Loading...
HomeMy WebLinkAbout20200524 Ver 1_PCN Form Submission_20200416April 16, 2020 Ms. Rachel Capito, Regulatory Specialist U. S. Army Corps of Engineers 69 Darlington Avenue Wilmington, NC 28403 Subject: 404/401 Nationwide 39 Permit Application Coastal Carolina Community College Proposed Bear Creek Public Safety Training Facility off NC 172 near Hubert Onslow County Dear Ms. Capito: Vaughn & Melton Consulting Engineers has been retained by Coastal Carolina Community College (CCCC) to design and permit the new roadway and 600-foot by 600-foot driver training pad (Phase I, II) for the subject project. The site is a 70-acre parcel adjacent to NC 172 approximately 0.56 miles north of the intersection of NC 172, Lyman Road and Bear Creek Road near Hubert in southeast Onslow County. CCCC proposes to construct a new training facility to train first responders. The proposed project is planned in four phases, Phase I – Roadway; Phase II, Concrete pad for driver training; Phase III – Firing Range, Classroom building, EMS building, Burn Building, Maintenance Building, and Parking lot; Phase IV – Outside training areas and running track; all depending upon available funding. No further permits are anticipated for full build-out of the project as all other amenities were designed to avoid the remaining jurisdictional features (wetlands) on the property. I have enclosed an agent authorization letter, PCN application, Approved Jurisdictional Determination and exhibits, State Environmental Assessment/FONSI, SHPO no comment letter, USFWS concurrence letter, permit drawings/plan sheets showing the proposed work, a USGS topographical map, and other pertinent information regarding the project. Permits Requested Vaughn and Melton, on behalf of CCCC, is hereby requesting authorization under Section 404 of the Clean Water Act to proceed with the construction project outlined above. I am also requesting authorization under Section 401 of the Clean Water Act from the North Carolina Department of Environmental Quality, Division of Water Resources (DWR). If you have any questions or need additional information, please contact me at (252) 229-4506 or by email at dhalligood@vaughnmelton.com. Your early review and consideration will be greatly appreciated. Sincerely, Dwayne H. Alligood, PE Project Manager Enclosures cc: Ms. Karen Higgins, Division of Water Resources, NCDEQ, Raleigh Ms. Sheri Montalvo, Division of Water Resources, NCDEQ, Raleigh Mr. Robb Mairs, Division of Water Resources, NCDEQ, Wilmington Mr. John Ellis, Biologist, US Fish and Wildlife Service, Raleigh 3115 Trent Road New Bern, NC 28562 P.252.631.5115 Corps Submittal Cover Sheet Please provide the following info: 1. Project Name: __CCCC – Bear Creek Public Safety Training Facility 2. Name of Property Owner/Applicant: Coastal Carolina Community College – David Heatherly, President 3. Name of Consultant/Agent: __Dwayne Alligood,PE, Vaughn & Melton Consulting Engineers, Inc. *Agent authorization needs to be attached. 4. Related/Previous Action ID number(s):__N/A___________________________________________ 5. Site Address: _805 Hwy. 172, Hubert, NC 28539 6. Subdivision Name: __N/A__________________________________________________________ 7. City: ____Hubert ____________________________________________________________ 8. County: __Onslow________________________________________________________________ 9. Lat: _ 34.66289ON Long: -77.23034OW (Approx. Project Center) 10. Quadrangle Name: ___Hubert, NC __________________________________________ 11. Waterways: Bear Creek (DWR Class: SA, HQW) 12. Watershed: _White Oak (HUC 030203010302) ______________________________ 13. Requested Action: _X_ Nationwide Permit # _39_ ___ General Permit # _____ ___ Jurisdictional Determination Request ___ Pre-Application Request ------------------------------------------------------------------------------------------------------------------ The following information will be completed by Corps office: AID: ______________________________ _____ Prepare File Folder _____ Assign number in ORM _______________ Begin Date Authorization: ____ Section 10 ____ Section 404 Project Description/ Nature of Activity/ Project Purpose: ________________________________________________________________________________________ Site/Waters Name: ________________________________________________________________________ Keywords: ______________________________________________________________________________ DWR Division of Water Resources Pre -Construction Notification (PCN) Form April 11, 2020 Ver 3.1 Initial Review Has this project met the requirements for acceptance in to the review process?* r Yes r No Is this project a public transportation project?* G Yes IT No Change only if needed. BIMS # Assigned 20200524 Is a payment required for this project?* r No payment required r Fee received r Fee needed - send electronic notification Reviewing Office * Wilmington Regional Office - (910) 796-7215 Information for Initial Review 1a. Name of project: Bear Creek Public Safety Training Facility 1a. Who is the Primary Contact?* Lisa Feller, PE 1b. Primary Contact Email:* lmfeller@vaughnmelton.com Date Submitted 4/16/2020 Nearest Body of Water Bear Creek Basin White Oak Water Classification SA, HQW Site Coordinates Latitude: 34.66289 A. Processing Information County (or Counties) where the project is located: Onslow Is this a NCDMS Project r Yes IT No Longitude: -77.23034 Is this project a public transportation project?* r Yes r No 1a. Type(s) of approval sought from the Corps: W Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) Version#* 1 What amout is owed?* IT $240.00 r $570.00 Select Project Reviewer* Robb Mairs:eads\rlmairs2 1c. Primary Contact Phone:* (252)631-5115 1b. What type(s) of permit(s) do you wish to seek authorization? W Nationwide Permit (NWP) r Regional General Permit (RGP) r Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? r Yes r No Nationwide Permit (NWP) Number: NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: W 401 Water Quality Certification - Regular r Non-404 Jurisdictional General Permit r Individual Permit 39 - Commercial/Institutional Developments le. Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: F- 401 Water Quality Certification - E)press r Riparian Buffer Authorization 1f. Is this an after -the -fact permit application?* r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No Acceptance Letter Attachment 1h. Is the project located in any of NC's twenty coastal counties? r Yes r No 1i. Is the project located within a NC DCM Area of Environmental Concern (AEC)? r Yes r No 1j. Is the project located in a designated trout watershed? C Yes r No F. Applicant Information 1d. Who is applying for the permit? fJ Owner W Applicant (other than owner) le. Is there an Agent/Consultant for this project?* r Yes r No 2. Owner Information 2a. Name(s) on recorded deed: Coastal Carolina Community College 2b. Deed book and page no.: Book 434 page 205 2c. Responsible party: Mr. David Heatherly, President 2d.Address Street Address 444 Western Blvd Address tine 2 city Jacksonville Postal / Zip Code 28546 2e. Telephone Number: (910)938-6210 2g. Email Address:* heatherlyd@coastaicarolina.edu r Unknown State / Ftovince / Region North Carolina Country US 2f. Fax Number: r Yes r No r Yes r No u 3. Applicant Information (if different from owner) 3a. Name: Dwayne Alligood, PE 3b. Business Name: Vaughn & Melton Consulting Engineers, Inc. 3c.Address Street Address 3115 Trent Road Address Line 2 City Slate / Province / Region New Bern INC Postal / Zip Code Country 28562 us 3d. Telephone Number: 3e. Fax Number: (252)229-4506 3f. Email Address:* dhalligood@vaughnrrielton.com 4. Agent/Consultant (if applicable) 4a. Name: Dwayne Alligood 4b. Business Name: Vaughn & Melton Consulting Engineers, Inc. 4c.Address Street Address 3115 Trent Road Address Line 2 city State / Rovince / Region New Bern North Carolina Postal / Zip Code Country 28562 us 4d. Telephone Number: 4e. Fax Number: (252)229-4506 4f. Email Address:* dhalligood@vaughnmelton.com Agent Authorization Letter* CCCC Agent Authorization Letter_Signed.pdf 558.36KB C. Project Information and Prior Project History l^J 1. Project Information 1b. Subdivision name: (if appropriate) N/A 1c. Nearest municipality/ town Hubert 2. Project Identification 2a. Property Identification Number: 2b. Property size: 040549 70.5 2c. Project Address Street Address 805 Hwy 172 Address Line 2 oily State / Rovince / Region Hubert INC Fbstal / Zip Code Country 28539 us 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Bear Creek 3b. Water Resources Classification of nearest receiving water:* SA, HOW 3c. What river basin(s) is your project located in?* White Oak 3d. Please provide the 12-digit HUC in which the project is located. 030203010302 4. Project Description and History 4a. Describe the existing conditions on the site and the general land use in the vicinityof the project at the time of this application:* Coastal Carolina Community College obtained the property from Camp Lejeune military base in 1973. The access road and cleared area already existed when the community college obtained the property. The site served as an unimproved outdoor training area from 1973 to present. The site currently has a dirt access road, two small buildings, approximately 14 acres of maintained open area, and the remaining acreage on the site is currently forested. Camp Lejeune adjoins the property to the west, undeveloped county property to the south, and Bear Creek on the east and north sides. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* r- Yes r No r- Unknown 4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) CCCC-Topo Map.pdf 748.19KB 4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) CCCC Bear Creek_Soil_Report LMF.pdf 967.61KB 4f. List the total estimated acreage of all existing wetlands on the property 17.6 acres 4g. List the total estimated linear feet of all existing streams on the property: There is approximately 300 linear feet of UT's to Bear Creek on the property interior and approximately 3,650 linear feet of Bear Creek, which forms the northern and eastern boundaries of property. 4h. Explain the purpose of the proposed project:* Coastal Carolina Community College proposes to construct a facility/satellite campus to train first responders. The Bear Creek Public Safety Training Facility is designed to provide a classroom building, EMS building, fire fighter training and burn building, driver training road course, firing range, parking lots, outside training areas and a running track to provide up to date training opportunities for first responder's in southeastern North Carolina. 41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* The Bear Creek Public Safety Training Facility is designed to have minimal impact to onsite wetlands. Only 0.117 acres of wetlands out of a total 17.6 acres of wetlands onsite will be permanently impacted due to roadway expansion and a retaining wall for a storm water pond. No additional direct or indirect wetland impacts are anticipated for the construction of this project. No additional offsite infrastructure is needed for this project. The construction of this facility will utilize typical earth moving equipment such as excavators, bulldozers, tractors, dump trucks, etc. Appropriate erosion control measures (BMP's) will be installed and maintained during construction according to the "Approved" NCDMLR Sedimentation and Erosion Control Plan. 4j. Please upload project drawings for the proposed project. Bear Creek Site Development Plan Sheets_01-29-20.pdf 23.91 MB Permit Drawings -Wetland Disturbance Plan-Revised.pdf 965.98KB 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* r Yes r No Comments: 5b. If the Corps made a jurisdictional determination, what type of determination was made?* r- Preliminary r Approved r- Not Verified r Unknown r N/A Corps AID Number: SAW-2015-00487 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Robert Turnbull Agency/Consultant Company: Environmental Services, Inc. Other: r Unknown 5d. List the dates of the Corp jurisdiction determination or State determination if a determination was made bythe Corps or DWR USACE Action ID No. SAW-2015-00487. Original Approved Jurisdictional Determination (AJD) was issued on March 11, 2015, with the condition that the wetlands be surveyed by a PLS. The final AJD was issued on May 14, 2015, by Brad Shaver, Regulatory Specialist, USACE, Wilmington Office. 5d1. Jurisdictional determination upload AJD Notification—USACE SAW-2015-00487.pdf 1.99MB 6. Future Project Plans 6a. Is this a phased project?* r Yes r No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? This is not a phased project in regard to permitting. Final build -out of the project may not occur for several years due to available funding allocations, but all future facilities were designed to avoid all remaining wetlands on the project site. D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): W Wetlands r Streams -tributaries ❑ Buffers r Open Waters r Pond Construction 2. Wetland Impacts 2a1 Reason (?) 2b. Impact type * M 2c. Type of W.* 2d. W. name * 2e. Forested * 2f. Type of Jurisdicition*(') 2g. Impact area* Wetland Fill/Culvert P Pine Flat WB Yes Corps 0.053 (acres) 1 Mechanized Clearing T Pine Flat WB Yes Corps 0.125 (acres) Wetland Fill/Culvert P Pine Flat WC Corps 0.062 (acres) Mechanized Clearing T Pine Flat �WC Corps 0.054 (acres) Wetland Fill P Pine Flat WA Yes Corps 0.002 (acres) 3 Mechanized Clearing T __] Pine Flat WA Yes Corps 0.067 (acres) 2g. Total Temporary Wetland Impact 0.246 2g. Total Wetland Impact 0.363 2h. Comments: 2g. Total Permanent Wetland Impact 0.117 Culverts were added at the roadway wetland crossings to maintain connectivity between the wetland areas. Temporary wetland impacts will include mechanized clearing to remove above ground vegetation so equipment can work safely during construction. No disturbance and/or grubbing of the root mat is anticipated during construction. E. Impact Justification and Mitigation v 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: The project was designed to utilize most of the existing roadway on the project site. The 0.115 acre of wetland impact was minimized to the maAmum extent practical in order to meet current transportation design guidelines and safety standards. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Mechanized clearing will only remove the above ground vegetation to allow construction equipment to operate during the placement of fill. The project design also utilized vertical retaining walls wherever feasible to avoid and minimize wetland impacts. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? r Yes r No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: The wetlands to be impacted by the new entrance road (0.115 acres) are currently degraded and of low quality due to being located immediately adjacent to the existing road and lie within the permanently maintained area. The project has been designed to avoid all the remaining wetlands on the property (17.483 acres). F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? r Yes r No If no, explain why: All ground disturbing activities are greater than 50 feet from streams and surface waters. 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* r Yes r No 2b. Does this project meet the requirements for low density projects as defined in 15ANCAC 02H .1003(2)? r Yes r No 2c. Does this project have a stormwater management plan (SMP) reviewed and approved under a state stormwater program or state -approved local government stormwater program? r Yes r No r NtA - project disturbs < 1 acre 2d. Which of the following stormwater management program(s) apply: r Local Government R State State Stormwater Programs F Phase II V HWQ or ORW r Coastal Counties r Other Comments: The NC Division of Energy, Mineral and Land Resources (Stormwater Section), Wilmington Regional Office, accepted the Stormwater Permit Application and the $505.00 application fee for the Bear Creek Public Training Facility on January 31, 2020. The project has been assigned to Steven Pusey of DEMLR and we are currently awaiting approval of the stormwater management plan. G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* r Yes r No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)?* r Yes r No 1c. If you answered "yes" to the above, has the document review been finalized bythe State Clearing House?* r Yes r No NEPAor SEPA Final Approval Letter CCCC EA State Clearinghouse Comments.pdf CCCC Bear Creek EA-FONSI signed.pdf 2. Violations (DWR Requirement) 984.98KB 4.25MB 2a. Is the site in violation of DWR Water Quality Certification Rules (15ANCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)?* r Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* r Yes r No 3b. If you answered "no," provide a short narrative description. The proposed CCCC Public Safety Training Facility should have little to no impact on future development in this isolated area of Onslow County. Property to the west is owned by Camp Lejeune and property to the east is separated by Bear Creek, which is comprised of residential housing/subdivisions. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* r Yes r Nor NIA 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* r Yes r No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* r Yes r No 5c. If yes, indicate the USFWS Field Office you have contacted. Raleigh 5d. Is another Federal agency involved?* r Yes r No 5e. Is this a DOT project located within Division's 1-8? r- Yes r No 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? r Yes r- No 5g. Does this project involve bridge maintenance or removal? r- Yes r No 5h. Does this project involve the construction/installation of a wind turbine(s)?* r Yes r No (- Unknown 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? r- Yes r No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? The NC Natural Heritage Program Database and the USFWS Threatened & Endangered County Species List for Onslow County (updated 10-4-2018) and Section 7 consultation with USFWS (see attached letter). Consultation Documentation Upload CCCC USFWS Response Letter Highlighted.pdf 56.2KB 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* r- Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* The NOAA-NMFS database. The proposed project does not impact any streams and/or surface waters. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* r- Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* The NC State Historic Preservation Office (SHPO) has reviewed the project and indicated no known archaeological or historic sites within the project area. SHPO issued a "No Comment Letter" on August 23, 2017, (Project No. GS-17-1473). 7c. Historic or Prehistoric Information Upload SHPO No Comment Letter_GS 17 1473_2.pdf 294.39KB 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain?* r- Yes r No 8c. What source(s) did you use to make the floodplain determination?* Onslow County GIS and NC Floodplain Mapping Program. Miscellaneous Comments Miscellaneous attachments not previously requested. CCCC-USACE-Permit Cover Sheet.pdf 12.35KB Nationwide 39 CovLet- CCCC Public Safety Training Facility - Onslow County_Signed.pdf 97.96KB Signature * R By checking the box and signing below, I certify that: • I have given true, accurate, and complete information on this form; I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: Dwayne H. Alligood Signature a0—,a - sty. Vr1l Date 4/16/2020 March 2020 Ms. Rachel Capito, Regulatory Specialist U. S. Army Corps of Engineers 69 Darlington Avenue Wilmington, NC 28403 Subject: Agent Authorization Letter Coastal Carolina Community College — Bear Creek Public Safety Training Center Onslow County Dear Ms. Capito: Vaughn & Melton Consulting Engineers has been retained by Coastal Carolina Community College (CCCC) to survey, design, conduct environmental evaluations, and permit the proposed Bear Creek Public Safety Training Center in Onslow County. The purpose of the project is to construct a training facility for first responders. The facility is designed to provide a driver training road course, firing range, fire fighter training area and burn building, EMS building, classroom building, parking lots, and other training areas including a running track. The project will occur on a 70 (+) acre tract of land adjacent to NC Hwy. 172 in the Bear Creek area east of Jacksonville. As part of this project, Coastal Carolina Community College will be submitting a Pre -Construction Notification (PCN) seeking authorization under Section 404 Nationwide Permit 39 and Section 401 General Water Quality Certification No. 4139 for impacts to jurisdictional features associated with this project. For this effort, Coastal Carolina Community College authorizes Dwayne Alligood, PE, with Vaughn & Melton Consulting Engineers, to act on our behalf and take all actions necessary for the processing, issuance, and acceptance of this permit. If you have any questions or need additional information, please contact me at (910) 445-1221 or by email at heatherrlyPcoastalcarolina.edu. Sincerely, David Heatherly, President Coastal Carolina Community College cc: Mr. Dwayne Alligood, Project Manager, Vaughn & Melton Consulting Engineers, Inc., New Bern Office Ms. Lisa Feller, PE, Vaughn & Melton Consulting Engineers, Inc., New Bern Office