Loading...
HomeMy WebLinkAboutNCC201572_ESC Approval Submitted_20200420140memoria Park Court Southern Pines, NC 28387 20-1003 Approval for Minor Erosion and Sediment Control SITE ADDRESS: 121 HOLLY SPRINGS CT ISSUED: 04/03/2020 PROJECT NAME: 121 Holly Springs Ct EXPIRES: PARCEL: 857200327573 cAT*oo.1o4soo c{Vva. -79:2181e AppLxCAVVr OWNER: pINNwcmLLvRESPONSIBLE PARTY' wCxsEHOmES LLC MCxesHOMES LLC mCxEeHOMES, LLC 1ooHAY STREET SUITE oo1 1OnHAY STREET SUITE au1 1ouHAY aT8Tsuo0 pxYsTTsv|LLE. mnnono1 Fw/sTTsv|LLs, wC2nnu1 rA/sTTewLLs. mo28uo1o1O7 CITY: SOUTHERN PINES COUNTY: MOOne ACRES APPROVED: 0.25 HOW. NO RECEIVING WATER: Aberdeen Tributary RIVER BASIN: Lumber STREAM CLASSIFICATION: C DATE RECEIVED BvTVSp:oo2u-04-no PLAN TYPE: Standard The review of the above referenced erosion control plan has been completed and the plan submitted has been found, acceptable, Amendments to the plan should Lmsubmitted to this office under the same procedure mafollowed for the original plan. Title 1axwCAC*13 .o11o(a)and the wQ]V1permit require that the following documentation »okept onfile authe job site: 1. The approved E&8Cplan auwell uoany approved deviation. o.The wCGo1permit and the COC.once u|ureceived. n. Records ofinspections made during the previous 3odays. This project bsubject mthe National Pollutant Discharge Elimination System (NPDES). As of April 1.2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) from requesting a Certificate of Coverage (COC) under the wCGo1uoV0Construction SonnwaterGeneral Permit. This form MUST umsubmitted prior mthe commencement ofany land disturbing activity onthe above named project. The w0|form may beaccessed atuoqoo.gowwCGo1. After you submit acomplete and correct mO| Form, uCOowill ueomai|odmyou within three business days. osmLRwill charge ufee for coverage under the wCGo1 pnnnx. This fee /ombesent mthe oEMLRSmnnwaterCentral Office staff inRaleigh. Please see North Carolina Department mEnvironmental Quality (wCoEO)documentation regarding procedures for obtaining permit mCGu10000. Refer mthe wCoEQNCGo1Ground Stabilization and Materials Handling Sheet for additional details on compliance with these requirements. Should you have questions contact the Division of Energy, Mineral and Land Resources, 91o7o7'30no. Acceptance and approval of this plan isconditioned upon your compliance with Federal and State water quality laws, regulations, and rules. maddition, local city mcounty ordinances mrules may also apply mthis land -disturbing activity. This approval does not supersede any other permit or approval. This Approval Shall Expire: 1. There is no substantial construction, erection, alteration, excavation, demolition or similar work authorized by such permits within one (1) year after issuance. o. Work has commenced, but there is no substantial progress on the project for a period of one (1) year. n. The project has not been completed within two (2)years o,issuance m[the permit. Authorized Signature: ' Date:0woa/2Oo0 Town Official _Date_