Loading...
HomeMy WebLinkAboutNCC201603_NOI Application_20200422Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 4/20/2020 10:16:20 AM (NCG01 NOI Submission) Approve by Garcia, Lauren V 4/20/2020 5:47:20 PM (Review- Construction NOI 24564) • Farkas, Jim J reassigned the task to Garcia, Lauren V 4/20/2020 2:33 PM . The task was assigned to Farkas, Jim J by round robin distribution 4/20/2020 10:16 AM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: April 22, 2020 5:00 PM. The priority is: High 4/20/2020 10:16 AM Submit by McCoy, Suzanne 4/22/2020 7:32:17 AM (Payment Verification for NCC201603) * Bradley Patterson • McCoy, Suzanne assigned the task to McCoy, Suzanne 4/22/2020 7:31 AM The task was assigned to DEMLR NCG01 Payment Team. The due date is: June 1, 2020 5:00 PM. The priority is: High 4/20/2020 5:47 PM .• SThF� '; 1 NORTH CAROLINA EnrlronmertW Quallly A. Project Information Part A. Project Location and Waterbody Information Are you submitting r No an NOI that was r Yes rejected before? Previous Rejected 24482 NOI No. Prior Reviewer Lauren Garcia Name 1a. Project Name * Huntersville Liquefier Upgrade 1 b. Specific Lot This field rray be used to list specifc lot numbers. Numbers 2. County* Mecklenburg 3. Highway or Street 11001 McCoy Rd Address * Street narre only is acceptable if no address number assigned yet 4. City or Township* Huntersville 5. State * NC 6. Zip Code * 28078 7. Latitude * Enter the latitude in decimal degrees 35.3771 8. Longitude* Enter the longitude in decimal degrees (M. ST be negative) -80.8901 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 05/18/2020 Estimated Construction Project Start Date 10. Date to End* 07/30/2021 Estimated Construction Project End Cute 11. SIC (Primary) * Other (9999) Standard Industrial Classification for Ceveloprrent 12. Acres to be 7.00 disturbed* (including off -site borrow and waste areas) 13. Total site area 198.00 (acres) * 14. Post- 8.00 construction (Estimated) impervious area (acres) * NCC Project NCC-MECKL-2020- Hu ntersvi Ile Liquefier Upgrade Tracking ID Assigned automatically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Gar Creek Waterbody* Barre of waterbody into which stormwater runoff will discharge 15b. Waterbody 11-116-(1) Index No.* NC Waterbody Index N r ber Stormwater V No discharges will flow r Yes to additional wate rs * 16a. Is this project F Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. ^ F2rnittee Inforrration - Legally Fbsponsible Entity and Individual Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Legally Responsible Entity Name * Piedmont Natural Gas It pernittee is an individual (i.e., organization does not apply), enter first and last narre in this field. 2. First Name * Bradley If Corporation, enter Registered Agent First %rre 3. Last Name* Patterson It Corporation, enter F;bgistered Agent Last %ne 3b. Title Director LNG Projects 4. Permitee E-mail bradley.patterson@duke-energy.com Address* 5. Permittee 704 731 4068 Telephone No.* 6. Permittee Mailing Street Address Address* PO Box33068 Address Line 2 City State / Rovince / Pbegion Charlotte NC Fbstal / Zip Code Country 28233 us Check box if the F Yes street address the same as mailing address 7. Permittee Street Street Address Address* 4720 Piedmont Row Drive Address Line 2 City State / Frovince / Region Charlotte NC Fbstal / Zip Code Country 28210 us 8. Type of Non -Government Ownership* C. Site Contact Information Part C. Roject Site Contact Inforrration .................................................................................................................................................................................................... 1. Primary Site Tony Contact - First Name * 2. Primary Site Bridges Contact - Last Name * 3. Title LNG Plant Manager 4. Site Contact E- Tony. bridges@duke-energy.com mail Address* 5. Site Contact 704 875 1305 Telephone No. 6. Organization Piedmont Natural Gas Name 7. Site Contact Street Address Mailing Address* 11001 McCoy Road Address Line 2 city Huntersville Fbstal / Zip Code 28078-6922 8. Consultant Name (Optional) Matthew Lane First and Last nacre 9. Consultant E-mail matthew.lane@nv5.com This person will be copied on all correspondence. 10. Consultant 6033736791 Telephone No. State / Rovince / Region NC Country us D. E&SC Plan Part D. ^ Erosion & Sediment Control (E&SC) Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 04/16/2020 Approved * 2. E&SC Plan Project MECKL-2020-078 Number/ID * Assigned by agency or local program 3. E&SC Plan r State DEQ Office Approved by* r Local Program 4. State DEQ Office * Mooresville (MRO) Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. For linear projects, please also upload a site map showing the overall extent of the project or include the beginning point and end point coordinates in the "Notes" box below. 5. E&SC Plan MECKL-2020-078 PNG-04162020-001.pdf 1.75MB Approval letter or Mast beRDFformat Grading Permit 6. Site Location Map Helpful for linear project review (Optional) Mast be FCFfornat. Rease do not upload entire set of E&SCplans. 7. Notes (Optional) Frovide any additional information that night help the reviewer better understand how uploaded docurrents support the application. Include additional waterbodies for linear projects if necessary. 8. NOI Certification NCG01-eNO1-Certification-Form-20190919-DEMLR- Form 761.92KB SW signed.2.pdf Mast be FCFfon-rat This is an Express f No Review Project* F Yes E. Certification North Carolina General Statute 143-215.6E (i) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Artcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Artcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent f Authorized Responsible Person* Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name * Bradley Patterson Title Director, LNG Projects / Delegate Organization Legally Responsible Entity Piedmont Natural Gas Company, Inc. Date * 04/20/2020 F. Tracking and COC Info NOI Tracking No. 24564 NC Reference No. NCG01-2020-1603 Uses 'count number' variable (incremrented by SP) Certificate of NCC201603 Coverage (COC) Uses 'count number' variable (incremented by SP) No.* Count Number 1603 Sequential number for submittal that is incremented by Stored Frocedure COC Year 2020 Year of date reviewed (used to assign YY digits after "NOC' in COCno.)