Loading...
HomeMy WebLinkAbout20190749 Ver 2_RE_ _External_ RE_ Brown Road pipe replacement Stokes_Plans_20200417 Wanucha, Dave From:Euliss, Amy Sent:Friday, April 17, 2020 10:40 AM To:Wanucha, Dave; Matthews, Monte K SAW Cc:White, Chuck; Dagenhart, Daniel R Subject:RE: \[External\] RE: Brown Road pipe replacement Stokes_Plans Attachments:840290_Permit Drawings_REV_April2020.pdf Dave and Monte, Once the permit drawings were revised (see attached), the impacts changed. See below for changes. Can you use this email and the attached plans to modify the 404 and 401 permits? Also, do you have any objections with the work proceeding while the permits are being modified? Impact type Permitted Revised Bank stabilization 25 0 Rip rap in channel and on banks 64 60 Culvert 7 32 Dewatering 38 19 Monte, Please review the emails below. Let me know if you need anything that you might not have access to. From: Euliss, Amy <aeuliss@ncdot.gov> Sent: Friday, March 27, 2020 7:47 AM To: Wanucha, Dave <dave.wanucha@ncdenr.gov>; Braspennickx, Nicholle M CIV USARMY CESAW (US) <Nicholle.M.Braspennickx@usace.army.mil> Subject: Re: \[External\] RE: Brown Road pipe replacement Stokes I wanted to say thank you for getting back to us so quickly especially as we are all home bound! Everybody stay safe! Amy Get Outlook for iOS From: Euliss, Amy <aeuliss@ncdot.gov> Sent: Friday, March 27, 2020 7:42:56 AM To: Braspennickx, Nicholle M CIV USARMY CESAW (US) <Nicholle.M.Braspennickx@usace.army.mil>; Wanucha, Dave <dave.wanucha@ncdenr.gov> Cc: White, Chuck <crwhite@ncdot.gov>; Braquet, Stephanie <scbraquet@ncdot.gov> Subject: Re: \[External\] RE: Brown Road pipe replacement Stokes Thanks Nicholle! We’ll proceed with submitting final plans once they are ready. Chuck, You are safe to proceed with fabrication. 1 Get Outlook for iOS From: Braspennickx, Nicholle M CIV USARMY CESAW (US) <Nicholle.M.Braspennickx@usace.army.mil> Sent: Friday, March 27, 2020 6:16:18 AM To: Euliss, Amy <aeuliss@ncdot.gov>; Wanucha, Dave <dave.wanucha@ncdenr.gov> Cc: White, Chuck <crwhite@ncdot.gov>; Braquet, Stephanie <scbraquet@ncdot.gov> Subject: \[External\] RE: Brown Road pipe replacement Stokes CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov<mailto:report.spam@nc.gov> Hello ! I read the email and re-read it - looked the file up in our data base - received a NWP 14 on July 9, 2019. As proposed, the replacement of the washed out crossing w/ a 20'6" span x 7'3" rise Aluminum Box Culvert w/ baffles for low flow, qualifies for a NWP 3. See attached NWP 3 Conditions: Page 1 (a) -- towards the bottom of first paragraph - NWP 3 -- includes the replacement of crossings damaged by storm events (provided the replacement occurs w/in the first 2 years of the event). Page 1 (b) -- NWP 3 -- covers the removal of accumulated sediments w/in 200' of the crossing... the removal of accumulated sediments is a reporting activity. The Corps would want plan views and cross sections to demonstrate what areas would be excavated. Preferably in the dry.. etc.. bmps are expected to minimize turbidity in the creek. We can discuss more if need be. Paragraph (c) -- NWP covers all temporary dewatering devices that are necessary to perform the pipe replacement. Special Conditions related to culvert replacement are on pgs. 29 - 36. W/ the inclusion of baffles - NCDOT has designed to comply w/ Special condition 3.6.2 (pg. 36). Sincerely, Nicholle Braspennickx Regulatory Project Manager Cell: 704-774-7551 -----Original Message----- From: Euliss, Amy \[mailto:aeuliss@ncdot.gov\] Sent: Thursday, March 26, 2020 8:27 AM To: Wanucha, Dave <dave.wanucha@ncdenr.gov>; Braspennickx, Nicholle M CIV USARMY CESAW (US) <Nicholle.M.Braspennickx@usace.army.mil> Cc: White, Chuck <crwhite@ncdot.gov>; Braquet, Stephanie <scbraquet@ncdot.gov> Subject: \[Non-DoD Source\] Brown Road pipe replacement Stokes Dave and Nicholle, 2 We have written 404 and 401 permits for the replacement of 2 lines of 98"x72" CMPA with 4' in between the pipe (Total of 192"). We have had the road closed since flooding damages caused a pipe failure on February 6, 2020. Prior to the failure of the pipe, the plan was to replace with a 2 barrel 8'X7' reinforced concrete box culvert that was going to be let to contract. However, now our Bridge Maintenance forces are going to handle the replacement. Our Bridge Maintenance Engineer has found that switching to a 20'-6" span x 7'-3" rise Aluminum Box Culvert will be more economical and quicker to install. He is in discussions with the pipe company to have the pipe fabricated with one foot baffles on a single side to maintain a low flow channel inside the pipe. Prior to giving him the ok to proceed with the cost, I wanted to run it by you and see if you had any objections. Page 5 and 6 of the attached quote are shop drawings of what the pipe will look like. Also attached is a picture of the flooding that damaged the pipe. The last pdf is a copy of pipe inspection report which has pictures of what the pipe looked like under normal conditions. This is a time sensitive matter, so please respond as soon as possible. Thanks so much! For reference the DWR permit number is 2019-0749 and the USACE Action ID is 2019-01013. Amy Euliss NCDOT Division 9 Environmental Officer 375 Silas Creek Parkway Winston Salem, NC 27127 (336) 747-7800 ________________________________ Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 3