HomeMy WebLinkAboutNCS000330_2020-03 (Tier 3) Monthly Monitoring Report No Flow_20200416April 16, 2020 P.O. Box 5030
2020 Ashcraft Avenue
Monroe, NC 28111-5030
Attn: Central Files Phone: (704) 289-451 I
Fax: (704)290-5194
N.C. Division of Water Quality Email: Tyler.Mercer@ATImetals.com
1617 Mail Service Center
Raleigh, NC 27699-1617
Central Files: Tier 3 Monthly Monitoring Report - No Flow
Attached, please find stormwater monitoring data for ATI Specialty Materials — Monroe Plant
Permit No NCS000330. The originals are included. A copy was also uploaded into the NPDES
Stormwater Individual Permits website. The monitoring data is for the following monitoring
schedule:
Moniorin Events '
Sam le Number
Start
End..
March 2020; Tier-3
NIA
NIA
NIA
Stormwater sampling for Outfall # 02(M) has been determined to be the representative outfall
through prior correspondence.
"I certify, under penalty of law, that this document and all attachments were prepared
under my direction or supervision in accordance with a system designed to assure that
qualified personnel properlygather and evaluate the information submitted. Based on my
inquiry of the person or persons who manage the system, or those persons directly
responsible forgathering the information, the information submitted is, to the best of my
knowledge and belief, true, accurate, and complete. I am aware that there are significant
penalties for submitting false information, including the possibility offines and
imprisonment for knowing violations."
If you have any questions or need additional information, please contact me at 704-289-4511.
Thank you.
Sincerely,
4YL %,,4,��
Tyler Mercer
EHS Manager
Environmental
Quality
Stormwater Discharge Outfall (SDO)
Qualitative Monitoring Report
For guidance on filling out this farm, please visit https:Hdeq.ne.gov/about/divisions/energy-mineral-land-resources/
npdes-stormwater-gps
Permit No.: N/C/ S/0/0/0/3/3/0 or Certificate of Coverage No.: N/C/GI I I I 1 1 I
Facility Name: ATI Specialty Materials- Monroe
county: Union
Inspector: _
Date of Inspection:
Time of Inspection:
Phone No. 704-289-4511
G--m K-t s-,ao
Total Event Precipitation (inches): too FIDLO
All permits require qualitative monitoring to be performed during a "measurable storm event."
A "measurable storm event" is a storm event that results in an actual discharge from the permitted site
outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm
interval does not apply if the permittee is able to document that a shorter interval is representative for
local storm events during the sampling period, and the permittee obtains approval from the local DEMLR
Regional Office.
By this signature, I certify that this report is accurate and complete to the best of my knowledge:
of Permittee or Designee)
1. Outfall Description:
Outfall No. 01 Structure (pipe, ditch, etc.): Pipe
Receiving Stream:
Richardson Creek
Describe the industrial activities that occur within the outfall drainage area:
Metal Storage
Page 1 of 2
S U-2a2, Last inodified 06/01 /2018
�r
Environmental
Quality
Stormwater Discharge Outfall (SDO)
Qualitative Monitoring Report
For guidance on filling out this form, please visit https://deq.ne.gov/about/divisions/energy-mineral-land-resources
npdes-stormwater-gps
Permit No.: N/C/ S/0/0/0/3/3/0 or Certificate of Coverage No.: N/C/GI l l l l l l
Facility Name: ATI Specialty Materials -Monroe
county: Union
Inspector:
Date of Inspection:
Time of Inspection:
Phone No. 704-289-4511
(+yin '1.15-40
Total Event Precipitation (inches): Igo Flow
All permits require qualitative monitoring to be performed during a "measurable storm event."
A "measurable storm event" is a storm event that results in an actual discharge from the permitted site
outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm
interval does not apply if the permittee is able to document that a shorter interval is representative for
local storm events during the sampling period, and the permittee obtains approval from the local DEMLR
Office.
By this signature, I certify that this report is accurate and complete to the best of my knowledge:
of Permittee or Designee)
1. Outfall Description:
Outfall No. 02 Structure (pipe, ditch, etc.): Pipe
Receiving Stream:
Richardson Creek
Describe the industrial activities that occur within the outfall drainage area:
Metal Storage
Page 1 of 2
SWU-242, Last modified 06/01 /201 &
Environmental
Quaiity
Stormwater Discharge Outfall (SDO)
Qualitative Monitoring Report
For guidance on filling out this farm, please visit https-Hdeq.nc.gov/about/divisions/energy-mineral-land-resources/
npdes-stormwater-gps
Permit No.: N/C/ S/0/0/0/3/3/0 or Certificate of Coverage No.: N/C/G/ 11 I I i I
Facility Name: ATi Specialty Materials- Monroe
county: Union Phone No. 704-289-4511
Inspector:
Date of Inspection: :figexch
Time of Inspection:
6.tw, `Hs-30
Total Event Precipitation (inches): N0 Ftow
All permits require qualitative monitoring to be performed during a "measurable storm event."
A "measurable storm event" is a storm event that results in an actual discharge from the permitted site
outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm
interval does not apply if the permittee is able to document that a shorter interval is representative for
local storm events during the sampling period, and the permittee obtains approval from the local DENILR
Regional Office.
By this signature, I certify that this report is accurate and complete to the best of my knowledge:
i r ► th/ZZ♦ • �r
(Si Lure of Permittee or Designee)
1. Outfall Description:
Outfall No. 03 Structure (pipe, ditch, etc.): Pipe/Ditch
Receiving Stream:
Richardson Creek
Describe the industrial activities that occur within the outfall drainage area:
Metal Storage, Hammer Repair Dust Collection
Page 1 of 2
SWEi-242, bast modified 06/01/2018
Environmental
Quality
Stormwater Discharge Outfall (SDO)
Qualitative Monitoring Report
For guidance on filling out this form, please visit https://deq.ne.gov/about/divisions/energy-mineral-land-resources/
npdes-stormwatengps
Permit No.: N/C/ S101010131310 or Certificate of Coverage No.: N/C/G/
Facility Name: ATI Specialty Materials - Monroe
County: Union
Inspector:
Date of Inspection: I)J" r A
Time of Inspection:
Phone No. 704-289-4511
Total Event Precipitation (inches): No Floua
All permits require qualitative monitoring to be performed during a "measurable storm event."
A "measurable storm events' is a storm event that results in an actual discharge from the permitted site
outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm
interval does not apply if the permittee is able to document that a shorter interval is representative for
local storm events during the sampling period, and the permittee obtains approval from the local DEMLR
Regional Office.
By this signature, I certify that this report is accurate and complete to the best of my knowledge:
of Permittee or Designee)
1. Outfall Description:
Outfall No. 04 Structure (pipe, ditch, etc.): Pipe/Ditch
Receiving Stream:
Richardson Creek
Describe the industrial activities that occur within the outfall drainage area:
Shipping Staging, Turnings Storage, Truck Loading
Page 1 of 2
SWU-242, Last modified 06/01/2018
Environmental
Quality
Stormwater Discharge Outfall (SDO)
Qualitative Monitoring Report
For guidance on f lling out this form, please visit https://deq.ne.gov/about/divisions/energy-n-tineral-land-resources/
npdes-stormwater-gps
Permit No.: NIC/ S/0/0/0/3/3/0 or Certificate of Coverage No.: N/C/G/ I I l I I 1
Facility Name: ATI Specialty Materials - Monroe
county: Union
Phone No. 704-289-4511
Inspector:
Date of Inspection:2G
Time of Inspection:
Sr, N -is- a 0
Total Event Precipitation (inches): NO FlOw
All permits require qualitative monitoring to be performed during a "measurable storm event."
A "measurable storm event" is a storm event that results in an actual discharge from the permitted site
outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm;
interval does not apply if the permittee is able to document that a shorter interval is representative for
local storm events during the sampling period, and the permittee obtains approval from the local DEMLR
Regional Office.
By this signature, I certify that this report is accurate and complete to the best of my knowledge:
of Permittee or Designee)
1. Outfall Description:
Outfall No. Q5 Structure (pipe, ditch, etc.):
Receiving Stream:
Richardson Creek
Ditch
Describe the industrial activities that occur within the outfall drainage area:
Metal Storage, Clean Empty Drums, Equipment Storage, Roll Off Containers
Page 1 of 2
SwU-242, Last modified 06/01/2018
Environmental
Quality
Stormwater Discharge Outfall (SDO)
Qualitative Monitoring Report
For guidance on f lling out this form, please visit https://deq.ne.gov/about/divisions/energy-mineral-land-resources/
npdes-stormwater-gps
Permit No.: NIC/ S/0/0/0/3/3/0 or Certificate of Coverage No.: N/C/GI
Facility Name: ATI Specialty Materials - Monroe
County: Union . Phone No. 704-289-4511
Inspector:
Date of Inspection:
Time of Inspection:
fir, y-1s-Q4z)
Total Event Precipitation (inches): N O F1 J
All permits require qualitative monitoring to be performed during a "measurable storm event."
A "measurable storm event" is a storm event that results in an actual discharge from the permitted site
outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm
interval does not apply if the permittee is able to document that a shorter interval is representative for
local storm events during the sampling period, and the permittee obtains approval from the local DEMLR
Regional Office.
By this signature, I certify that this report is accurate and complete to the best of my knowledge:
(SigAafure of Permittee or Designee)
1. Outfall Description:
Outfall No. 06 Structure (pipe, ditch, etc.): Ditch
Receiving Stream:
Richardson Creek
Describe the industrial activities that occur within the outfall drainage area:
Trash Compactor, Metal Storage, Parking Lot
Page 1 of 2
SWU-242, Last modified 06/0U2018