Loading...
HomeMy WebLinkAbout20030105 Ver 1_COMPLETE FILE_20030131?OF WgTEROG e 62 r O lii? 'C Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E., Director Division of Water Quality DIVISION OF WATER QUALITY July 15, 2003 Fairfield Harbour POA WA'?17Jul. Attn: Mr. Robert Brown ?I 902 Coral Reef Drive New Bern, NC 28560 Dear Mr. Brown: Subject: Stormwater Permit No. SW7000518 Fairfield Harbour Subdivision Permit Modification High Density Stormwater Project Craven County The Washington Regional Office issued stormwater permit SW7000518 on January 4, 2002. Our staff have considered questions raised by the Property Owners Association (POA) regarding certain permit conditions. We have also evaluated the fact that (6) drainage outlets, originally constructed in violation of the Neuse Riparian Buffer Rules, have recently been plugged and revegetated. Based upon our review of these factors, and the Property Owners Association request, we have determined that a permit modification is appropriate. We are forwarding modified Permit No. SW7000518 dated July 15, 2003 to the Fairfield Harbour POA. This permit shall be effective from the date of issuance until July 15, 2005 and shall be subject to the conditions and limitations as specified therein. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. 943 Washington Square Mall Washington, N.C, 27889 Telephone (252) 946-6481 FAX (252) 946-9215 1K State Stormwater Management Systems Permit No. SW7000518 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Fairfield Harbour POA Craven County FOR THE construction, operation and maintenance of stormwater management systems in compliance with the provisions of 15A NCAC 2H.1000 (hereafter referred to as the "stormwater rules") and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit for a wet detention pond, constructed wetlands and grass swales to serve Fairfield Harbour Subdivision located near New Bern, NC. This permit shall be effective from the date of issuance until July 15, 2005 and shall be subject to the following specified conditions and limitations: 1. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described on page 4 of this permit, the Project Data Sheet. 3. Approved plans and specifications for this project found in the "FAIRFIELD HARBOUR REDESIGNED STORMWATER PLAN", dated April 16, 2001, are incorporated by reference and are enforceable parts of the permit. 3 R 4. No homeowner/lot owner/developer shall be allowed to fill in, alter, or pipe any vegetative practices (such as swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division. Typical driveway culverts for access to single family lots are excluded. 5. The following items will require a modification to the permit: a. Any revision to the approved plans, regardless of size b. Project name change c. Change of ownership d. Redesign or addition of built-upon area for any new streets or newly platted lots. Building permits issued by the POA for existing platted single family residential lots are excluded and will not require modification of this permit. e. Further subdivision of the project area. In addition, the Director may determine that other revisions to the project may require a modification to the permit. 6. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. II. SCHEDULE OF COMPLIANCE 1. The permittee will comply with the following schedule for construction and maintenance of the stormwater management system. a. The stormwater management system shall be constructed in its entirety according to the schedule found in Section "IV. Special Conditions". b. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 2. The facilities must be properly maintained and operated at all times. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals. 5 R 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6(a) to 143-215.6(c). 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. IV. Special Conditions In keeping with the resolution of the Neuse Riparian Buffer Violations cited by letter dated January 16, 2001, the FairField Harbour Property Owners Association has plugged and restored the previously constructed drainage outlets. The construction of the approved stormwater control measures, as well as any new drainage outlets, shall comply with the following conditions: (1) For any wetland impacts that might occur by the implementation of the stormwater plan, a determination of the acreage of impact is necessary, and must be submitted to the US Army Corps of Engineers and the Division of Water Quality for any necessary written approvals prior to beginning construction. (2) All of the stormwater treatment measures approved by this permit; including the (6) constructed wetland systems, the vegetated swales and weir/orifice structures, and the wet detention pond, shall be constructed by July 15, 2005. (3) The approved stormwater treatment measures shall be constructed and stabilized with vegetation prior to making any new outlet connections to state waters. 7 A. Fairfield Harbour POA Drainage Improvements Project Grass Swales with weir/orifice structures, Constructed Wetlands and Wet Detention Pond System Stormwater Permit No. SW7000518 Designer's Certification I, as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Project) for (Project Owner) hereby state that to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. Signature Registration Number Date 9 ?0?1 WATFRP ?? r 4 `< Michael F. Easley Governor William G. Ross, Jr., Secretary Department of Environment and Natural Resources Alan W. Klimek, PE, Director Division of Water Quality February 7, 2003 Wayne Massetti & Kay Wertz 1573 Bud Lane Yardley, PA 19067 DWQ Project # 03-0105 Craven County Page 1 of 2 Subject Property: Lot 128, Section 7, Part 2, Fairfield Harbor SD, 906 Jewell Court, New Bern, NC 28560 Northwest Creek [03-04-10; 27-105; SB Sw NSW (Nutrient Sensitive)) APPROVAL for the use of the "General" MAJOR VARIANCE; From the Neuse and Tar-Pamlico Riparian Buffer Rules for the Construction of Residential Structures on Existing Lots within the Coastal Counties as defined by the Coastal Area Management Act with ADDITIONAL CONDITIONS Dear Mr. Massetti & Ms. Wertz: You have our approval, in accordance with the conditions listed below, to impact approximately 890 square feet (fe) of Zone 2 of the protected riparian buffers for the purpose of constructing a single family residence on the subject property as described within. your application dated January 23, 2003. This letter shall act as your approval for the use of the "General" Major Variance; From the Neuse and Tar-Pamlico Riparian Buffer Rules for the Construction of Residential Structures on Existing Lots within the Coastal Counties as defined by the Coastal Area Management Act with ADDITIONAL CONDITIONS as approved by the Water Quality Committee (WQC) of the Environmental Management Commission (EMC) on May 10, 2001. In addition, you should get any other required federal, state or local permits before you proceed with your project including (but not limited to) Sediment and Erosion Control and CAMA permits. This approval shall expire when the variance expires on April 11, 2006 unless it is renewed before that time by the EMC. This approval is only valid for the purpose and design that you described in your variance request. If you change your project, you must notify us and you may be required to send us a new request for approval. If the property is sold, the new owner must be given a copy of this approval and is thereby responsible for complying with all conditions. For this approval to be valid, you must follow the conditions listed below. Conditions: 1. No impacts shall occur to Zone 1 of the protected buffers except for "exempt" activities listed within the Buffer Rule, unless otherwise approved by the DWQ. 2. All new stormwater drainage shall be directed to vegetated areas as diffuse flow at non-erosive velocities prior to entering the protected riparian buffers as identified within 15A NCAC 26 .0233(5). No new ditching or piping of stormwater through the protected buffers is allowed. If you do not accept any of the conditions of this approval, you may ask for and adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition that conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. This approval and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under the Neuse River Riparian Buffer Protection Rules (15A NCAC 2B .0233 (9)(b)). Please call Mr. Bob Zarzecki at 919-733-9726 or Ms. Tom Steffens at 252-946-6481 if you have any questions or require copies of our rules or procedural materials. North Carolina Division of Water Quality, 401 Wetlands Certification Unit, 1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address) 2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location) 919-733-1786 (phone), 919-733-6893 (fax), http://h2o.enr.state.nc.us/ncwetlands/ 4 OFFICE USE ONLY: Date Received -- U State of North Carolina ??i' ??pt 3 r] Department of Environment and Natural Resources Wu? JAN G 2003 Division of Water Quality 3 WETLANDS GROUT' r ?PJATEr U I.iTY SCf,T )l? Q-WARD Variance Request Fora - for Minor Variances Protection and Maintenance of Riparian Areas Rules NOTE: This form may be photocopied for use as an original. Please identify which Riparian Area (Buffer) Protection Rule applies. u Neuse River Basin: Nutrient Sensitive Waters Management Strategy Protection and Maintenance of Riparian Areas Rule (15A NCAC 02B .0233) u Tar-Pamlico River Basin: Nutrient Sensitive Waters Management Strategy Protection and Maintenance of Riparian Areas Rule (15A NCAC 0213.0259) u Catawba River Basin: Protection and Maintenance of Existing Riparian Buffers (15A NCAC 02B .0243) Part 1: General Information (Please include attachments if the room provided is insufficient.) 1. Applicant's name (t a corporation, •ndividual, etc. who owns the property): lea ne yY G1s,&#1 u)mi?_ _ 2. Print Owner/Signing Official (person legally respon ible forth property and its compliance) Name: W nt__ NG1.5.5a,+-? i ?ka W?,r . Title. Street address: I City, State, Zip: UaC6t,t). AA 906P 1 Telephone: Fax: N1., 3. Contact person who can answer questions about the proposed project: Name: Telephone: q47 Fax: Email 4. Project Name (Subdivision, facility, or establishment name - consistent with project name on plans, specifications, letters, opeIrat•yon and maintenance agreements, etc.): Fair- ; el d Corb6,u Version 2: November 2002 E a 5. Project Location: G U. ' Street address: 10 ? Jewel of City, State, Zip: ?e .6ern N G 4X540 County: frauCn Latitude/longitude: A/ ,3.?? _ O - 3 W -14- s8- 6. Directions to site from nearest major intersection (Also, attach an 8'/z x 11 copy of the USGS topographic map indicating the location of the site): - e _ 7. Stream to be impacted by the proposed activity: Stream ,nfiame (fo unnamed streams label as "UT" to the nearest named stream): , Stream classification [as identified within the Schedule of Classifications 15A NCAC 2B .0315 (Neuse) or.0316 (Tar-Pamlico)]: 8. Which of the following permits/approvals will be required or have been received already for this project? Required: Received: Date received: Permit Type: CAMA Major _ CAMA Minor 401 Certification/404 Permit On-site Wastewater Permit NPDES Permit (including stormwater) Non-discharge Permit Water Supply Watershed Variance Others (specify) Part 2: Proposed Activity (Please include attachments if the room provided is insufficient.) 1. Description of proposed activity [Also, please attach a map of sufficient detail (such as a plat map or site plan) to accurately delineate the boundaries of the land to be utilized in carrying out the activity, the location and dimension of any disturbance in the riparian buffers associated with the activity, and the extent of riparian buffers on the land. Include the area of buffer impact in ft2.]: 2. State reasons why this plan for the proposed activity cannot be practically accomplished, reduced or reconfigured to better minimi or eliminat disturbance o the riparian buffers: . rc hr ,_c r.vP? a .?nf S.1_J __ _ maft_ _re of cy?d e I in e_ se•-} &do _ Variance Request Form, page 2 Version 2: November 2000 3. Description of any best management practices to be used to control impacts associated with the proposed activity (i.e., control of runoff from impervious surfaces to provide diffuse flow, re-planting vegetation or enhancement of existing vegetation, etc.): We W ll rude -500e,5 4a4 Pf 6 6 tt. t c? ra? a 1-0---?lt?cri d?____-1-k.EaJ, sodded _ wrt _cn1 P-CLL _sod . 4. Please provide an explanation of the following: (1) The practical difficulties or hardships that would result from the strict application of this Rule. _7he hbu.Se could 1161 f14 16f (2) How these difficulties or hardships result from conditions that are unique to the property involve , The _ 5Q __q w? J?u??er Cm, rack _ tkt- bLt'l -0a,61e 3 is 4 wh;ch a _ aua c? ???11-?_ build?? CSC acid yam 4h1 ?L7 (3) If economic hardship is the major consideration, then include a specific explanation of the economic hardships and the proportion of the hardship to the entir value of the project. _L-? l??w -I--Q- yln Inc pe ,l?. Part 3: Deed Restrictions By your signature in Part 5 of this application, you certify that all structural stormwater best management practices required by this variance shall be located in recorded stormwater easements, that the easements will run with the land, that the easements cannot be changed or deleted without concurrence from the State, and that the easements will be recorded prior to the sale of any lot. Part 4: Agent Authorization If you wish to designate submittal authority to another individual or firm so that they may provide information on your behalf, please complete this section: Designated agent (individual or firm):.n 1iw0??_ _ _ _ Mailing address: tc City, State, Zip: U > 1Y?1 Telephone: !7a__ BcS n _ Fax: &-9- - Email: Part 5: Applicant's Certification Variance Request Form, page 3 Version 2: November 2000 I, WA n e_ / r 1N?SSe? _ _ (print or type name of person listed in P>? I, Item 2), certify t at the information included on this permit application form is correct, that the project will be constri7cted in conformance with the approved plans and that the deed restrictions in accordance with Part 5 of this form will be recorded with all required permit conditions. Signature: ao-7 X_ Date: ,/Q Title: L? O` THE PROPERTY SHOWN DOES FALL WITHIN THE FEDERAL, FLOOD 00 / j INSURANCE RATE MAP ONE HUNDRED (100) YEAR FLOOD PLAIN. Go`o / I REFERENCE RESTRICTIVE COVENANTS FOR RESTRICTIONS AND EASEMENTS THAT MAY APPLY. / LEGEND 0 O` Treasure Cove Horbo`ur IPF - IRON PIPE FOUND a our IPS - IRON PIPE SET MBS - MINIMUM BUILDING SETBACK t7 ''.J' . 1 1 I DUE - DRAINAGE AND UTILITY EASEMENT X 9.0' - SPOT ELEVATION (NGVD 1929) y- TEMPORARY BENCHMARK SET AT 9.0' IN 18" PINE f Gondolier Dr ® - HEAT PUMP L OGA TION / Latitude -F Long_Itude \ - - N 35-04-32 W 7G-58-OG 1 / ? 11 (j 0 i LOT 280 'I J? Cap; Q o 'I / D-7G'4G'3: L X 4.7 X IPF 5 80. 7'22 I^ N i, R-50.00 4, 8 E N I / L-G7.00 5' DUE _ 130.0p• N 47'55'55' E i9 -? x 4.4 I 62.10. X A X 00OS / 9 eo - . 10" MBS , ??.32 x 5.0 r' O y woy I 1 NAIL R+gJ / / B??O ?o ?) X ? ill IPF 0 ? ? ? s s? ti I el II l I ??' - l 3. C Porch 4.5 / l /Il /i ,y 1Propo5ed One sr s o\ and half Story Brick! / Tie' From MAG Nall in X'1ng Olm'5 to G' Roof 0/lil h ' l l., G / 11 e.6! Gt + G rd.;!!ar Or ?j \ C /I I I 'PFF 11.0' S 54'48' W 335.1 ' \ ?j l I ?a Concrete /?A' Bulkhead tx 1 ti D=43'00'59' R l? X R=180.00 LOT 282 L=135.14 9' \ I / ' 31'03'08' W 3.7 131.99' 0 2 2 0 \ ?? Jc o.4 Oi00 q0 5a V% - ?o so \ \ C?o 00 t e, 6( 6')f i 5 52'33'41' W J? \ ft?4 ?? -- 5.00' rr ,,? ?GUgb / q? V CERTIFICATE OF SURVEY AND ACCURACY i I, JERRY R. RYAN, CERTIFY THAT THIS PLAT WAS DRAWN UNDER MY SUPERVISION FROM AN ACTUAL SURVEY MADE UNDER MY SUPERVISION, THAT THE RATIO OF PRECISION IS 1:15,000+, THAT THIS FLAT MEE'S THE MINIMUM STANDARDS FOR LAND SURVE"ING ?4 C Ak:,-.NA AS AMENDED. THAT THE BOUNDARIES N01 0 SURVEYED ARE SHOWN AS BROKEN LINES, THAT ARI=AS ARE BY Re5URVE1' Oh :OORDINATE CALCULATION UNLESS SHOWN OTHERWISE, THAT THIS SURVEY iS OF AN EXISTING PARCEL OF LAND AS SHOWN BY PLAT LOT 281- SECTION 7 - PART 2 RECORDED AT MAP BOOK 13, PAGE 60. FAIRFIELD ! IAI?pBDUR7? WITNESS MY SIGNATURE AND SEAL N THIS 19th DAY OF DECEMBER, 2002. 90G Jewell Court r, Fop 9 _ Johnson 1-ome5 - Massetti / Wertz TOWN5HIF No. 2 CRAVEN GOUNFI' 'I01R1h •aF' -1irrA d-y ?2 DATL, Dec 1112002 Atlantic Sur-ye?% v' Design, PA RUF L LA VEYOR, i JAB No L3302 302 SOUTH FRONT STREET SCALE, NEW BERN. NORTH CAROLINA 0 (252) G33-GC,4 9 d -ya _ x \ 2 r /w l( -C I I X12 eoe C T ?F - ?_ d ? ? • C _? •? Golf C Yrw?. l t ?'/' • ? ?? ' -1 0----VY ., 1 Pilin • - .?,_ ? . ? •.,' •J C ?' • 411 C` C\ - _ tea. , ??. ,,,, •• \ •• •, ',? ??? ?\ ??Q , ice.,-_. .- rl --,? • -? -. k s. /r _ ?/ - ?~ •? i _ r CCU Pi, ng Iver E .. Green 2? Z •. .?_ ,-?* -'.y ?- r?-_ •_ ''?:.•: .` ¦'a' • ?-? ' ? %' i- 4? x34??;•'?V?- Y C!• j t ,.( f ` "• ?' ti ?.y-r=Wit':,- - I ; ?.. ?1'C-.?C ?.' I ?. ___-? -- -!?- , QPiling + - ` I _ _ Manna a 74- ` laf ? '<.? ?:k??r -? .ii ?. - \ 7600 _ 5.+ ryas ^'r r ? Y •. ?q I t ca D r c `, - landt T f;???t 1)b _ ?c Y r/ y t _ y; ? d x1 f { ? i ? g{Jy ? ty, jjam} s ,,f+ 4 y . a '?! - ?. L f1 64?' :.? t l ? 'G?•?t,1Fl Yl?f _t\ 1 l __ p 1 Y1k !. a. ?rPek Pt ??y 011 John Abash ru ff` / ??? r y A _ J . Johnson Ptf4 ??? a I 1 ?1 r??? S? v'? +:?? ti?w y rfi+r Y 'w• a q n I ?,- • 3\}?. :\ .l\ (- Tai T' A _ v Pk) ` $- kZ' d ^S s? t a 1 r'F 5 /? 3?SoPllang'y".9 V as l 7r ?? 1 - - 17 ? 1 Y? a i .{ p., ?k • r i J S a ? \? r fj? z Cooper t / 'rds iW-i HAMPTON , SHOAL ???) '1- t$ ? 4 D`?`? 3 s ?,?Ptkc i^F' ? r kr' • ?. - , , ??\ ( 1 y t lhlY / C `u`:f:4?ia?i ?t. Iti. HSOM Mandi Johnson General Contractor P.O. Box 15014 New Bern, NC 28561 252/633-2947 e-mail: custombuildersOjohnsonhomesnc.com web site: www.johnsonhomesnc.com