HomeMy WebLinkAbout20200371 Ver 1_Buffer Determination_20200417ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. DANIEL SMITH
Director
Pitt & Greene EMC
Member EMC Solar Five, LLC
ATTN: Mark Suggs
PO Box 249
Farmville, North Carolina 27828
NORTH CAROLINA
Environmental Quality
April 17, 2020
Subject: On -Site Determination for Applicability to Neuse Riparian Buffer Rules (15A NCAC 02B .0233)
Subject Property/ Project Name: Arba Solar Facility
Address/Location: 3666 NC HWY 903, Snow HIII, NC
Stream(s) Evaluated: (2) — UT to Tyson Marsh, Class C; Sw, NSW; Stream Index 27-86-17; Neuse River Basin
Determination Date: March 30, 2020
Staff: Chris Pullinger
2020-0371 v1
Greene County
Determination Type:
Buffer:
Stream:
® Neuse (15A NCAC 02B .0233)
❑ Intermittent/Perennial Determination
❑ Tar -Pamlico (15A NCAC 026 .0259)
❑ Catawba (15A NCAC 02B .0243)
❑ Jordan (15A NCAC 02B .0267) (governmental and/or
interjurisdictional projects)
❑ Randleman (15A NCAC 02B .0250)
❑ Goose Creek (15A NCAC 02B .0605-.0608)
Stream
E/I/P*
Not
Subject
Subject
Start@
Stop@
Soil
Survey
USGS
Topo
2020-0371 A
swale
X
2020-0371 A Start
2020-0371 A Origin
X
X
2020-0371 A
I
X
2020-0371 A Origin
2020-0371 A Finish
X
X
2020-0371 B
P
X
2020-0371 B Start
2020-0371 A Finish
X
X
*E/1/P = Ephemeral/Intermittent/Perennial
The Division of Water Resources has determined that the streams listed above and included on the attached map have been
located on page of the most recent published NRCS Soil Survey of Greene County, North Carolina and/or the most recent copy
of the Snow Hill USGS Topographic map at a 1:24,000 scale and evaluated for applicability to the Neuse Riparian Buffer Rule.
Each stream that is checked "Not Subject" has been determined to not be at least intermittent,not present on the property, or
man-made in nature. Streams that are checked "Subject" have been located on the property and possess characteristics that
qualify them to be at least intermittent streams. There may be other streams or features located on the property that do not
appear on the maps referenced above but may be considered jurisdictional according to the US Army Corps of Engineers and
subject to the Clean Water Act.
This on -site determination shall expire five (5) years from the date of this letter. Landowners or affected parties that dispute
a determination made by the DWR may request a determination by the Director. An appeal request must be made within
sixty (60) calendar days of date of this letter to the Director in writing.
D E Q�� North Carolina Department of Environmental Quality I Division of Water Resources Washington Regional Office 1 943 Washington Square Mall I Washington, North Carolina 27889
NoarH o AaouNA
Dopanmeol f Envo-onma.wi aUari /� 252.946.6481
If sending via US Postal Service:
c/o Paul Wojoski
DWR — 401 & Buffer Permitting Unit
1617 Mail Service Center
Raleigh, NC27699-1617
If sending via delivery service (UPS, FedEx, etc.):
c% Paul Wojoski
DWR — 401 & Buffer Permitting Unit
512 N. Salisbury Street
Raleigh, NC27604
This determination is final and binding as detailed above, unless an appeal is requested within sixty (60) days.
This determination only addresses the applicability to the buffer rules and does not approve any activity within the
buffers. The project may require a Section 404/401 Permit for the proposed activity. Any inquiries regarding
applicability to the Clean Water Act should be directed to the US Army Corps of Engineers Washington Regulatory
Field Office at (910)-251-4629.
If you have questions regarding this determination, please feel free to contact Chris Pullinger at (252) 948-3918.
Sincerely,
Plow T"I"
Robert Tankard, Assistant Regional Supervisor
Water Quality Regional Operations Section
Division of Water Resources, NCDEQ
cc: WaRO DWR File Copy/LASERFICHE
Emily Thompson, USACE Washington Regulatory Office (via e-mail)
Heather Patti, (via e-mail: hpatti@trccompanies.com)
AL
RIVERGREENF
- �ilitx �
II i
Y _ {
COUNTY. NORTH CAROL"'
PUBLISHED SOIL SURVEY MAP
',�• :ate
`�:.
�-
`�..•
North Cifflvoft awwornner"
Management Commission
Wsion of water Resource. .
i�r- Neu. ._.Basin
MMW
April 17
Reviewed
DWR Project #2020-0371 yl
i
�a .d��l GPI �TJe`�aq� �n7 ' • SUBJECT
NOT SUBJECT � 903
-_
J
1 ` 1
SUBJECT
1 `•
gum
or
f na 'We'