Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW6200402_1490 Storm System_4/22/2020
PROJECT NAME Johnsonville School Road Subdivision DATE 03.17-20 PROJECT NO 1490 DESIGN PHASE PRELIM CONSTR / X / REVISION LOCATION Harnett County, North Carolina BY CJP RECORD OTHER CHECKED BY CSB (SPECIFY) n= 0.013 g= 226 h= 26 STORM DRAINAGE SCHEDULE CONTINUED AREAS (INLETS) INLET AREA (AC) INLET Cc RUNOFF COEFF. INLET DISCHARGE (CFS) Q (+) UPSTREAM BYPASS (CFS) Q(-) INLET BYPASS (CFS) CAPTURED INLET DISCHARGE (CFS) TOTAL AREAS (AC) INLET TIME (MIN) PIPE TIME (MIN) Tc TIME OF CONC. (MIN) I INTENSITY (IN/HR) Cc RUNOFF COEFF. FROM TO 0.35 0.46 SOL 0+28.3 SOL 0.33 0.00 0.00 0.46 0.33 5.00 0.00 5.00 8.75 0.35 SOL 4+03.5 SOL 39.81 0.25 39.81 0.00 0.00 39.81 39.81 5.00 0.00 5.00 5.86 0.25 SOL 29+86.6 SOL 0.85 0.55 1.87 0.00 0.00 1.87 0.85 5.00 0.00 5.00 8.75 0.55 WOL 0+45.4 WOL 0.26 0.40 0.42 0.00 0.00 0.42 0.26 5.00 0.00 5.00 8.75 0.40 WOL 1+93.4 WOL 5.56 0.25 5.56 0.00 0.00 5.56 5.56 5.00 0.00 5.00 8.75 0.25 SEA 2+21 SEA 3.04 0.45 5.47 0.00 0.00 5.47 3.04 5.00 0.00 5.00 8.75 0.45 DOUBLE SEA 5+50.9 DOUBLE SEA 8.29 0.45 14.92 0.00 0.00 14.92 8.29 5.00 0.00 5.00 8.75 0.45 SAM 1+19.8 SAM 1.52 0.45 2.74 0.00 0.00 2.74 1.52 5.00 0.00 5.00 8.75 0.45 1490 Storm System.xlsx 10-YEAR Date: 4/22/2020 Time: 8:10 AM Page 1 of 5 DATE DESIGN PHASE PROJECT NAME Johnsonville School Road Subdivision 03-17-20 PRELIM / / CONSTR / X / REVISION PROJECT NO 1490 LOCATION Harnett County, North Carolina BY CJP RECORD OTHER CHECKED BY CSB (SPECIFY) n= 0.013 9= 226 h= 26 STORM DRAINAGE SCHEDULE - CONTINUED Q DISCHARGE (Cl Q SIDE- STREAM (Cl SLOPE DIA. (IN) CAPACITY (FULL) (Cl V FULL (FPS) LENGTH (FT) SEGMENT TIME (MIN) UPPER INV. (FT) LOWER INV. (FT) UPSTREAM TOP El (FT) FROM TO 9.4 55 0.10 285.10 288.56 274.78 1 282.23 279.50 283.07 284.05 287.44 284.50 288.77 279.60 284.29 276.20 280.76 275.50 280.34 SOL 0+28.3 1.01 0.00 0.0253 18 16.7 286.50 71.40 13.07 4.09 0.00 0.91 0.00 12.16 0.00 SOL 4+03.5 0.0136 48 167.6 13.3 51 0.06 275.48 SOL 29+86.6 0.0146 18 12.7 7.2 66 0.15 280.46 284.50 285.00 WOL 0+45.4 0.0121 18 11.5 6.5 37 0.10 WOL 1+93.4 0.0090 30 39.0 7.9 55 0.12 SEA 2+21 11.97 0.00 0.0130 24 25.8 8.2 50 0.10 280.25 9.3 46 0.08 12.8 41 0.05 DOUBLE SEA 5+50.9 32.64 0.00 0.0123 45.5 276.77 SAM 1+19.8 10.08 0.0318 24 40.4 276.80 1490 Storm System.xlsx 10-YEAR Date: 4/22/2020 Time: 8:10 AM Page 2 of 5 STORMHYDRAULICDATE ANALYSIS (10 YEAR) PROJECT NAME Johnsonville School Road Subdivision 03-17-20 PROJECT NO 1490 LOCATION Harnett County, North Carolina BY CJP CHECKED BY CSB n= g= h= 0.013 226 26 BOX DEPTH COVER CI COVER BELOW SUBGRADE (8") HYDRAULIC GRADE LINE PIPE HYDRAULIC SIDESTREAM AREA RADIUS SUMMATION (FT) (FT) (CFS) Hf He 90 DEG=0.7 60 DEG=0.55 HEAD LOSS He BEND LOSS Hb K'S 30 DEG=0.28 15 DEG=0.10 Ht BEND LOSS K FROM TO SOL 0+28.3 2.06 0.56 (0.56) 1.7671 0.3750 0.00 0.01 0.00 0.00 0.00 0.01 0.00 SOL 4+03.5 6.75 2.75 1.63 12.5664 1.0000 13.07 0.13 0.12 0.17 0.00 0.42 0.00 SOL 29+86.6 2.61 1.11 (0.01) 1.7671 0.3750 0.00 0.10 0.02 0.03 0.00 0.15 0.00 WOL 0+45.4 2.94 1.44 0.31 1.7671 0.3750 0.00 0.00 0.00 0.00 0.00 0.01 0.00 WOL 1+93.4 3.77 1.27 0.14 4.9087 0.6250 0.00 0.05 0.02 0.03 0.00 0.10 0.00 SEA 2+21 4.04 2.04 0.92 3.1416 0.5000 0.00 0.14 0.06 0.08 0.00 0.27 0.00 DOUBLE SEA 5+50.9 3.99 1.49 0.37 4.9087 0.6250 0.00 0.29 0.17 0.24 0.00 0.70 0.00 SAM 1+19.8 3.54 1.54 0.41 3.1416 0.5000 4.09 0.08 0.04 0.06 0.00 0.18 0.00 1490 Storm System.xlsx 10-YEAR Date: 4/22/2020 Time: 8:10 AM Page 3 of 5 DESIGN PHASE PRELIM / / CONSTR / X / REVISION / / RECORD / / OTHER / / (SPECIFY) DATE 03-17-20 DESIGN PHA PROJECT NAME Johnsonville School Road Subdivision PRELIM CONSTR REVISION RECORD OTHER (SPECIFY) PROJECT NO 1490 LOCATION Harnett County, North Carolina BY CJP CHECKED BY CSB n= 0.013 g= 226 h= 26 CONTINUED --► HYDRAULIC GRADE LINE - CONTINUED DESIGN CRITERIA: 1. DESIGN FOR THE 10 YR STORM 2. ASSUME TIME OF CONCENTRATION T AN INDIVIDUAL INLET = 5 MIN. (Unless o 3. INTENSITY = g/(h+T), FOR 10 YR STOR (g and h were derived from Raleigh-Durha CAPACITY VS Duration -Frequency Charts, REF: NC Eros DISCHARGE Sediment Control Planning and Design Ma 4. MANNINGS "n" FACTOR= 0.013 FRICTION SLOPE (FT/FT) FRICTION VELOCITY (FPS) OUTLET W.S. ELEV I (FT) INLET W.S. ELEV. FLOW CONDITION CONTROL FREE- BOARD (FT) HGL TO CROWN COMMENTS FROM TO OUTLET INLET USE CONTOL CONTROL (FT) (FT) (FT) SOL 0+28.3 0.0001 0.57 286.30 286.31 287.26 287.26 INLET 1.30 0.74 OK 15.68 5. RUNOFF COEFICIENT Cc=0.50 (Per CR- SOL 4+03.5 0.0024 5.64 277.98 278.40 278.87 278.87 INLET 3.36 0.61 OK 96.23 SOL 29+86.6 0.0015 2.30 280.70 280.85 281.44 281.44 INLET 1.63 0.52 OK 8.58 WOL 0+45.4 0.0001 0.51 285.25 285.26 285.26 285.26 INLET 2.18 0.74 OK 10.63 WOL 1+93.4 0.0009 2.46 286.50 286.60 286.51 286.60 OUTLET 2.17 0.90 OK 26.82 SEA 2+21 0.0028 3.79 281.20 281.47 281.88 281.88 INLET 2.41 0.37 OK 13.86 DOUBLE SEA 5+50.9 0.0063 6.61 278.20 278.90 279.93 279.93 INLET 0.83 (0.66) OK 12.86 SAM 1+19.8 0.0020 3.19 277.10 277.28 278.24 278.24 INLET 2.10 0.56 OK 30.28 1490 Storm System.xlsx 10-YEAR Date: 4/22/2020 Time: 8:10 AM Page 4 of 5 ;E n= 0.013 g= 226 h= 26 herwise noted) Intensity - FROM TO on and ual) SOL 0+28.3 107) SOL 4+03.5 SOL 29+86.6 WOL 0+45.4 WOL 1+93.4 SEA 2+21 DOUBLE SEA 5+50.9 SAM 1+19.8 1490 Storm System.xlsx 10-YEAR Date: 4/22/2020 Time: 8:10 AM Page 5 of 5