HomeMy WebLinkAboutNCC201635_ESC Approval Submitted_20200423ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. DANIEL SMITH
Energy, Mineral Interim Director
and Land Resources
ENVIRONMENTAL DUALITY
April 02, 2019
LETTER OF APPROVAL WITH PERFORMANCE RESERVATIONS
USAED, Wilmington
Attention: Gregory L. Williams, Chief, engineering Branch
69 Darlington Avenue
Wilmington, North Carolina 28403
RE: Project Name: Concord Streams Restoration; Section 206 Aquatic Ecosystem Restoration
Acres Approved: 12.6
Project ID: CABAR-2017-097
County: Cabarrus
City: Concord
Address: Cabarrus Avenue W
River Basin: Yadkin-PeeDee
Stream Classification: Other
Submitted By: USAED, Wilmington
Date Received by LQS: March 26, 2019
Plan Type: Revised
Dear Mr. Gregory L. Williams:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable
with modifications and hereby issue this letter of Approval with Performance Reservations. The Performance
Reservations are listed on the attached page. This plan approval shall expire three (3) years following the date
of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129.
As of March 1, 2019, all new construction activities are required to complete and submit an electronic Notice of
Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO 10000 Construction Stormwater
General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on
the above named project. The NOI form may be accessed at deq.nc.gov/NCGO1. Please direct questions about
the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After
you submit a complete and correct NOI Form, a COC will be emailed to you within three business days.
Initially, DEMLR will not charge a fee for coverage under the NCG01 permit. However, on or after May 1,
2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff
in Raleigh.
Title 15A NCAC 4B .0118(a) and the NCGOI permit require that the following documentation be kept on file at
the job site:
Slate of North Carolina I Environmental Quality E Energy, Mineral and Land Resources
Mooresville Regional Office 1 610 East Center Ave Ste 301 1 Mooresville, NC 28115
704 663 1699 T
Letter of Approval with Modifications
Concord Streams Restoration; Section 206 Aquatic Ecosystem Restoration
April 02, 2019
Page 2 of 3
The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure
compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing
natural resources and adjoining properties. If, following the commencement of this project, the erosion and
sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of
1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and
implementation of the revisions to insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality
laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -
disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. You are requested to file an amended form if there is any change in
the information included on the form. In addition, it would be helpful if you notify this office of the proposed
starting date for this project. Please notify us if you plan to have a preconstruction conference.
Your cooperation is appreciated.
Sincerely,
Z-7&111(
Christopher Graybeal
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
Performance Reservations
NCGO1 Fact Sheet
c: SEPI Engineering & Construction
1025 Wade Avenue
Raleigh, North Carolina 27605
Inspection Department
c:
Letter of Approval with Modifications
Concord Streams Restoration; Section 206 Aquatic Ecosystem Restoration
April 02, 2019
Page 3 of 3
City of Concord
Engineering Dircetor
Attention: Sue Hyde, PE
Post Office Box 308
Alfred M. Brown Operations Center
850 Warren C Coleman Boulevard
Concord, North Carolina 28026
PERFORMANCE RESERVATIONS
Project Name: Concord Streams Restoration; Section 206 Aquatic Ecosystem Restoration
Project ID: CABAR 2017-097
County: Cabarrus
Additional measures may be required - The applicant is responsible for the control of sediment on -
site. If the approved erosion and sedimentation control measures prove insufficient, the applicant
must take those additional steps necessary to stop sediment from leaving this site. [15A NCAC 4B
.01151
Additional Comments:
Our Division maintains an interactive web -based map to help the public determine whether
development activities are subject to the post -construction state stormwater permitting
program or other stormwater permitting requirements. If your project is subject to state
Phase H stormwater permitting requirements, you must have the post -construction
stormwater permit prior to construction. The web -based map is located at:
https:lldeq.ne. govlaboutldivisionslenergy-inineral-land-re sourceslenergy-mineral-land-
data/stormwater-maps-gis-resources
All
�
V
o
OW
WI
ra
4-0
Poo
A
A a
U
•ICI
,pwy