Loading...
HomeMy WebLinkAboutNCS000549_2020 Renewal Application Email Transmittal_20200421Georgoulias, Bethany From: Loveland, Brad P <Brad.Loveland@duke-energy.com> Sent: Tuesday, April 21, 2020 1:47 PM To: Lucas, Annette Cc: Georgoulias, Bethany; Vinson, Toby; Wrenn, Brian L; Khan, Zahid; Pearson, Tyler B; McCoy, Suzanne; Moore, James Subject: [External] Riverbend Industrial Stormwater Package 4.20.20 Attachments: Signed.Dcouments.Permit.Renewal.pdf, Rive rbend_Oufall_Description.DOCX; Riverbend ISW Recap.xlsx; Riverbend_PollutionPrevention Plan.pdf; Riverbend Visual ISW Summary.xlsx External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Good afternoon Annette, Hard copies were mailed to 1612 Mail Service Center this morning, but I wanted to send you digital copies of the renewal package. Thanks and let me know next steps forward in this process. Brad Brad Loveland, CPESC, CEPSCI, CFM Duke Energy I Permitting and Compliance, Carolinas 526 South Church Street I EC13K I Charlotte, NC 28202 Office: 980 373 2820 Cell: 704 609 5637 V It DUKE "ENERGY Suzanne McCoy NCDEMLR Stormwater Program 1612 Mail Service Center Raleigh, North Carolina 27699-1612 Subject: Duke Energy Carolinas, LLC Riverbend Steam Station Industrial Storm Water Permit#NCS000549 Gaston County Dear Ms. McCoy: Duke Energy 526 South Church Street Charlotte, NC 28202 Mailing Address: Mail Code EC13K1 P.O. Box 1006 Charlotte, NC 28201-1006 NCDEQ staff have recently requested that Duke Energy Carolinas, LLC (Duke Energy) submit a permit renewal application for the Riverbend NPDES Stormwater Permit number NCS000549, to maintain the permit while the agency finishes review of the permit rescission request and no exposure certification submitted for the site on October 21, 2019 and October 7, 2019 respectively. As indicated in our previous submittals, there is no industrial activity at the site that would require continuing NPDES stormwater permit coverage. Steam electric energy generation and ash excavation and transport have been completed and have permanently ceased at the site. Duke Energy requests both the No Exposure certification for the Lark maintenance facility and Rescission or expiration of the subject permit be completed as previously requested. In response to the agency's request however, Duke Energy attaches a: 1. Renewal Application Form, 2. SPPP Certification Form, 3. Map of site drainage areas, 4. Analytical and Visual Summary Spreadsheets and 5. Drainage area Descriptions. If you have questions or need additional information, please contact Brad Loveland at (704) 609-5637 or brad.loveland@duke-energy.com. "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. 1 am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Sincerely, Tim Hill General Manager, CCP Regional Operations & Maintenance Permit Coverage Renewal Applicatilan Form National Pollutant Discharge Elimination System NPDES Permit Number St NCS 000649 Environmental ormwater Individual Permit Quality Please provide your permit number in box in the upper right hand corner, complete the information in the space provided below and return the completed renewal form along with the required supplemental information to the address indicated. Owner Information * Address to which permit correspondence will be mailed Owner / Organization Name: Duke energy Carolinas Owner Contact: Tim Hill Mailing Address: Charlotte. NC 28201-twos Charlotte. NC 28201.1006 Phone Number: 980373-6166 Fax Number: E-mail address: Tim.HitIQduke-energy.com Facility Information Facility Name: Riverbend Station Facility Physical Address: 175 Steam Plant Rd Mount Holly NC 28120 Facility Contact: Brandon Garrison Mailing Address: 115 Steam Plant Rd Mount Holly NC 28120 Phone Number: 704 263 3325 Fax Number: E-mail address: Brandon.Ganison(oduke-energy.com Permit Information Permit Contact: Same as Owner Mailing Address: Phone Number: Fax Number: E-mail address: ' Discharge Information Receiving Stream: Catawba R ver (Mountain Island Lake) Stream Class: class ws.IV. a Basin: CA stream in the Catawba River Basin Sub -Basin: Number of Outfalls: 7 Facility/Activity Changes Please describe below any changes to your facility or activities since issuance of your permit. Attached a separate sheet if necessary. Riverbend Station Demo was completed May 2018. Ash transport ceased from rail on March 2018 No Industrial activity is occuring in the drainage areas of the existing seven outfalls. CERTIFICATION I certify that I am familiar with the information contained in the application and that to the best of my knowledge and belief such information is true, complete and urate. Signature Date �- 020 ' .10 IM !Vf LL Print or type name of person signing above ��aa! N1. M,+Gain CcP 0o1 Title Please return this completed application form DEMLR - Stormwater Programpept. of Environmental Quality and requested supplemental information to: 1612 Mail Service Center Raleigh, North Carolina 27699-1612 STORMWATER POLLUTION PREVENTION PLAN DEVELOPMENT AND IMPLEMENTATION CERTIFICATION North Carolina Division of Energy, Mineral, and Land Resources — Stormwater Program Facility Name: RrverbendStation Permit Number: NCS000549 Location Address: 175 Steam Plant Rd Mount Holly NC County: Gaston "I certify, under penalty of law, that the Stormwater Pollution Prevention Plan (SPPP) document and all attachments were developed and implemented under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information required by the SPPP. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information gathered is, to the best of my knowledge and belief, true, accurate and complete." "I certify that the SPPP has been developed, signed and retained at the named facility location, and the SPPP has been fully implemented at this facility location in accordance with the terms and conditions of the stormwater discharge permit." And "I am aware that there are significant penalties for falsifying information, including the possibility of fines and imprisonment for knowing violations." ISign (according to permit signatory requirements) and return this Certification. DO NOT SEND STORMWATER POLLUTION PREVENTION PLAN WITH THIS CERTIFICATION. Signature i 7'!N1 /Y, L L Print or type name of person signing above Date q_ay—aV rt44�,*[ — CCP d S Title SPPP Certification 10/13 SDO Narrative Description and BMP Summary Location: Riverbend Steam Station Permit No. NCS000549 Outfall ID SWO02 M +` Discharge Structure 18" CMP Location Western bank of the intake canal - -- Latitude - Longitude 35°21'38"N - 80°58'30"W Drainage Area 12.3 acres Percent Impervious 35 Permit Monitoring 1 Table Industrial Activities This drainage area includes runoff from the 44 kV switchyard, lower 230 kV and Description switchyard, and a portion of the main switchyard; these areas cover 3.5 acres, including half an acre of yard and parking. To the south of the main switchyard, there are approximately 4.3 acres of lawn area. The railroad embankment along the eastern basin boundary is sloped at a ratio of 1.5 horizontal to 1 vertical (1.5H: 1V). The embankment and railways cover approximately 2.3 acres. About one mile of railways and one-third mile of paved roadways pass through the area. Due to the removal / closure of the ash basin, ash hauling is no longer occurring onsite. Approximately 35 percent of this drainage basin is paved. All runoff from this drainage basin is processed through the 10,000 gallon oil separator tank #2. There is a vehicle rinse area within this basin, but the effluent is not discharged through this outfall because it is routed to the ash basin through the septic system. Effective July 7, 2017 a new Erosion and Sediment Control Plan (GASTO 2017- 016) was approved for the 100kV Switchyard Demolition and Stormline Installation (Phase 6). This new E&SC Plan necessitated replacement of the existing SWO02 stormwater discharge pipe, which occurred on 9/18/17 by Earnhardt Grading. The original discharge has been abandoned in place. Significant Oil: The 44 kV switchyard contains a total volume of 5,000 Materials/Potential gallons of mineral oil. The main switchyard is only Pollutants partially located within this drainage area. Transformer 7A and its 7,500 gallons of mineral oil are located in this drainage area. Some switchgear equipment has containment pits beneath them. In addition, the diesel fuel storage tank (280 gallons) and unloading operations are located here on the east side of the powerhouse. Notes: 1. Outfall fact sheet provides documentation for permit sections for narrative description of potential pollutants (Part II, Section A, 1.(b)) and BMP Summary (Part II, Section A, 2.(c)). SDO Narrative Description and BMP Summary BMP Summary Location: Riverbend Steam Station Permit No. NCS000549 Liquid Storage Tanks/Oil Bearing Equipment • If containment structures have drains, ensure that the drains have valves, and that valves are maintained in the closed position. Institute protocols for checking/testing stormwater in containment areas prior to discharge. • Inspect storage tanks and piping systems (pipes, pumps, flanges, couplings, hoses, and valves) for failures or leaks and perform preventive maintenance. • Properly dispose of chemicals that are no longer in use. • Develop and implement spill plans or spill prevention, containment, and countermeasure (SPCC) plans. Oil bearing equipment switchyards • Level grades and gravel surfaces are constructed to retard flows and limit the spread of spills. • Stormwater runoff is collected in perimeter ditches and routed around switchyard. Notes: 1. Outfall fact sheet provides documentation for permit sections for narrative description of potential pollutants (Part II, Section A, 1.(b)) and BMP Summary (Part II, Section A, 2.(c)). SDO Narrative Description and BMP Summary Location: Riverbend Steam Station Permit No. NCS000549 Outfall ID SWO03 Discharge Structure 36" CMP Location Western bank of the intake canal Latitude - Longitude 35°21'40"N - 80°58'32"W Drainage Area 14.6 acres Percent Impervious 5 Permit Monitoring 1 Table Industrial Activities This drainage area includes approximately one-half acre of the slopes below and Description the Lark Maintenance Facility. Approximately ten acres of lawn area border the plant access road. Drainage from the three acre, upper 230 kV switchyard is discharged into a concrete ditch which leads to this outfall. About 900 feet of paved access road and 800 feet of railways border this area. Approximately 5 percent of this drainage basin is paved. Significant Oil: Switchgear equipment in the upper 230 kV yard contains Materials/Potential approximately 6,700 gallons of oil. A 400 gallon oil rupture Pollutants collection tank collects drainage from the two station service transformers which contain a total of 226 gallons of mineral oil. Runoff from the upper 230 kV switchyard is discharged into a concrete ditch running along the north side of the yard. The ditch passes under the plant access road through a 36 inch diameter CMP. The west end of the CMP has a swing gate which would be closed to help contain oil spillage from the switchyard. BMP Summary Liquid Storage Tanks/Oil Bearing Equipment • If containment structures have drains, ensure that the drains have valves, and that valves are maintained in the closed position. Institute protocols for checking/testing stormwater in containment areas prior to discharge. • Inspect storage tanks and piping systems (pipes, pumps, flanges, couplings, hoses, and valves) for failures or leaks and perform preventive maintenance. • Properly dispose of chemicals that are no longer in use. • Develop and implement spill plans or spill prevention, containment, and countermeasure (SPCC) plans. Oil bearing equipment switchyards • Level grades and gravel surfaces are constructed to retard flows and limit the spread of spills. • Stormwater runoff is collected in perimeter ditches and routed around switchyard. Notes: 1. Outfall fact sheet provides documentation for permit sections for narrative description of potential pollutants (Part II, Section A, 1.(b)) and BMP Summary (Part II, Section A, 2.(c)). SDO Narrative Description and BMP Summary Location: Riverbend Steam Station Permit No. NCS000549 OutfallID SWO04 k Y�' „��" Discharge Structure 18" RCP Location East of Horse Ben Beach Road Latitude - Longitude 35°21'22"N - 80°58'32"W §' Drainage Area 4.6 acres& Percent Impervious 15 Permit Monitoring 2 Table...e.s. Industrial Activities This drainage basin is bound on the west by the access road parallel to the and Description rail line and on the east by Horse Bend Beach Road. Approximately 15 percent of the drainage basin is paved; the rest is grass. Note that there is a catch basin / field inlet across the street from the stormwater outfall for this area and distributes to the adjacent wooded area. Significant None — truck traffic / non -industrial activities occur in the vicinity Materials/Potential Pollutants BMP Summary None Notes: 1. Outfall fact sheet provides documentation for permit sections for narrative description of potential pollutants (Part II, Section A, 1.(b)) and BMP Summary (Part II, Section A, 2.(c)). SDO Narrative Description and BMP Summary Location: Riverbend Steam Station Permit No. NCS000549 OutfallID SWO06 �F . Discharge 36" CMP Structure mE Location Western bank of the intake canal Latitude - 35°21'39"N - 80°58'32"W Longitude Drainage Area 5.1 acres Percent 45 Impervious Permit Monitoring 4 Table Industrial This drainage area includes approximately 0.5 acres of the upgradient storage / Activities and maintenance facilities. In addition, there are about three acres of grassed area, Description including the slopes of below the Lark High Bay Maintenance Shop. Approximately 500 feet of paved roadway passes through the area. About 45 percent of the total drainage area is either paved or roofed. All runoff from this drainage basin is processed through the 20,000 gallon oil/water separator tank #1. Significant None — parking and non -industrial activities occur in the vicinity Materials/Potential Pollutants BMP Summary None Notes: 1. Outfall fact sheet provides documentation for permit sections for narrative description of potential pollutants (Part II, Section A, 1.(b)) and BMP Summary (Part II, Section A, 2.(c)). SDO Narrative Description and BMP Summary Location: Riverbend Steam Station Permit No. NCS000549 OutfallID SWO10 Discharge Structure 18" CMP Location North of W.F. Lark Fossil Maintenance Facility A , Latitude - Longitude 35°21'38"N - 80°58'41 "W Drainage Area 1.7 acres Percent Impervious 90 Permit Monitoring 7 Table Industrial Activities The drainage area includes wooded area north of the W.F. Lark Fossil and Description Maintenance Facility; flow is then overland to Mountain Island Lake. This drainage basin includes approximately 16,000 square feet of roofed area and 50,000 square feet of paved storage area and parking lot. Approximately 90 percent of this drainage basin is paved or roofed. On August 24, 2017 NCDEQ recommended that outfall SWO12 be eliminated as SWO10 was deemed representative of both SWO10 and SW012. Significant None Materials/Potential Pollutants BMP Summary None Notes: 1. Outfall fact sheet provides documentation for permit sections for narrative description of potential pollutants (Part II, Section A, 1.(b)) and BMP Summary (Part II, Section A, 2.(c)). SDO Narrative Description and BMP Summary Location: Riverbend Steam Station Permit No. NCS000549 Outfall ID SW011 $ a E` Discharge Structure 18" CMP Location West of W.F. Lark Fossil Maintenance Facility'" Latitude - Longitude 35°21'33"N - 80°58'45"W Drainage Area 1.1 acres Percent Impervious 70 Permit Monitoring 7'` Table Industrial Activities The drainage area includes runoff from the wooded area west of the W.F. and Description Lark Fossil Maintenance Facility; flow is then overland to a creek leading to Mountain Island Lake. This drainage basin includes approximately 11,000 square feet of roofed area and 33,000 square feet of paved parking area. There is about 250 feet of paved access road. Approximately 70 percent of this drainage basin is paved or roofed. Well water circulates through the heating/cooling unit at the W.F. Lark Fossil Maintenance Facility and is discharged at this outfall as non -process wastewater. The system is a closed loop, and maintenance chemicals are not added. Significant None — upgradient storage / maintenance facilities only; non -industrial Materials/Potential Pollutants Note that the stormwater piping under the upgradient parking lot may contribute to Tier III status BMP Summary Per correspondence with NCDEQ on August 28, 2017, Permit NCS000549 will be rescinded when the coal ash is fully remediated, however, the W.F. Lark facility shall be covered under NC0000496 under the metal fabrication / maintenance category. Notes: 1. Outfall fact sheet provides documentation for permit sections for narrative description of potential pollutants (Part II, Section A, 1.(b)) and BMP Summary (Part II, Section A, 2.(c)). SDO Narrative Description and BMP Summary Location: Riverbend Steam Station Permit No. NCS000549 Outfall ID SWO18 Discharge Structure 18" RCP Location East side of station along Intake Canal Latitude - Longitude 35°24'41.9"N - -- Drainage Area 16.1 Percent Impervious n/a Permit Monitoring 10;''', Table Industrial Activities The drainage area for the proposed stormwater outfall SW018 covers a total and Description area of 8.8 acres. The majority of stormwater is generated due to runoff from the substation pad. This stormwater will be collected using a network of catch basins and storm drains and subsequently conveyed to a detention basin and then discharged through the new outfall. The detention basin will also receive sheet flow from a grassed area around the substation pad. The area where the substation pad is built used to be the coal stock pile area when the plant was under operation. The substation pad will be covered with 6 inches of #57 stone and contain various electrical equipment including transformers, circuit breakers, and metering devices. The substation will be built in two phases. Phase One will be the construction of a 100kV switchyard and Phase Two will be the 44kV transformation yard. The transformers containing mineral oil will be located in the 44kV yard. Drainage will be routed to a 10,000 gallon oil water separator (proposed for construction) prior to discharge into the detention basin. Significant Mineral Oil: There will be multiple oil -filled transformers in Materials/Potential the new 44kV substation which will be installed Pollutants during Phase 2 of the Substation Construction. The transformers contain approximately 6000- 8000 gallons of oil. The oil water separator will be sized to accommodate the largest volume and installed prior to transformer delivery. The separator will tie into the storm drainage within the switchyard and be routed to the detention basin. BMP Summary Oil bearing equipment switchyards • Level grades and gravel surfaces are constructed to retard flows and limit the spread of spills. • Stormwater runoff is collected in perimeter ditches and routed around switchyard. Notes: 1. Outfall fact sheet provides documentation for permit sections for narrative description of potential pollutants (Part II, Section A, 1.(b)) and BMP Summary (Part II, Section A, 2.(c)). RIVERBEND STEAM STATION DATE F)lSITE AERIAL AND TOPOGRAPHIC MAP DECEMBER 2019 STORMWATER POLLUTION PREVENTION PLAN FIGURE FIGURE 1 GASTON COUNTY, NC Riverbend - Stormwater Outfall SWO04 Monitoring •�� O pap � '�a` ova` .`O'�a` '`°tea '�3` ,ate � ,`p'�a` �p'�a` �,pJp` p'�p� 1001 Benchmark 6.0-9.0 100 0.0003 0.34 N/A 0.065 0.003 0.9 0.010 0.335 0.075 0.09 0.056 N/A 0.126 N/A Adverse Weather Adverse Weather Units inches mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L ng/L 6/9/2015 0.5 6/27/2015 2.25 8/11/2015 8/27/2015 0.375 7.00 650 <0.0003 0.00320 <0.05 <0.001 <0.001 0.01040 0.0200 0.00782 0.00761 <0.001 <0.001 <0.0002 0.089 12.0 Tier One (Copper and TSS) Tier Two (Copper) Tier One (pH, TSS), Tier Two (Copper) Tier One (Silver, Lead and Zinc) Tier Two (TSS) Tier Three (Copper) Tier Three (TSS, Copper) No Sample - Adverse Weather No Sample - Adverse Weather No Sample - Adverse Weather No Sample - Adverse Weather No Sample - Adverse Weather No Sample - Adverse Weather Tier Three (TSS, Copper) No Sample - No Flow Tier Three (TSS, Copper) No Sample - No Flow Tier Three (TSS, Copper) Tier Three (TSS, Copper) No Sample - Adverse Weather No Sample - Adverse Weather No Sample - Adverse Weather No Sample - Adverse Weather No Sample - Adverse Weather No Sample - Adverse Weather NO FLOW No Sample - Adverse Weather No Sample - Adverse Weather No Sample - Adverse Weather No Sample - Adverse Weather No Sample - Adverse Weather No Sample - Adverse Weather NO FLOW No Sample - No Flow No Sample - Adverse Weather or No Flow No Sample - Adverse Weather or No Flow No Sample - Adverse Weather or No Flow No Sample - Adverse Weather or No Flow 11/30/2015 12/14/2015 0.91 7.15 78 <0.0003 0.00389 <0.05 <0.001 <0.001 0.00496 0.0121 0.00343 0.00524 <0.001 <0.001 <0.0002 0.067 20.0 1/15/2016 1/22/2016 1.15 9.71 130 <0.0003 0.00310 <0.05 <0.001 <0.001 0.00650 0.0120 0.0045 0.00393 <0.001 <0.001 0.000652 0.063 12.5 2/3/2016 2/17/2016 0.73 6.98 2500 0.00031 0.02280 <0.05 0.00424 0.00101 0.15500 0.3070 0.14700 0.09700 <0.001 0.00269 0.00266 1.040 63.2 3/13/2016 3/24/2016 0.14 7.91 120 <0.0003 0.00196 <0.05 <0.001 <0.001 0.00843 0.0100 0.00371 0.00365 <0.001 <0.001 <0.0002 0.045 11.2 APRIL 5/17/2016 6/8/2016 0.42 8.01 20 <0.0003 0.00305 <0.05 <0.001 <0.001 0.00199 0.00591 0.00101 <0.001 <0.001 <0.001 <0.0002 0.016 1.705 JUNE JULY AUGUST SEPTEMBER OCTOBER 11/29/2016 12/14/2016 0.36 6.91 510 <0.0003 0.00234 <0.05 <0.001 <0.001 0.00202 0.00776 0.00175 0.00121 <0.001 <0.001 <0.0002 0.028 10.9 1/20/2017 N/A 3.01 2/15/2017 3/2/2017 0.27 6.90 42 <0.0003 0.00173 <0.05 <0.001 <0.001 0.00154 0.00481 <0.001 <0.001 <0.001 <0.001 <0.0002 0.025 7.8 3/13/2017 0.16 4/3/2017 4/18/2017 0.58 7.22 26.0 <0.0003 0.00213 <0.05 <0.001 <0.001 0.00130 0.0053 <0.001 <0.001 <0.001 <0.001 <0.0002 0.012 8.56 5/1/2017 5/1/2017 0.31 6.33 37.0 <0.0003 0.00166 <0.05 <0.001 <0.001 0.00143 0.00498 0.00128 0.00105 <0.001 <0.001 <0.0002 0.022 5.5 JUNE JULY 8/31/2017 9/18/2017 0.66 7.60 19.0 <0.0003 0.00289 <0.05 <0.001 <0.001 0.00117 0.00496 <0.001 <0.001 <0.001 <0.001 <0.0002 0.016 5.36 9/6/2017 9/19/2017 0.87 7.80 14.0 <0.0003 0.00186 <0.05 <0.001 <0.001 <0.001 0.00338 <0.001 <0.001 <0.001 <0.001 <0.0002 0.013 6.12 10/23/2017 11/7/2017 2.13 6.80 87.0 <0.0003 0.00369 <0.05 <0.001 <0.001 0.00669 0.0151 0.00446 0.00487 <0.001 <0.001 <0.0002 0.86 11.2 NOVEMBER 12/20/2017 1/5/2018 0.90 7.55 20.0 <0.0003 0.00163 <0.05 <0.001 <0.001 0.00103 0.00397 <0.001 <0.001 <0.001 <0.001 <0.0002 0.020 6.67 1/11/2018 1/25/2018 0.13 7.85 <5 <0.0003 0.00462 0.056 <0.001 <0.001 <0.001 0.00375 <0.001 <0.001 <0.001 <0.001 <0.0002 0.10 3.19 FEBRUARY 3/6/2018 3/21/2018 0.40 7.50 31.0 <0.0003 0.00177 <0.05 <0.001 <0.001 0.00151 0.00446 <0.001 <0.001 <0.001 <0.001 <0.0002 0.022 9.66 4/23/2018 5/4/2018 0.41 7.30 48.0 <0.0003 0.00158 <0.05 <0.001 <0.001 0.00162 0.00584 0.00123 0.00110 <0.001 <0.001 <0.0002 0.024 10.1 MAY JUNE JULY AUGUST SEPTEMBER OCTOBER NOVEMBER 12/20/2018 1/9/2019 1.71 6.30 56.0 <0.0002 0.00265 <0.05 <0.001 <0.001 0.00243 0.00644 <0.001 0.00245 <0.001 <0.001 <0.0002 0.043 10.6 FEBRUARY MARCH 4/12/2019 4/29/2019 1.00 8.10 19 <0.0002 <0.001 <0.05 <0.001 <0.001 <0.001 0.00325 <0.001 <0.001 <0.001 <0.001 <0.0002 0.026 6.67 MAY JUNE JULY AUGUST SEPTEMBER OCTOBER 11/12/2019 Riverbend ISW Recap 0 fo*\.0000 0 n G2- C ) 0\0 0� 0\\ O•p� o� o� ° . o1 �. `fir ` a`°� 11 /12/2019 0.44 1 Clear N I 1 1 1 1 1 N 1 N I N I N I 12/10/2019 0.17 Clear N 1 1 1 N N N N SWO02 1 /7/2020 0.11 Clear N 1 1 1 N N N N 2/6/2020 1.6 Clear N 1 1 1 N N N N 3/3/2020 0.75 Clear N 1 1 1 N N N N 11 /12/2019 0.44 Lt Brown N 1 2 1 N N N N 12/10/2019 0.17 Clear N 1 1 1 N N N N SWO03 1 /7/2020 0.11 Clear N 1 1 1 N N N N 2/6/2020 1.6 Lt Brown N 1 1 1 N N N N 3/3/2020 0.75 Clear N 1 1 1 N N N N 11 /12/2019 0.16 Clear N 1 1 1 N N N N 12/10/2019 0.17 Lt Yellow 18 2 1 1 Y N N N SWO04 1 /7/2020 0.73 NO FLOW 2/6/2020 0.11 Lt Brown N 1 1 1 Y N N N 3/3/2020 0.75 Lt Brown N 2 1 1 Y N N N 11 /12/2019 0.44 Clear N 1 1 1 N N N N 12/10/2019 0.17 Clear N 1 1 1 N N N N SWO06 1 /7/2020 0.11 Clear N 1 1 1 N N N N 2/6/2020 0.11 Clear N 1 1 1 N N N N 3/3/2020 0.75 Clear N 1 1 1 N N N N 11 /12/2019 0.44 Clear N 1 2 1 N N N N 12/10/2019 0.17 Clear N 1 2 1 N N N N SW010 1 /7/2020 0.11 Clear N 1 1 1 N N N N 2/6/2020 1.6 Clear N 1 1 1 N N N N 3/3/2020 0.75 Clear N 1 1 1 N N N N 11 /12/2019 0.44 Clear N 1 1 1 N N N N 12/10/2019 0.17 Lt Tan N 1 2 1 N N N N SW011 1 /7/2020 0.11 Lt Yellow N 1 1 1 N N N N 2/6/2020 1.6 Clear N 1 1 1 N N N N 3/3/2020 0.75 Cloudy N 2 2 1 N N N N 11 /12/2019 0.44 Lt Brown N 2 1 1 N N N N 12/10/2019 0.17 NO FLOW SW018 1 /7/2020 0.11 NO FLOW 2/6/2020 1.6 Clear N 1 1 1 N N N N 3/3/2020 0.75 Brown N 3 1 2 N N N N No Flow for July, August, September and October 2019 No Flow for July, August, September and October 2019 No Flow for July, August, September and October 2019