETE PIPE - - EASEMENT (MISC) O IRON PIPE CI CURB INLET R/W RIGHT OF WAY --- a ----- a -- ELECTRIC (OVERHEAD) x LIGHT POLE DB DEED BOOK RT RIGHT OFFSET FROM CENTERLINE DEMO DEMOLITION SS SANITARY SEWER UE ---UE ----- UE--- ELECTRIC (UNDERGROUND) O O MISCELLANEOUS METER DIA DIAMETER SSCO SANITARY SEWER CLEANOUT EROSION BAFFLE p 0 MISCELLANEOUS UTILITY PEDESTALOR MARKER DOM DOMESTIC SSMH SANITARY SEWER MANHOLE — x — x — x — — x x x — FENCE o o REDUCER DCA DOUBLE CHECK ASSEMBLY SVC SERVICE LATERAL DE DRAINAGE EASEMENT SIP SET IRON PIPE FLOODPLAIN ❑ ❑ RIGHT OF WAY MONUMENT DWG DRAWING S/W SIDEWALK FW — FW FLOODWAY ® ROCK DAM DWY DRIVEWAY SDE SIGHT DISTANCE EASEMENT G --- G ----- G --- GAS LINE o o SANITARY CLEANOUT DI DROP INLET SF SQUARE FEET DIP DUCTILE IRON PIPE STD STANDARD GUARDRAIL © QS SANITARY MANHOLE ESMT EASEMENT STA STATION LANDSCAPE BUFFER ® SHRUB EC EDGE OF CONCRETE SD STORM DRAIN LA --- LA----- LA--- LANDSCAPED AREA TF TF TRANSFORMER EG EDGE OF GRAVEL STMH STORM MANHOLE EP EDGE OF PAVEMENT TMH TELEPHONE MANHOLE PHASE LINE TRANSMISSION TOWER E ELECTRICAL TPED TELEPHONE PEDESTAL — — PROPERTY LINE (ADJACENT) TREE (CANOPY) EMH ELECTRICAL MANHOLE TEMP TEMPORARY PROPERTY LINE (SUBJECT) ® rL `07 TREE (UNDERSTORY) EL,ELEV ELEVATION T/C TOP OF CURB EX EXISTING TBM TRAVERSE BENCHMARK RAILROAD TRACKS CO-) UTILITY POLE FC FACE OF CURB TYP TYPICAL — — RIGHT OF WAY ® 0 WATER METER FO FIBER OPTIC UG UNDERGROUND — RD RD --- RD ----- RD --- ROOF DRAIN 9 ® WATER VALVE FG FINISH GRADE UE UTILITY EASEMENT FFE VG FMB --- FM ----- FM--- SANITARY SEWER (FORCEMAIN) Q WELL FINISHED FLOOR ELEVATION VALLEY GUTTER FDC FIRE DEPARTMENT CONNECTION VCP VITRIFIED CLAY PIPE SS --- SS----- SS--- SANITARY SEWER (GRAVITY) ® ® YARD GRATE FH FIRE HYDRANT WTR WATER --- SB----- SB--- --- SB----- SB--- SETBACKS ❑ YARD INLET FES FLARED END SECTION WL/WM WATER MAIN FL WV --- SF_____ SF__— SILT FENCE O SWALE NUMBER FLOW LINE WATER VALVE FIP FOUND IRON PIPE YI YARD INLET --- ST----- ST--- STORM DRAIN FIR FOUND IRON ROD — STREAM BUFFER (ZONE 1) G GAS STREAM BUFFER (ZONE 2) HATCHING & SHADING GV GATE VALVE GI GRATE INLET W W ---W-----W--- WATER MAIN ASPHALT HVAC HEATING, VENTILATION, AIR CONDITIONING WOODS LINE HDPE HIGH DENSITY POLYETHYLENE BUILDING HYD HYDRANT CONCRETE INV INVERT IRR GRAVEL IRRIGATION RIP RAP ROCK Q v� MTYuls T P 9 N1+, 2G'�J�O RAT J LOI 2 Q Z y m 7 n y BEFORE YOU DIGI CONTACT ONE. -CALL CENTER � U) 2 ) O m 4J � > N � V V)Z E U o 0 L11 Ln .> O N r— V N del •O �c�6N �Z Ln w F- o0 un co M U iuco�3� W LL z O �o QU W N U d z O azww LL O�U'9 ir�--j0 W LC� Q zWoz 0 o O LL N � z C Q a�wnn V LL] w J 06 U) C45 z O J J Q \Q_ Lu V zco m Z Q z Q w O o�}¢ U LL]Z o°ow 1u)LO Z } Z U w�ZLii U o}0a (IQQU) U w H O z z O w w Q 0 z a a a a a a DRAWN BY CP CHECKED BY: RB DATE: 04/14/2020 PROJECT NO.: 06006.001 SCALE: N/A CA �s �. �� •, = SEAL 027436 N�RA gas 4-23-20 SHEET 2 OF 15 FINAL - NOT RELEASED FOR CONSTRUCTION SILAS CREEK PARKWAY i RD m ■ ITESURVEYORS I . . K G�p�E pA , LANDSCAPE, r! . Oaks t ENEVA ROAD Winston-Salem, NC 04 ph 336.765.1923 TURNING + •LANDMARKS NC CORPORATE LICENSE #C-3999 north rI ? co co 0G— z V I C I NI7 Y MAP a S SAN. SEWER MH� _ -_ _..786. -- ............ RIM 78s.15' NOTES: {NOT TC SALE; z 1. RAW ERROR OF CLOSURE 1:10,000+. THIS IS I w �0HU_ --0"U OHU )D4U �OHU-- �0M�i — OH U�_ NOT A BOUNDARY SURVEY. THE PURPOSE OF THIS MAP IS TO DEPICT AN AREA WHERE TOPOGRAPHY WAS SURVEYED. OHU�. flHU---� --782-• _ ' - - _ \ ! 2. DISTANCES SHOWN ARE HORIZONTAL GROUND DISTANCES UNLESS NOTED OTHERWISE. DISTANCES, COORDINATES AND ELEVATIONS ARE IN U.S. SURVEY FEET NOTED OTHERWISE. 1 UNLESS -- - - ,, , ` ! g , ASPHALT 3. THIS PROPERTY IS IN ZONE X, AREA DETERMINED TO BE OUTSIDE THE 0.2°Io - ANNUAL CHANCE FLOODPLAIN, ACCORDING \ TO F.I.R.M. PANEL NO. 3710682400J, EFFECTIVE !' \ •- ` =! ! - 7R� _- DATE JANUARY 2, 2009. l �`� �88 !,,! `` 4. NC GRIT] POSITION HAS BEEN PREVIOUSLY `• \ * - \)$ ESTABLISHED BASED ON OTHER SURVEYS `! !, �\ r $� _ 'g, ACCOMPLISHED NEAR THIS SITE. \ ! ! 1 r 5, SURVEY FIELD WORK WAS COMPLETED ON: JANUARY 16, 2020. 6, THIS SURVEY IS SUBJECT TO ANY AND ALL FACTS THAT MAY BE DISCLOSED BY A FULL �6� TITLE SEARCH, WHICH HAS NOT BEEN FURNISHED TO SURVEYOR AS OF THIS DATE. ..\ �� \!!1 \�•� `F+ \\ \ \\ � \N ,!\ `, \ \ `\ \ • ! ` - 7, NON -GRAVITY UNDERGROUND UTILITIES , ` ! '�. ' \ \ \ a cv \ �\ !;,1 ! . �� . \ \ � � "r � ' ASPHALT CONCRETE DEPICTED HEREON HAVE BEEN SURVEYED BASED ON ABOVE -GROUND MARKINGS BY A • CA 1 \ �� � \ c �, a \ 1� ,,, \ \� \ • \ Ep DOCK UTILITY LOCATING CONSULTANT. SURVEYOR m Bar k' x t DOES NOT CERTIFY THE ACCURACY OF THE UTILITY LOCATIONS NOR THAT ALL ! I t` 1 `• 24" OAK i �; �\ \ i . ` •. ` x d'j UNDERGROUND UTILITIES HAVE BEEN SHOWN. �, ,�\' \ \ ! �. 1 1 1 1 kl f �' I l , • \� 1 CONTACT NG ONE -CALL PRIOR TO ANY EXCAVATION. own ,,!�r\ ! 1!!!�1� 111 15 f"E` !�1 1 j ` END; WALL, ' 17� '� >. �•, � 24 "RCP CF• � � � ', , �,; , � ` •, j ; , � I a 1. ', !. , \ \ _ - � � 22" OAK ' `111W. 777-7T ` UPSTRtAM CONN�C ION i ` , � , { !III, ii � �2 �\ \ ` \ --_ k \ � / �•`_ � 7$ � SpN\SEWER MN \ \� �--- _._.� - `, -., Q? �.. \\ i i R s �9 SLOPE FAILURE\ ■ =_ = .! ' ,' ,� �f rJ/yy�'S� CRACK �I51BLE �',� >»� �• 10 \ sR - .].•! �14." POP`AR SYCAMORE e >> Y �4 AiL1@�+1 D. 18" SYCAMORE �'PLAR CERTIFICATE OF ACCURACY OF TOPOGRAPHIC MAPPING \ PS'TREAM �)� c� \ NMEG°Tla�d \ IN 771.49' .. �' T� t� ti CVO �aY�R YED� �77 i, BUD E. BAUGHMAN, CERTIFY THAT THIS PROJECT WAS COMPLETED UNDER MY DIRECT AND RESPONSIBLE CHARGE FROM AN ACTUAL SURVEY MADE UNDER MY SUPERVISION; THAT THIS GROUND SURVEY WAS PERFORMED AT THE 95% CONFIDENCE LEVEL TO MEET FEDERAL o At, 1. • \ '' , 0 , GEOGRAPHIC DATA COMMITTEE STANDARDS; THAT THIS SURVEY WAS PERFORMED TO MEET ` \ \ , ,. I' POPLAR THE REQUIREMENTS FOR A TOPOGRAPHICIPLANIMETRIC SURVEY TO THE ACCURACY OF SD PUP A(A' 0 CLASS A AND VERTICAL ACCURACTY WHEN APPLICABLE TO THE CLASS A STANDARD, AND THAT THE ORIGINAL DATA WAS OBTAINED ON AUGUST 14 2020; THAT THE SURVEY WAS COMPLETED ON .2020; TI4AT CONTOURS SHOWN WITHIN HIGHLIGHTED AREAS (IF ANY) MAY NOT MEET THE STATED STANDARD; AND ALL COORDINATES ALL ELEVATIONS ARE BASED ON NAVD88. ARE BASED ON NAD53, REALIZATION 2011 AND l THIS THE 22ND DAY OF JANUARY 2020 op rT -.. ►►►frr�rrrr►� L-3993 `, p LICENSE NO. PROFESSIONAL LAND SURVEYOR �' CA C` ` aFf-SS�p %�y�: _ SEAL - SURVEY FOR ss L-3993 m '�9 -� ��" FORSYTH TECHNICAL COMMUNITY COLLEGE 2100 SILAS CREEK PARKWAY f,GQ' SUR` �,�•` �'�• � WINSTON-SALEM, NC 27103 BANG �'''�r�+r"'�►��t, PARCEL INFORMATION DEED BOOK 2988, PAGE 2847 TAX P.I.N. 6824-35-9286.00 LEGEND TOWNSHIP: WINSTON GUY WIRE ANCHOR COUNTY: FORSYTH LIGHT POLE STATE: NORTH CAROLINA UTILITY POLE SEWER MANHOLE SIGN Qs -� , SURVEY FIELD WORK CONDUCTED FOR THIS CURB CATCH BASIN PLAT WAS COMPLETED ON JANUARY 16, 2020. DROP l YARD INLET THIS PLAT HAS BEEN PREPARED BY BUD E. BAUGHMAN, LICENSE #L-3993. WATER WELL TREE DATE: JANUARY 22, 2020 CENTERLINE COMBINED GRID FACTOR C/L CGF s SAN. SEWER MH RIM 770.45' SURVEYED BY: JW MAPPED BY: DBIBB CURB AND GUTTER C&C PROJECT# LS-19111 DEED SOAK PARCEL IDENTIFICATION NO- pg P11W PLAT BOOK PB PROPERTY LINE PA REINFORCED CONCRETE PIPE RIGHT-OF-WAY WAY TEMPORARYBENCHMARK RCP R, 1B!� TOPOGRAPHIC EASEMENT - - - SURVEY SANITARY SEWER LINE SS SS TREE LINE ��� FORSYTH TECHNICAL FENCE LINE EDGE OF GRAVEL — x x --- - i FG — — — - 20 a 20 40 COMMUNITY COLLEGE EDGE OF PAVEMENT TELEPHONE LINE _ i FP —_ G G SCALEI =24 WINSTON-SALEM, NC OVERHEAD UTILITY -—OHU-0HU� I I 1 \ ` \---------———--———---------- — ♦♦---- �ss♦ 1 \--------------�-�-------�------- -- — --- — — — — —----—____ / s ♦♦ OAK GROVE ROAD SW EX. SANITARY MANHOLE , \ \ \� s / �_°— ♦♦♦� RIM =786.15 — __�__ __.__� — _------_� —�-- —\—___ \ C/L INV = 772.30 --G-- °/—°�—�—°-- \� \ \ � � �a � ♦ `lam � !_ T Al ♦♦ � ____ -` \ s - � CONSTRUCTION \ III \ \ /// ° / I /♦�— \ �\ \ \ VEHICLE TRAVEL PATH OH' OH I I ENTRANCE TO BE USED FOR ALL CONSTRUCTION VEHICLES. SEE GENERAL NOTES 2 AND 3. I \ I EX. STORM N PIPES \\ �, r %III \" i� \ \ \ \ \ \ J I \ \ INLETSEX. GRATE EX. SANITARY \ \ \ TO MAIN EUNDISTURBED. \ I I \ \\I \ ° SEWER LINE. SEE \ \ \ \ \ I \ \ I I \ \ \\ SITE PLAN NOTE 7. \ \ \ I L \ ` \ \ \ \ \ \ LIMIT OF EX. `� PAVEMENT \ I I \ °x0_ EX. CREEK C/L \ \ \\\ \\ \ EX. 5' SIDEWALK TO REMAIN \ \ \ \\ \\\\ \ \ \ \ \ \ ^ \ \ — \ \ \I UNDISTURBED. \\ \\ \ \ EX. MAINTENANCE FACILITY IN \ 24 " OAK 0\ \ Nx \ I I I I EX. TREES TO I hC X X \ X \ X X X X \ + I I I \ , BE REMOVED I%\ ° ° \\ \ \ \ \ \ \ I I+ EX. FENCE TO REMAIN UNDISTURBED I \ \ TEMPORARY POLE AND SUPPORT STRAP TO BRACE EXISTING GAS LINE DURING WALL CONSTRUCTION. 22" OAK ° DUKE ENERGY/PIEDMONT NATURAL GAS TO REVIEW AND APPROVE PRIOR TO START OF ° CONSTRUCTION (TYP). SEE SITE PLAN NOTE 6. �\ PROP. RETAINING WALL' I III �� \ \ \ \\ ` EX. CONCRETE ENDWALL , , 1 \\ \\ LENGTH: 117 FT I \\ - INV OUT = 777.76 L RADIUS: 70FT k \ \ s � SEE WALL PLANS FOR \ \ \ CONSTRUCTION c \ \\ \ 1, \ \ \ /� EX. GRATE INLET �\ \ \ \ \ \\ SPECIFICATIONS. \ \\\ \\ \\ X. TREE TO BE REMOVED \ \ EX. SANITARY MANHOLE ° \ \ \ \\ \\\\ \ RIM = 777.58 \ \ \ / C/L INV - 769.80 \ I \ \ SURVEY LIMITS \ ` 4' POPLAR \ \\ EX. 2" GAS LINE TO BE \ \\ \ \\" \\ SUPPORTED DURING \ \\\\ "SYCAMORE . EX. TREES TO \ \ \ BE REMOVED \ \ \ \\ CONSTRUCTION. ° ° ° \ \ \\\ O � J'J, �L, \ \ \ G\\\ \ \ 0 18" SYCAMORE \ ^ \ \ \ \ 1 \\ \ r 1 W �7PL EX. ABANDONED WELL ) \ I \ \ \ \ \ \ \ \ \ \X \ \ \ \\ TO REMAIN \ \ \ I \ ° ° EX. 24" RCP \ 0 PP/LSAR 1 \ \ \ \ ° INV OUT = 771.49 ° -__A ° ° \ \ \ \18\PQPL1 EX. RETAINING \ \1 a WALL TO REMAIN \ / \ \ \\ \ ° ' UNDISTURBED J/ \ EX. DRIVE TO REMAIN\ \ UNDISTURBED EX. 10' SIDEWALK I 0'\\\\\ TO REMAIN UNDISTURBED °\ \ \ s I I L\ o \ - \ ,ON MUST \ \ \ Y p�tic0p Q o z m \\� \\\ \ \\\ \ \ \ \ \ \ \ \ \ z D I �\ \ \ ° A\I \ \\\ \ \ \ \ \ \ \ \ \ 2 BEFORE YOU DIGI CONTACT ONE -CAM CENTER cn cn Of w J J SILAS CREEK PKWY SITE VICINITY MAP 1 "=2000' SITE DATA: FORSYTH TECHNICAL COMMUNITY COLLEGE PIN:6824-35-9286 D.B. 2988 PG. 2847 TOTAL AREA: 25.51 ACRES ZONING: ZONING: C (CAMPUS) DEVELOPMENT STANDARDS: WINSTON-SALEM FRONT SETBACK: 20' SIDE SETBACK: 20' REAR SETBACK: 20' WATERSHED DATA: WATERSHED: SALEM CREEK WATERSHED CLASSIFICATION: C RIVER BASIN: YADKIN PEE-DEE SOIL TYPES: PcD2, PcF2, PaB, PaC, PaD, Ch AVG. SLOPE: 10% GENERAL NOTES: 1. NO WORK IS TO BE CONDUCTED FROM THE TOP SIDE OF THE WALL. 2. ALL CONSTRUCTION VEHICLES SHALL ARRIVE TO THE SITE USING SILAS CREEK PARKWAY, MILLER STREET, AND OAK GROVE ROAD. THE WESTERN MAINTENANCE FACILITY ENTRANCE SHALL BE USED AS NOTED. 3. MATERIALS DELIVERIES WILL BE PROHIBITED BETWEEN THE HOURS OF 11:00 AM AND 2:00 PM. 4. EXISTING WALL, PARKING LOT, AND SIDEWALK SHALL REMAIN UNDISTURBED. 5. CONTRACTOR IS RESPONSIBLE FOR COORDINATING INSPECTION WITH GEOTECHNICAL ENGINEER DURING WALL CONSTRUCTION SUCH THAT GEOTECHNICAL ENGINEER CAN PROVIDE AN ENGINEERING CERTIFICATION TO FORSYTH COMMUNITY COLLEGE THAT THE WALL HAS BEEN CONSTRUCTED ACCORDING TO PLANS. SITE PLAN NOTES: 1. ALL CONSTRUCTION SHALL CONFORM TO THE LATEST NCDEQ STANDARDS AND SPECIFICATIONS. 2. CONTRACTOR SHALL NOTIFY "NC811" (811) OR (1-800-632-4949) AT LEAST 3 FULL BUSINESS DAYS PRIOR TO BEGINNING CONSTRUCTION OR EXCAVATION TO HAVE EXISTING UTILITIES LOCATED. CONTRACTOR TO CONTACT ANY LOCAL UTILITIES THAT PROVIDE THEIR OWN LOCATOR SERVICES INDEPENDENT OF "NC811". REPORT ANY DISCREPANCIES TO THE ENGINEER IMMEDIATELY. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE LOCATION AND/OR RELOCATION OF ALL EXISTING UTILITIES IN COORDINATION WITH THE APPROPRIATE UTILITY, AGENCY, OR COMPANY. CONTRACTOR TO COORDINATE ACTIVITIES WITH UTILITY COMPANIES INVOLVED IN ANY RELATED RELOCATION, AND THE COLLEGE. 4. EXISTING UTILITIES SHOWN ARE BASED ON FIELD SURVEYS AND THE BEST AVAILABLE RECORD DRAWINGS. THE CONTRACTOR SHALL VERIFY CONDITIONS PRIOR TO BEGINNING CONSTRUCTION. ANY DISCREPANCIES BETWEEN ACTUAL FIELD CONDITIONS AND THE PLANS SHALL BE REPORTED TO THE ENGINEER IMMEDIATELY. 5. PRIOR TO STARTING CONSTRUCTION, THE GENERAL CONTRACTOR SHALL HOLD A PRE -CONSTRUCTION CONFERENCE WITH FTCC, NCDEQ, DUKE ENERGY/PIEDMONT NATURAL GAS, GEOTECHNICAL ENGINEER, AND ENGINEER/REP. 6. CONTRACTOR SHALL DOCUMENT CONDITION OF EXISTING SEWER MAIN WITHIN PROJECT LIMITS. ANY DAMAGE TO SEWER MAIN/MANHOLES SHALL BE REPAIRED/REPLACED AT CONTRACTOR'S EXPENSE. THE CONTRACTOR WILL BE RESPONSIBLE FOR PROVIDING TEMPORARY BYPASS SUCH THAT THE MAIN WILL NOT BE OUT OF SERVICE IF REPAIRS ARE WARRANTED. ill =20' PIEDMONT NATURAL GAS GREG BURTON PHONE: 336-726-7808 EMAIL: GREG.BURTON@DUKE-ENERGY.COM CRAIG HYATT EMAIL: CRAIG.HYATT@DUKE-ENERGY.COM O m (V N � > cV Z V �z �M E U o 0 C � O N C) V o c�6 cV L) z Sri ' w 00 � un CC) r rn a) iu 00 W LL Z O �o Q U O� N 2) U a.Z O Q zww O wUQ �/� z ~U)� v/ W H_jO W Z �oU) o� 0 o LL Q Lu w Z J ca a J H_ Q cn V Z Z z Q w J J O OZ}U W VO�� <j00 LL O C)Z } Z 1 LLJ z o}Z)Q ♦U1 0- Q co V UL w O z z O W w w Q 0 z QQQQQQ DRAWN BY CP CHECKED BY: RB DATE: 04/14/2020 PROJECT NO.:06006.001 SCALE: 1 "=20' SEA 027436 ;,�9�/'�NGINE�QQ� C o"... �,,,,���� 4-23-20 SHEET 4 OF 15 FINAL - NOT RELEASED FOR CONSTRUCTION s� 22" OAK \� \\ EX. TREE TO � .�.\� BE REMOVED"%� 1% L . eo* XAO%l O \ 4\ * NE TO BE . \ D DURING RUCTION.. <. a a oyll" y won \�. SYCAMORE SCALE (IN FEET) 2.5 5 5 0 EX. TREES TO BE REMOVED L 11 ILI %,,%, <?'-Y%�� to- . . I � t6 L7 EX. SAN IT RIM = 777. C/L INV = ' N%6,n 14" POP AR UcooCDcfl co= o r` M coxtia? RETAINING WALL DESIGN PARAMETERS J 00CL �o WALL AND GEOGRID WALL/ BLOCK SYSTEM: WALL BATTER (deg)- Ll MINIMUM FACTORS OF SAFETY I � O SLIDING: 1.5 OVERTURNING: 2. BEARING CAPACITY: 2.0 PULLOUT: 1.5 GLOBAL STABILITY: 1.3 SOIL PARAMETERS WALL BACKFILL - NO FINES CONCRETE (REFER TO DETAILS FOR SPECIFICATIONS) UNIT WEIGHT, pcf: 110 RETAINED ZONE UNIT WEIGHT, pcf: 110 FRICTION ANGLE (PHI), degrees: 24 COHESION, psf: 100 FOUNDATION ZONE UNIT WEIGHT, pcf: 120 FRICTION ANGLE (PHI), degrees: 34 COHESION, psf: 100 c/) z REQUIRED SOIL BEARING CAPACITY: 4,000 psf O_ U) RETAINING WALL DESIGNED BASED ON PLAN AND PROFILE, SHEET 5, DATED JANUARY 3, w 2020, AND SITE PLAN DATED FEBRUARY 28, 2020, BY FLEMING ENGINEERING, INC. THE SITE PLAN SHOWN ON THIS SHEET IS PROVIDED FOR INFORMATIONAL USE ONLYAND SHOULD NOT BE USED FOR WALL STAKE OUT. MODULUS, PLLC ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY, AND IS NOT RESPONSIBLE FOR GRADING, DRAINAGE, OR EROSION CONTROL OF THE PROJECT. REFER TO CIVIL ENGINEERING PLANS. REFER TO OTHER SHEETS FOR ADDITIONAL INFORMATION. w 0 w Q J z 0 _j UQO �w� QLr) z�v00 00 � z � z �w�A.- U 0�00 Z L z a_ J U w a_ J� Z w Q U Q z 2-1ww0 � z U 0c 0 LL SITE PLAN 04/08/2020 �NCA SHEET R c UMB� o •�...,,,,,..,..• OF 4 ULOo�cfl M = o r` rn xtia? Jm�o� M o 790 790 M C U) U a) a) 2'x2'x6' Waste Concrete Blocks z E TOW=779.50+/- Min. Unit Weight 150 pcf TOW=781.50+/- 0� z _--- _-- _---- -- -- --- -- _-- ----- ------------------------------------- --- -- _-- p 780 ------------ 780 O Z------------------ --- m O r- >------------------------------- y w----------------- -- -- 0 LLJ 770 --- ------ ------------------------- 770 T_ � � P I Ground surface at base of wall RETAINING WALL MUST BEAR ON HARD RESIDUAL SOILS 12" Leveling Pad Not Shown For Clarity I BOW=765.50+/- I 760 I 760 NFC=10' I C/) Z 0 CIO 0+00 0+10 0+20 0+30 0+40 0+50 0+60 0+70 0+80 0+90 1+00 1+10 STATION W CD W J Q J Z O0�J UQO �w� QLr) ZU00 00 � Z z �W��, 0 0 U Z L Z a_ J U wa_ J Z W Q GENERAL CONSTRUCTION NOTES: GEOGRID LEGEND = o U Q Z 2_1 1. ALL CONTRACTORS AND TRADES TO COORDINATE WITH WALL Due to the inherent nature of soils used as construction materials, it W W 0 CONSTRUCTION, INCLUDING UTILITY AND LANDSCAPING is not uncommon for the foundation soils and the reinforced soils to � I-___= settle under load and their own self -weight. � � � CONTRACTORS. Z NO -FINES CONCRETE BACKFI LL Large trees, particularly those with aggressive root systems, planted NFC = 10 FROM FACE OF WALL, FEET within the reinforced zone can adversely impact the long term C� 2. EXCAVATIONS BEHIND THE WALL SHOULD BE PERFORMED BY 0C integrity of the retaining wall. eEFORE You DIG 1 CALL 811 O IT' HAND. CONTRACTORS SHALL PROTECT RETAINING WALL S THE LAW ! LL COMPONENTS. CONTACT ENGINEER PRIOR TO BEGINNING TOW = TOP OF WALL HEIGHTABOVE FINISHED GRADE EXCAVATION. PROFILE 04/08/2020 .o y\ CA o SHEET SCALE (IN FEET) 2.5 5 2 G I N ti n e� 5 0 ,,� . CUM c, �, ULO M�OC�9 J M M X [,- J m° moa GROUND SURFACE AT TOP OF WALL NO -FINES CONCRETE BACKFILL � o �o � z° 12" IMPERVIOUS SOIL COVER � a v coa) No -Fines Concrete shall have water to cementious materials ratio of 0.35 Z0 J READY MIX PLANT WASTE +5%, with avoid content of 25/o _ 50+ 0 /o. � �CONCRETE BLOCK NON -WOVEN FILTER FABRIC`� Z VERTICAL CONFIGURATION MIRAFI 140 OR EQUAL O � WALL HEIGHT VARIES NO -FINES No -Fines Concrete shall have minimum compressive strength (f'c) = 5 0 g� K RLL E ET 2)000 psi. ,N a 12" THICK COMPACTED NCDOT ABC STONE LEVELING PAD 4-INCH DIAMETER PERFORATED HDPE DRAINAGE PIPES - EXTEND TO DAYLIGHT EACH END OF WALL TYPICAL NO -FINES CONCRETE CROSS SECTION NOT TO SCALE CONTRACTOR TO PROVIDE AN ENGINEER APPROVED MECHANICAL CONNECTION BETWEEN WASTE BLOCKS AND NO -FINES -CONCRETE BACKFILL FOR EACH BLOCK No -Fines Concrete shall have a cured unit weight of 110 pcf ± 5 lbs. No -Fines Concrete shall be composed of cementious materials, coarse aggregate, and water. Mix design shall be submitted and approved prior to installation. Individual No -Fines Concrete lifts shall not exceed 24 inches vertical. Subsequent lifts shall not be placed until previous No -Fines Concrete lift is verified to have hardened sufficiently to support foot traffic without disturbance. All void spaces between blocks shall be filled with No -Fines Concrete. Retaining wall and No -Fines Concrete backfill shall be protected from weather and site runoff. M an C w Q J z O 0C J U Q O >_w� QLo zp�U°° 00 73 � �w��, z z O2Oo U � z 0 J v°0w_j z W < o U Q z 2-1Ww0 =ten �c~nz U rc O H DETAILS 04/08/2020 SHEET 3 OF 4 PART 1 - GENERAL DESCRIPTION The construction of the retaining wall shown on these plans shall be monitored and tested by an independent testing firm to ensure that the retaining wall is constructed in accordance with the intent of the design. This wall was designed using ready mix concrete plant waste blocks and no -fines -concrete kL-fiII POST -CONSTRUCTION CERTIFICATION The Owner's Soils' Consultant shall provide to the Owner a post -construction certification by a professional engineer registered in the State of North Carolina, who is competent in the design of Mechanically Stabilized Earth retaining walls. The certification shall be based on an appropriate level of field observations during wall construction, and shall state that, in the Engineer's professional opinion, construction of the wall system has been completed in accordance with the approved Drawings and Specifications, and consistent with good construction practice. The Contractor shall conduct and coordinate his construction work in such a way as to give proper notice and time for adequate inspections for this purpose. DELIVERY. STORAGE AND HANDLING Contractor shall check the materials upon delivery to ensure that the specified materials have been received. Contractor shall prevent excessive mud, wet concrete, epoxies, and like materials which may affix themselves, from coming in contact with the wall materials. Contractor shall protect the materials from damage. Damaged material shall not be incorporated into the reinforced wall system. PART 2 - PRODUCTS \A/moo+o PI—L r Retaining wall units shall consist of 2' x 2' x 6' ready mix concrete plant waste blocks. All units shall be sound and free of cracks or other defects that would interfere with the proper placing of the units or significantly impair the strength or permanence of the construction. Cracking or excessive chipping may be grounds for rejection. Units showing chips visible at a distance of 20 feet from the wall shall not be used within the wall. Concrete used to manufacture wall units shall have a minimum 28 days compressive strength of 3000 psi in accordance with ASTM C 90 and C 140. Units shall be installed in a running bond pattern. Leveling Pad Material: NCDOT ABC stone at a minimum of 12 inches in depth. Drainage Piping: 4" minimum diameter Corrugated Perforated High Density Polyethylene (HDPE) pipe and fittings. Perforated pipe shall be used at the bottom of the drainage zone. Piping shall be daylighted at each end of the retaining wall. Foundation Soil: Undisturbed residual soils or rock free of debris and meeting the ASTM D2487 classification for ML, SM, SIP or SW. Foundation soil shall have a compacted Total (Wet) Density of at least 120 pcf. Foundation soil shall have effective stress friction angle of at least 34 degrees and a cohesion value of at least 100 psf according to ASTM D3080 or ASTM D4767. Filter Fabric: Filter Fabric shall be Mirafi 140N or shall be a non -woven needle -punched geotextile fabric manufactured for the purpose of filtration and which has engineering properties not less favorable for the intended purpose than that of Mirafi 140N. PART 3 - EXECUTION CAICDAI All retaining wall work shall comply with the plans and specifications. CHANGES If the elevation, location, surcharge loading, or grading surrounding the retaining wall changes from that depicted on these plans, Modulus, PLLC shall be notified to that modifications to the design can be made, if necessary. Changes to block heights (total block height for wall) or lengths of runs shall not be permitted without the explicit written consent of the Designer. CLEARING AND SUBGRADE PREPARATION Clearing and stripping limits shall be extended a minimum of 1 foot in front of the retaining wall. All existing topsoil, rootmat, and any other soft or unsuitable materials shall be removed from the clearing and stripping limits. LEVELING PAD CONSTRUCTION Place leveling pad as shown with a minimum thickness of 12 inches. The leveling pad shall extend laterally at least 6 inches from the front and back of the lower -most wall unit. Compact leveling pad material with multiple passes of a vibratory compactor to provide a level hard surface on which to place the first course of units. NCDOT ABC stone shall be compacted to at least 95 percent of standard Proctor maximum dry density. Prepare leveling pad to ensure intimate contact of wall units with pad. WALL UNIT INSTALLATION Place first course of wall units on the leveling pad. Align adjacent units, and level units side -to -side, front -to -rear, and with adjacent units. Ensure that units are in full contact with leveling pad. Ensure that first course is placed in the correct horizontal location and alignment, and correct vertical elevation. Continue vertical placement of wall units in a running bond pattern. Do not stack more than one wall unit above the top of the backfill before placing no -fines -concrete backfill for the wall. Place no -fines -concrete between units and extending to the length indicated on the profile sheet. Fill all voids with no -fines -concrete. Install perforated drainage pipe behind wall at the locations shown on the drawings. Dewatering and Site Drainage The contractor shall provide sump pit and pumping operations should dewatering be necessary. The contractor shall provide and maintain adequate site drainage during earthwork operations, including providing for drainage of surface water away from the construction areas. All erosion and sedimentation control shall be controlled in accordance with sound engineering practice and current county and state requirements. The contractor shall provide positive drainage away from the back of the wall at all times during construction. CONSTRUCTION TOLERANCES Installation of wall faces shall be within all the following tolerances: 1. Vertical control from plan: 1.25 inches over a 10 ft. distance. 2. Horizontal location control from plan: Straight lines: 1.25 inches over a 10 ft. distance. Straight & radius corner locations: 1.0 ft. Curves and serpentine radius: 2.0 ft. 3. Rotation of the wall face during construction: Maximum 2.0 degrees from established wall plan batter. Maximum 10.0% from total established horizontal setback. 4. Bulging: 1.25 inches over a 10.0 ft. distance. CONSTRUCTION MARKING The contractor shall mark the wall construction with appropriate stakes and offsets to maintain horizontal and vertical control of the wall construction. The contractor shall establish temporary markings indicating station numbers along the wall which are consistent with the stations indicated on the construction plans. The station marks shall be painted on the subgrade behind the wall facing units. Ensure no paint will be visible from the front of the wall after completion of wall construction. Station marks shall be every 40 feet beginning with Station 0+20. The contractor shall also mark the elevation of the top of the wall unit at every station mark. Marks shall not be applied to the exposed parts of the wall. QUALITY ASSURANCE TESTING Quality Assurance Testing The Owner will provide a Testing Laboratory (TL) to perform quality assurance testing for the benefit of the Owner. Testing by the Owner's TL is for the sole benefit of the Owner to verify that wall construction meets the plans and specifications. Testing by the Owner's TL shall not be relied upon by the contractor for the contractor's quality control purposes. Testing or lack of testing by the Owner's TL does not relieve the contractor from the requirement to provide for quality control of the work. Testing or lack of testing by the Owner's TL does not relieve the contractor from the requirement to meet the plans and specifications during all aspects of wall construction. The Owner's TL does not have authority or responsibility to direct the contractor's work. Testing or lack of testing by the Owner's TL does not imply acceptance of the work by the Owner. The contractor shall coordinate with the Owner's TL to ensure that the minimum testing outlined in this section is performed. The contractor shall assist the Owner's TL as necessary for the TL to perform the required tests and observations. Prior to initiation of backfill placement, the stripped area shall be observed by the Owners Foundations and Leveling Pad testing firm to determine the extent of any remedial work. CY(`A\/ATI(lKl Contractor shall excavate to the grades required to construct the wall system per the project grading plans, and the engineered wall system drawings. Contractor shall note that this may require excavation to the top of leveling pad elevation for the full plan area below the reinforced zone in those cases where the reinforced backfill has stronger properties than the foundation soil materials. Contractor shall take precautions to minimize over -excavation. Contractor shall also take precautions to protect existing utilities which shall remain in place. Over -excavation shall be corrected by backfilling with material meeting the requirements of Retained Backfill or Foundation Soil, as appropriate for the area of over -excavation, or by backfilling with lean concrete. Backfilling of over -excavation shall be completed at the Contractor's expense. Contractor shall verify the locations of existing structures and utilities prior to excavation. Contractor shall ensure all surrounding structures are protected from the effects of excavation and backfilling. Excavations shall be braced, shored, or sloped and benched in compliance with OSHA requirements for temporary excavations. Temporary slopes shall be no steeper than 1:1 (H:V). The contractor shall not stockpile excavated materials or equipment immediately adjacent to the excavation walls or slopes. All such materials shall be kept back from the top of the excavation a minimum distance equal to the excavation depth. where equipment or materials must be placed immediately adjacent to the excavation walls, the excavation walls shall be designed for the anticipated surcharge loading, or additional bracing must be provided to support the anticipated surcharge loading. The Owner's TL shall check the bearing capacity of the foundation soils below the bottom of the leveling pad with Dynamic Cone Penetrometer (DCP) testing performed at least every 50 linear feet, or part thereof, along the leveling pad excavation prior to placement of leveling pad material. DCP testing shall also be performed at least every 50 linear feet or part thereof below the foundation subgrade behind the leveling pad in the area of the reinforced backfill. After placement and tamping of leveling pad material, the thickness of the leveling pad material shall be verified by excavation. The thickness shall be checked at least every 50 linear feet. Drain Pipes and Drainage Fill The Owner's TL shall observe installation of all drainage pipes. u N 74 �w V W J J O U Z C� CG G O U J Q U_ Z 2 U w 2 N) 0. O LL UJ 0. Z Cw G Z C� G UJ G Q w ��� v! LOoNt(0 M = O ti d') M X I m , O M . C: O-) O O o Z U N U_ O J Z E IL U 0� Z O Z_ J O Q Lo U 06 Z N� Z O" N Z O J w 0- J Q 0 I 70 Z � O v, Z SPECIFICATIONS 04/08/2020 SHEET 4 OF 4 STORM DRAINAGE ANALYSIS DRAINAGE AREA (ACRES) AVG. RUNOFF COEFFICIENT (C) 2-YEAR RAINFALL INTENSITY (IN/HR) 10-YEAR RAINFALL INTENSITY (IN/HR) TIME OF CONCENTRATION (MIN) 2-YEAR FLOW RATE (CFS) 10-YEAR FLOW RATE (CFS) 102.4 0.60 1.56 2.19 60 95.85 t 134.55 TEMPORARY BYPASS FLOW CAPACITY (PIPES ONLY) PIPE QUANTITY PIPE DIAMETER (IN) PIPE LENGTH (FT) SLOPE (%) PIPE AREA (S.F.) WETTED PERIMETER (FT) HYDRAULIC RADIUS MANNING'S N VALUE 3 PIPE FULL FLOW CAPACITY (CFS) 2-YEAR STORM FLOW RATE (CFS) 2-YEAR STORM OVERFLOW (CFS) 10-YEAR STORM FLOW RATE (CFS) 10-YEAR STORM OVERFLOW (CFS) 3 24 107 0.0187 3.14 6.28 0.5 0.013 1 93.06 95.85 2.79 134.55 41.50 I ----- --_ -=�- --- 5--- =____ -------- ---------- OAK GROVE ROAD SW \ \ ► l �--_----------------- \ -_--- _- _ / _ ss -�� 2A� kp H (AI�R I �T I \\\\� /1�78222 I° \\ TEMPORARY PIPE BYPASS PROP. 120 LF \ 3x24"PIPES CONSTRUCTION ENTRANCE ° EX. MAINTENANCE FACILITY a ❑ �, \ ---- I TEMPORARY COFFERDAM \� INV IN: 770.00' I \ (SEE INSET 1) \ \ \ \ \ \ I o a I - L1xx xx x xx x - - �- k- \ \\ \ \ id IL �X SILT FENCE MARKS / xl CONSTRUCTION ENTRANCE DISTURBED LIMITS \ TO OVERLAP EX. PARKING \ \ AREA FOR PAVEMENT PROTECTION \ d ° \ I I I PROP. TREE LINE Y ROCK OUTLET (TP.) d� I\\ \ \ \ \ \ \\ I I \ s \ / --FX. F NC \ \ I�\ G' 'MIN. SEPARATIONAl A TEMPORARY PIPE BYPASS NV OUT: 68.00' RIP RAP APRON TO BE INSTALLED OVER MATTING \ r \ \ l \ $ \ \� \� � o AND KEYED INTO THE BANKS OF THE CHANNEL.\OO RIP RAP TO REMAIN AFTER CONSTRUCTION. \ \ CLASS 1 RIP RAP \ -� W = 18' D = 24" \ d ° \ \ \ C D ��L\ \ 4�JP\ \S� � I TYT g �O T 'p2i �J o ��� O wOz = Q Z D m 7 n Y BEFORE YOU DIGI CONTACT ONE -CALL CENTER CONSTRUCTION SEQUENCE: 1. OBTAIN SITE PLAN, EROSION CONTROL, AND U.S. ARMY CORPS OF ENGINEERING'S APPROVALS AND PERMITS. 2. FLAG DISTURBED LIMITS PRIOR TO PRE -CONSTRUCTION MEETING. 3. ONCE DISTURBED LIMITS HAVE BEEN FLAGGED, SETUP A PRE -CONSTRUCTION MEETING WITH NCDEQ, THE CONTRACTOR, THE DUKE ENERGY/PIEDMONT NATURAL GAS REPRESENTATIVE, GEOTECHNICAL ENGINEER, THE OWNER (OR OWNER'S REPRESENTATIVE), AND THE ENGINEER. 4. INSTALL TEMPORARY CONSTRUCTION ENTRANCE UP TO LOCATION SHOWN FOR TEMPORARY PIPE BYPASS. 5. CLEAR, GRUB, AND INSTALL EROSION CONTROL MEASURES NECESSARY FOR THE INSTALLATION OF THE TEMPORARY BYPASS. 6. CLEAR AND GRUB AREA NECESSARY FOR THE INSTALLATION OF TEMPORARY BYPASS. 7. INSTALL (3) 24" RCP PIPES FOR TEMPORARY BYPASS AS WELL AS ENERGY DISSIPATOR PAD DOWNSTREAM OF BYPASS STRUCTURES. 8. ONCE BYPASS PIPES HAVE BEEN INSTALLED, CONSTRUCT COFFER DAM ON UPSTREAM END AND STONE BYPASS CHANNEL [TO CARRY THE 10-YR RAIN EVENT] TO DIVERT WATER THROUGH TEMPORARY BYPASS AND OVERFLOW. 9. PROCEED TO STAGE 2 EROSION CONTROL. PROP. PIPE BYPASS 3 x 2N: PIPES \ INV IN: 770.00' PROP. COFFERDAM TO EXTEND OVER PIPES \ \\ I I INSET 1 ill =10' TEMPORARY BYPASS TYPICAL SECTION N.T.S. cn cn Of w _j SILAS CREEK PKWY SITE VICINITY MAP 1 "=2000' SITE DATA: FORSYTH TECHNICAL COMMUNITY COLLEGE PIN:6824-35-9286 D.B. 2988 PG. 2847 TOTAL AREA: 25.51 ACRES ZONING: ZONING: C (CAMPUS) DEVELOPMENT STANDARDS: WINSTON-SALEM FRONT SETBACK: 20' SIDE SETBACK: 20' REAR SETBACK: 20' WATERSHED DATA: WATERSHED: SALEM CREEK WATERSHED CLASSIFICATION: C RIVER BASIN: YADKIN PEE-DEE SOIL TYPES: PcD2, PcF2, PaB, PaC, PaD, Ch AVG. SLOPE: 10% DISTURBED AREA: 0.42 ACRES PERMITTED AREA: 1.00 ACRES 1. CONTRACTOR IS TO ENSURE WORK AREA IS NOT FILLED HIGHER THAN ELEV. 773, TO PROMOTE POSITIVE DRAINAGE TO TEMPORARY SEDIMENT TRAP. EROSION CONTROL NOTES: 1. TEMPORARY AND PERMANENT EROSION CONTROL MEASURES SHALL BE PROVIDED FOR ALL LAND DISTURBING WORK IN ACCORDANCE WITH AN APPROVED EROSION CONTROL PLAN. 2. ALL PERMANENT EROSION CONTROL MEASURES SHALL BE INCORPORATED INTO THE WORK AT THE EARLIEST PRACTICAL TIME. 3. ALL TEMPORARY MEASURES SHALL BE MAINTAINED UNTIL THE PERMANENT MEASURES HAVE TAKEN EFFECT OR APPROVED BY THE EROSION CONTROL OFFICER. 4. UPON APPROVAL OF GRADING PLAN, A NOTICE OF INTENT (NOI) STORMWATER APPLICATION MUST BE FILED WITH NCDENR. EROSION CONTROL MAINTENANCE PLAN 1. ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY RUNOFF -PRODUCING RAINFALL BUT IN NO CASE LESS THAN ONCE EVERY WEEK. ANY NEEDED REPAIRS SHALL BE MADE IMMEDIATELY TO MAINTAIN ALL MEASURES AS DESIGNED. 2. SEDIMENT BASINS SHALL BE INSPECTED REGULARLY DURING LAND DISTURBING ACTIVITIES AND AFTER EACH RUNOFF -PRODUCING RAINFALL. SEDIMENT SHALL BE REMOVED AND THE BASIN RESTORED TO ITS ORIGINAL DIMENSIONS WHEN SEDIMENT HAS ACCUMULATED TO ONE-HALF THE DESIGN DEPTH OF EACH BASIN. PORTIONS OF THE BASIN'S GRAVEL FACING THAT ARE CONTAMINATED BY SEDIMENT SHALL BE REPLACED WITH FRESH GRAVEL DURING EACH SEDIMENT REMOVAL EPISODE. 3. SEDIMENT FENCES SHALL BE INSPECTED AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. REPAIRS SHALL BE MADE IMMEDIATELY. SEDIMENT DEPOSITS SHALL BE REMOVED AS NEEDED TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAINFALL EVENT, AND TO REDUCE PRESSURE ON THE FENCE. FENCING MATERIALS AND SEDIMENT DEPOSITS SHALL BE REMOVED, AND THE AREA BROUGHT TO GRADE FOLLOWING STABILIZATION OF UPGRADIENT DISTURBED AREAS. 4. DIVERSION DITCHES/BYPASS PIPING MUST REMAIN IN PLACE UNTIL PROJECT IS STABILIZED AND PERMISSION GIVEN BY THE EROSION CONTROL OFFICER. 5. A RAIN GAUGE AND REPORT BOX SHALL BE LOCATED ON -SITE FOR RAINFALL MONITORING AND SITE INSPECTIONS. THE CONTRACTOR IS RESPONSIBLE FOR CONDUCTING THE WEEKLY INSPECTIONS OR AFTER 1" OF RAINFALL TO CONFORM WITH THE NPDES PERMIT REQUIREMENTS. REPORTS SHALL BE KEPT IN THE INSPECTION BOX AND REMAIN AVAILABLE TO REVIEWING AGENCIES UPON REQUEST. ill =20' PIEDMONT NATURAL GAS GREG BURTON PHONE: 336-726-7808 EMAIL:GREG.BURTON@DUKE-ENERGY.COM CRAIG HYATT EMAIL: CRAIG.HYATT@DUKE-ENERGY.COM O m (V N � > cV Z V V) Z E U o 0 un Ln .>_ o N a, N V 0 O • M Ln ' w CO � iuCO 3__j W LL r o Q O O� N 2) U d Z O Q Z w w HLL O wUQ �/� z ~U� cn H_jO �W/ Z cf)oU) I.L 0oZ W O LL Q F- LU (1) cn O 0 J Q Q V z 0 o Z U) Z W _ Q W J O OZ}U W VO�� <j00 LL O C)LLJZ } Z 1 z F_ O}Z)Q U 0- Q co V H w O z z 0 on w Ix Lu Q 0 Z a a a a a a DRAWN BY CP CHECKED BY: RB DATE: 04/14/2020 PROJECT NO.:06006.001 SCALE: 1 "=20' Cq ; S � Y�' L' 027436 ;,/GINE�Q NORA B\sS 4-23-20 SHEET 9 OF 15 FINAL - NOT RELEASED FOR CONSTRUCTION STORM DRAINAGE ANALYSIS DRAINAGE AREA (ACRES) AVG. RUNOFF COEFFICIENT (C) 2-YEAR RAINFALL INTENSITY (IN/HR) 10-YEAR RAINFALL INTENSITY (IN/HR) TIME OF CONCENTRATION (MIN) 2-YEAR FLOW RATE (CFS) 10-YEAR FLOW RATE (CFS) 102.4 0.60 1.56 2.19 60 95.85 t 134.55 TEMPORARY BYPASS FLOW CAPACITY (PIPES ONLY) PIPE QUANTITY PIPE DIAMETER (IN) PIPE LENGTH (FT) SLOPE (%) PIPE AREA (S.F.) WETTED PERIMETER (FT) HYDRAULIC RADIUS MANNING'S N VALUE 3 PIPE FULL FLOW CAPACITY (CFS) 2-YEAR STORM FLOW RATE (CFS) 2-YEAR STORM OVERFLOW (CFS) 10-YEAR STORM FLOW RATE (CFS) 10-YEAR STORM OVERFLOW (CFS) 3 24 107 0.0187 3.14 6.28 0.5 0.013 1 93.06 95.85 2.79 134.55 41.50 T / OAK GROVE ROAD SW � - a - - ? a - -Q� s - - - - - - - - d a °/ Al S III _ �78`¢\\ L - ° \ - �I�i - oHu oHu ❑Hu �a �a I I \ \ \ (A R I �T I / \\\\\ �-78a, 1 \ \ \ I III I L C TI -� \ \ \ \ I ' CONSTRUCTION \ I \ I�� PROP. TREE LINE \ I FENCING \ I \ I \ 1 �\ I I � \, \ a I I \ �\ I \ \\ STAGING AREA (4,700 S.F.) \ \ I \ Io \ �1\ , \d° DIVERSION BERM POROUS BAFFLES %x\ ` ~ ��' \ \\\ a SKIMMER BASIN #2 DIVERSION BERM I 1 I \ \ \ \ \ \ \ \ \\\ \ \ \\ / ��j TOP OF DAM: 782.50' SLOPE DRAIN (TYP.) TEMPORARY PIPE BYPti `1 ♦♦ - EX. MAINTENANCE FACILITY \ I // \ �\ \ 3x24"PIPES ♦� o ❑p \ ----� 1 \TEMPO RY COFFERDAM\\\ \ INV IN: 770.00 d'o ♦ ♦ \ \ o \ (SEEINSET1) \ OX00 90 lk \ \v �o ♦♦♦ o o I \ \ \ I 100 \ \ \\\ \ \ ♦ TETHER SKIMMER SF / Al, \ \ \\ \ \ I TO DAM 8 o I L� IX X X X X \ X X X I X \\ \ d \ \ \ \ 1 I� I \\\ \ \\ \ �♦ SILT FENCE MARKS /X\ I CONSTRUCTION ENTRANCE DISTURBED LIMITS TO OVERLAP EX. PARKING I \ \ X AREA FOR PAVEMENT yl� PROTECTION \\ d d \ I CONSTRUCTION PROP. TREE LINE ENTRANCE \ d \ i I \ y °� ✓ o \\ I ROCK OUTLET (TYP.) \ \ 8S v A d4 \ \ CONSTRUCTION ENTRANCE TO BE \\\ �, \\\ \\ \\ EXTENDED 32 L.F. \ � q2 L POROUS BAFFLES \ 5' MIN. SEPARATION �� I \ \ 1 \ 0/4 TEMPORARY PIPE BYPASS \ \ I \ ) \ \\ \\ \ �. .\\\ �j 3 x 24" PIPES \\ ° SKIMMER BASIN #1 2 INV OUT: 768.00' \ \ I \ 1 / \ \ \ \ \ \ 1vtTOP OF DAM = 772.50' / ^ry RIP RAP APRON TO BE INSTALLED OVER MATTING o AND KEYED INTO THE BANKS OF THE CHANNEL. RIP RAP TO REMAIN AFTER CONSTRUCTION. TETHER SKIMMER TO DAM pL \ \ \ \ \ \ CLASS 1 RIP RAP 1 1 ° ° , SPILLWAY ELEV: 772.00' \ \ W 488 d D = 24" \ \� CONSTRUCTION SEQUENCE: STREAM IMPACT SUMMARY 1. CLEAR AREAS REQUIRED FOR INSTALLATION OF EROSION CONTROL MEASURES INSTALLED IN PHASE 2. COFFER DAM 21.0 LF 2. EXTEND TEMPORARY CONSTRUCTION ENTRANCE ACROSS BYPASS DIVERSION PIPE/CHANNEL. TEMPORARY STREAM BYPASS 110.0 LF 3. INSTALL ALL REMAINING EROSION CONTROL MEASURES. WHEN ALL EROSION CONTROL MEASURES ARE IN PLACE, REQUEST AN INSPECTION RIP RAP 52.5 LF FROM THE EROSION CONTROL INSPECTOR. ANY MODIFICATIONS REQUIRED SHALL BE MADE PRIOR TO MOVING TO STAGE 3. TOTAL 183.5 LF Skimmer Basin #1 Summary Required Skimmer Basin #2 Summary Required 4. GRADE AND STABILIZE THE TEMPORARY STAGING AREA. 5. ALL EROSION AND SEDIMENTATION CONTROL PRACTICES SHALL BE CHECKED BY CONTRACTOR FOR STABILITY AND OPERATION FOLLOWING Basin volume = 339 cu. ft. Basin volume = 263 cu. ft. EVERY RUNOFF -PRODUCING RAINFALL BUT IN NO CASE LESS THAN ONCE EVERY WEEK. ANY NEEDED REPAIRS SHALL BE MADE IMMEDIATELY \ \ (12") #57 WASHED STONE EX. GRADE / Basin surface area = 360 sq. ft. Basin surface area = 250 sq. ft. TO MAINTAIN ALL PRACTICES AS DESIGNED. \ \ �/ / Basin storage depth = 2 ft Basin storage depth = 2 ft Basin C . Length = 45 ft Basin Length = 25 ft 10 YEAR STORM ELEV. Basin Min Width = 8 ft Basin Width = loft 2 YEAR STORM ELEV. Basin Max Width = loft Spillway length = 2ft min (12") CLASS B STONE Spillway length = 2ft min Side Slopes= 2:1 24" PIPE 24" PIPE 24" PIPE I Side Slopes= 2:1 N MUST FILTER FABRIC QJG�vS �L ITY pOti� Skimmer Size Summary: Required =��J�o pR0�F 7.5' Skimmer Size Summary: Required Skimmer size: 1.5 in ��o o �1 0 9 5' Skimmer size: 1.5 in Orifice size: 1.5 in ir ' _4 Orifice size: 1.5 in o D m TEMPORARY BYPASSTYPICAL SECTION N.T.S. n Y 2 BEFORE YOU DIG! CONTACT ONE -CALL CENTER O U) of w J SILAS CREEK PKWY SITE VICINITY MAP 1 "=2000' SITE DATA: FORSYTH TECHNICAL COMMUNITY COLLEGE PIN:6824-35-9286 D.B. 2988 PG. 2847 TOTAL AREA: 25.51 ACRES ZONING: ZONING: C (CAMPUS) DEVELOPMENT STANDARDS: WINSTON-SALEM FRONT SETBACK: 20' SIDE SETBACK: 20' REAR SETBACK: 20' WATERSHED DATA: WATERSHED: SALEM CREEK WATERSHED CLASSIFICATION: C RIVER BASIN: YADKIN PEE-DEE SOIL TYPES: PcD2, PcF2, PaB, PaC, PaD, Ch AVG. SLOPE:10% DISTURBED AREA: 0.42 ACRES PERMITTED AREA: 1.00 ACRES 1. CONTRACTOR IS TO ENSURE WORK AREA IS NOT FILLED HIGHER THAN ELEV. 773, TO PROMOTE POSITIVE DRAINAGE TO TEMPORARY SEDIMENT TRAP. EROSION CONTROL NOTES: 1. TEMPORARY AND PERMANENT EROSION CONTROL MEASURES SHALL BE PROVIDED FOR ALL LAND DISTURBING WORK IN ACCORDANCE WITH AN APPROVED EROSION CONTROL PLAN. 2. ALL PERMANENT EROSION CONTROL MEASURES SHALL BE INCORPORATED INTO THE WORK AT THE EARLIEST PRACTICAL TIME. 3. ALL TEMPORARY MEASURES SHALL BE MAINTAINED UNTIL THE PERMANENT MEASURES HAVE TAKEN EFFECT OR APPROVED BY THE EROSION CONTROL OFFICER. 4. UPON APPROVAL OF GRADING PLAN, A NOTICE OF INTENT (NOI) STORMWATER APPLICATION MUST BE FILED WITH NCDENR. EROSION CONTROL MAINTENANCE PLAN 1. ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY RUNOFF -PRODUCING RAINFALL BUT IN NO CASE LESS THAN ONCE EVERY WEEK. ANY NEEDED REPAIRS SHALL BE MADE IMMEDIATELY TO MAINTAIN ALL MEASURES AS DESIGNED. 2. SEDIMENT BASINS SHALL BE INSPECTED REGULARLY DURING LAND DISTURBING ACTIVITIES AND AFTER EACH RUNOFF -PRODUCING RAINFALL. SEDIMENT SHALL BE REMOVED AND THE BASIN RESTORED TO ITS ORIGINAL DIMENSIONS WHEN SEDIMENT HAS ACCUMULATED TO ONE-HALF THE DESIGN DEPTH OF EACH BASIN. PORTIONS OF THE BASIN'S GRAVEL FACING THAT ARE CONTAMINATED BY SEDIMENT SHALL BE REPLACED WITH FRESH GRAVEL DURING EACH SEDIMENT REMOVAL EPISODE. 3. SEDIMENT FENCES SHALL BE INSPECTED AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. REPAIRS SHALL BE MADE IMMEDIATELY. SEDIMENT DEPOSITS SHALL BE REMOVED AS NEEDED TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAINFALL EVENT, AND TO REDUCE PRESSURE ON THE FENCE. FENCING MATERIALS AND SEDIMENT DEPOSITS SHALL BE REMOVED, AND THE AREA BROUGHT TO GRADE FOLLOWING STABILIZATION OF UPGRADIENT DISTURBED AREAS. 4. DIVERSION DITCHES/BYPASS PIPING MUST REMAIN IN PLACE UNTIL PROJECT IS STABILIZED AND PERMISSION GIVEN BY THE EROSION CONTROL OFFICER. 5. A RAIN GAUGE AND REPORT BOX SHALL BE LOCATED ON -SITE FOR RAINFALL MONITORING AND SITE INSPECTIONS. THE CONTRACTOR IS RESPONSIBLE FOR CONDUCTING THE WEEKLY INSPECTIONS OR AFTER 1" OF RAINFALL TO CONFORM WITH THE NPDES PERMIT REQUIREMENTS. REPORTS SHALL BE KEPT IN THE INSPECTION BOX AND REMAIN AVAILABLE TO REVIEWING AGENCIES UPON REQUEST. ill =20' GAS CONTACT: PIEDMONT NATURAL GAS GREG BURTON PHONE: 336-726-7808 EMAIL:GREG.BURTON@DUKE-ENERGY.COM CRAIG HYATT EMAIL: CRAIG.HYATT@DUKE-ENERGY.COM O m (V N � > cV Z V � Z E U o 0 un Ln .>_ o N 6i L V O c�6 cV Z Ln ' w Co un �CO r a, ����__j W LL Z 0 Cl) Q O N 2) U d Z O Q zw2 XWW O wUQ v/ W H-jO W N Z CCU) of C) W O LL Q W _I Cn 0 0 J 0 Q U Z 0 Z U) Z W W � Q z L, J J O OZ}U W 0 � _ <j00 ULLJ Z } Z 1 z F_ O}Z)Q ♦U1 dUOUco V looloollool O z z 0 w IX w Q 0 Z a a a a a a DRAWN BY CP CHECKED BY: RB DATE: 04/14/2020 PROJECT NO.:06006.001 SCALE: 1 "=20' N CAR Off, SE L 027436 ;,NGINE�QQ� NORA III -o oll���1111,,4``23-20 SHEET 10 OF15 FINAL - NOT RELEASED FOR CONSTRUCTION STORM DRAINAGE ANALYSIS DRAINAGE AREA (ACRES) AVG. RUNOFF COEFFICIENT (C) 2-YEAR RAINFALL INTENSITY (IN/HR) 10-YEAR RAINFALL INTENSITY (IN/HR) TIME OF CONCENTRATION (MIN) 2-YEAR FLOW RATE (CFS) 10-YEAR FLOW RATE (CFS) 102.4 0.60 1.56 2.19 60 95.85 t 134.55 TEMPORARY BYPASS FLOW CAPACITY (PIPES ONLY) PIPE QUANTITY PIPE DIAMETER (IN) PIPE LENGTH (FT) SLOPE (%) PIPE AREA (S.F.) WETTED PERIMETER (FT) HYDRAULIC RADIUS MANNING'S N VALUE 3 PIPE FULL FLOW CAPACITY (CFS) 2-YEAR STORM FLOW RATE (CFS) 2-YEAR STORM OVERFLOW (CFS) 10-YEAR STORM FLOW RATE (CFS) 10-YEAR STORM OVERFLOW (CFS) 3 24 107 0.0187 3.14 6.28 0.5 0.013 1 93.06 95.85 2.79 134.55 41.50 T / OAK GROVE ROAD SW -�- -- d c--6l s- - - - - - - -dv °/ Al S III ' �I�78,�\ L - ° \ - �I�i - 0Hu oHu ❑Hu H �I ������a �a \ � PROP. TREE LINE \ I CONSTRUCTION \ I \ \\ 1 FENCING \ I \ \ I I STAGING AREA BE RM J \ BE RM,700 S.F.) 1 I \ \ , POROUS BAFFLES (4 SKIMMER BASIN #2 DIVERSION BERM I I \ \ I \ � \\ \� � -\ \ \ \ � ��� �' \ \ \ ♦ � \ \ \ \ TOP OF DAM: 782.50' SLOPE DRAIN (TYP.) TEMPORARY PIPE BYPASS \ ���^ 1 o EX. MAINTENANCE FACILITY I / 3x24"PIPES \� >a / ❑O \TEMPORARY COFFER Am INV IN: 770.00 d'o 140 \ \o \ v (SEEINSET1) \ \ \\\ \a \ s \ \ \ �100 o d COFFER DAM I � TETHER SKIMMER �' SF �'' X \\ \ \ \ \ DEMAND a o I I ° ( I \\ \\ \\\ \ Al TO DAM 8 0 1 I \ I L 1X X X X X \ X X X X SILT FENCE MARKS / x\1 CONSTRUCTION ENTRANCE DISTURBED LIMITS TO OVERLAP EX. PARKING \ \ AREA FOR PAVEMENT 1 I \ \ PROTECTION l CONSTRUCTION TEMPORARY POLE AND SUPPORT STRAP TO BRACE ° ° \ \ \ \\ + SF'� PROP. TREE LINE ENTRANCE EXISTING GAS LINE DURING WALL CONSTRUCTION. ° \ \ \ \ I DUKE ENERGY/PIEDMONT NATURAL GAS TO ° \ \ \ \\ I \ > �\\ \ \ \ \ l REVIEW AND APPROVE PRIOR TO START OF \ \ \\ I I I \'\ �ROCK OUTLET (TYP.) CONSTRUCTION (TYP). SEE SITE PLAN NOTE 6. 44 \\ \ `\\ \ /-_\ �❑ '\`\\\ \ ` \ I / \ 110 LF STREAM L �\ I ° TEMPORARILY BYPASSED �� \ \k\ \ \ \ \ S POROUS BAFFLES \ \�6, PROP. RETAINING WALL s ° \ j >� 0 4 1 \ > \� LENGTH: 117 FT ° \ \ 69 \ 5' MIN. /.-, / RADIUS:70FT \ �\ SEPARATION \ SEE WALL PLANS FOR \ \ " �p \ CONSTRUCTION \ SPECIFICATIONS. s Q�NG d \ TEMPORARY PIPE BYPASS \ \ I \ ) \ \ \ \ \ 3 x 24" PIPES g 00' 2 INV OUT: 768.I \ \ \\ I ° d SKIMMER BASIN #1 \ ao EX. 2" GAS LINE TO BE \ \ o �'m \ \ '� � \ SUPPORTED DURING ° ( _ CONSTRUCTION. ° I ` TOP OF DAM = 772.50' \ )) Ox 00 RIP RAP APRON TO BE INSTALLED OVER MATTING ^V \ \ \ \ \ \\ \\ \ \ AND KEYED INTO THE BANKS OF THE CHANNEL. RIP RAP TO REMAIN AFTER CONSTRUCTION. TETHER SKIMMER TO DAM \ \ \ \ � \ ' � \ \ � � CLASS 1 RIP RAP SPILLWAY ELEV: 772.00' \� W 488 ° CONSTRUCTION SEQUENCE: 1. ALL CONSTRUCTION VEHICLES SHALL USE DESIGNATED TEMPORARY STREAM CROSSING TO NAVIGATE TO WORKING AREA. 2. COMPLETE WALL CONSTRUCTION AS PER STRUCTURAL PLANS. 52.5 LF RIP RAP\ op \SEX. RETAINING \� �� �// \ \ WALL TO REMAIN �'� I I \�\G \ �/ UNDISTURBED I / / �-� toj, 3. ALL AREAS AND SLOPES DISTURBED DURING CONSTRUCTION AND EXPOSED SHALL BE STABILIZED WITH TEMPORARY SEEDING AND MULCHING WITHIN 14 CALENDAR DAYS. FOLLOWING COMPLETION OF ANY PHASE OF GRADING OR PERIOD OF INACTIVITY. PERMANENT GROUND COVER IS TO BE ESTABLISHED FOR ALL DISTURBED AREAS WITHIN 14 CALENDAR DAYS, FOLLOWING COMPLETION OF CONSTRUCTION, COMPLETION OF GRADING, OR PERIOD OF INACTIVITY, PERMANENT SEEDING, MULCHING, AND GROUND COVER SHALL BE APPLIED TO THE SITE FOLLOWING COMPLETION OF CONSTRUCTION. 4. WHEN WALL CONSTRUCTION IS COMPLETE, PROCEED WITH STREAM RESTORATION (SEE STREAM RESTORATION PLAN). TEMPORARY BYPASS CHANNEL SHALL REMAIN IN PLACE UNTIL STREAM RESTORATION ACTIVITIES ARE COMPLETE. 5. PROCEED TO STAGE 4 EROSION CONTROL. ��JG(\()� I TYT p "0 g �O T 'p2i ��� o wOz = Q Z D m 7 n Y BEFORE YOU DIGI CONTACT ONE -CALL CENTER STREAM IMPACT SUMMARY COFFER DAM 21.0 LF TEMPORARY STREAM BYPASS 110.0 LF RIP RAP 52.5 LF TOTAL 183.5 LF \ \ (12") #57 WASHED STONE -",, TONE EX. GRADE--,,,,,, 10 YEAR STORM ELEV. 2 YEAR STORM ELEV. (12") CLASS B STONE 24" PIPE 24" PIPE 24" PIPE FILTER FABRIC 7.5' 9.5' TEMPORARY BYPASS TYPICAL SECTION N.T.S. Skimmer Basin #1 Summary Required Skimmer Basin #2 Summary Required Basin volume = 339 cu. ft. Basin volume = 263 cu. ft. Basin surface area = 360 sq. ft. Basin surface area = 250 sq. ft. Basin storage depth = 2 ft Basin storage depth = 2 ft Basin C . Length = 45 ft Basin Length = 25 ft Basin Min Width = 8 ft Basin Width = loft Basin Max Width = loft Spillway length = 2ft min Spillway length = 2ft min Side Slopes= 2:1 Side Slopes= 2:1 Skimmer Size Summary: Required Skimmer Size Summary: Required Skimmer size: 1.5 in Skimmer size: 1.5 in Orifice size: 1.5 in Orifice size: 1.5 in O U) of W J SILAS CREEK PKWY SITE VICINITY MAP 1 "=2000' SITE DATA: FORSYTH TECHNICAL COMMUNITY COLLEGE PIN:6824-35-9286 D.B. 2988 PG. 2847 TOTAL AREA: 25.51 ACRES ZONING: ZONING: C (CAMPUS) DEVELOPMENT STANDARDS: WINSTON-SALEM FRONT SETBACK: 20' SIDE SETBACK: 20' REAR SETBACK: 20' WATERSHED DATA: WATERSHED: SALEM CREEK WATERSHED CLASSIFICATION: C RIVER BASIN: YADKIN PEE-DEE SOIL TYPES: PcD2, PcF2, PaB, PaC, PaD, Ch AVG. SLOPE:10% DISTURBED AREA: 0.42 ACRES PERMITTED AREA: 1.00 ACRES 1. CONTRACTOR IS TO ENSURE WORK AREA IS NOT FILLED HIGHER THAN ELEV. 773, TO PROMOTE POSITIVE DRAINAGE TO TEMPORARY SEDIMENT TRAP. EROSION CONTROL NOTES: 1. TEMPORARY AND PERMANENT EROSION CONTROL MEASURES SHALL BE PROVIDED FOR ALL LAND DISTURBING WORK IN ACCORDANCE WITH AN APPROVED EROSION CONTROL PLAN. 2. ALL PERMANENT EROSION CONTROL MEASURES SHALL BE INCORPORATED INTO THE WORK AT THE EARLIEST PRACTICAL TIME. 3. ALL TEMPORARY MEASURES SHALL BE MAINTAINED UNTIL THE PERMANENT MEASURES HAVE TAKEN EFFECT OR APPROVED BY THE EROSION CONTROL OFFICER. 4. UPON APPROVAL OF GRADING PLAN, A NOTICE OF INTENT (NOI) STORMWATER APPLICATION MUST BE FILED WITH NCDENR. EROSION CONTROL MAINTENANCE PLAN 1. ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY RUNOFF -PRODUCING RAINFALL BUT IN NO CASE LESS THAN ONCE EVERY WEEK. ANY NEEDED REPAIRS SHALL BE MADE IMMEDIATELY TO MAINTAIN ALL MEASURES AS DESIGNED. 2. SEDIMENT BASINS SHALL BE INSPECTED REGULARLY DURING LAND DISTURBING ACTIVITIES AND AFTER EACH RUNOFF -PRODUCING RAINFALL. SEDIMENT SHALL BE REMOVED AND THE BASIN RESTORED TO ITS ORIGINAL DIMENSIONS WHEN SEDIMENT HAS ACCUMULATED TO ONE-HALF THE DESIGN DEPTH OF EACH BASIN. PORTIONS OF THE BASIN'S GRAVEL FACING THAT ARE CONTAMINATED BY SEDIMENT SHALL BE REPLACED WITH FRESH GRAVEL DURING EACH SEDIMENT REMOVAL EPISODE. 3. SEDIMENT FENCES SHALL BE INSPECTED AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. REPAIRS SHALL BE MADE IMMEDIATELY. SEDIMENT DEPOSITS SHALL BE REMOVED AS NEEDED TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAINFALL EVENT, AND TO REDUCE PRESSURE ON THE FENCE. FENCING MATERIALS AND SEDIMENT DEPOSITS SHALL BE REMOVED, AND THE AREA BROUGHT TO GRADE FOLLOWING STABILIZATION OF UPGRADIENT DISTURBED AREAS. 4. DIVERSION DITCHES/BYPASS PIPING MUST REMAIN IN PLACE UNTIL PROJECT IS STABILIZED AND PERMISSION GIVEN BY THE EROSION CONTROL OFFICER. 5. A RAIN GAUGE AND REPORT BOX SHALL BE LOCATED ON -SITE FOR RAINFALL MONITORING AND SITE INSPECTIONS. THE CONTRACTOR IS RESPONSIBLE FOR CONDUCTING THE WEEKLY INSPECTIONS OR AFTER 1" OF RAINFALL TO CONFORM WITH THE NPDES PERMIT REQUIREMENTS. REPORTS SHALL BE KEPT IN THE INSPECTION BOX AND REMAIN AVAILABLE TO REVIEWING AGENCIES UPON REQUEST. ill =20' GAS CONTACT: PIEDMONT NATURAL GAS GREG BURTON PHONE: 336-726-7808 EMAIL:GREG.BURTON@DUKE-ENERGY.COM CRAIG HYATT EMAIL: CRAIG.HYATT@DUKE-ENERGY.COM O m (V N � > cV Z V � Z E U o 0 un Ln .>_ o N 6i L V O c�6 cV Z Ln ' w Co un �CO r a, ����__j W LL rZ O �o Q O O� N 2) U d Z O Q zWW O wUQ �/� Z ~U� v/ W H_jO LV �"� W ; C) U) z of �O Z_ W O 0 Q W (1) Cn O 0 J Q Q U Z 0 O Z U) Z W W � z Q W J J O OZ}U W VO�� _jU0 Of ) O U Z } Z 1 :zF_ O}Z)Q ♦U1 dUOUco V UL Lu I- 0 Z Z 0 w IX w Q 0 Z a a a a a a DRAWN BY CP CHECKED BY: RB DATE: 04/14/2020 PROJECT NO.:06006.001 SCALE: 1 "=20' o CA 1. SE L 027436 4-23-20 SHEET 11 OF 15 FINAL - NOT RELEASED FOR CONSTRUCTION STORM DRAINAGE ANALYSIS DRAINAGE AREA (ACRES) AVG. RUNOFF COEFFICIENT (C) 2-YEAR RAINFALL INTENSITY (IN/HR) 10-YEAR RAINFALL INTENSITY (IN/HR) TIME OF CONCENTRATION (MIN) 2-YEAR FLOW RATE (CFS) 10-YEAR FLOW RATE (CFS) 102.4 0.60 1.56 2.19 60 95.85 t 134.55 TEMPORARY BYPASS FLOW CAPACITY (PIPES ONLY) PIPE QUANTITY PIPE DIAMETER (IN) PIPE LENGTH (FT) SLOPE (%) PIPE AREA (S.F.) WETTED PERIMETER (FT) HYDRAULIC RADIUS MANNING'S N VALUE 3 PIPE FULL FLOW CAPACITY (CFS) 2-YEAR STORM FLOW RATE (CFS) 2-YEAR STORM OVERFLOW (CFS) 10-YEAR STORM FLOW RATE (CFS) 10-YEAR STORM OVERFLOW (CFS) 3 24 107 0.0187 3.14 6.28 0.5 0.013 1 93.06 95.85 2.79 134.55 41.50 T OAK GROVE ROAD SW - - - - - - - \ \ \ �� /ice -�--a =�=Qa --- --_-- -------------- - -6l s - - - � _g -- S S - - -�- ---- ------ j/ °° ° "� �-d\\\ \III \ 78� \L_❑ \ \ �___ �_ %1 �\ > 7Fi� ❑HU ❑HU ❑HU H I \��MI a ���a � I I \ \\t(A(Al. R I i,jI I\ I III I Ci�TI � 9 �PROP. TREE LINE \ \ I CTION FENCING / STAGING AREA J \ \ \ \ S.F.) I °° (4,700 ' DIVERSION BERM POROUS BAFFLES \ DIVERSION BERM �' 8\ \\ �' \ \\ SKIMMER BASIN #2 \ \ \ ♦\ / � ��js TOP OF DAM: 782.50; > \\ \ j SLOPE DRAIN (TYP.) \ ♦♦ o I TEMPORARY PIPE BYPASS r � ��^ 100� o � \\ 1 \ INV IN: 770.00' d' � - - - - - - - - - - - - - - - - - I � �� / � I / ►) � � III/ 7/777 \ \ I EX. MAINTENANCE FACILITY \ I 1 \\ \ \ \ \ TEMPORARY COFFERDAM \ \ v � ° a \ \ (SEEINSET1) I \ `\ \ \ \ \ \\\ \a \ S \ \ \ \ to \ , '40 \ \ \\\ \ TETHER SKIMMER SF o a I \ I I I \\\\ \\\ \\ °/ TO DAM 8 o I L 1X - X_ X- X X \X X X X \ SILT FENCE MARKS /xl CONSTRUCTION ENTRANCE DISTURBED LIMITS 1 ° \ \ I o o TO OVERLAP EX. PARKING \ AREA FOR PAVEMENT 1 PROTECTION \ CONSTRUCTION PROP. TREE LINE ENTRANCE ROCK OUTLET (TYP.) \A\ .0 s POROUS BAFFLES ° 5' MIN. \ \p SEPARATION TEMPORARY PIPE BYPASS \ \ \ \ \ ° �. A. , ��2 � OUT: NV O68.00' \ \ \ I \ \ \ \ I SKIMMER BASIN #1 \\\ \ C:)(0� \ �i TOP OF DAM = 772.50' RIP RAP APRON TO BE INSTALLED OVER MATTING AND KEYED INTO THE BANKS OF THE CHANNEL. \ \ \ I \ TETHER SKIMMER TO DAM \ RIP RAP TO REMAIN AFTER CONSTRUCTION. \X,t z \ \ < CLASS 1 RIP RAP ° , SPILLWAY ELEV: 772.00' \ \ W 488 kp 4�JP\ \S� L I TYT b �O T p2i �J o ��� O wOz = Q Z D m 7 n Y BEFORE YOU DIG! CONTACT ONE -CALL CENTER CONSTRUCTION SEQUENCE: 1. STABILIZE AREA UPSTREAM OF NEWLY CONSTRUCTED WALL. 2. BEGIN STREAM RESTORATION. RESTORATION SHALL BEGIN AT THE DOWNSTREAM END AND WORK TOWARDS THE CONSTRUCTION ENTRANCE. IN ADDITION TO STREAM RESTORATION, SKIMMER BASIN#1 CAN BE REMOVED AND AREA STABILIZED. STAGING AREA SHALL REMAIN IN PLACE UNTIL STREAM RESTORATION CONSTRUCTION IS COMPLETE. 3. REMOVE CONSTRUCTION ENTRANCE AND RE-CREATE STREAM IN THE VICINITY OF CONSTRUCTION ENTRANCE. COMPLETE RESTORATION IN THIS VICINITY. 4. ONCE STREAM BANKS HAVE BEEN RESTORED AND STABILIZED, REMOVE COFFERDAM TO REDIRECT FLOW THROUGH THE RESTORED STREAM. TEMPORARY DIVERSION PIPES ARE TO BE REMOVED AND AREA STABILIZED WITH COMPACTED FILL. UNSUITABLE MATERIAL MAY BE EVENLY DISTRIBUTED THROUGHOUT DISTURBED AREA PRIOR TO SEEDING AND FINAL STABILIZATION. 5. SEED AND STABILIZE STAGING AREA. 6. CONTACT EROSION INSPECTION FOR APPROVAL TO REMOVE SEDIMENT BASIN #2. SILT FENCE SHALL BE MAINTAINED UNTIL AREA HAS BEEN STABILIZED. 7. REMOVE ALL REMAINING EROSION CONTROL DEVICES WHEN SITE IS STABILIZED. 8. CONTACT EROSION CONTROL INSPECTOR TO FINALIZE SITE TO CLOSEOUT PROJECT. U) of w _j SILAS CREEK PKWY SITE VICINITY MAP 1 "=2000' SITE DATA: FORSYTH TECHNICAL COMMUNITY COLLEGE PIN:6824-35-9286 D.B. 2988 PG. 2847 TOTAL AREA: 25.51 ACRES ZONING: ZONING: C (CAMPUS) DEVELOPMENT STANDARDS: WINSTON-SALEM FRONT SETBACK: 20' SIDE SETBACK: 20' REAR SETBACK: 20' WATERSHED DATA: WATERSHED: SALEM CREEK WATERSHED CLASSIFICATION: C RIVER BASIN: YADKIN PEE-DEE SOIL TYPES: PcD2, PcF2, PaB, PaC, PaD, Ch AVG. SLOPE:10% DISTURBED AREA: 0.42 ACRES PERMITTED AREA: 1.00 ACRES 1. CONTRACTOR IS TO ENSURE WORK AREA IS NOT FILLED HIGHER THAN ELEV. 773, TO PROMOTE POSITIVE DRAINAGE TO TEMPORARY SEDIMENT TRAP. EROSION CONTROL NOTES: 1. TEMPORARY AND PERMANENT EROSION CONTROL MEASURES SHALL BE PROVIDED FOR ALL LAND DISTURBING WORK IN ACCORDANCE WITH AN APPROVED EROSION CONTROL PLAN. 2. ALL PERMANENT EROSION CONTROL MEASURES SHALL BE INCORPORATED INTO THE WORK AT THE EARLIEST PRACTICAL TIME. 3. ALL TEMPORARY MEASURES SHALL BE MAINTAINED UNTIL THE PERMANENT MEASURES HAVE TAKEN EFFECT OR APPROVED BY THE EROSION CONTROL OFFICER. 4. UPON APPROVAL OF GRADING PLAN, A NOTICE OF INTENT (NOI) STORMWATER APPLICATION MUST BE FILED WITH NCDENR. EROSION CONTROL MAINTENANCE PLAN 1. ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY RUNOFF -PRODUCING RAINFALL BUT IN NO CASE LESS THAN ONCE EVERY WEEK. ANY NEEDED REPAIRS SHALL BE MADE IMMEDIATELY TO MAINTAIN ALL MEASURES AS DESIGNED. 2. SEDIMENT BASINS SHALL BE INSPECTED REGULARLY DURING LAND DISTURBING ACTIVITIES AND AFTER EACH RUNOFF -PRODUCING RAINFALL. SEDIMENT SHALL BE REMOVED AND THE BASIN RESTORED TO ITS ORIGINAL DIMENSIONS WHEN SEDIMENT HAS ACCUMULATED TO ONE-HALF THE DESIGN DEPTH OF EACH BASIN. PORTIONS OF THE BASIN'S GRAVEL FACING THAT ARE CONTAMINATED BY SEDIMENT SHALL BE REPLACED WITH FRESH GRAVEL DURING EACH SEDIMENT REMOVAL EPISODE. 3. SEDIMENT FENCES SHALL BE INSPECTED AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. REPAIRS SHALL BE MADE IMMEDIATELY. SEDIMENT DEPOSITS SHALL BE REMOVED AS NEEDED TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAINFALL EVENT, AND TO REDUCE PRESSURE ON THE FENCE. FENCING MATERIALS AND SEDIMENT DEPOSITS SHALL BE REMOVED, AND THE AREA BROUGHT TO GRADE FOLLOWING STABILIZATION OF UPGRADIENT DISTURBED AREAS. 4. DIVERSION DITCHES/BYPASS PIPING MUST REMAIN IN PLACE UNTIL PROJECT IS STABILIZED AND PERMISSION GIVEN BY THE EROSION CONTROL OFFICER. 5. A RAIN GAUGE AND REPORT BOX SHALL BE LOCATED ON -SITE FOR RAINFALL MONITORING AND SITE INSPECTIONS. THE CONTRACTOR IS RESPONSIBLE FOR CONDUCTING THE WEEKLY INSPECTIONS OR AFTER 1" OF RAINFALL TO CONFORM WITH THE NPDES PERMIT REQUIREMENTS. REPORTS SHALL BE KEPT IN THE INSPECTION BOX AND REMAIN AVAILABLE TO REVIEWING AGENCIES UPON REQUEST. ill =20' GAS CONTACT: PIEDMONT NATURAL GAS GREG BURTON PHONE: 336-726-7808 EMAIL:GREG.BURTON@DUKE-ENERGY.COM CRAIG HYATT EMAIL: CRAIG.HYATT@DUKE-ENERGY.COM O m (V N � > cV Z V � Z E U o 0 un Ln .>_ o N 6' N V O c�6 cV Z Ln ' w 00 un _ CO >_ �n M v iuco�3� W LL z O �o Q U N <az O Q Z w w O wUQ cn�/� z ~U)� H_jO mow/ z c)o__ I.L 0oZ W O LL Q W (1) cn O 0 J Q Q U z 0 O Z U) Z W W � Q z w J O J OZ}U W VOWS �<i00 U Z } Z 1 � z O}Z)Q ♦U1 d50co V LL w O z z 0 w Of w Q 0 z a a a a a a DRAWN BY CP CHECKED BY: RB DATE: 04/14/2020 PROJECT NO.:06006.001 SCALE: 1 "=20' SEA 027436 GINE�Q N�R C A gas 4-23-20 SHEET 12 OF 15 FINAL - NOT RELEASED FOR CONSTRUCTION STORM DRAINAGE ANALYSIS DRAINAGE AREA (ACRES) AVG. RUNOFF COEFFICIENT (C) 2-YEAR RAINFALL INTENSITY (IN/HR) 10-YEAR RAINFALL INTENSITY (IN/HR) TIME OF CONCENTRATION (MIN) 2-YEAR FLOW RATE (CFS) 10-YEAR FLOW RATE (CFS) 102.4 0.60 1.56 2.19 60 95.85 134.55 790 780 770 760 0+00 790 770 760 790 770 0+50 STA. 1 + 25 SCALE: H: 1 "=20' V: 1 "=10' 0+00 0+50 STA. 1 + 75 SCALE: H: 1 "=20' V: 1 "=10' 760 0+00 790 780 770 760 1+00 1+00 0+50 STA. 2 + 25 SCALE: H: 1 "=20' V: 1 "=10' SEEDING ONLY (SEE SHEET 8) PLANTINGS RETAINING WALL (SEE SHEET 8) 790 780 770 760 790 780 770 1 760 1+00 KEYED -IN CLASS 1 RIP RAP WITH LINING \ \ LIVESTAKES CROSS-SECTION NOTES: k \� \ Q 1. STREAM CHANNEL SHALL BE RESTORED TO EXISTING CONDITIONS VARIES VARIES WITH RIP RAP AS SPECIFIED. STA. Y (ft) BANK SLOPE I 2. CHANNEL SLOPES SHOULD BE GRADED AS SHOWN WITH SLOPES NO STEEPER 1 + 25 4.0 1 : 1 Y AVERAGE 1 + 75 6.9 0.5 . 1 THAN 2HAV. 2 + 25 16.2 1.1 : 1 3. IN AREAS WHERE IT IS NOT FEASIBLE TYPICAL RESTORED CHANNEL TO LAY SLOPE BACK TO ANGLE, IT IS ACCEPTABLE TO MAINTAIN 1:1 SLOPE. N.T.S. HORIZONTAL LIMITS OF AREAS TO BE CONSTRUCTED AT 1:1 SLOPE WILL BE DETERMINED BASED ON SITE CONDITIONS AS VERIFIED DURING CONSTRUCTION. MUST L I TY AR TKO J Lu O S Z > m � n y BEFORE YOU DIGI CONTACT ONB CALL CENTER 780 770 760 0+00 780 770 760 0+00 780 770 760 0+00 1 SS - 775 �=.774 773772 �..� �/�,��,'� \✓� �%%ice � � o --� � � `` ���IV� rbo 1jo '3 780. 7 \ 8'� - TEMPORARY TEMPORARY COFFERDAM SEDIMENT TRAP TOP OF DAM = 772.50' RIP RAP A EX. GRADE _ ��OVER MAT ��Ci�U�o�OO THE BANK AP 0+40 0+80 1+20 1+60 2+00 EROSION CONTROL STAGE 3 SCALE: H: 1 "=20' V: 1 "=10' O of w J _J I d SILAS CREEK PKWY SITE �J 0 0 VICINITY MAP 1 "=2000' LEGEND: SITE DATA: LOG DROP AND RIFFLE STONES FORSYTH TECHNICAL COMMUNITY COLLEGE PIN:6824-35-9286 COFFERDAM D.B. 2988 PG. 2847 TOTAL AREA: 25.51 ACRES ZONING: ZONING: C (CAMPUS) DEVELOPMENT STANDARDS: WINSTON-SALEM FRONT SETBACK: 20' SIDE SETBACK: 20' REAR SETBACK: 20' WATERSHED DATA: WATERSHED: SALEM CREEK WATERSHED CLASSIFICATION: C RIVER BASIN: YADKIN PEE-DEE SOIL TYPES: PcD2, PcF2, PaB, PaC, PaD, Ch AVG. SLOPE: 10% 780 770 TO BE INSTALLED TING AND KEYED INTO S OF CHANNEL. 760 2+40 2+80 3+00 0+40 0+80 1+20 1+60 2+00 EROSION CONTROL STAGE 3 SCALE: H: 1 "=20' V: 1 "=10' O of w J _J I d SILAS CREEK PKWY SITE �J 0 0 VICINITY MAP 1 "=2000' LEGEND: SITE DATA: LOG DROP AND RIFFLE STONES FORSYTH TECHNICAL COMMUNITY COLLEGE PIN:6824-35-9286 COFFERDAM D.B. 2988 PG. 2847 TOTAL AREA: 25.51 ACRES ZONING: ZONING: C (CAMPUS) DEVELOPMENT STANDARDS: WINSTON-SALEM FRONT SETBACK: 20' SIDE SETBACK: 20' REAR SETBACK: 20' WATERSHED DATA: WATERSHED: SALEM CREEK WATERSHED CLASSIFICATION: C RIVER BASIN: YADKIN PEE-DEE SOIL TYPES: PcD2, PcF2, PaB, PaC, PaD, Ch AVG. SLOPE: 10% 780 770 TO BE INSTALLED TING AND KEYED INTO S OF CHANNEL. 760 2+40 2+80 3+00 780 770 TO BE INSTALLED TING AND KEYED INTO S OF CHANNEL. 760 2+40 2+80 3+00 Al 0+40 0+80 1+20 1+60 2+00 BEGIN STREAM RESTORATION SCALE: H: 1"=20' V: 1"=10' 0+40 TEMPORARY COFFERDAM REMOVED � / 0+80 PROP. LOGJ DROP AND STONE RIFFLE PLACE LOG DROP 2" ABOVE INVERT AND NOTCH TO INVERT. PLACE LOG DROP 2" ABOVE INVERT AND NOTCH TO INVERT. EX. GRADE PROP.GRADE -PROP. LOG DROP AND STONE RIFFLE 1+20 1+60 2+00 FINAL STREAM RESTORATION SCALE: H: 1 "=20' V: 1 "=10' 2+40 2+40 780 770 760 2+80 3+00 780 770 RIP RAP APRON TO REMAIN 760 2+80 3+00 2 STREAM RESTORATION CONSTRUCTION SEQUENCE: 1. CONTRACTOR SHALL STEAK OUT PROPOSED STREAM AND STREAM BED ALIGNMENT. 2. GRADE STREAM, STREAM BED ALIGNMENT, AND FLOOD PRONE BANKFULL BENCH TO ELEVATIONS SPECIFIED. STREAM BANKS SHALL BE LAID BACK SMOOTHLY AND GRADUALLY AS INDICATED ON PLANS. SHEER OR STEEPLY SLOPING STREAM BANKS ARE NOT PERMISSIBLE. 3. INSTALL MATTING AND RIP -RAP ALONG ENTIRE FACE OF RETAINING WALL WITH CLASS 1 STONE AND PLACE AT A MAXIMUM OF 35 CUBIC FEET PER LINEAR FOOT. RIP -RAP IS TO BE INSTALLED IN ACCORDANCE TO RIP -RAP SPECIFICATION AND PAID UNDER RIP -RAP, CLASS 1 STONE UNIT PRICE. 4. INSTALL LOG DROP STRUCTURES AT LOCATIONS AND INVERT ELEVATIONS SPECIFIED. SEE LOG DROP DETAIL. FOR INSTALLATION SPECIFICATIONS. 5. INSTALL FILTER FABRIC ON UP -GRADIENT SIDES OF LOG DROP STRUCTURES. 6. PREPARE FINISH GRADES AROUND STRUCTURES AND STREAM BANKS. EXCAVATE RIFFLE SECTIONS TO ALLOW FOR INSTALLATION OF RIFFLE BED MATERIAL AT SPECIFIED FINISHED STREAMBED ELEVATIONS TO BE INSTALLED FOLLOWING INSTALLATION OF COIR FIBER MATTING ON STREAM BANKS (RIFFLE SECTIONS ONLY). SEE LOG DROP SPECIFICATION FOR DETAILS AND UNIT PRICE. 7. SEED AND STRAW ALONG STREAM BANKS. a. USE NATIVE WETLAND SEED MIX TO SPECIFICATIONS PER SEED MIX. GENERALLY, 1/2 L.B. PER 1,000SF SHOULD BE APPLIED. SEE WETLAND SEED MIX SPECIFICATION FOR DETAILS AND UNIT PRICE. b. A CONTRACTOR'S BLEND OF PERMANENT AND TEMPORARY SEED SHALL BE APPLIED IN ADDITION TO THE WETLAND SEED MIX. 8. INSTALL WOVEN GEOTEXTILE BLANKET COMPOSED OF 100% BIODEGRADABLE, NATURAL COCONUT (COIR) FIBER MATTING OVER SEEDED AND STRAWED STREAM BANKS. NOTE: MATTING SHALL EXTEND FROM STREAM BANK TOE SLOPE TO BEYOND TOP OF BANK. 9. INSTALL RIFFLE MATERIALS WITHIN RIFFLE SECTIONS TO ELEVATIONS SPECIFIED, WHILE OVERLAPPING EROSION CONTROL COIR MATTING ON STREAM BANKS. CONTRACTOR SHALL TAMP DOWN RIFFLES WITH THE KNUCKLE TO CLEAR VOIDS, CREATE A THALWEG WITHIN THE CHANNEL AND ACHIEVE THE SPECIFIED ELEVATIONS. 10. ENSURE FINAL GRADES ON REMAINDER OF PROJECT AREA, INCLUDING BANKFULL BENCHES. 11. SEED AND STRAW THE REMAINDER OF THE DISTURBED AREAS. a. USE NATIVE WETLAND SEED MIX TO SPECIFICATIONS PER SEED MIX WITHIN THE FLOOD PRONE BENCHES. GENERALLY, 1/2 L.B. PER 1,000SF SHOULD BE APPLIED DEPENDING ON SEED MIX. b. A CONTRACTOR'S BLEND OF PERMANENT AND TEMPORARY SEED SHALL BE APPLIED IN ADDITION TO THE WETLAND SEED MIX AND ON REMAINDER OF DISTURBED AREAS.. 12. INSTALL COCONUT FIBER EROSION CONTROL COIR SURFACE BLANKET (0.5 IB/YD2) OVER AREAS NOT SUBJECT TO STREAM FLOW AND AS NEEDED FOR SLOPING AREAS. 13. PROCEED TO PLANTING SCHEDULE FOR LIVE STAKE, TREE, AND SHRUB INSTALLATION SPECIFICATIONS. ill 20' Ln O rn >,(V N � > cV � V V) Z E U o 0 � � L11 c rn .> o 6i : V a) C) O c�6 cV u Z Ln .- C 00 : un _ � >_ Ln M v Uco�3� W LL Z O �o Q U N LD U a- z OQ 2 w ♦^ V♦ O mww wUQ U)�) v/ H_j O m < z W O Z �oU) 0 o z_ O LL Q cn W I W Z H p 06 Q J J O Qlill- W V Z Z ''a' z Q LL w J J 0 OZ}U W UOW� °UjLL o0 0 U Z } Z z H O}�Q U a_ 0 co V U. W H 0 z z 0 > w w Q 0 z a a a a A A DRAWN BY CP CHECKED BY: RB DATE: 04/14/2020 PROJECT NO.:06006.001 SCALE: 1 "=20' ",N sCAR-., ' SEAL 027436 5 A 1-23-20 SHEET 13 OF 15 FINAL - NOT RELEASED FOR CONSTRUCTION W H 0 z z 0 > w w Q 0 z a a a a A A DRAWN BY CP CHECKED BY: RB DATE: 04/14/2020 PROJECT NO.:06006.001 SCALE: 1 "=20' ",N sCAR-., ' SEAL 027436 5 A 1-23-20 SHEET 13 OF 15 FINAL - NOT RELEASED FOR CONSTRUCTION FINAL - NOT RELEASED FOR CONSTRUCTION — ZONE 1 — LIVESTAKES THREE ROWS (TYP. ) N w z 0 PLANTING DENSITY: ZONE 1: - PLANT LIVE STAKES PER DETAIL AND PLACED AT A MINIMUM SPACING OF 4' x 4' ON THE OUTSIDE BANK OF THE RESTORED STREAM MEANDERS. - SPACING SHALL BE A MINIMUM OF 2' x 2' ADJACENT TO GRADE CONTROL DEVICES. - SPACING SHALL BE A MINIMUM OF 6' x 6' ALONG THE REMAINDER OF THE STREAM BANKS. ZONE 2: - PLANT TREES AND SHRUBS PER THE FOLLOWING SPECIFICATIONS: TREES -- INSTALL CONTAINERIZED 1-3 GALLON PLANTS CONSISTING OF NATIVE WOODY SPECIES PLANTED AT 10' x 10' SPACING. SHRUBS -- INSTALL CONTAINERIZED 1 GALLON PLANTS CONSISTING OF NATIVE SPECIES PLANTED AT 20' x 20' SPACING. BARE ROOT SHRUBS SHOULD BE AVOIDED, IF POSSIBLE. - NO TREES OR SHRUBS ARE TO BE INSTALLED ON THE TOP SIDE OF THE WALL, AREA IS TO BE SEEDED ONLY AS SHOWN IN DRAWING. PLANTING LAYOUT: - TREES AND SHRUBS WILL BE PLANTED IN A RANDOM PATTERN AND DISTRIBUTED THROUGHOUT ZONE 2, NO LESS THAN 15 FEET FROM STREAM CHANNEL. ��JG( �(� L I TYT pR N,cO CD mac" O _jw z= Z y m 7 n y BEFORE YOU DIGI CONTACT ONE -CALL CENTER N w z 0 80 77B— SS - G O —774 S 1+00 S SS SS \ 26 = Mo \ �I ;Zsa2 RIP RAP IS TO BE INSTALLED ALONG \ a �Zg4 THE WALL FACE. AREA TO BE — 8g MATTED AND CLASS 1 RIP RAP TO _ — \ BE PLACED AT A MAXIMUM OF 35 C.F. PER LINEAR FOOT / \ A X 1 PLANTING SCHEDULE ZONE COMMON NAME SCIENTIFIC NAME STOCK QUANTITY ZONE 1 ELDERBERRY SAMBUCUS CANADENSIS LIVE STAKE SILKY DOGWOOD CORNUS AMOMUM LIVE STAKE BLACK WILLOW SALIX NIGRA LIVE STAKE TAG ALDER ALN US SERRULATA LIVE STAKE RED MAPLE ACER RUBRUM BARE ROOT SWEET GUM LIQUI DAMBAR STYRACI FLUA BARE ROOT RIVER BIRCH BETULA NIGRA BARE ROOT AMERICAN ELM ULMUS AMERICANA BARE ROOT BLACKHAW VIBURNUM PRUNIFOLIUM BARE ROOT TOTAL ZONE 2 TULIP POPLAR LIRIODENDRON TULIPIFERA BARE ROOT BLACK OAK QUERCUS VELUTINA BARE ROOT SOUTHERN OAK QUERCUS FALCATA BARE ROOT RED BUD CERCIS CANADENSIS BARE ROOT SASSAFRAS SASSAFRAS ALBIDUM BARE ROOT RED MAPLE ACER RUBRUM BARE ROOT GROUNDSELTREE BACCHARIS HALIMIFOLIA BARE ROOT SWEET GUM LIQUI DAMBAR STYRACI FLUA BARE ROOT WHITE OAK QUERCUS ALBA BARE ROOT BLACK GUM NYSSA SYLVATICA BARE ROOT PIGNUT HICKORY CARYA GLABRA BARE ROOT TOTAL ZONE3 LOBLOLLYPIN E PINUSTAEDA BAREROOT TOTAL 2 75 I�+ 00__ SEEDING SCHEDULE ZONE COMMON NAME SCIENTIFIC NAME WETLAND INDICATOR COMPOSITION (%) ZONE 1 SWAMP SUNFLOWER HELIANTHUS ANGUSTIFOLIUS FAC+ IRONWEED VERNONIA NOVEBORACENSIS FAC+ SWAMP MILKWEED ASCLEPIA INCARNATE OBL SPOTTED BEE BALM MONARDA PUNCTATA FAC+ TAG ALDER ALN US SERRULATA FACW+ BUSHY BEARD GRASS ANDROPOGON GLOMERATUS FACW+ DEERTONGUE PANICUMCLANDESTINUM FACW SWITCHGRASS PAN ICUM VI RGATUM FAC+ SOFT RUSH JUNCUS EFFUSUS FACW+ SHOWYTICKSEED SUNFLOWER BIDENS ARISTOSA FACW SWAMP ROSE ROSA PALUSTRIS OBL FOX SEDGE CAREX VULPINOIDEA OBL LEAFY BULLRUSH SCIRPUS POLYPHYLLUS OBL SNEEZEWEED HELENIUM AUTUMNALE FACW BROWNTOP MILLET* PAN ICUM RAMOSUM NA RYE CEREAL* SECALE CEREALE NA ZONE 2 BIG BLUE STEM ANDROPOGON GERARDII FAC IRONWEED VERNONIA NOVEBORACENSIS FAC+ SPOTTED BEE BALM MONARDA PUNCTATA FAC INDIAN GRASS ORCHASTRUM NUTANS FACU SWITCHGRASS PAN ICUM VI RGATUM FAC+ BROWNTOP MILLET* PANNICUM RAMOSUM NA RYE CEREAL* SECALE CEREALE NA ZONE 3 REBEL TALL FESCUE** NA NA ZONE 1 (STREAM CHANNEL BANKS) ZONE 2 SEEDING ONLY AREA STREAM BED (NO PLANTING) RIP RAP LOG DROP AND RIFFLE STONES W Of w J WT J SILAS CREEK PKWY SITE VICINITY MAP 1 "=2000' SITE DATA: FORSYTH TECHNICAL COMMUNITY COLLEGE PIN:6824-35-9286 D.B. 2988 PG. 2847 ZONING: ZONING: C (CAMPUS) DEVELOPMENT STANDARDS: WINSTON-SALEM FRONT SETBACK: 20' SIDE SETBACK: 20' REAR SETBACK: 20' WATERSHED DATA: WATERSHED: SALEM CREEK WATERSHED CLASSIFICATION: C RIVER BASIN: YADKIN PEE-DEE SOIL TYPES: PcD2, PcF2, PaB, PaC, PaD, Ch AVG. SLOPE: 10% STREAM RESTORATION CONSTRUCTION SEQUENCE (CONT.): 14. INSTALL LIVE STAKES AS SPECIFIED WITHIN THE PLANTING DENSITY. 15. INSTALL TREES AND SHRUBS AS SPECIFIED WITHIN THE PLANTING DENSITY. 2 ill =20' J O m 4J > � N � V �z E -0v `~ O "o CD [6 v) N 0-) .� +' O Q) cy) c- O MN °z woo u) —_co � a >_ Lr) m v V co W LL rooz Q Lu J U N Z J LD daz O Q Q z w: 2 w w W O wbQ z ��u� ♦^ V/ LLJ L) U =Qz rY �JO w } v♦ z 0oz o LLcN3: Q W ~ U) a 06 ' J Z o J Q F- C� O Z ~ _ U) Z w _ Q Q � Z J z w O C C � OZ�U W C)2 � OJ U)Ow0 IQ Ix _ o c)Z�Z Lu 1 it O } Q V 0-oo(n dUUcn V F_ LL w O z z O w w Q 0 0 a a a a A A DRAWN BY : CP CHECKED BY: RB DATE: 04/14/2020 PROJECT NO.:06006.001 SCALE: 1 "=20' c A)y -, 4EA _ 027436 ' �'"'uinnnuu��ua�```• 4-23-20 SHEET 14 OF 15 FINAL - NOT RELEASED FOR CONSTRUCTION NEW YORK DOT DISSIPATOR METHOD FOR USE IN DEFINED CHANNELS (Source: "Bank and channel lining procedures", New York Department of Transportation, Division of Design and Construction, 1971.) NOTE: To use the following chart you must know: (1) Q full capacity (2) Q10 (3) V full (4) V10 where Q = discharge in cfs and V = Velocity in FPS. ESTIMATION OF STONE SIZE AND DIMENSIONS FOR CULVERT APRONS Step 1) Compute flow velocity V at culvert or paved channel outlet. Step 2) For pipe culverts Do is diameter. For pipe arch, arch and box culverts, and paved channel outlets, Do = Ao where A. = cross -sectional area of flow at outlet. For multiple culverts, use Do = 1.25 x Do of single culvert. Step 3) For apron grades of 10% or steeper, use recommendations For next higher zone. (Zones 1 through 6). 25 20 F 15 - CL U 10 > 5 0 1�, i4' ie 4e• Gif I I I I 0' 5' 10, 15' 20' 25' DIAMETER (Ft.) Figure 8.06c m�a a - �m i�ao ■mvm�'�-�mov�um Q�o�o.d.®oo®.■�.o® o .m..00�®®� ®amo■� ®mm®gym®�-oo��■ m■®.m®moo®�mms-m■■� LENGTH OF APRON w 0 APRON MATERIAL TO PROTECT TO PREVENT SCOUR CULVERT HOLE USE L2ALWAYS L2 L1 1 STONE FILLING (FINE) CL. A 3 X DD 4 x De 2 STONE FILLING (LIGHT) CL. B 3 X Di, 6 x Da 3 STONE FILLING (MEDIUM) CL. 1 4 X DD 8 x Do 4 STONE FILLING (HEAVY) CL. 1 4 X DD 8 x Do 5 STONE FILLING (HEAVY) CL. 2 5 X DD 10 x Do 6 STONE FILLING (HEAVY) CL. 2 6 X DD 10 x Do 7 SPECIAL STUDY REQUIRED (ENERGY DISSIPATORS, STILLING BASIN OR LARGER SIZE STONE). Figure 8.06d Width = 3 times pipe dia. (min.) DETERMINATION OF STONE SIZES FOR DUMPED STONE CHANNEL LININGS AND REVETMENTS Step 1. Use figure 8.06.b.3 to determine maximum stone size (e.g. for 12 Fps = 20" or 550 lbs. Step 2. Use figure 8.06.b.4 to determine acceptable size range for stone (for 12 FPS it is 125-500 lbs. for 75% of stone, and the maximum and minimum range in weight should be 25-500 lbs.). NOTE: In determining channel velocities for stone linings and revetment, use the following coefficients of roughness: Diameter Manning's Min. thickness (inches) "n" of lining (inches) Fine 3 0.031 9 12 Light 6 0.035 12 18 Medium 13 0.040 18 24 Heavy 23 0.044 30 36 (Channels) (Dissapators) TEMPORARY BYPASS OUTLET PROTECTION ZONE 3 CLASS 1 RIP RAP L=48' W=18' D = 24" (12") #57 WASHED STONE EX. GRADE i 10 YEAR STORM ELEV. 0 0 2 YEAR STORM ELEV. (12") CLASS B STONE 24' PIPE 24" PIPE 24" PIPE FILTER FABRIC - - - - - - - 7.5' 9.5' TEMPORARY BYPASS TYPICAL SECTION N.T.S. DIVERSION DIKE HOLD-DOWN STAKES 10' SPACING PLASTIC - CORRUGATED PIPE 4' MIN ISLAND OVER INLET f,.��� .,• �'. .� IS, MIN �NLET 41 x4Wx 18" DEEP �.� 11 CLASS "B" RIP -RAP STABILIZE n `1 O` I I � TOP O I 4'min OUTLET 9 I DIVERSION I- I NATURAL GROUND t_\1' e 1.5'MIN ' MIN 4'MIN _ DIVERSION CHANNEL r LEVELLEVEL s TEMPORARY SLOPE DRAIN TOP OF HAND -COMPACTED FILL (ISLAND) 0.5' min �s NOTES: 1.) TOTAL DRAINAGE AREA FLOWING TO SILT FENCE MAY NOT EXCEED 114 ACRE PER 100' OF FENCE. DRAINAGE AREAS MAY BE INCREASED WITH A STORAGE PIT IN FRONT OF FENCE AND/OR STONE OUTLETS. 2.) MAXIMUM PLACEMENT OF POST USING HOG WIRE WITH APPROVED EROSION CONTROL FABRICS TO BE F-0". 3.) MAXIMUM PLACEMENT OF POST WITHOUT HOG WIRE WITH APPROVED EROSION CONTROL FABRICS TO BE 6'-0". 4.) SKIRT AND WIRE OF FABRIC SHOULD BE TRENCHED 6" INTO GROUND AND BACKFILLED W/ DIRT TO 6" ABOVE GROUND MAINTENANCE INSPECT TEMPORARY DIVERSIONS ONCE A WEEK AND AFTER EVERY RAINFALL. IMMEDIATELY REMOVE SEDIMENT FROM THE FLOW AREA AND REPAIR THE DIVERSION RIDGE. CAREFULLY CHECK OUTLETS AND MAKE TIMELY REPAIRS AS NEEDED. WHEN THE AREA PROTECTED IS PERMANENTLY STABILIZED, REMOVE THE RIDGE AND THE CHANNEL TO 1 BLEND WITH THE NATURAL GROUND LEVEL AND APPROPRIATELY STABILIZE IT. COMPACTED SOIL 2' IMIN._i • I � F�O� 11�)�►I�I�........................................................... rniR -, , , ... ... .. TYPICAL... ... ... ... I I DIVERSION SWALE N.T.S. STREAM AFTER PLACEMENT OF LOGS, NOTCH 2-3 INCHES TO SPECIFIED INVERT, APPROXIMATELY 1 FOOT IN WIDTH. INSTALL LIVE STAKE AND - RIP -RAP AROUND LOGS FOR BANK PROTECTION HEADER LOG FOOTER LOG CONSTRUCTION NOTES: 6 MIL. PLASTIC PUMP EXCESS WATER TO APPROVED DEWATERING D DRY WORK AREA SAND OR GRAVEL BAG COFFERDAM NOT TO SCALE FILTER FABRIC TO BE PLACED BENEATH CONSTRUCTED RIFFLE AND FASTEN TO UPPER LOG REBAR ANCHORS (MINIMUM OF 2) INSTALL SPLASH ROCKS (1-2 FEET IN WIDTH) AND LEVEL WITH STREAM BED. LOG DROP: 1. CONSTRUCT LOG DROP STRUCTURES BY FIRST SHAPING THE CHANNEL TO THE GRADES SPECIFIED, INCLUDING SCOUR POOLS. 2. NEXT, EXCAVATE ENOUGH BED MATERIAL TO PLACE THE LOGS, FILTER FABRIC AND GRAVEL OVERLAY. 2.1. PLACEMENT OF LOGS SHALL EXTEND A MINIMUM OF THREE FEET INTO STREAM BANK. 2.1.1. FIRST, PLACE FOOTER LOG AND THEN CHECK THE ELEVATIONS ON STREAM BOTTOM AND TIE INTO THE BANK. 2.1.2. PLACE HEADER LOG ON FOUNDATION LOG AND SECURE WITH REBAR IN ACCORDANCE WITH SPECIFIED PLANS. LOGS CAN BE TIED TOGETHER IN LIEU OF REBAR DEPENDING ON FIELD CONDITIONS. IF LOGS ARE TIED TOGETHER, THEN THE FOOTER LOG SHOULD BE OFF -SET FROM THE HEADER LOG BY 1-2 INCHES DOWN -STREAM. THE MAXIMUM OFFSET OF HEADER AND FOOTER LOGS SHOULD NOT EXCEED 3 INCHES DOWN -STREAM. HEADER LOG SHOULD BE SET 3" ABOVE FINAL STRUCTURE INVERT. 2.1.3. BACKFILL EDGES OF LOGS AND CUT NOTCH TO SPECIFIED INVERT. THE LOGS SHALL BE PLACED TIGHTLY TOGETHER TO MINIMIZE GAPS. 2.2. STABLE OR NAIL FILTER FABRIC AT THE UPSTREAM END OF THE STRUCTURE AS SHOWN ON THE DRAWINGS AND BACKFILL WITH GRAVEL TO SEAL ANY GAPS. 2.3. FILL THE VOIDS ON THE UPSTREAM SIDE OF SURFACE LOGS WITH GRAVEL SUCH THAT WATER WILL FLOW OVER THE SURFACE LOGS RATHER THAN THROUGH GAPS IN THE LOGS. LOGS: 1. USE LOGS THAT ARE STRAIGHT, UNIFORM DIAMETER AND FREE OF ROT, DISEASE AND INSECT INFESTATION. 2. USE ONLY HARDWOOD TREE SPECIES, WITH EXCEPTION OF TULIP POPLAR. 3. LOGS SHALL BE A MINIMUM OF 12 INCHES IN DIAMETER AND 12 FEET IN LENGTH. FABRIC: 1. FILTER FABRIC SHALL CONSIST OF A NON -WOVEN GEOTEXTILE FABRIC WITH A MINIMUM WEIGHT OF 80Z/SY. 2. RIFFLE SHALL BE CONSTRUCTED AFTER PLACEMENT OF LOGS AND FILTER FABRIC. LOG DROP NOT TO SCALE f METAL FENCE POST MAINTENANCE INSPECT SEDIMENT FENCES AT LEAST 14 GAUGE MINIMUM ONCE A WEEK AND AFTER EACH HOGWIRE (OPTIONAL) RAINFALL. MAKE ANY REPAIRS IMMEDIATELY. SHOULD THE FABRIC OF A SEDIMENT PROPEX FABRIC W/WIRE BACKING FENCE COLLAPSE, YEAR, DECOMPOSE o Q OR BECOME INEFFECTIVE, REPLACE IT M PROMPTLY. o REMOVE SEDIMENT DEPOSITS AS ACKFILL WITH DIRT NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDEUCE PRESSURE ON THE `c f FLOW FENCE. i -1 I - REMOVE ALL FENCING MATERIALS AND El I _ 00 -i �__l 1-1 �__� �__� �= UNSTABLE SEDIMENT DEPOSITS AND II II I I I I II I II I I I I EL„� I -1 I �, �� l r- BRING THE AREA TO GRADE AND 4" STABILIZE IT AFTER THE CONTRIBUTING o DRAINAGE AREA HAS BEEN PROPERLY i� STABILIZED. POST: METAL T-POST 5'-0" OR 6'-0" IN HEIGHT DEPENDING ON FILL SLOPE (MIN. 1.33 LB/LF STEEL CONSTRUCTION) FABRIC: T-O" IN WIDTH (MUST MEET STANDARD SPECIFICATIONS FOR SILT FENCE - ASTM D 6461). SILT FENCE DETAIL N.T.S. EMERGENCY SPILLWAY CONSTRUCTED OVER UNDISTURBED GROUND AND ARMORED WITH RIP RAP ----- ----- STANDARD SEDIMENT BASIN WITH SKIMMER NTS MAINTENANCE INSPECT TEMPORARY SEDIMENT BASINS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1/2 INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. REMOVE SEDIMENT AND RESTORE THE BASIN TO ITS ORIGINAL DIMENSIONS WHEN IT ACCUMULATES TO ONE-HALF THE DESIGN DEPTH. PLACE REMOVED SEDIMENT IN AN AREA WITH SEDIMENT CONTROLS. CHECK THE EMBANKMENT, SPILLWAYS, AND OUTLET FOR EROSION DAMAGE, AND INSPECT THE EMBANKMENT FOR PIPING AND SETTLEMENT. MAKE ALL NECESSARY REPAIRS IMMEDIATELY. REMOVE ALL TRASH AND OTHER DEBRIS FROM THE RISER AND POOL AREA. NOTE SKIM SURI DEVI PAD SKIM DEVI FLEXI I PE (RADI, OUTLET END: CONNECTION TO OUTLET PIPE OR RISER CONSTRUCTION SPECIFICATIONS 1. CLEAR THE ENTRANCE AND EXIT AREA OF ALL VEGETATION, ROOTS, AND OTHER OBJECTIONABLE MATERIAL AND PROPERLY GRADE IT. 2. PLACE THE GRAVEL TO THE SPECIFIC GRADE AND DIMENSIONS SHOWN ON THE PLANS, AND SMOOTH IT. 3. PROVIDE DRAINAGE TO CARRY WATER TO A SEDIMENT TRAP OR OTHER SUITABLE OUTLET. 4. USE GEOTEXTILE FABRICS BECAUSE THEY IMPROVE STABILITY OF THE FOUNDATION IN LOCATIONS SUBJECT TO SEEPAGE OR HIGH WATER TABLE. MAINTENANCE MAINTAIN THE GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH 2- INCH STONE. AFTER EACH RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT AND CLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALS SPILLED, WASHED, OR TRACKED ONTO PUBLIC ROADWAYS. SILT FEN TEMPORARY GRAVEL CONSTRUCTION ENTRANCE N.T.S. 0 0 4- 4 �L a5u=n SILT FENCE W/ TEMP. ROCK FILTER DAM N.T.S. PIPE OUTLET TO FLAT AREA WITH NO DEFINED CHANNEL INC L #57 w Flow I Stream Channel In NCDOT #5 or #57 Capacity of pipe culverts washed stone together = bankfull flow Class B Erosion L i Stone .71 `r 2 diameter of pipe or 12" �. whichever is greater i l F ter Cloth Figure 6.70b Temporary culvert backfilled with stone. Construction 1. Keep clearing and excavation of the stream banks and bed and approach sections to a minimum. Specifications 2. Divert all surface water from the construction site onto undisturbed areas adjoining the stream. 3. Keep stream crossings at right angles to the stream flow. 4. Align road approaches with the center line of the crossing for a minimum distance of 30 feet. Raise bridge abutments and culvert fills a minimum of 1 foot above the adjoining approach sections to prevent erosion from surface runoff and to allow flood flows to pass around the structure. 5. Stabilize all disturbed areas subject to flowing water, including planned overflow areas, with riprap or other suitable means if design velocity exceeds the allowable for the in -place soil (Table 8.05a, Appendix 8.05). =ENCE 6. Ensure that bypass channels necessary to dewater the crossing site are stable before diverting the stream. Upon completion of the crossing, fill, compact, and stabilize the bypass channel appropriately. 7. Remove temporary stream crossings immediately when they are no longer needed. Restore the stream channel to its original cross-section, and smooth and appropriately stabilize all disturbed areas. 8. Any in -stream sediment control measures must be removed upon stabilization of the area. NOTES A A 1. La IS THE LENGTH OF THE RIP -RAP APRON. 3 d 0 dO 2. d = 1.5 TIMES THE MAXIMUM STONE DIAMETER BUT NOT LESS TAN 6". 3. IN A WELL DEFINED CHANNEL EX -TEND THE APRON UP THE CHANNEL BANKS TO AN PLAN VIEW ELEVATION OF 6" ABOVE THE MAXIMUM TAILWATER DEPTH OR TO THE TOP OF THE BANK, WHICHEVER IS LESS. La 4. A FILTER BLANKET OR FILTER _ -III-II FABRIC MUST BE INSTALLED d I II II II II II- BETWEEN THE RIP -RAP AND SOIL T FOUNDATION. IT FILTER BLANKET SECT. A -A 5. INSTALL PAD ON 0% GRADE OUTLET STABILIZATION STRUCTURE N.T.S. SKIMMER DETAIL NTS 3LE THROUGH DOOR )AT IN. 'PLIED BY USER. 6.70.5 Maintenance Inspect temporary stream crossings after runoff -producing rains to check for blockage in channel, erosion of abutments, channel scour, riprap displacement, or piping. Make all repairs immediately to prevent further damage to the installation. TEMPORARY SEEDING RECOMMENDATIONS SEASON SPECIES RATE (LB/ACRE) LATE WINTER - EARLY SPRING RYE GRAIN 120 ANNUAL LESPEDEZA 50 (KOBE IN PIEDMONT & COASTAL PLAIN, KOREAN IN MOUNTAINS) SUMMER GERMAN MILLET 40 FALL RYE GRAIN 120 OMIT ANNUAL LESPEDEZA WHEN DURATION OF TEMPORARY COVER IS NOT TO EXTEND BEYOND JUNE. SEEDING DATES MOUNTAINS --ABOVE 2500 FEET: FEB. 15 - MAY 15 BELOW 2500 FEET: FEB. 1- MAY 1PIEDMONT--JAN. 1 - MAY 1COASTAL PLAIN --DEC. 1 - APR. 15 SOIL AMENDMENTS FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 750 LB/ACRE 10-10-10 FERTILIZER. MULCH APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. TOPDRESS WITH 50 LB/ACRE OF NITROGEN IN MARCH. IF IT IS NECESSARY TO EXTENT TEMPORARY COVER BEYOND JUNE 15, OVERSEED WITH 50 LB/ACRE KOBE (PIEDMONT AND COASTAL PLAIN) OR KOREAN (MOUNTAINS) LESPEDEZA IN LATE FEBRUARY OR EARLY MARCH. PERMANENT SEEDING SPECIFICATIONS PLANTING PLANTS & MIXTURE RATE PLANTING DATES LBS/ACRE TALL FESCUE (LOW MAINTENANCE) 100-150 SEPT. 1 - APRIL 15 TALL FESCUE WATERWAYS & LAWNS 200-250 SEPT. 1 -APRIL 16 (HIGH MAINTENANCE) BLEND OF TWO TURF TYPE TALL FESCUES (90%) AND TWO OR MORE IMPROVED KENTUCKY 200-250 SEPT. 1 - APRIL 17 BLUEGRASS VARIEITES (10%) (HIGH MAINTENANCE) TALL FESCUE AND KOBE 100 AND 10 MAY 1- SEPT 1 OR KOREAN LESPEDEZA 1 TALL FESCUE AND 50 AND 15 SEPT 1-APRIL 15 SERICEA LESPEDEZA 1 TALL FESCUE AND GERMAN MILLET OR 60 AND 30 SEPT 1- APRIL 16 SUDANGRASS 2 TALL FESCUE AND RYEGRAIN 2 70 AND 25 SEPT 1 - APRIL 17 COMMON 25 APRIL 15 DUNE 30 BERMUDAGRASS 1. FOR SPRING SEEDINGS, USE SCARIFIED LESPEDEZA SEED. FOR LATE FALL AND WINTER SEEDINGS, USE UNSCARIFIED SEED. 2. ANNUALS SUCH AS MILLET, SUDANGRASS AND RYEGRAIN MUST BE KEPT AT 10"-12" MAXIMUM HEIGHT. PREPARATION PREPARE SEEDBED BY RIPPING, CHISELING, HARROWING OR PLOWING TO DEPTH OF SIX INCHES SO AS TO PRODUCE A LOOSE, FRIABLE SURFACE. REMOVE ALL STONES, BOULDERS, STUMPS OR DEBRIS FROM THE SURFACE WHICH WOULD PROHIBIT GERMINATION OR PLANT GROWTH. INCORPORATE INTO THE SOIL 800 TO 1,000 POUNDS OF 10-10-10 FERTILIZER PLUS 500 POUNDS OF TWENTY PERCENT (20%) SUPERPHOSPHATE PER ACRE AND TWO TONS OF DOLOMITIC LIME PER ACRE UNLESS SOIL TESTS INDICATE THAT A LOWER RATE OF LIME BE USED. MULCH AFTER SEEDING WITH 2.0 TONS OF GRAIN STRAW PER ACRE AND EITHER CRIMP STRAW INTO SOIL OR TACK WITH LIQUID ASPHALT AT 400 GALLONS PER ACRE OR EMULSIFIED ASPHALT AT 300 GALLONS PER ACRE. Ln m N rV) Z E VU 0 �� a� c rn o Q)0) V O c�6 N U Z vi ' w 00 � � -_ CO - ?: C >_ Lr1 M U V 00 5 W LL ro a z O Q O � O Z W ♦♦� V♦ w z 0 NW W C a UNJ J (n 06 a J LU J a � V Z Z a UJ z ° a U ' U O 1 p�0Q U a- 0 co LL LU F- O z Z O > W W Q 0 Z a a a a a a DRAWN BY CP CHECKED BY: RB DATE: 04/14/2020 PROJECT NO.:06006.001 SCALE: N.T.S. N s� .q = SEAL� ' 027436 ;,-P9%1-1 ' /GINE�Q''*Q� , C 4 ``23-20 SHEET 15 pF15 FINAL - NOT RELEASED FOR CONSTRUCTION