Loading...
HomeMy WebLinkAboutNCC201579_NOI Application_20200421Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 4/20/2020 9:30:35 AM (NCG01 NOI Submission) Approve by Clark, Paul 4/20/2020 2:07:12 PM (Review- Construction NOI 24558) • The task was assigned to Clark, Paul by round robin distribution 4/20/2020 9:31 AM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: April 22, 2020 5:00 PM 4/20/2020 9:31 AM Submit by McCoy, Suzanne 4/21/2020 7:31:04 AM (Payment Verification for NCC201579) * Bridget McClellan • McCoy, Suzanne assigned the task to McCoy, Suzanne 4/21/2020 7:30 AM The task was assigned to DEMLR NCG01 Payment Team. The due date is: June 1, 2020 5:00 PM 4/20/2020 2:07 PM .• SThF� '; 1 NORTH CAROLINA EnrlronmertW quallly A. Project Information Part A. Project Location and Waterbody Information Are you submitting IT No an NOI that was r Yes rejected before? 1a. Project Name * Poe 1 b. Specific Lot This field may be used to list specifc lot numbers. Numbers 080306812, 08306809 2. County* Mecklenburg 3. Highway or Street 2715 North Davidson Street Address* Street narre only is acceptable if no address number assigned yet 4.CityorTownship* Charlotte 5. State * NC 6. Zip Code * 28205 7. Latitude* Enter the latitude in decimal degrees 35.2450 8. Longitude* Enter the longitude in decimal degrees (M.JST be negative) -80.8130 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 04/20/2020 Estimated Construction Project Start Date 10. Date to End * 04/30/2021 Estinated Construction Project End Date 11. SIC (Primary)* Residential, Other than SFE (1522) Standard Industrial aassification for Developrrent 12. Acres to be 1.24 disturbed* (including off -site borrow and waste areas) 13. Total site area 1.52 (acres) * 14. Post- 0.80 construction (Estirrated) impervious area (acres) * NCC Project NCC-MECKL-2020-Poe Tracking ID Assigned automatically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Little Sugar Creek Waterbody* %rre of waterbody into which storrrwater runoff will discharge 15b. Waterbody 11-137-8 Index No.* NCWaterbody Index Number Stormwater V No discharges will flow r Yes to additional wate rs * 16a. Is this project F Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. ^ Fbrnittee Inforrration - Legally Fbsponsible Entity and Individual Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Legally Pesponsible Entity Name * byFiorenza Poe NoDa, LLC It pernittee is an individual (i.e., organization does not apply), enter first and last narre in this field. 2. First Name * Adam IF Corporation, enter Faegistered Agent First %rre 3. Last Name* Fiorenza It Corporation, enter F;bgistered Agent Last %ne 3b. Title Principal 4. Permitee E-mail adam@byfiorenza.com Address* 5. Permittee adam@byfiorenza.com Telephone No.* 6. Permittee Mailing Street Address Address* 227 East Boulevard Address Line 2 City State / Rovince / F;bgion Charlotte NC Fbstal / Zip Code Country 28203-4719 us Check box if the V Yes street address the same as mailing address 7. Permittee Street Street Address Address* 227 East Boulevard Address Line 2 City State / Ftovince / Faegion Charlotte NC Fbstal / Zip Code Country 28203-4719 us 8. Type of Non -Government Ownership* C. Site Contact Information Part C. Roject Site Contact Inforrration .................................................................................................................................................................................................... 1. Primary Site Bridget Contact - First Name * 2. Primary Site McClellan Contact - Last Name * 3. Title Principal 4. Site Contact E- bamcclellan522@gmail.com mail Address* 5. Site Contact 17046496601 Telephone No. 6.Organization 1984 Name 7. Site Contact Street Address Mailing Address* 15110 Hubbard Road Address Line 2 City Huntersville Fbstal / Zip Code 28078 8. Consultant Name (Optional) Bridget A McClellan First and Last nacre 9. Consultant E-mail bridget@byfiorenza.com This person will be copied on all correspondence. 10. Consultant 7047416923 Telephone No. State / Rovince / Region NC Country United States D. E&SC Plan Part D. ^ Erosion & Sediment Control (E&SC) Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 04/15/2020 Approved * 2. E&SC Plan Project LDGP-2020-00074 Number/ID * Assigned by agency or local program 3. E&SC Plan f State DEQ Office Approved by* r Local Program 4. Local Program* City of Charlotte Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. For linear projects, please also upload a site map showing the overall extent of the project or include the beginning point and end point coordinates in the "Notes" box below. 5. E&SC Plan Letter of Approval modified April 2019 - Poe.pdf 27.07KB Approval letter or Mist be RDF format Grading Permit 6. Site Location Map Helpful for linear project review (Optional) C1.00 SIGNED SURVEY.pdf 3.92MB Mast be RDFfon- at. Rease do not upload entire set of E&SCplans. 7. Notes (Optional) Rovide any additional information that night help the reviewer better understand how uploaded docurrents support the application. Include additional waterbodies for linear projects if necessary. Resubmittal of rejected application and include Review Construction NOI 24451 reference NOI application no. 24451 and Project ID NCC-MECKL- 2020-Poe. 8. NOI Certification NCG01-eNO1-Certification-Form-20190919-DEMLR- Form 738.59KB SW - Poe. pdf Mast be RDFfon-rat This is an Express r No Review Project* r Yes E. Certification North Carolina General Statute 143-215.66 (1) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Artcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Artcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ If the Erosion and Sediment Control Plan approved by the delegated program is not compliant with Part II (Stormwater Pollution Prevention Plan) of the NCG010000 General Permit. I will nonetheless ensure that all conditions of Part II of the permit are met on the project at all times. * 17 I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent f Authorized Responsible Person* Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name* Adam Fiorenza Title Principal Organization Legally Iesponsible Entity by Fiorenza Poe NoDa Date * 04/20/2020 F. Tracking and COC Info NOI Tracking No. 24558 NC Reference No. NCG01-2020-1579 Uses 'count number' variable (incremrented by SP) Certificate of NCC201579 Coverage (COC) Uses 'count number' variable (incremented by SP) No.* Count Number 1579 Sequential number for submittal that is incremented by Stored Frocedure COC Year 2020 Year of date reviewed (used to assign YY digits after "NOC' in COCno.)