Loading...
HomeMy WebLinkAbout20200424 Ver 1_More Info Received_20200421PUMP -AROUND DETAIL SANDBAG BYPASS -TYPICAL PLAN VIEW DAMMED STREAMFLOW ...........,s............... �l......................... STREAM FLOW SCREENED INTAKE VALVE BYPASS DAM: SANDBAGS COVERED BY IMPERVIOUS MEMBRANE ON UPSTREAM SIDE VOLUME PUMP REMOVE SEDIMENT/TURBIDITY INTO A SEDIMENT BAG LOCATED ON AN APPROVED SITE BAN KFULL CHANNEL (LEFT BANK) b .........TOE OF BANK FLOW ♦-- STREAM BYPASS/ CONSTRUCTION REACH a FLOW OUTLET ................................ ...... ONTO STABLE ............................. MATERIAL "BROWN -WATER" DOWNSTREAM OF SUMP CONSTRUCTION NOTES: 1. THIS DEWATERING PLAN SHOWS THE MINIMUM ACCEPTABLE CRITERIA, AND MAY REQUIRE ADDITIONAL MEASURES. THE CONTRACTOR WILL SUBMIT A DESIGN/PLAN TO THE C.O.R. FOR APPROVAL THAT MEETS OR EXCEEDS THE STANDARDS SHOWN HEREON. 2. MAINTAINING THE WATER TUBIDITY DOWNSTREAM (NOT EXCEEDING THE TURBIDITY OF THE UPSTREAM WATERS) IS THE RESPONSIBILITY OF THE CONTRACTOR THROUGHOUT THE DURATION OF THE PROJECT. 3. PUMPS CAPABLE OF PUMPING STREAMFLOW SHALL BE ON -SITE UNTIL IN -STREAM WORK IS COMPLETED. 4. OVERNIGHT PUMPING IS NOT PERMITTED. OPERATE "BROWN -WATER" SUMP AT END OF WORK DAY UNTIL SUMP WATER IS CLEAR. 5. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING THE NEW CONSTRUCTION AREA IN AS DRY A CONDITION AS POSSIBLE BYPASS STREAMFLOW PUMPED AROUND CONSTRUCTION SITE DURING CONSTRUCTION.