HomeMy WebLinkAbout20200424 Ver 1_More Info Requested_20200421Moore, Andrew W
From: Moore, Andrew W
Sent: Tuesday, April 21, 2020 8:54 AM
To: brady.dodd@usda.gov
Cc: Fuemmeler, Amanda J CIV (US); Leslie, Andrea J
Subject: Request for Additional Information, Corner Rock Creek Stream Enhancement Project,
Buncombe County (DWR Project #20200424)
Brady,
On March 27, 2020, the Division received your application requesting a 401 Water Quality Certification for the subject
project. The Division has determined that your application is incomplete and cannot be processed. The application is on
hold until all of the following information is received:
There are references in the Pre -Construction Notification to construction occurring in the presence of
streamflow and flow being diverted away from the work activity where feasible. The project must comply with
Condition 11.9. of 401 General Water Quality Certification, which requires that all work in or adjacent to streams
be conducted so that the flowing stream does not come in contact with the disturbed area. Typically, on streams
of size similar to Corner Rock Creek, this condition is adhered to via a pump around system. Please describe how
this condition will be met for the subject project. [15A NCAC 02H .0506(b)(3)]
Pursuant to Title 15A NCAC 02H .0502(c) the applicant shall furnish all of the above requested information for the
proper consideration of the application. If all of the requested information is not received, the Division will be unable to
approve the application and it will be denied as incomplete.
Feel free to contact me if you have any questions.
Andrew W. Moore, PG
Environmental Specialist — Asheville Regional Office
Water Quality Regional Operations Section
NCDEQ — Division of Water Resources
828 296 4684 office
email: Andrew.W.Moore(a)ncdenr.gov
2090 U.S. Hwy. 70
Swannanoa, N.C. 28778
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.