HomeMy WebLinkAboutNCS000549_2020 Renewal Application Email Transmittal_20200421Georgoulias, Bethany
From: Loveland, Brad P <Brad.Loveland@duke-energy.com>
Sent: Tuesday, April 21, 2020 1:47 PM
To: Lucas, Annette
Cc: Georgoulias, Bethany; Vinson, Toby; Wrenn, Brian L; Khan, Zahid; Pearson, Tyler B;
McCoy, Suzanne; Moore, James
Subject: [External] Riverbend Industrial Stormwater Package 4.20.20
Attachments: Signed.Dcouments.Permit.Renewal.pdf, Rive rbend_Oufall_Description.DOCX;
Riverbend ISW Recap.xlsx; Riverbend_PollutionPrevention Plan.pdf; Riverbend Visual
ISW Summary.xlsx
External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
report.spam@nc.gov
Good afternoon Annette,
Hard copies were mailed to 1612 Mail Service Center this morning, but I wanted to send you digital copies of the
renewal package.
Thanks and let me know next steps forward in this process.
Brad
Brad Loveland, CPESC, CEPSCI, CFM
Duke Energy I Permitting and Compliance, Carolinas
526 South Church Street I EC13K I Charlotte, NC 28202
Office: 980 373 2820
Cell: 704 609 5637
V It DUKE
"ENERGY
Suzanne McCoy
NCDEMLR Stormwater Program
1612 Mail Service Center
Raleigh, North Carolina 27699-1612
Subject: Duke Energy Carolinas, LLC
Riverbend Steam Station
Industrial Storm Water Permit#NCS000549
Gaston County
Dear Ms. McCoy:
Duke Energy 526 South
Church Street Charlotte,
NC 28202
Mailing Address:
Mail Code EC13K1 P.O. Box 1006
Charlotte, NC 28201-1006
NCDEQ staff have recently requested that Duke Energy Carolinas, LLC (Duke Energy) submit a permit
renewal application for the Riverbend NPDES Stormwater Permit number NCS000549, to maintain the
permit while the agency finishes review of the permit rescission request and no exposure certification
submitted for the site on October 21, 2019 and October 7, 2019 respectively.
As indicated in our previous submittals, there is no industrial activity at the site that would require
continuing NPDES stormwater permit coverage. Steam electric energy generation and ash excavation and
transport have been completed and have permanently ceased at the site. Duke Energy requests both the
No Exposure certification for the Lark maintenance facility and Rescission or expiration of the subject
permit be completed as previously requested.
In response to the agency's request however, Duke Energy attaches a:
1. Renewal Application Form,
2. SPPP Certification Form,
3. Map of site drainage areas,
4. Analytical and Visual Summary Spreadsheets and
5. Drainage area Descriptions.
If you have questions or need additional information, please contact Brad Loveland at
(704) 609-5637 or brad.loveland@duke-energy.com.
"I certify, under penalty of law, that this document and all attachments were prepared under
my direction or supervision in accordance with a system designed to assure that qualified
personnel properly gather and evaluate the information submitted. Based on my inquiry of
the person or persons who manage the system, or those persons directly responsible for
gathering the information, the information submitted is, to the best of my knowledge and
belief, true, accurate, and complete. 1 am aware that there are significant penalties for
submitting false information, including the possibility of fines and imprisonment for knowing
violations."
Sincerely,
Tim Hill
General Manager, CCP Regional Operations & Maintenance
Permit Coverage
Renewal Applicatilan Form
National Pollutant Discharge Elimination System NPDES Permit Number
St NCS 000649
Environmental ormwater Individual Permit
Quality
Please provide your permit number in box in the upper right hand corner, complete the information in the space provided
below and return the completed renewal form along with the required supplemental information to the address indicated.
Owner Information
* Address to which permit correspondence will be mailed
Owner / Organization Name:
Duke energy Carolinas
Owner Contact:
Tim Hill
Mailing Address:
Charlotte. NC 28201-twos
Charlotte. NC 28201.1006
Phone Number:
980373-6166
Fax Number:
E-mail address:
Tim.HitIQduke-energy.com
Facility Information
Facility Name:
Riverbend Station
Facility Physical Address:
175 Steam Plant Rd
Mount Holly NC 28120
Facility Contact:
Brandon Garrison
Mailing Address:
115 Steam Plant Rd
Mount Holly NC 28120
Phone Number:
704 263 3325
Fax Number:
E-mail address:
Brandon.Ganison(oduke-energy.com
Permit Information
Permit Contact:
Same as Owner
Mailing Address:
Phone Number:
Fax Number:
E-mail address:
'
Discharge Information
Receiving Stream:
Catawba R ver (Mountain Island Lake)
Stream Class:
class ws.IV. a
Basin:
CA stream in the Catawba River Basin
Sub -Basin:
Number of Outfalls:
7
Facility/Activity Changes Please describe below any changes to your facility or activities since issuance of your permit. Attached a
separate sheet if necessary.
Riverbend Station Demo was completed May 2018. Ash transport ceased from rail on March 2018
No Industrial activity is occuring in the drainage areas of the existing seven outfalls.
CERTIFICATION
I certify that I am familiar with the information contained in the application and that to the best of my knowledge and belief
such information is true, complete and urate.
Signature Date �- 020 ' .10
IM !Vf LL
Print or type name of person signing above
��aa! N1. M,+Gain CcP 0o1
Title
Please return this completed application form DEMLR - Stormwater Programpept. of Environmental Quality
and requested supplemental information to: 1612 Mail Service Center
Raleigh, North Carolina 27699-1612
STORMWATER POLLUTION PREVENTION PLAN
DEVELOPMENT AND IMPLEMENTATION
CERTIFICATION
North Carolina Division of Energy, Mineral, and Land Resources — Stormwater Program
Facility Name:
RrverbendStation
Permit Number:
NCS000549
Location Address:
175 Steam Plant Rd
Mount Holly NC
County:
Gaston
"I certify, under penalty of law, that the Stormwater Pollution Prevention Plan (SPPP) document and all
attachments were developed and implemented under my direction or supervision in accordance with a system
designed to assure that qualified personnel properly gather and evaluate the information required by the SPPP.
Based on my inquiry of the person or persons who manage the system, or those persons directly responsible
for gathering the information, the information gathered is, to the best of my knowledge and belief, true,
accurate and complete."
"I certify that the SPPP has been developed, signed and retained at the named facility location, and the SPPP
has been fully implemented at this facility location in accordance with the terms and conditions of the
stormwater discharge permit."
And
"I am aware that there are significant penalties for falsifying information, including the possibility of fines and
imprisonment for knowing violations."
ISign (according to permit signatory requirements) and return this Certification. DO NOT
SEND STORMWATER POLLUTION PREVENTION PLAN WITH THIS CERTIFICATION.
Signature i
7'!N1 /Y, L L
Print or type name of person signing above
Date q_ay—aV
rt44�,*[ — CCP d S
Title
SPPP Certification 10/13
SDO Narrative Description and BMP Summary
Location: Riverbend Steam Station
Permit No. NCS000549
Outfall ID
SWO02
M +`
Discharge Structure
18" CMP
Location
Western bank of the
intake canal
-
--
Latitude - Longitude
35°21'38"N - 80°58'30"W
Drainage Area
12.3 acres
Percent Impervious
35
Permit Monitoring
1
Table
Industrial Activities
This drainage area includes runoff from the 44 kV switchyard, lower 230 kV
and Description
switchyard, and a portion of the main switchyard; these areas cover 3.5 acres,
including half an acre of yard and parking. To the south of the main switchyard,
there are approximately 4.3 acres of lawn area.
The railroad embankment along the eastern basin boundary is sloped at a ratio
of 1.5 horizontal to 1 vertical (1.5H: 1V). The embankment and railways cover
approximately 2.3 acres. About one mile of railways and one-third mile of
paved roadways pass through the area. Due to the removal / closure of the ash
basin, ash hauling is no longer occurring onsite.
Approximately 35 percent of this drainage basin is paved. All runoff from this
drainage basin is processed through the 10,000 gallon oil separator tank #2.
There is a vehicle rinse area within this basin, but the effluent is not discharged
through this outfall because it is routed to the ash basin through the septic
system.
Effective July 7, 2017 a new Erosion and Sediment Control Plan (GASTO 2017-
016) was approved for the 100kV Switchyard Demolition and Stormline
Installation (Phase 6). This new E&SC Plan necessitated replacement of the
existing SWO02 stormwater discharge pipe, which occurred on 9/18/17 by
Earnhardt Grading. The original discharge has been abandoned in place.
Significant
Oil: The 44 kV switchyard contains a total volume of 5,000
Materials/Potential
gallons of mineral oil. The main switchyard is only
Pollutants
partially located within this drainage area. Transformer
7A and its 7,500 gallons of mineral oil are located in this
drainage area. Some switchgear equipment has
containment pits beneath them. In addition, the diesel
fuel storage tank (280 gallons) and unloading
operations are located here on the east side of the
powerhouse.
Notes:
1. Outfall fact sheet provides documentation for permit sections for narrative description of potential
pollutants (Part II, Section A, 1.(b)) and BMP Summary (Part II, Section A, 2.(c)).
SDO Narrative Description and BMP Summary
BMP Summary
Location: Riverbend Steam Station
Permit No. NCS000549
Liquid Storage Tanks/Oil Bearing Equipment
• If containment structures have drains, ensure that the drains have
valves, and that valves are maintained in the closed position. Institute
protocols for checking/testing stormwater in containment areas prior to
discharge.
• Inspect storage tanks and piping systems (pipes, pumps, flanges,
couplings, hoses, and valves) for failures or leaks and perform
preventive maintenance.
• Properly dispose of chemicals that are no longer in use.
• Develop and implement spill plans or spill prevention, containment, and
countermeasure (SPCC) plans.
Oil bearing equipment switchyards
• Level grades and gravel surfaces are constructed to retard flows and
limit the spread of spills.
• Stormwater runoff is collected in perimeter ditches and routed around
switchyard.
Notes:
1. Outfall fact sheet provides documentation for permit sections for narrative description of potential
pollutants (Part II, Section A, 1.(b)) and BMP Summary (Part II, Section A, 2.(c)).
SDO Narrative Description and BMP Summary
Location: Riverbend Steam Station
Permit No. NCS000549
Outfall ID
SWO03
Discharge Structure
36" CMP
Location
Western bank of the
intake canal
Latitude - Longitude
35°21'40"N - 80°58'32"W
Drainage Area
14.6 acres
Percent Impervious
5
Permit Monitoring
1
Table
Industrial Activities
This drainage area includes approximately one-half acre of the slopes below
and Description
the Lark Maintenance Facility. Approximately ten acres of lawn area border
the plant access road. Drainage from the three acre, upper 230 kV
switchyard is discharged into a concrete ditch which leads to this outfall.
About 900 feet of paved access road and 800 feet of railways border this
area. Approximately 5 percent of this drainage basin is paved.
Significant
Oil: Switchgear equipment in the upper 230 kV yard contains
Materials/Potential
approximately 6,700 gallons of oil. A 400 gallon oil rupture
Pollutants
collection tank collects drainage from the two station service
transformers which contain a total of 226 gallons of mineral oil.
Runoff from the upper 230 kV switchyard is discharged into a
concrete ditch running along the north side of the yard. The ditch
passes under the plant access road through a 36 inch diameter
CMP. The west end of the CMP has a swing gate which would be
closed to help contain oil spillage from the switchyard.
BMP Summary
Liquid Storage Tanks/Oil Bearing Equipment
• If containment structures have drains, ensure that the drains have
valves, and that valves are maintained in the closed position.
Institute protocols for checking/testing stormwater in containment
areas prior to discharge.
• Inspect storage tanks and piping systems (pipes, pumps, flanges,
couplings, hoses, and valves) for failures or leaks and perform
preventive maintenance.
• Properly dispose of chemicals that are no longer in use.
• Develop and implement spill plans or spill prevention, containment,
and countermeasure (SPCC) plans.
Oil bearing equipment switchyards
• Level grades and gravel surfaces are constructed to retard flows and
limit the spread of spills.
• Stormwater runoff is collected in perimeter ditches and routed
around switchyard.
Notes:
1. Outfall fact sheet provides documentation for permit sections for narrative description of potential
pollutants (Part II, Section A, 1.(b)) and BMP Summary (Part II, Section A, 2.(c)).
SDO Narrative Description and BMP Summary
Location: Riverbend Steam Station
Permit No. NCS000549
OutfallID
SWO04
k Y�'
„��"
Discharge Structure
18" RCP
Location
East of Horse Ben
Beach Road
Latitude - Longitude
35°21'22"N -
80°58'32"W
§'
Drainage Area
4.6 acres&
Percent Impervious
15
Permit Monitoring
2
Table...e.s.
Industrial Activities
This drainage basin is bound on the west by the access road parallel to the
and Description
rail line and on the east by Horse Bend Beach Road. Approximately 15
percent of the drainage basin is paved; the rest is grass.
Note that there is a catch basin / field inlet across the street from the
stormwater outfall for this area and distributes to the adjacent wooded area.
Significant
None — truck traffic / non -industrial activities occur in the vicinity
Materials/Potential
Pollutants
BMP Summary
None
Notes:
1. Outfall fact sheet provides documentation for permit sections for narrative description of potential
pollutants (Part II, Section A, 1.(b)) and BMP Summary (Part II, Section A, 2.(c)).
SDO Narrative Description and BMP Summary
Location: Riverbend Steam Station
Permit No. NCS000549
OutfallID
SWO06
�F .
Discharge
36" CMP
Structure
mE
Location
Western bank of the intake canal
Latitude -
35°21'39"N - 80°58'32"W
Longitude
Drainage Area
5.1 acres
Percent
45
Impervious
Permit Monitoring
4
Table
Industrial
This drainage area includes approximately 0.5 acres of the upgradient storage /
Activities and
maintenance facilities. In addition, there are about three acres of grassed area,
Description
including the slopes of below the Lark High Bay Maintenance Shop.
Approximately 500 feet of paved roadway passes through the area. About 45
percent of the total drainage area is either paved or roofed. All runoff from this
drainage basin is processed through the 20,000 gallon oil/water separator tank
#1.
Significant
None — parking and non -industrial activities occur in the vicinity
Materials/Potential
Pollutants
BMP Summary
None
Notes:
1. Outfall fact sheet provides documentation for permit sections for narrative description of potential
pollutants (Part II, Section A, 1.(b)) and BMP Summary (Part II, Section A, 2.(c)).
SDO Narrative Description and BMP Summary
Location: Riverbend Steam Station
Permit No. NCS000549
OutfallID
SWO10
Discharge Structure
18" CMP
Location
North of W.F. Lark Fossil
Maintenance Facility
A ,
Latitude - Longitude
35°21'38"N - 80°58'41 "W
Drainage Area
1.7 acres
Percent Impervious
90
Permit Monitoring
7
Table
Industrial Activities
The drainage area includes wooded area north of the W.F. Lark Fossil
and Description
Maintenance Facility; flow is then overland to Mountain Island Lake. This
drainage basin includes approximately 16,000 square feet of roofed area
and 50,000 square feet of paved storage area and parking lot.
Approximately 90 percent of this drainage basin is paved or roofed.
On August 24, 2017 NCDEQ recommended that outfall SWO12 be
eliminated as SWO10 was deemed representative of both SWO10 and
SW012.
Significant
None
Materials/Potential
Pollutants
BMP Summary
None
Notes:
1. Outfall fact sheet provides documentation for permit sections for narrative description of potential
pollutants (Part II, Section A, 1.(b)) and BMP Summary (Part II, Section A, 2.(c)).
SDO Narrative Description and BMP Summary
Location: Riverbend Steam Station
Permit No. NCS000549
Outfall ID
SW011
$ a
E`
Discharge Structure
18" CMP
Location
West of W.F. Lark Fossil
Maintenance Facility'"
Latitude - Longitude
35°21'33"N - 80°58'45"W
Drainage Area
1.1 acres
Percent Impervious
70
Permit Monitoring
7'`
Table
Industrial Activities
The drainage area includes runoff from the wooded area west of the W.F.
and Description
Lark Fossil Maintenance Facility; flow is then overland to a creek leading to
Mountain Island Lake. This drainage basin includes approximately 11,000
square feet of roofed area and 33,000 square feet of paved parking area.
There is about 250 feet of paved access road. Approximately 70 percent of
this drainage basin is paved or roofed.
Well water circulates through the heating/cooling unit at the W.F. Lark Fossil
Maintenance Facility and is discharged at this outfall as non -process
wastewater. The system is a closed loop, and maintenance chemicals are
not added.
Significant
None — upgradient storage / maintenance facilities only; non -industrial
Materials/Potential
Pollutants
Note that the stormwater piping under the upgradient parking lot may
contribute to Tier III status
BMP Summary
Per correspondence with NCDEQ on August 28, 2017, Permit NCS000549
will be rescinded when the coal ash is fully remediated, however, the W.F.
Lark facility shall be covered under NC0000496 under the metal fabrication /
maintenance category.
Notes:
1. Outfall fact sheet provides documentation for permit sections for narrative description of potential
pollutants (Part II, Section A, 1.(b)) and BMP Summary (Part II, Section A, 2.(c)).
SDO Narrative Description and BMP Summary
Location: Riverbend Steam Station
Permit No. NCS000549
Outfall ID
SWO18
Discharge Structure
18" RCP
Location
East side of station along
Intake Canal
Latitude - Longitude
35°24'41.9"N -
--
Drainage Area
16.1
Percent Impervious
n/a
Permit Monitoring
10;''',
Table
Industrial Activities
The drainage area for the proposed stormwater outfall SW018 covers a total
and Description
area of 8.8 acres. The majority of stormwater is generated due to runoff from
the substation pad. This stormwater will be collected using a network of
catch basins and storm drains and subsequently conveyed to a detention
basin and then discharged through the new outfall. The detention basin will
also receive sheet flow from a grassed area around the substation pad. The
area where the substation pad is built used to be the coal stock pile area
when the plant was under operation. The substation pad will be covered with
6 inches of #57 stone and contain various electrical equipment including
transformers, circuit breakers, and metering devices. The substation will be
built in two phases. Phase One will be the construction of a 100kV switchyard
and Phase Two will be the 44kV transformation yard. The transformers
containing mineral oil will be located in the 44kV yard. Drainage will be
routed to a 10,000 gallon oil water separator (proposed for construction) prior
to discharge into the detention basin.
Significant
Mineral Oil: There will be multiple oil -filled transformers in
Materials/Potential
the new 44kV substation which will be installed
Pollutants
during Phase 2 of the Substation Construction.
The transformers contain approximately 6000-
8000 gallons of oil. The oil water separator will
be sized to accommodate the largest volume
and installed prior to transformer delivery. The
separator will tie into the storm drainage within
the switchyard and be routed to the detention
basin.
BMP Summary
Oil bearing equipment switchyards
• Level grades and gravel surfaces are constructed to retard flows and
limit the spread of spills.
• Stormwater runoff is collected in perimeter ditches and routed around
switchyard.
Notes:
1. Outfall fact sheet provides documentation for permit sections for narrative description of potential
pollutants (Part II, Section A, 1.(b)) and BMP Summary (Part II, Section A, 2.(c)).
RIVERBEND STEAM STATION DATE
F)lSITE AERIAL AND TOPOGRAPHIC MAP DECEMBER 2019
STORMWATER POLLUTION PREVENTION PLAN FIGURE
FIGURE 1
GASTON COUNTY, NC
Riverbend - Stormwater Outfall SWO04 Monitoring
•�� O pap � '�a` ova` .`O'�a` '`°tea '�3` ,ate � ,`p'�a` �p'�a` �,pJp` p'�p�
1001
Benchmark
6.0-9.0
100
0.0003
0.34
N/A
0.065
0.003
0.9
0.010
0.335
0.075
0.09
0.056
N/A
0.126
N/A
Adverse Weather
Adverse Weather
Units
inches
mg/L
mg/L
mg/L
mg/L
mg/L
mg/L
mg/L
mg/L
mg/L
mg/L
mg/L
mg/L
mg/L
mg/L
ng/L
6/9/2015
0.5
6/27/2015
2.25
8/11/2015
8/27/2015
0.375
7.00
650
<0.0003
0.00320
<0.05
<0.001
<0.001
0.01040
0.0200
0.00782
0.00761
<0.001
<0.001
<0.0002
0.089
12.0
Tier One (Copper and TSS)
Tier Two (Copper)
Tier One (pH, TSS), Tier Two (Copper)
Tier One (Silver, Lead and Zinc) Tier Two (TSS) Tier Three (Copper)
Tier Three (TSS, Copper)
No Sample - Adverse Weather
No Sample - Adverse Weather
No Sample - Adverse Weather
No Sample - Adverse Weather
No Sample - Adverse Weather
No Sample - Adverse Weather
Tier Three (TSS, Copper)
No Sample - No Flow
Tier Three (TSS, Copper)
No Sample - No Flow
Tier Three (TSS, Copper)
Tier Three (TSS, Copper)
No Sample - Adverse Weather
No Sample - Adverse Weather
No Sample - Adverse Weather
No Sample - Adverse Weather
No Sample - Adverse Weather
No Sample - Adverse Weather
NO FLOW
No Sample - Adverse Weather
No Sample - Adverse Weather
No Sample - Adverse Weather
No Sample - Adverse Weather
No Sample - Adverse Weather
No Sample - Adverse Weather
NO FLOW
No Sample - No Flow
No Sample - Adverse Weather or No Flow
No Sample - Adverse Weather or No Flow
No Sample - Adverse Weather or No Flow
No Sample - Adverse Weather or No Flow
11/30/2015
12/14/2015
0.91
7.15
78
<0.0003
0.00389
<0.05
<0.001
<0.001
0.00496
0.0121
0.00343
0.00524
<0.001
<0.001
<0.0002
0.067
20.0
1/15/2016
1/22/2016
1.15
9.71
130
<0.0003
0.00310
<0.05
<0.001
<0.001
0.00650
0.0120
0.0045
0.00393
<0.001
<0.001
0.000652
0.063
12.5
2/3/2016
2/17/2016
0.73
6.98
2500
0.00031
0.02280
<0.05
0.00424
0.00101
0.15500
0.3070
0.14700
0.09700
<0.001
0.00269
0.00266
1.040
63.2
3/13/2016
3/24/2016
0.14
7.91
120
<0.0003
0.00196
<0.05
<0.001
<0.001
0.00843
0.0100
0.00371
0.00365
<0.001
<0.001
<0.0002
0.045
11.2
APRIL
5/17/2016 6/8/2016
0.42
8.01
20
<0.0003
0.00305
<0.05
<0.001
<0.001
0.00199
0.00591
0.00101
<0.001
<0.001
<0.001
<0.0002
0.016
1.705
JUNE
JULY
AUGUST
SEPTEMBER
OCTOBER
11/29/2016
12/14/2016
0.36
6.91
510
<0.0003
0.00234
<0.05
<0.001
<0.001
0.00202
0.00776
0.00175
0.00121
<0.001
<0.001
<0.0002
0.028
10.9
1/20/2017
N/A
3.01
2/15/2017
3/2/2017
0.27
6.90
42
<0.0003
0.00173
<0.05
<0.001
<0.001
0.00154
0.00481
<0.001
<0.001
<0.001
<0.001
<0.0002
0.025
7.8
3/13/2017
0.16
4/3/2017
4/18/2017
0.58
7.22
26.0
<0.0003
0.00213
<0.05
<0.001
<0.001
0.00130
0.0053
<0.001
<0.001
<0.001
<0.001
<0.0002
0.012
8.56
5/1/2017
5/1/2017
0.31
6.33
37.0
<0.0003
0.00166
<0.05
<0.001
<0.001
0.00143
0.00498
0.00128
0.00105
<0.001
<0.001
<0.0002
0.022
5.5
JUNE
JULY
8/31/2017
9/18/2017
0.66
7.60
19.0
<0.0003
0.00289
<0.05
<0.001
<0.001
0.00117
0.00496
<0.001
<0.001
<0.001
<0.001
<0.0002
0.016
5.36
9/6/2017
9/19/2017
0.87
7.80
14.0
<0.0003
0.00186
<0.05
<0.001
<0.001
<0.001
0.00338
<0.001
<0.001
<0.001
<0.001
<0.0002
0.013
6.12
10/23/2017
11/7/2017
2.13
6.80
87.0
<0.0003
0.00369
<0.05
<0.001
<0.001
0.00669
0.0151
0.00446
0.00487
<0.001
<0.001
<0.0002
0.86
11.2
NOVEMBER
12/20/2017
1/5/2018
0.90
7.55
20.0
<0.0003
0.00163
<0.05
<0.001
<0.001
0.00103
0.00397
<0.001
<0.001
<0.001
<0.001
<0.0002
0.020
6.67
1/11/2018
1/25/2018
0.13
7.85
<5
<0.0003
0.00462
0.056
<0.001
<0.001
<0.001
0.00375
<0.001
<0.001
<0.001
<0.001
<0.0002
0.10
3.19
FEBRUARY
3/6/2018
3/21/2018
0.40
7.50
31.0
<0.0003
0.00177
<0.05
<0.001
<0.001
0.00151
0.00446
<0.001
<0.001
<0.001
<0.001
<0.0002
0.022
9.66
4/23/2018
5/4/2018
0.41
7.30
48.0
<0.0003
0.00158
<0.05
<0.001
<0.001
0.00162
0.00584
0.00123
0.00110
<0.001
<0.001
<0.0002
0.024
10.1
MAY
JUNE
JULY
AUGUST
SEPTEMBER
OCTOBER
NOVEMBER
12/20/2018 1/9/2019
1.71
6.30
56.0
<0.0002
0.00265
<0.05
<0.001
<0.001
0.00243
0.00644
<0.001
0.00245
<0.001
<0.001
<0.0002
0.043
10.6
FEBRUARY
MARCH
4/12/2019 4/29/2019
1.00
8.10
19
<0.0002
<0.001
<0.05
<0.001
<0.001
<0.001
0.00325
<0.001
<0.001
<0.001
<0.001
<0.0002
0.026
6.67
MAY
JUNE
JULY
AUGUST
SEPTEMBER
OCTOBER
11/12/2019
Riverbend ISW Recap
0
fo*\.0000
0
n G2- C )
0\0
0�
0\\
O•p� o� o�
° . o1 �.
`fir ` a`°�
11 /12/2019
0.44
1
Clear
N
I
1
1
1
1
1
N
1
N
I
N
I
N
I
12/10/2019
0.17
Clear
N
1
1
1
N
N
N
N
SWO02
1 /7/2020
0.11
Clear
N
1
1
1
N
N
N
N
2/6/2020
1.6
Clear
N
1
1
1
N
N
N
N
3/3/2020
0.75
Clear
N
1
1
1
N
N
N
N
11 /12/2019
0.44
Lt Brown
N
1
2
1
N
N
N
N
12/10/2019
0.17
Clear
N
1
1
1
N
N
N
N
SWO03
1 /7/2020
0.11
Clear
N
1
1
1
N
N
N
N
2/6/2020
1.6
Lt Brown
N
1
1
1
N
N
N
N
3/3/2020
0.75
Clear
N
1
1
1
N
N
N
N
11 /12/2019
0.16
Clear
N
1
1
1
N
N
N
N
12/10/2019
0.17
Lt Yellow
18
2
1
1
Y
N
N
N
SWO04
1 /7/2020
0.73
NO FLOW
2/6/2020
0.11
Lt Brown
N
1
1
1
Y
N
N
N
3/3/2020
0.75
Lt Brown
N
2
1
1
Y
N
N
N
11 /12/2019
0.44
Clear
N
1
1
1
N
N
N
N
12/10/2019
0.17
Clear
N
1
1
1
N
N
N
N
SWO06
1 /7/2020
0.11
Clear
N
1
1
1
N
N
N
N
2/6/2020
0.11
Clear
N
1
1
1
N
N
N
N
3/3/2020
0.75
Clear
N
1
1
1
N
N
N
N
11 /12/2019
0.44
Clear
N
1
2
1
N
N
N
N
12/10/2019
0.17
Clear
N
1
2
1
N
N
N
N
SW010
1 /7/2020
0.11
Clear
N
1
1
1
N
N
N
N
2/6/2020
1.6
Clear
N
1
1
1
N
N
N
N
3/3/2020
0.75
Clear
N
1
1
1
N
N
N
N
11 /12/2019
0.44
Clear
N
1
1
1
N
N
N
N
12/10/2019
0.17
Lt Tan
N
1
2
1
N
N
N
N
SW011
1 /7/2020
0.11
Lt Yellow
N
1
1
1
N
N
N
N
2/6/2020
1.6
Clear
N
1
1
1
N
N
N
N
3/3/2020
0.75
Cloudy
N
2
2
1
N
N
N
N
11 /12/2019
0.44
Lt Brown
N
2
1
1
N
N
N
N
12/10/2019
0.17
NO FLOW
SW018
1 /7/2020
0.11
NO FLOW
2/6/2020
1.6
Clear
N
1
1
1
N
N
N
N
3/3/2020
0.75
Brown
N
3
1
2
N
N
N
N
No Flow for July, August, September and October 2019
No Flow for July, August, September and October 2019
No Flow for July, August, September and October 2019