HomeMy WebLinkAboutNC0003425_Rox_CAP_Figures 6-14a and b_20200416I e
♦
%
4. EASTERN DISCHARGE CANAL] Ll
J ♦ f
,
► ' ♦ \
.o♦,
_ra
� , I
f
� s I
• f
v `♦ I
1 I
. .
I
10
t
DUKE
ENERGY
PROGRESS
(IN FEET)
DRAWN BY: C. WYATT DATE: 06/11/2019
REVISED BY: C. WYATT/K. KING DATE: 12/16/2019
CHECKED BY: K. LAWING DATE: 12/16/2019
APPROVED BY: K. LAWING DATE: 12/16/2019
PROJECT MANAGER: C. EADY
LEGEND
•
NOTES:
FIGURE 6-14a
ISOCONCENTRATION MAP
STRONTIUM IN TRANSITION FLOW ZONE
EAST ASH BASIN
CORRECTIVE ACTION PLAN UPDATE
ROXBORO STEAM ELECTRIC PLANT
SEMORA, NORTH CAROLINA
' / l
000*1
�•r• �nnevu�uvv _
AREA 1 /
INTAKE
CANAL
UNIT 3 COOLING
TOWER POND �. • ��
UNIT 3 HEATED �•
WATER DISCHARGE POND
-� EASTASH
BASIN
:ID LANDFILL
a
WEST ASH
BASIN0-..,
♦ J
♦ 1 \
♦ 1
♦ � EASTERN DISCHARGE CANAL
LEGEND
•
NOTES:
•
rs_
DUKE
FIGURE 6-14b
ENERGY
ISOCONCENTRATION MAP
(IN FEET)
STRONTIUM IN BEDROCK FLOW ZONE
PROGRESS
DRAWN BY: C. WYATT DATE:06/11/2019
EAST ASH BASIN
�jp
REVISED BY: C. WYATT/K. KING DATE: 12/18/2019
CORRECTIVE ACTION PLAN UPDATE
CHECKED BY: K. LAWING DATE: 12/18/2019
C
APPROVED BY: K.LAWING DATE: 12/18/2019
ROXBORO STEAM ELECTRIC PLANT
synTerra
PROJECT MANAGER: C. EADY
SEMORA, NORTH CAROLINA
f7
www.svnterracorD.COM