Loading...
HomeMy WebLinkAbout20200532 Ver 1_A16008.02_01_Hyd_prm_wet_Phase2_20200413_20200420BEGIN PHASE 2 CONSTRUCTION SITE 3 -L1- STA:10+53.07 TOWN OF WAKE FOREST NORTH CAROLINA SMITH CREEK GREENWAY WETLAND AND SURFACE WATER IMPACTS PERMIT NEUSE RIVER BASIN TYPE OF WORK: GRADING, PAVING, DRAINAGE, EROSION CONTROL, AND STRUCTURES. SITE 6 0 g 6 ' 5 N-- SITE 2 SITE 1 SITE 5 SHEET 9 SHEET 8:.. ti a \—SITE 4 THESE PLANS HAVE BEEN APPROVED FOR CONSTRUCTION BY THE TOWN OF WAKE FOREST. ENGINEERING DEPARTMENT DATE PUBLIC WORKS DEPARTMENT DATE EROSION 8 SEDIMENT CONTROL DATE FIRE PREVENTION DATE ACCESSIBILITY DATE PLANNING DEPARTMENT DATE CITY OF RALEIGH PUBLIC UTILITIES DEPARTMENT DATE URBAN FORESTER DATE Prepared In ift 011"floe aft '�I,,�►'.�;r VHB Engineering NC, P.C. (C-3705) 940 Main Campus Drive, Suite 500 Y V Raleigh, NC 27606 2018 STANDARD SPECIFICATIONS END PHASE 2 `^ CONSTRUCTION -L2- STA:61 +78.73 rAJ STEWART 223 WEST STREET, SUITE 1100 FIRM LICENSE k C-1051 RALEIGH, NO 27603 wvw.sleweMinc.wm T 919.380.8— PROJECT k Al6008.02 Client: TOWN of WAKE FOREST 301 S. BROOKS STREET WAKE FOREST, NORTH CAROLINA 27587-2901 T: 919-435-9513 F: 919-435-9539 Project: SMITH CREEK GREENWAY PHASE 2 OF 3 Vicinity map: Seal: PRELIMINARY- DO NOT USE FOR CONSTRUCTION Issued for: No. Date Description 1 01/06/20 Per Town of Wake Forest (HORIZONTAL) 0 500' 1000, Title. WETLAND IMPACTS PERMIT DRAWING SHEET 1 OF 12 Project number: A16008.02 Sheet: Date: 03/02/20 Drawn by: __ Approved by: -- Z j l ' _ l 28 Jkl E E f mm E f E E E E E E f f M Z s f �s atmoc f �i E f f f f / S f e f f F e u -- E E a s s f f f f f fog f i T f E a N \ f f f ag�E f E E E f f f f f f ' • I \ �\\ E E f � f f s \ f f f f f • f f a o� z ...... 0 f sww f f f © <Lp • o z3m • 4 � �� F L1 - 10+00 11+00 12+00 13+00 14+00 15+00 16+00 IMPACTS IN— URF 60" E F AND ING F F F TE IMPACTSIN F CE WATER F E SITE 2 ® DENOTES HAND CLEARING ®DENOTES TEMPORARY IMPACTS IN SURFACE WATER ®DENOTES IMPACTS IN SURFACE WATER THESE PLANS HAVE BEEN APPROVED FOR CONSTRUCTION BY THE TOWN OF WAKE FOREST. ENGINEERING DEPARTMENT DATE PUBLIC WORKS DEPARTMENT DATE EROSION 8 SEDIMENT CONTROL DATE FIRE PREVENTION DATE ACCESSIBILITY DATE PLANNING DEPARTMENT DATE CITY OF RALEIGH PUBLIC UTILITIES DEPARTMENT DATE URBAN FORESTER DATE STEWART 223 WESTSTREET, SMITE 1100 FIRM LICENSE k C-1051 RALEIGH,NC27603 wvw.-Mi.- T 919.38D.8750 PROJECT k Al6008.02 Client: TOWN of WAKE FOREST 301 S. BROOKS STREET WAKE FOREST, NORTH CAROLINA 27587-2901 T: 919-435-9513 F: 919-435-9539 Project: SMITH CREEK GREENWAY PHASE 2 OF 3 Vicinity map: Seal: PRELIMINARY- DO NOT USE FOR CONSTRUCTION Issued for: NO. Dale Description (HORIZONTAL) 0 50' 100' (VERTICAL) 0 10' 20' Title: WETLAND IMPACTS PERMIT DRAWING SHEET 2 OF 12 Project number: A16008.02 Sheet: Date: 03/02/20 Drawn by: __ Approved by: -- ----------------------- ----------------------- ----------------------- ----------------------- --- -================= --- - _ _r,".��----�----------- � ���� ��i��� y _ ���� �'��i n���� ��Y��Qa��������� ���� � ��4��l.����.� ������������ ���� �����������������y�is�,vi����� ------------------------------------- ------------------------------------- =Mac' ....—.....a�.-��w.i�e.�-.r_s....-....-....c 2:a r_r—s_�Gs—�ee:e.�---rs�i•� :.ram ��..��i�i' ....----�■-�. �....�; rs�....u...�—= �--_�....-....-....c:�..m.-- .....:vim....—....—.....-�1� p� ��...-��.-..,�.-....—....—....— ..�....Y..11........ ....- [-l_i--....N III..C.r..i+u�....-.....,11-1.......-....-.....:J II�L'�...-...-.....-.....----� �■. ------------------ ------------------------------------- ------------------------------------- =Mac' ....—.....a�.-��w.i�e.�-.r_s....-....-....c 2:a r_r—s_�Gs—�ee:e.�---rs�i•� :.ram ��..��i�i' ....----�■-�. �....�; rs�....u...�—= �--_�....-....-....c:�..m.-- .....:vim....—....—.....-�1� p� ��...-��.-..,�.-....—....—....— ..�....Y..11........ ....- [-l_i--....N III..C.r..i+u�....-.....,11-1.......-....-.....:J II�L'�...-...-.....-.....----� �■. ------------------ --------------------------------------------------- --------------------------------------------------- --------------------------------------------------- --------------------------------------------------- --------------------------------------------------- -_-_-_-_-_---_-_-_-_-_-_-_-_-_-_------_--_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_ ---------------- �-C��CE�������� ` --------------------------------------------------- --------------------------------------------------- --------------------------------------------------- --------------------------------------------------- --------------------------------------------------- -_-_-_-_-_---_-_-_-_-_-_-_-_-_-_------_--_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_ ---------------- �-C��CE�������� ` --------------------------------------------------- --------------------------------------------------- --------------------------------------------------- --------------------------------------------------- --------------------------------------------------- -_-_-_-_-_---_-_-_-_-_-_-_-_-_-_------_--_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_ ---------------- �-C��CE�������� ` --------------------------------------------------- --------------------------------------------------- --------------------------------------------------- --------------------------------------------------- --------------------------------------------------- -_-_-_-_-_---_-_-_-_-_-_-_-_-_-_------_--_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_ ---------------- �-C��CE�������� ` k `< - I / B-na-BODHA N ��1 0/ C x2251-7- x E X262 � 1917 j z45 s 2x6� l 227.4 K74 / � 69 190.4 25.4s\ IIJ 89. OUi=189. J^ / xI I I 293.9xi 2x 189. IN=215.41' 8"PVC _ 5. 1 x2Z4 6 I (�� \. c �t V N C RIM=214.22 NIF ING. 92 632 J / D IN NlW%2 7S 9g 00 12"RCP INUT 7�SITE 6 RIM=2 Y V1 19 EWER OFEASE RA NI S F C1 � a ftIM= 6 ✓ —_ J o o 4. =� Q% 2004"'\ �V ���� l L ��� % ✓S /57 I 195.5 J91.7 189 1x ®DENOTES TEMPORARY IMPACTS IN SURFACE WATER 19+94 19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 THESE PLANS HAVE BEEN APPROVED FOR CONSTRUCTION BY THE TOWN OF WAKE FOREST. EN INEERIN DEPARTMENT DATE PUBLI W RK DEPARTMENT DATE ERO ION& EDIMENT NTR L FIRE PREVENTI N DATE A E IBILITY DATE PLANNIN DEPARTMENT DATE ITY F RALEI H PUBLI UTILITIE DEPARTMENT DATE URBANFORESTER ATE ril STEWART 223 WESTSTREET, SUITE 1100 FIRM LICENSE k C-1051 1— IGH, NO 27603 wvw.sleweninc.wm T 919,380.8]50 PROJECT k Al 6008.02 Client: TOWN of WAKE FOREST 301 S. BROOKS STREET WAKE FOREST, NORTH CAROLINA 27587-2901 T: 919-435-9513 F: 919-435-9539 Project: SMITH CREEK GREENWAY PHASE 2 OF 3 Vicinity map: Seal: PRELIMINARY- DO NOT USE FOR CONSTRUCTION Issued for: CONSTRUCTION DOCUMENTS NO. Dale Description (HORIZONTAL) 0 50' 100' (VERTICAL) 0 to- 20' Title. WETLAND IMPACTS PERMIT DRAWING SHEET 11 OF 12 Project number: A16008.02 Sheet: Date: 03/02/20 Drawn by: Approved by: -12 - WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 1 11+06 to 13+84 -L1- Boardwalk 0.090 2 15+72 to 16+41 -L1- Clearing 0.003 3 16+34 to 16+64 -1-1- 60" RCP -III Pipe Crossing 0.005 0.003 55 26 4 18+40 to 18+70 -1-2- 72" RCP -III Pipe Crossing 0.008 0.004 71 34 5 45+48 to 52+20 -1-2- Boardwalk (fill slope/concrete footer) 0.003 0.258 6 16+20-Y2TCE- Temp. Construction Access 0.004 36 TOTALS: 0.003 0.351 0.013 0.011 126 96 0.000 'Rounded totals are sum of actual impacts NOTES: 2018 Feb