Loading...
HomeMy WebLinkAbout12-21-16 Duke Energy - Site Analysis and Removal Plans LetterENERGY, DcuGmber 21, 2016 vIA ELEt;TRONIC MAIL AND U.S. MAIL Donald van dcr Vaart Set,rutary North Carolina Department of Environmental Quality (NCDEQ) Mailing: 1636 Mail Service Center ;,-1 r west Junva Street Raleigh, North c;arolina 27699-1636 RE: a Dear Secreta y van der Vaart: George 1. rramricR Senior Vice President Coal Combobtion Products 40 J. 1 ryon JGaat, S 1 V6A Charlotte, NC 28M vnma: 880-373.8113 tma;1: gooFy-e.hanntCk(l duke-ene�yy.Com In accordance with patayraph 5.e of the Cuurt's June 1, 2016 Order, in the matter of Srate of North Carolina ex rel. N.C. uepartmant of Envirnment and Natural Resources, Division of Environme,dal Quahiy v. Duke Energy Carolinas, LLC, Mauklenbury County, Case Nos. 13 -CVS -9352 and 73-CvS- 14661; Srare of Norrh Carolina ax rel. N. (;. Department of Environment and Natural Resources, uivisibn of Environmenra/ Quality v. Duke Enetyy Pruyress, LLC, Wake County, Case Nos. 13 -CVS -4061 and 13 - CVS -11032, attached are the Jitu Analysis and Rumuval Plans for the Asheville Steam Electric Generating Plant; Dan River Combined c;yc;lc Statiun, Riverbend Steam Station and L.V. Sutton Electric Plant. If you have any questions or need darificatiun regarding the information provided, feel free to contact Randy HaR at Randy. RartOduke-unergyxom ur 980-373-5630 at your convenience. Respectfully submitted: George . Hamrick Senior Vice President w/attachments: i) Ashevilie Steam Elcutriu ucrneratinyy Plant, bite Analysis and Removal Plan z) Dan River Combined Cyule Station, Site Analysis and Removal Plan 3) Riverbend Steam Station, Site Analysis and Removal Plan 4) L.V. Sutton Eiectric Plant; Site Analysis and Remuval Plan NGDEQ cc: Tracy Davis, Shane Cook, Tuby Vinsun, Brad rule, Stan Aiken, Zahid Khan, John Holley, Dan Sams, Ruyer King, Muya Dashbuld Duke Energy cc: Jon Kerin; Dave Renner, Dane Mc Rainey, Brian Weisker, Jim Wells, Steve Struble, MicRael Kafka, Randy Hart