Loading...
HomeMy WebLinkAbout20200504 Ver 1_Revised D3. Stream Impact Table from PCN_202004163. Stream ImpactsIf there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted.3a.Stream impact numberPermanent (P) or Temporary (T) 3b.Type of impact 3c.Stream name 3d.Perennial (PER) or intermittent (INT)? 3e.Type of jurisdiction3f.Averagestreamwidth(feet)3g.Impactlength(linearfeet)S1 S2 S3 S4 S5 S6 3h. Total stream and tributary impacts3i. Comments: CulvertStream 1PERBoth3145Stream 1120Stream 1420185Total Permanent impacts 165lf for culvert and rip rap. Rip rap will be installed flush with existing stream bed elevation so that this permanent impactwould not trigger mitigation (see attached plan details).Temporary stream impacts 20lf for coffer dam.PTP---Coffer DamStabilizationChoose oneChoose oneChoose onePERPER---BothBoth---