Loading...
HomeMy WebLinkAbout20010357 Ver 1_More Info Received_20091210A ;0'?I BSC GROUT ????`,;? 970 Trinity Road December 9, 2009 r Raleigh, NC 27607 Ms. Lauren Witherspoon DE C 1 0 2009 Tel: 919-854-o811 NC Division of Water Quality 2321 Crabtree Boulevard DENR-WATER QUALt1Y 800-288-812; yVE-I LMOS AND SI OR"A7ERi Fax: 919-854-0812 Raleigh, NC 27604-2260 Re: Upchurch Farms Subdivision, Wake County, NC www.bscgroup.com 401 Water Quality Certification DWQ #01-0357 Response to Compliance Status Letter dated September 2, 2009 Dear Ms. Witherspoon: On behalf of Upchurch Farms Homeowners Associates, Inc. and Triton Upchurch, LLC, BSC Group has provided a response to the Compliance Status Letter, dated September 2, 2009, for the above referenced project. Below are the responses to the issues and how they have been addressed. The following items have been provided in response to the Compliance Status Letter. 1. One (1) original and One (1) copy of the Response Letter 2. Two (2) copies of the bypass pipe design 3. Two (2) copies of the forebay embankment design 4. Two (2) copies of the forebay embankment stabilization calculations 5. Two (2) copies of the construction sequence 6. Two (2) copies of the DWQ Compliance Status Letter Comment: "Maintenance of the facility needs to be performed. Specifically, the pool-side slope between the forebay and stormwater pond has eroded and needs to be stabilized and vegetation needs to be established on the bare portions stormwater pond side slopes." RESPONSE: Based on visual observation during on-site meetings with the developer, Edge Development, D. Miller & Associates, and BSC Group a low volume of flow spills over the existing berm days after a rain event. This flow Engineers saturates the top layer of soil and reduces the soil's ability to bond and ultimately establish adequate vegetative cover. To convey this flow it has been Environmental suggested that a permanent 12-in bypass pipe with an inverted riser be installed dentists at the end of the forebay adjacent to Luke Meadow Lane and discharge directly c1S Consultants to the pond. The installation of the bypass pipe should allow for the conveyance of this flow, while the berm conveys the volume of water generated landscape during a storm event. BSC Group has prepared a drawing detailing the design Architects of the bypass pipe for review and approval. As for the forebay embankment, D. Planners Surveyors Upchurch Farms Subdivision, Wake County, NC 401 Water Quality Certification DWQ #01-0357 December 9, 2009 Page 2 of 2 Miller & Associates has prepared a detailed plan to correct the eroded areas and help stabilize the existing slope. Edge Development assisted by preparing a construction sequence that outlines the necessary steps to provide corrective action. We wish to thank you for your assistance in getting this problem resolved. Should you or any of the other staff members have any other question or comments, please give us a call or send an email and the requested information will be provided promptly. Very truly yours, BSC GROUP C400 w Cameron M. Rice, P.E. Project Manager/Associate cc: Mr. Michael Jones, Triton Upchurch, LLC Ms. Cecilia Gray, Community Association Services, Inc. Mr. William Pollock, Cranfill Sumner & Hartzog LLP Mr. Timothy P. Grady, G2 Design, P.A. Mr. Marc Burke, Edge Development Mr. Kumar Turlapati, D. Miller & Associates BSC File # 02063.00 O O ? O O ? ? N ' O M M o? o ? x o O zo ?z U ? ??o00 4?00 v ?y •a., C/1 N ? C ?o 06 a) C> 00 00 _O cd N w ? ? Q U U N ? O •? a U Q) U > U , V, C/) ? w ?i cd U U b ?U, ? U Cy N - G) 42 Z ? O b'o Cd m ? ? ? V) Q w U 'C3 ? `Dy N U N U z U N ~ M -- U _ O N kr) Q U a.i O U O O O N .-- kf) - 0 U 7d 0 U U O U bA ? w a L.0? vi Sr u r. 4, o ?o Q cdQ) c? O cd r, C's a? M ? ?. o ? ? O ? O i. cd u - ^lu cn cn VI ?n Cd `-'0000 ?' N V] In l() Vr) V) o a a U U 3 3 c0. `. U Ste" L7 4. 4. 0 0 o o o o +-+ +..+ n r+ H H H H E--' E-.i UPCHURCH FARM FOREBAY WEIR REPAIR CONSTRUCTION SEQUENCE 1) Open riser drain valve to lower permanent pool and fully expose slope toe of forebay weir. Drain valve should remain open until forebay weir repair, listed in Sequence # 5 below and detailed on Sheet # S-1, are completed. Pump down forebay surface water level and maintain an elevation of at least 4 feet below top of weir until installation of the forebay draw down pipe, listed in Sequence # 3 below and detailed on Sheets # X-1, X-2, and X-3, is completed. 2) Minimize disturbance by removing the smallest amount of existing P550 erosion control matting, littoral shelf plantings and soil required to properly install the forebay draw down pipe, listed in Sequence # 3 below and detailed on Sheets # X-1, X-2, and X-3. Discard the P550 matting and retain the plantings and soil for reuse. 3) Install 12 inch, double wall, high density polyethylene (HDPE forebay draw down pipe per Sheets # X-1, X-2, and X-3. Backfill retained excavated soil in 8 inch thick layers (post compaction and compact to 95 percent of the Standard Proctor maximum dry density test. Excess soil can be used to complete the forebay weir repair, listed in Sequence # 5 below and detailed on Sheet # S-1. 4) Remove and discard the existing P550 erosion control matting and bench cut the underlying saturated soil from the eroded, unstable area of the forebay weir embankment, as shown on Sheet # S-1. Waste the excavated soil by evenly grading the material in a _< 3 inch layer, along the mid to upper pond slope contours, and stabilize with winter rye and fescue seed, lime, fertilizer and straw mulch. 5) Backfill the bench cuts listed in Sequence # 4 with soil (permeability < 1x10-7 centimeter per second, > 30 percent passing a number 200 standard sieve, liquid limit > 30, plastic index > 15 inches in 8 inch thick layers (post compaction and compact to 95 percent of the Standard Proctor maximum dry density test and within 3 percent of the optimum moisture content, as detailed on Sheet # S-1. Cover the repaired forebay weir with winter rye, lime, fertilizer, soil specific water soluble anionic polyacrylamides, and North American Green C350 erosion control matting. 6) Apply winter rye and fescue seed, lime, and fertilizer to the area backfilled during the forebay draw down pipe installation, described above in Sequence # 3, install North American Green P550 erosion control matting, and replant the littoral shelf. 7) All remaining areas disturbed during work activities should be graded to remove ruts and excessive surface compaction and covered with winter rye and fescue seed, lime and fertilizer. 8) To be completed during the 2010 growing season (Spring-Summer: place Bermuda sod over the C350 erosion control matting, described in Sequence # 5, to obtain 100 percent vegetative coverage, and insert sod staples through C350 and into underlying soil. KNEW Forth Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Governor Dee Freeman Secretary Coleen H. Sullins Director September 2, 2009 Upchurch Farms Ms. Cecilia Williford 207 West Millbrook Road, Suite 110 Raleigh, NC 27609 Subject: Upchurch Farms Compliance Status Dear Ms. Williford: On May 9, 2002, the NC Division of Water Quality (DWQ) issued a 401 Water Quality Certification (WQC) (DWQ Project # 01-0357) to place fill in 0.2122 acre of wetlands, 2899 linear feet of perennial streams, and 396 linear feet of intermittent unnamed tributaries to White Oak Creek to construct the Upchurch Farms Subdivision in Wake County, NC. On August 7, 2002, the DWQ approved a strormwater management pond and level spreader described in plans dated July 2, 2002 to meet Condition I of the 401 WQC. On April 19, 2007, Annette Lucas and Lauren (Cobb) Witherspoon from the DWQ conducted a site inspection at the above referenced site. Specifically, DWQ inspected the stormwater management facility and stream down gradient of the stormwater management facility. During this site inspection, Ms. Lucas and Ms. Witherspoon observed that the stormwater management facility was not constructed according to the plans and specifications that were approved by the DWQ on August 2, 2002 and that sediment measuring approximately 3-6 inches had been deposited into the stream down gradient from the level spreader. On May 7, 2007, DWQ issued a Notice of Violation (NOV) to the developer of the property and 401 WQC applicant Triton Upchurch, LLC (Mike Jones) for 401 WQC violations and other waste (in-stream sediment) violation (NOV-2007-WQ-0026). As a result of subsequent site visits, DWQ determined that the in-stream sediment was not a result of erosion from the stormwater facility, but was due to natural stream sediment transport. Two responses dated June 4 and 15, 2007 were submitted to DWQ by Mike Jones as required in the NOV. Plans dated July 13, 2007, to resolve the issues documented in the NOV and to modify the original stormwater management plan were submitted to DWQ by BSC Rice Associates, an behalf of Triton Upchurch, LLC. Revised stormwater plans were submitted by BSC Rice Associates and received by DWQ on December 13, 2007 and approved by DWQ on January 10, 2008. On August 21, 2008, DWQ received plans to modify the stormwater management plan by D. Miller & Associates, PA on behalf of Triton Upchurch, LLC. These plans were approved by DWQ on August 22, 2008. On November 18, 2008, BSC Group submitted a Wet Detention Pond Engineer's Certification to the Town of Cary stating that the Upchurch Farms Subdivision - Tract 4 Phase 2 permitted facility had been completed. North Carolina Division of Water Quality Internet: www.ncwaterquality.org No'" hCarob aurally Raleigh Regional office Surface Water Protection Phone (919) 791-4240 Customer Service 1628 Mail Service Center Raleigh. NC 27899-1828 FAX (919) 788-7159 877-623.8748 An Equal Opportunity/Affirmative Action Employer - 50% Recycled/t0% Post Consumer Paper September 2 , Paim 2 ctf On August 26, 2009, Ms. Lucas and Ms. Witherspoon conducted a site visit to determine the compliance status of the stormwater management facility. During this site inspection, DWQ staff observed that the stormwater management facility had been constructed per the approved plan but maintenance of the facility needs to be performed. Specifically, the pool-side slope between the forebay and stormwater pond has eroded and needs to be stabilized and vegetation needs to be established on the bare portions of stormwater pond side slopes. During the site inspection, Triton Upchurch, LLC representatives (specifically Mike Jones), D. Miller & Associates, PA representatives, and DWQ discussed stabilization techniques to be utilized on the eroding slopes between the forebay and stormwater pond. Triton Upchurch, L.LC, has stated they are prepared to perform the work necessary to bring the site into compliance. It is DWQ's understanding that the Upchurch Farms Subdivision Homeowner's Association (HOA) is the owner of the parcel that occupies the stormwater management facility. Therefore, the purpose of this letter is to assist HOA with compliance requirements and to formally notify the HOA of following items: 1) the current compliance status of the stormwater management facility, 2) the HOA's has responsibility to adhere to the conditions of the approved 401 WQC, and 3) the specifications set forth in the approved Stormwater Management Plan. Items in the paragraph above must be addressed in order forthe site to be brought into compliance. Please understand, like with all stormwater ponds, periodic maintenance of the stormwater pond will be required in the future. Finally, be aware that the only alterations that can be made to the stormwater management facility must be in keeping with the most recent stormwater management plan, as approved by DWQ. Any modifications made to the stormwater management facility that are not approved by DWQ will be in violation of the 401 WQC - Stormwater Management Plan and is subject to a civil penalty assessment of up to $25,000.00 per day for each violation. Thank you for your attention to this matter. Should you have any questions regarding these matters, please contact me at (919) 791-4251 or Annette Lucas at (919) 715-3425. Sincerely, t' Lauren Witherspoon Surface Water Protection Section cc: DWQ RRO file copy John Hennessy, NPS Assistance and Compliance Oversight Unit Annette Lucas, 401 Oversight/Express Review Permitting Unit Mr. Mike Jones, Triton Upchurch, LLC, 5660 Six Forks Road, Suite 202, Raleigh, NC 27609 \ NN I C \ m ? w t W 0 LL. " > = % % .,r Nils/k ? l l ° L L o a:cz > Z `n D r7 if - 0 W 0 c U ODd ®; w LA: ZZZ U C9 F- z r ' O= rn >in QZw a,? (n0 n cwi? ? LLJ uLL, l ? to w a C ?3aaLLJ s t ! x 3N y? H 3 dnHS Z O W W N 2 N j3 q* 9 O m w a_ Q v Na m W N 0z L ga ( n0 a .` LL J Q Y m (V m x? V LL Q W V m ? Um W I 0 L) a I ? Q z J a U 2 af 0 z a U 7 0) X 0 z W QW Q ? 1 w04 WI Nx YO 0 4= J W LL ~ ~° U ®LL. I a O c? I Z z Z °o>Q 0 O NaaLLJ > =W=F. ZNOO ,?aa oZLLJ I` J?.O(/) CO " X W (0 (V W X I N p c n J ?? N O \ Z 11 T Q Ur ?° 82'..?? vI W 1- O c O L. V O .? .? Z C m OG N 00 d' 00 Ln O 004 Q1 Ln r-- 00 ?d) d1 ? C S o C. LL N ?I 6 ?y J Q U 0 0 z } p a z z 0m F c) a-:2 >Q?o 0 K ° z C) a W ?0w z aw w? zw 3:: p 00 wm w(Y m v? pa Z:2 ?a vi L, zw rD ;J ?Z O aw Oz 00= 3?0 >- x~ f-z F N Z F Zpw a 3Q 3a V>?-,O ?Z F- 0 Z OJ W J Q Z? (ZjH WNW 0O of -j fr -JZL" OD - To- QOL. Q0 O Ow z0 wQ° Zv; w x? >z UWZ Wp_ O WF- yF~- OWQ mH W YZ J Ja J Ha 0d' pv)W JU m Up Qw JzWw Qli N QZ -0 =a 50 vxiw O za 00 in vi d'Fx-UW ON W U Z?N Q p p Z Q'- N ? aj Z U Z N < (D U 00 a N Z 't p O Q Q 0? < F=w NN of QM Owf, vi of ZZDZ Z° az 0wM C) LO 00 ONO U0 w? <w0 w-j? WOOx JH WQ Odm O2o H-jU? Qcn pw 00 - UU N M d ui N 1 :1 'p!olgo l 'And agopy'9DlH7 'W!/ 7P:np:n I !nn7../R/7.1 ' I -X'6mp•asoq /n-71-Ann7\adl?l ssodAq Ar)g9A04\c)NlNggNinNq\CnNimv>inl \9Fn- I n U:)any:)dn\4uawdolanan Ainaaavv\Ia,1\:, Z O m H Z v? W LI N L 2 N 0 W w O In c) m W Q Z i M X o a ? -? N W U)i Na IX Q o N cn 0() olj Mz z ao a?0 0 QN o U co Q X? LL V Z W O 3: w W "' _ O U LL a w w Q: O r- ^ N_ v > >-- co 00 N 0 w N V) u ? OM( n 1.1% _ Ir EL U o 1 00 ct C3 Z) Z D 0z . 01 ON LLJ 00 01 m]Q U C) 0 V) V) V) CY) g ° O C C V U t\ D) mC N . co O LL OOW a. EL z C.) . . ?n o LO Q L? a N O N? w Lq W o I? LO LO N M m r O r LA- M N I? w V Ln M M M M M 0 0 L976+01 :Vl o W U3 LL t-N to N V DG ? O L + o Ln C/7 Q m O O Ln o Ln O Ln + O M M M N M M M M O M M n d M W q ' a• m ? Z Q o U 0 'OS£ :d01786, d01 211 T«2 ? U. N 2135 N II J II V r T (n^jH Oj O ? o = U r a- N I r N W a a ?' Z J N Q W m a O W oo' t£ am nrvl ? SZ+oI :d1S a o dN3 •?ii;:::: 1 Z Z X W M I : 1 'p!olgp I 'aCl.l agoPH'a?lN7 'Wt! 9 1 :R7:(l I !,(l(l7./R/7I '7.-X'6Mp•asoq /n-7.1-hf1f17.\adil ssDdAR Aogaaoa\nNl?IaaNlnNa\CnNIMV?ICl \9f'(l- I (1 U:)anUDdn\iuawdolanan-A.in:)aayy\!a,l\:, i 0 (A H La t ryes Y C, 1 ?' G U :tr P &M i? ?,S l N fv 64 N M ? CI ?r. cp i? m a? t" 7 fl N Lt3 to r n ) r ? v e ' '? .^v N N t? r r r Y r .o F v ` c+ R ?,yt r "J `D tL` ?0 iD l v ? i « CCi _ _ r C'] fy ; I Z O co r N = W W N N ? G a m w Z a 0 nC) J N ?N N Q o Q X o O l W O z W (/? = ?a U ('f N Z t n - a4- W ? ie rn ?N O ao m X LL U z Q W Cc ca um co to F U w W LO _ 0 U LL a n ?a .c o oorq ?v 00 U oA 0o 00 ? o ' z ,-- 00 c d) o v z o X CO ? s C13 m oG N CL LL J W _Q = C) 1 af 0 p Z J w F- In w z m Q Q 3 F- O Y C-) w j m LO CY) w~ K Q m w a O _Z 00 p z wO C) Q w - 0- Z = o to w ~ 0 O C) C7 Z Z Z ? w Of U) :D pr Q p p Q Q 0 Q ?- Q Utn 0 O F- = w m ^ t0 Q F J O J 1 F--1 O , w Q Q O Z wQ (If p s N C) Q - w pas W s V) a V) :2 n LU F- N ^ F - 1 ?" ' Q -? O O U J V J J O ?? th ?? V w 0 LLJ m mO d' wO m~ qQ ' B (n J Q J w EB }l?r O 2F- JO I? " ? i ®a t g p V) 0 M - ¢ a° JA 4 Q N JQ w 1 (n J F+1 Z) ?p C9m MAX . -?- ul r _j LLj Z Q ?U M0 mp Q J } O W a m? w Qa Z) = NO w- mw wQ m Q Z:? < O QW F wp wQ N? Z F F O D F- Z (n N (n M m i. r u O ?- vi ,c) z C <t' N C7 OO C?? L v ci Ut I t? l- U cl1 a t.7 !rl r W z d_ N 1: 1 'plolgp I 'an, agopy'aoi>j-) 'yVV 7.1':R7.:n I f nn7./R/7.1 'p.-X'6Mp'asoq /n-7l -hnn7\adl,{ ssodAq ADgaJ04\-)Nl>lggNlnNq\ggwjmv>in \gpn- I n 4:)anu:)dn\iuawdolanan--/un:)aaW\la,4\:, j REVISIONI N0. REFERENCE DATE I 08-331-0623-00 711108 3 OR-331-0623-01 7118/08 3 09-331-1641-00 11/30/09 church Farms Ca C p ~ rY~ ~,~,~'CAR~~~''~, M~n.l ~ ~o~~H°°SSI~(/~9~~: $ l Replaced Erosion Control Mat by (see Note 9) °0 033237 0 ~ Top Width °QQ: Top of Embankment '~~,~MqR Existing Erosion Control Mat Replaced Erosion C m°^°~e°~e~P~~ Existing 3(H):1(V) Slope(Max) (see Not, iced Erosion Control Mat (see Note 9J Existing Geosynthetic Existing Failure Plane Top or Embankment Reinforcement La ers Exisitn Elev. 351 Exi tin Ero i n ntrol Mat 3o Elev. 351 ~ i ~ INOnh nmerlean ~aeenPS°Al (Approximate) s g s o Co Fo~ebay Side / ~ ~ ExistingEerm Foreba Side a~ - -ff-- Pool Side / lev. 346 ~ . ® ~ Foundation Soil Proposed ~ ~ ~ 3(H):1(V) Slope or Flatter Existing 3(H):1(\~') Slope(Max) C~ ~ i, Compacted EXIStIng e~ impermeablesoil EXISItng Toe Drain 1 ® ~ Filter Fabric Elev. 344 Pool Side ~ ~ _ ~ ~ Normal Pool Lev I Approximate Limits of ~ ~ - - - - - - - - - - Previously Reomved soils and Re laced with Com acted Not To Scale - p P ~ ~ Impermeable soil v ~ ~ ro 4 G ~ ro ~ s F ~ w ei y ® ~ I ~ p. To Width p I' I Existin Failure Plane Existin 3 H :1 V Slo e Max 9 g O O p( ) (approximate) Existing Geosynthetic To of Embankment Existin Elev. 351 , Not To Scale ~ i i Reinforcement La ers 9 n r I Mat Existing Erosion Cot o , NoMAmen'an Geen PSb~ I _ / 3'to5' (TY ) Existing Berm Foreba Side 3~ 6' Desa n Zonell ~TYP) Zonel Design ssumptions: ~ ~ 1 ~ r / 1, The assi 1, The assigned soil properties; ~ , o Pool Side / Zone I Zone I Friction angle ~ = 25°, Cohesion, c = 200 psf, Moist unit weight y =120 pcf, permeability =1 e-07 cm/sec or less ~ ~ lev. 346 , Zone II Zone II Friction angle ~ = 25°, Cohesion, c = 200 psf, Moist unit weight y =120 pcf, permeability =1 e-07 cmisec or less 8" Min. ( } - a Foundation Soil The abc The above soil properties were assigned based on our Atterberg limits (ASTM D-4318) and ~ ~ sieve ar sieve analysis tests (ASTM D-422), conducted during the original design phase and construction observa observation phase. Existing Compacted Existing Toe Drain impermeable soil Filter Fabric Elev. 344 2. The asst Normal Pool Level 2. The assumed soil properties for the proposed slope repair: 'i Zone II* Zone II* Friction angle ~ = 25°, Cohesion, c = 200 psf, Moist unit weight y =120 pcf, permeability =1e-07 cm/sec or less i Approximate Limits of The above soil ro oerties shall be verified b the onsite eotechnical en ineer or his re resentative rior to i Previously Reomved soils and The abo~ Not To Scale p p Y 9 g p p commencement of excavation. v Replaced with Compacted commen a a 4 Im ermeable soil p Based or Based on BSC Group's Design Calculations, $ ~ G Length o Length of Berm = 30 feet and Width of Berm = 8 feet (Min.) j Top Elev Top Elevation of the Berm = 351 0 Discharg Discharge, Q (Cubic feetlsec) = 96.6 for 2 year storm,121.1 for 10 year storm, 150.3 for 50 year storm and 163.1 for 100 ~ c year stop year storm j Velocity, Velocity, v (feetlsec) = 4.6 for 2 yera storm, 5 for 10 year storm, 5.6 for 50 year storm, 5.4 for 100 year storm Nead , H Head , H(ft) = 0.7 for 2 year storm, 0.8 for 10 year storm, 0.9 for 50 year storm and 1 for 100 year storm 8` Key Trench per Manfacturer General Notes for iope Reconstruction Re laced Erosion Control Mat Replaced Erosion Control Mat Recommnedations General P (see Note 9) EXIStIng 1. LOOSe a 1. Loose and wet soils in the failure area of the slope on the pool side and the existing erosion control mat shall be removed. The ~ ' Existing Geosynthetic 3 H :1 V Slo e Max existin existing slope on pool side shall be cut in benches in general accordance with OSHA guide lines. Pro osed Bench Cuts p ( ~ g P Te otEmbankment Elev. 351 Reinforcement La ers 2, The la 2, The placement of controlled fill shall be started immediately after the removal of existing slope materials. ~ f N ~ (Per OSHA Guide Lines) p 'Remove ExistingMatandall Foreba Side 3. The suitability of the soils to be used for reconstruction shall be verified by a professional geotechnical engineer prior to the ~ ~ ° loose soils in the failure area. a Sul' Tne Excavation must meet Existing Erosion Control Mat eomme commencement of construction. I ~ ~ (NO~n Amenwnfxeen PS`A~ OSHA Excavation Guide Lines. 4. A signe 4. A signed and sealed soil verification report shall be submitted to D. Miller & Associates PA (DMA) prior to the commencement ~ ~ cn ~ ° % Elev. 348.38 Existing Berm Of COnS of construction if the soils will be verified by a geotechnical engineer other than DMA. ~ ~ ~ ~ ~ Pool Slde 100 r. Flood elevation ( y ~ Zone I I' 95% compacted impermeable soil Zone I 5. The fi II i 5. The fill materials for the proposed new slope shall be placed in 8-inch thick layers after compaction and compacted to i ~ ~ ~ ~ in 8-inch thick lifts a mmirr a minimum of 95 percent of maximum dry density of the standard Proctor test and at or greater 3 percentage points of ~ ~ ~ ~ Proposed Elev. 346 optimur optimum moisture content. Each lift shall be keyed into the bench cut line. ~ ~ ~ o~ ~ 3(H):1(V) Slope or Flatter r, ' 6. The Pla 6. The Plasticity index of the fill in the proposed embankment should not be less than 15 and liquid limt should be greater than or ~ ? ~ 'a~ ~ 8 Mln. I equa tt: equal to 30. i ~ ~ ~ Foundation Soil 7. Structur 7. Structural fill placement shall extend to approximately 5 feet beyond the final planned slope, 5 Min. Be and No a 8. Once th ' rm I Pool 8. Once the fill placement is completed, the compacted fill shall be cut back to the final designed slope 3(H): 1(V) or Flatter slope. ~ ~ ~ Repalced Replaced 9. Install e compacted Re laced 9. Install erosion control mat such as North American Green P550 or equivalent down the final designed slope from the top to ~ i ~ ~ W impermeable soil p Toe Drain bottom bottom to the extents illustrated after slope construction is completed.The existing erosion control mat shall be removed and ~ ~ Elev. 344 Filter Fabric replace Normal Pool Lev I replaced at the failure area of the berm and damaged portions of the mat. The on-site geotechnical engineer or his i represe representative shall verify the condition of the erosion control mat at the time of construction and determine the serviceability of ,j the mat the mat. Approximate Limits of Not To Scale 1 . The erc 0 Remove and Replace the 11. The sic 10. The erosion control mat shall be secured properly to the final slope in accordance with manufacturer's recommendations. Previously Reomved and the per 11. The slope shall be vegetated immediately. The vegetation density shall be greater than or equal to 95 percent. Please note that Replaced soils the performance of erosional control mats such as P550 is generally low under unvegitated condition (less than 95 percent). 12. In the e 12. In the event a geotechnical engineer other than DMA monitors the slope reconstruction, the onsite geotechnical engineer or his represF aspect representative should remain on-site during the entire slope repair to document all aspects of the design. If any aspect of the design is noncompliant, DMA must be contacted immediately for review and possible slope design modification. PfeieCt oa-3st-is~z-ooR 13. The da 13. The daily reports produced by the on-site geotechnical engineer shall be provided to DMA concurrently as construction ` I Date: Deoember zoos procee proceeds. ~ ~r,~o 14. The by 14. The hydraulic loading conditions, water elevations and embankment design were provided to DMA by the engineer of the record s (BSC G (BSC Group). DMA analyzed the slope for global stability of the embankment and provided recommendations to minimize the erosion erosion control based on the hydraulic loading conditions and embankment design. I$ S- of i