Loading...
HomeMy WebLinkAboutNCC201571_NOI Signed Certification_20200420N0001 Not ce f Intent (NOI) Certification Form Directions: Print this form, co mplete, scan and upload to the electronic NOI. Then, mail the original form to the NC DEMLR Stormwater Program (with $100 check if paying by check) at: Division of E ergy, Mineral & Land Resources Stormwater Program 512 N. Salisbury Street, 6'h Floor (Office 640K) 1612 Mail Service Center Raleigh, NC 27699-1612 DO NOT MAIL THIS FORM C, R PAYMENT UNTIL YOUR APPLICATION HAS BEEN REVIEWE AND ACCEPTED AS COMPLETE Per NC General Statute 143-215.6B (i), a y person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article ... shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousond dollars ($10,000). Under penalty of law, I certify that (check all boxes to indicate your agreement): I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, an for any civil or criminal penalties incurred due to violations of this permit. The information submitted in & is NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. 1,6 If the approved Erosion and Seciment Control Plan is not compliant with Part 11 (Stormwater Pollution Prevention Plan) of the NCG01011000 General Permit, I will nonetheless ensure that all conditions of Part II of the permit are met on he project at all times. Ik I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Name of Project. I...Atlrrawo FAjrms sullflw,SIAAI P.44W ,Z. Leg Ily Responsible Organizational, Entit�,: .. 4mEr, A 6xsE r .T,vC. Leg 311y Responsible Person: , JA)4s, it Titl of Legally ible Person: mu *Signature: Date: 4 17 20 *Pr nt Na and Title of Signed if Authors ed In ivi ual Differs from Permittee:, V A Phc ne Number. gig 917 — 62%9 k IMPORTANT NOTE: This form mush be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is out orized in accordance with Part 1V, Section 8, Item (6) of the NCG010000 permit. For nore information on signatory requirements, see Part 1V, Section B, Item (6) of the NCG010000 permit.