HomeMy WebLinkAboutDuke Energy - Site Analysis and Removal Plans Letter_20161221ENERGY,
DcuGmber 21, 2016
vIA ELEt;TRONIC MAIL AND U.S. MAIL
Donald van dcr Vaart
Set,rutary
North Carolina Department of Environmental Quality (NCDEQ)
Mailing: 1636 Mail Service Center
;,-1 r west Junva Street
Raleigh, North c;arolina 27699-1636
RE: a
Dear Secreta y van der Vaart:
George 1. rramricR
Senior Vice President
Coal Combobtion Products
40 J. 1 ryon JGaat, S 1 V6A
Charlotte, NC 28M
vnma: 880-373.8113
tma;1: gooFy-e.hanntCk(l duke-ene�yy.Com
In accordance with patayraph 5.e of the Cuurt's June 1, 2016 Order, in the matter of Srate of North
Carolina ex rel. N.C. uepartmant of Envirnment and Natural Resources, Division of Environme,dal
Quahiy v. Duke Energy Carolinas, LLC, Mauklenbury County, Case Nos. 13 -CVS -9352 and 73-CvS-
14661; Srare of Norrh Carolina ax rel. N. (;. Department of Environment and Natural Resources, uivisibn
of Environmenra/ Quality v. Duke Enetyy Pruyress, LLC, Wake County, Case Nos. 13 -CVS -4061 and 13 -
CVS -11032, attached are the Jitu Analysis and Rumuval Plans for the Asheville Steam Electric
Generating Plant; Dan River Combined c;yc;lc Statiun, Riverbend Steam Station and L.V. Sutton Electric
Plant.
If you have any questions or need darificatiun regarding the information provided, feel free to contact
Randy HaR at Randy. RartOduke-unergyxom ur 980-373-5630 at your convenience.
Respectfully submitted:
George . Hamrick
Senior Vice President
w/attachments: i) Ashevilie Steam Elcutriu ucrneratinyy Plant, bite Analysis and Removal Plan
z) Dan River Combined Cyule Station, Site Analysis and Removal Plan
3) Riverbend Steam Station, Site Analysis and Removal Plan
4) L.V. Sutton Eiectric Plant; Site Analysis and Remuval Plan
NGDEQ cc: Tracy Davis, Shane Cook, Tuby Vinsun, Brad rule, Stan Aiken, Zahid Khan,
John Holley, Dan Sams, Ruyer King, Muya Dashbuld
Duke Energy cc: Jon Kerin; Dave Renner, Dane Mc Rainey, Brian Weisker, Jim Wells,
Steve Struble, MicRael Kafka, Randy Hart