Loading...
HomeMy WebLinkAboutNCC201635_ESC Approval Submitted_20200423ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Energy, Mineral Interim Director and Land Resources ENVIRONMENTAL DUALITY April 02, 2019 LETTER OF APPROVAL WITH PERFORMANCE RESERVATIONS USAED, Wilmington Attention: Gregory L. Williams, Chief, engineering Branch 69 Darlington Avenue Wilmington, North Carolina 28403 RE: Project Name: Concord Streams Restoration; Section 206 Aquatic Ecosystem Restoration Acres Approved: 12.6 Project ID: CABAR-2017-097 County: Cabarrus City: Concord Address: Cabarrus Avenue W River Basin: Yadkin-PeeDee Stream Classification: Other Submitted By: USAED, Wilmington Date Received by LQS: March 26, 2019 Plan Type: Revised Dear Mr. Gregory L. Williams: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Performance Reservations. The Performance Reservations are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of March 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO 10000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.gov/NCGO1. Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCG01 permit. However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Title 15A NCAC 4B .0118(a) and the NCGOI permit require that the following documentation be kept on file at the job site: Slate of North Carolina I Environmental Quality E Energy, Mineral and Land Resources Mooresville Regional Office 1 610 East Center Ave Ste 301 1 Mooresville, NC 28115 704 663 1699 T Letter of Approval with Modifications Concord Streams Restoration; Section 206 Aquatic Ecosystem Restoration April 02, 2019 Page 2 of 3 The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land - disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, Z-7&111( Christopher Graybeal Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval Performance Reservations NCGO1 Fact Sheet c: SEPI Engineering & Construction 1025 Wade Avenue Raleigh, North Carolina 27605 Inspection Department c: Letter of Approval with Modifications Concord Streams Restoration; Section 206 Aquatic Ecosystem Restoration April 02, 2019 Page 3 of 3 City of Concord Engineering Dircetor Attention: Sue Hyde, PE Post Office Box 308 Alfred M. Brown Operations Center 850 Warren C Coleman Boulevard Concord, North Carolina 28026 PERFORMANCE RESERVATIONS Project Name: Concord Streams Restoration; Section 206 Aquatic Ecosystem Restoration Project ID: CABAR 2017-097 County: Cabarrus Additional measures may be required - The applicant is responsible for the control of sediment on - site. If the approved erosion and sedimentation control measures prove insufficient, the applicant must take those additional steps necessary to stop sediment from leaving this site. [15A NCAC 4B .01151 Additional Comments: Our Division maintains an interactive web -based map to help the public determine whether development activities are subject to the post -construction state stormwater permitting program or other stormwater permitting requirements. If your project is subject to state Phase H stormwater permitting requirements, you must have the post -construction stormwater permit prior to construction. The web -based map is located at: https:lldeq.ne. govlaboutldivisionslenergy-inineral-land-re sourceslenergy-mineral-land- data/stormwater-maps-gis-resources All � V o OW WI ra 4-0 Poo A A a U •ICI ,pwy