Loading...
HomeMy WebLinkAboutNC0003425_Rox_CAP_Figures 6-17a_20200416a r 91 IL ad )RRECTIVE ACTION PLAN -AREA DWELL NETWORK TRACTION SYSTEM 18 TRANSITION ZONE -BEDROCK EXTRACTION WELLS (EX-1 THRU EX-18) EAN WATER INFILTRATION SYSTEM 27 SHALLOW -TRANSITION ZONE -BEDROCK CLEAN WATER INFILRATION WELLS (IW-1 THRU IW-27) III'' � � .•�' III I " • ................ • • lid/ �y:: g, • • • • • _ � �x I W-8 pi 0 v a I MAPS@ ••'s \ pF i 1 ' - o i is -�,_,�!/• /i "" ,, ...•" _ ; := :�!`'::`�i©/ �/ _ j e� opop 1 4 - • .�SL� ,., I I/ � • . • • • • • erg% 1 ulll/IIII// NO • �i i%'` • mills.0 III rr� J v pA �I DERGROUND CONVEYANCE , p1p0 WATER INFILTRATION SYSTEM IF N LEGEND DUKE ENERGY PROGRESS PROPERTY LINE ® IW-15 PROPOSED CLEAN WATER N WELL IN SHALLOW, TRANSITION ZONENE AND AND BEDROCK ASH BASIN WASTE BOUNDARY PROPOSED EXTRACTION WELL IN THE �i Ex-19 — — — —ASH BASIN COMPLIANCE BOUNDARY TRANSITION ZONE AND BEDROCK SOLID WASTE LANDFILL BOUNDARY Ex-33 PROPOSED EXTRACTION WELL IN BEDROCK r , SOURCE AREA 1 GROUNDWATER REMEDIATION AREA SOLID WASTE LANDFILL COMPLIANCE BOUNDARY r MONITORING WELL IN SHALLOW ZONE , SOURCE AREA 3 GROUNDWATER REMEDIATION AREA MW-06S L—_—__J MW 06D MONITORING WELL IN TRANSITION ZONE PROPOSED CLEAN WATER INFILTRATION LINE MW 01BR MONITORING WELL IN BEDROCK - - - - - - - - POSSIBLE CLEAN WATER INFILTRATION LINE AB-3BR ABANDONED MONITORING WELL PROPOSED CLEAN WATER INFILTRATION LINE FLOW DIRECTION c GMW-2A PIEZOMEfER IN TRANSITION ZONE PROPOSED WELL EXTRACTION COLLECTION LINE �PROPOSED WELL EXTRACTION COLLECTION LINE FLOW DIRECTION S-13 IN -STREAM SURFACE WATER SAMPLE LOCATION PER SOC PROPOSED WELL EXTRACTION COLLECTION MAIN LINE O S-2 NON -CONSTRUCTED SEEP (APPROXIMATE) PROPOSED WELL EXTRACTION COLLECTION MAIN LINE FLOW DIRECTION NPDES REGULATED PLANT WATER FEATURE _ NPDES REGULATED PLANT WATER FEATURE FLOW DIRECTION AMEC STREAM 0 AMEC STREAM AS EASTERN DISCHARGE CANAL NOTES 1.) ALL BOUNDARIES ARE APPROXIMATE. 2.) SAMPLE LOCATIONS WERE DERIVED FROM VARIOUS SOURCES AND ARE A MIX OF SURVEYED AND APPROXIMATE LOCATIONS. THEREFORE LOCATIONS ARE DEEMED TO BE APPROXIMATE. 3.) DUKE ENERGY PROPERTY LINES ARE REPRESENTED BASED ON DUKE ENERGY'S INTERPRETATION OF HISTORICAL DOCUMENTED PROPERTY BOUNDARIES AND CURRENT PERSON COUNTY GIS. 4.) THE WATERS OF THE US DELINEATION HAS NOT BEEN APPROVED BY THE U.S. ARMY CORPS OF ENGINEERS AT THE TIME OF THE MAP CREATION. THIS MAP IS A PRELIMINARY JURISDICTIONAL DETERMINATION ONLY. THE PRELIMINARY WETLANDS AND STREAM BOUNDARIES WERE OBTAINED FROM AMEC FOSTER WHEELER ENVIRONMENTAL AND INFRASTRUCTURE INC. NATURAL RESOURCE TECHNICAL REPORT (NRTR) FOR ROXBORO STEAM ELECTRIC PLANT, DATED JUNE 2015. 5.) THE TOPOGRAPHY IS SHOWN FOR REFERENCE PURPOSES ONLY AND SHOULD NOT BE USED FOR DESIGN OR ENGINEERING PURPOSES. THE TOPOGRAPHY BASED ON A COMBINATION OF SOURCES. "AERIAL TOPOGRAPHIC SURVEY FOR: ROXBORO LANDFILL" BY STEWART DATED MAY 15, 2019. LIDAR DATA OBTAINED FROM NC FLOODPLAIN MAPPING PROGRAM -SPATIAL DATA DOWNLOAD AT https://sdd.nc.gov/DataDownload.aspx# DATA WAS SOURCED FROM THEIR PHASE 3 - 2015 QL2 LIDAR 6.) SITE FEATURES INCLUDING UTILITIES ARE BASED ON SEVERAL SOURCES. ANY UTILITIES SHOWN ARE FOR REFERENCE PURPOSES ONLY AND HAVE NOT BEEN FIELD VERIFIED WITH REGARDS TO THEIR HORIZONTAL OR VERTICAL LOCATIONS IN THE FIELD. ALL FEATURES INCLUDING UTILITIES ARE DEEMED TO BE APPROXIMATELY LOCATED. 2019 AERIAL PHOTOGRAPH FROM BY STEWART DATED MAY 15 2019. 2017 AERIAL PHOTOGRAPHS OBTAINED FROM NC ONE MAP AT https://nconemap.maps.arcgis.com/apps/webappviewer/index.html?id=2c8a9b366c4841flbe2b464347dO4a2b 2014 AERIAL PHOTOGRAPH WAS OBTAINED FROM WSP FLOWN ON APRIL 17, 2014. DRAWING BY WSP, CARY NC TITLED "AERIAL TOPOGRAPHIC SURVEY ROXBORO PLANT", DATED JUNE 8, 2015. JOB NUMBER 1570002.00, FILE NAME ROXBORO FINAL 06-18-2015.DWG DRAWING BY CAROLINA POWER AND LIGHT COMPANY TITLED "DRY FLYASH MODIFICATIONS- GRADING PAVING AND DRAINAGE PLAN 1", REVISED FEBRUARY 18,1997, DRAWING NUMBER D-4504 7.) DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIP 3200 (NAD83 AND NAVD 88. gSTORM A 4l0 �' '+ O WATER POND W.E. 427.2 k,�0 I CCU LVERT' + I 00 4 / , \ ® N60 j 0 ' S A IDONED RAILROAD LINE 0.� / i \\ Ago 480 i A 490 � � I 500 410 DFA HANDLING AREA 0 o CORRECTIVE ACTION PLAN - AREA C WELL NETWORK \\\\ \ O o O 0 EXTRACTION SYSTEM 51 SILO ���� 12 BEDROCK EXTRACTION WELLS (EX-39THRU Q W-22BRL SILO1 EX-49 \ DRY FLY ASH SUMP EQUIPMENT BUILDING DISCHARGE INTO EXISTING4y0 \ DRY FLY ASH SUMP O PROPOSED EXTRACTION / � / COLLECTION AND PUMP STATION EX-44 • \ i_� i i I ii + ` 4�° \\\ j ^n N^/ \\ _ Ex-48 CORRECTIVE ACTION PLAN - AREA B WELL NETWORK rV ACTIVE BORROW AREA N SEX-45 �� EXTRACPOND W.E.ION SYSTEM �O 5 BEDROCK EXTRACTION WELLS (EX-19 THRU EX-23) \ E465.3 \\ n i EX-24 _ EX-26 MW 0 0 '' ° �� �`— '- — 35S 0.5 0.g, 0.10 O i \y�GATE c a /i �EX21 EX-27 EX-28 EX-29 35BR / 470 o / 510EX-30 )44 EX-31 i' - — 3A l /1 32 \ 1BR M ' / GMW-10 g0 / EX-33 / CCR-1 \� SCCR-1056R / '/ • 50o Szo CORRECTIVE ACTION PLAN - AREA A WELL NETWORK EXTRACTION SYSTEM 15 BEDROCK EXTRACTION WELLS (EX-24 THRU EX-38) E + i 510 i 530 \ / _---------- -------- CCR: \ 2 i \ \ 540 \\\\ — \\\\\ CONTRACTOR 560 DUKEI o a \\ --- - - ---- ENERG --- // 5so 590 PROGRESS N 590 600 err �4 1 S°\ STORM WATER POND' D I I 1 \\ \ \ 490 \\ \ I II I _ ------ -- \ j I PROPOSED EXTRACTION COLLECTION \ \\ �/ OWN NOV-_ PROPOSED EXTRACTION \ COLLECTION AND PUMP ST, WATER 0 I I Ir II II � II NOT FOR CONSTRUCTION GRAPHIC SCALE FIGURE 6-17a 100 0 50 100 200 REMEDIAL ALTERNATIVE 3 (IN FEET) WELL SYSTEM LAYOUT DRAWN BY: J. CHASTAIN DATE: 12/26/2019 GROUNDWATER REMEDIATION BY REVISED BY: - DATE:- EXTRACTION COMBINED WITH CLEAN WATER CHECKED BY: J CLEMMER DATE: 12/26/2019 INFILTRATION AND TREATMENT APPROVED BY: C EADY DATE: 12/26/2019 CORRECTIVE ACTION PLAN UPDATE PROJECT MANAGER: C. EADY ROXBORO STEAM ELECTRIC PLANT www.synterracorp.com SEMORA, NORTH CAROLINA