HomeMy WebLinkAbout20200265 Ver 1_Riparian Buffer Authorization_20200423State of North Carolina
Department of Environmental Quality
Division of Water Resources
15A NCAC 02B .0233 (8)(b), .0243 (8)(b), .0250 (11)(b), .0259 (8)(b), .0267 (11)(c), .0607 (e)(2) – Buffer Authorization
FORM: BA 10-2013
FORM: BA 10-2013 Page 1 of 4
Riparian Buffer Authorization Form
A. Applicant Information
1. Project Information
1a. Name of project: Oxxford Hunt Arch Bridge
1b. County: Wake
1c. Nearest municipality: Cary
1d. Subdivision name: Oxxford Hunt
1e. Is the project located in any of North Carolina’s twenty coastal counties?
If yes, answer 1f below. Yes X No
1f. Is the project located within a NC Division of Coastal Management Area of
Environmental Concern (AEC)? Yes X No
2. Owner Information
2a. Name on Recorded Deed: Oxxford Hunt Community Association Inc.
2b. Deed Book and Page No. 004263;00936
2c. Map Book and Page No.
(include a copy of the
recorded map that indicates
when the lot was created):
2d. Responsible Party
(for Corporations):
2e. Street address: 160 NE MAYNARD RD STE 210
2f. City, state, zip: Cary, North Carolina 27513
2g. Telephone no.: (919)461-0102
2h. Fax no.:
2i. Email address: oxhomega@oxxfordhunt.com
3. Applicant Information (if different from owner)
3a. Applicant is: Agent Other, specify:
3b. Name:
3c. Business name
(if applicable):
3d. Street address:
3e. City, state, zip:
3f. Telephone no.:
3g. Fax no.:
3h. Email address:
4. Agent/Consultant Information (if applicable)
4a. Name: Jeremy Aronson
4b. Business name
(if applicable):
Aronson Construction
4c. Street address: 7113 Deer Brook Street
4d. City, state, zip: Willow Spring, North Carolina 27592
4e. Telephone no.: (919)630-3459
4f. Fax no.:
4g. Email address: aronsonconstruction@gmail.com
FORM: BA 10-2013 Page 2 of 4
B. Project Information and Prior Project History
1. Property Identification
1a. Property identification no. (tax PIN or parcel ID): 0753454769;0753465306
1b. Site coordinates (in decimal degrees): Latitude: 35.771522
Longitude: -78.815024
1c. Property size: 19.81;12.70 acres
2. Surface Waters
2a. Name of nearest body of water to proposed project: Crabtree Creek
2b. Water Quality Classification of nearest receiving water: C; NSW
2c. River basin: Neuse
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of
this application:
The existing walkway is in need of replacement. It is part of a nature trail
3b. Attach an 8 ½ x 11 excerpt from the most recent version of the USGS topographic map indicating the location
of the site
3c. Attach an 8 ½ x 11 excerpt from the most recent version of the published County NRCS Soil Survey Map
depicting the project site
3d. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:
1300
3e. Explain the purpose of the proposed project:
Replacement of the existing arch bridge
3f. Describe the overall project in detail, including the type of equipment to be used:
We will be removing the existing arch bridge and building a new arch bridge exactly one foot wider than the
existing bridge. New bridge will be assembled on land and then a crane will set it in the exact same location
as the original
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by
the Corps or State been requested or obtained for this
property/ project (including all prior phases) in the past?
Yes No X Unknown
Comments:
4b. If yes, who delineated the jurisdictional areas?
Name (if known):
Agency/ Consultant Company:
Other:
4c. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach
documentation.
5. Project History
5a. Have permits or certifications been requested or obtained
for this project (including all prior phases) in the past?
Yes X No Unknown
5b. If yes, explain and detail according to “help file” instructions.
6. Future Project Plans
6a. Is this a phased project? Yes X No
6b. If yes, explain.
FORM: BA 10-2013 Page 3 of 4
C. Proposed Impacts Inventory
1. Buffer Impacts
1a. Project is in which protected basin?
X Neuse Tar-Pamlico Catawba
Randleman Jordan Goose Creek
1b. Individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of
this form.
Buffer impact
number –
Permanent (P)
or Temporary
(T)
Reason for
impact
Type of impact
(exempt, allowable,
allowable w/
mitigation)
Stream name Buffer
mitigation
required?
Zone 1
impact
(sq ft)
Zone 2
impact
(sq ft)
B1 X P T
Bridge
Replacement-
Footing
Allowable Hoffman Lake Yes X No 56 0
B2 P T Yes No
Total buffer impacts 56 0
1c. Comments: Impacts are a result of bridge replacement from a piling bridge to an arch bridge.
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
All haul roads, staging areas, and stockpile areas were designed to be replanted with appropriate grasses
following construction of new walkway. The temporary haul road was designed to be the minimum width and
length necessary to get the vehicles to and from the construction site.
1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction
techniques.
Access path matting used to protect sewer crossings on the temporary haul road. All ground stabilization
takes place within 14 days of the cessation of land disturbance. Use of a temporary haul road minimizes land
area disturbed and having exposed soil.
2. Buffer Mitigation
2a. Will the project result in an impact within a protected riparian buffer that
requires buffer mitigation?
Yes X No
2b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation and
calculate the amount of mitigation required in the table below.
Zone Reason for impact Total impact
(square feet)
Multiplier Required mitigation
(square feet)
Zone 1 3 (2 for Catawba)
Zone 2 1.5
Total buffer mitigation required:
2c. If buffer mitigation is required, is payment to a mitigation bank or NC DMS
proposed?
Yes No
2d. If yes, attach the acceptance letter from the mitigation bank or NC DMS.
2e. If no, then discuss what type of mitigation is proposed.
2f. Comments:
FORM: BA 10-2013 Page 4 of 4
E. Diffuse Flow Plan
All buffer impacts and high ground impacts require diffuse flow or other form of
stormwater treatment. Include a plan that fully documents how diffuse flow will be
maintained. If a Level Spreader is proposed, attach a Level Spreader Supplement Form.
If due to site constraints, a BMP other than a level spreader is proposed, please provide a
plan for stormwater treatment as outlined in Chapter 8 of the NC Stormwater BMP
Manual and attach a BMP Supplement Form.
Diffuse flow
Other BMP
Water will flow in
a sheet-like manner
and will will not
channelized.
F. Supplementary Information
1. Environmental Documentation
1a. Does the project involve an expenditure of public (federal/state/local) funds or the
use of public (federal/state) land?
Yes X No
1b. If you answered “yes” to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State (North
Carolina) Environmental Policy Act (NEPA/SEPA)?
Yes No
1c. If you answered “yes” to the above, has the document been finalized by the State
Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.)
Comments:
Yes No
2. Violations
2a. Is the site in violation of DWR Wetland Rules (15A NCAC 02H .0500), Isolated
Wetland Rules (15A NCAC 02H .1300), DWR Surface Water or Wetland Standards,
or Riparian Buffer Rules (15A NCAC 02B .0200)?
Yes X No
2b. Is this an after-the-fact permit application? Yes X No
2c. If you answered “yes” to one or both of the above questions, provide an explanation of the violation(s):
Jeremy Aronson__________
Applicant/Agent's Printed Name
________________________________________________
Applicant/Agent's Signature
(Agent's signature is valid only if an authorization letter from the applicant is provided.)
__________
Date
Send 3 complete sets of this form and accompanying documents to the following:
For government transportation projects sent by
First Class Mail via the US Postal Service:
OR
For government transportation projects sent by
delivery service (UPS, FedEx, etc.):
NC DWR, Transportation Permitting Unit
1617 Mail Service Center
Raleigh, NC 27699 - 1617
NC DWR, Transportation Permitting Unit
512 N. Salisbury Street
Raleigh, NC 27604
For all other projects sent by First Class Mail via
the US Postal Service
OR
For all other projects sent by delivery service
(UPS, FedEx, etc.):
Karen Higgins
NCDWR – 401 & Buffer Permitting Branch
1617 Mail Service Center
Raleigh, NC 27699 - 1617
Karen Higgins
NCDWR – 401 & Buffer Permitting Branch
512 N. Salisbury Street
Raleigh, NC 27604
ZONE 2
a
GUARDRAIL SUPPORT LINE POST—,
TYP 22 — PLACES
L
�R
P�
�G
EXTERIOR DECK /
SEE NO 1
ILe7l1m
NOTES:
1.) DECK FLOOR CONSTRUCTION TO BE PRESERVATIVE TREATED (AWPA UC313 MINIMUM) SYP#2 OR
BETTER (Fb=1,100psi, Ft=675psi, Fv=175psi, E=1,400,00psi) 2 x 6 MEMBERS. ATTACH TO DECK
FRAMING WITH 2 — #8 SCREWS (GALVANIZED) AT EACH JOIST.
2.) GLULAM TO BE POWER PRESERVED GLULAM EWS 24F— V5M1/SP BY ANTHONY FOREST PRODUCTS OR
TYP APPROVED EQUAL.
ZONE 1 PERMANANT IMPACT 56 SF
4
4
4
4 � 4 a
a
a a a
4 4 4
4
� 4 4
Q 4
a
ZONE 2
/ � 4
4
4 Q
4 4
4 /
�O J
4
a 4
a
4
4 4
4
4
�0 •°DES s Ip '•°
OIs
34�
°
04.22.20
Z
6oco02
1,
J w
W
❑
..W
t4 H LL w
�
� 2
W
z
W w
C
4
/��
li
W
W
z
Zz
W
w
W
"
f�
a
Z
�
W
W
z
W�a
a
a
Project#:
19-EO39
Date:
04.22.20
Drawn/Design ll °:
AC
DIVG. Checked EL
BM
Scale:
VARIES
REVISIONS
No.
Date:
Remarks
08.08.19
REVISION
04.22.20
REVISION
A
V�-t
Sheet Number
S101 I NEW PEDESTRIAN BRIDGE
SCALE: 1/4" = 1'-0