Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20200516 Ver 1_2020-04-01_100% Bid Plan Set_Silver-Line Park_20200415
PROJECT NAME: SILVER-LINE PARK ADDRESS: 1054 Riverside Dr. Asheville, NC 28804 Latitude: 35.626462° N Longitude: -82.582327° W PROJECT SIZE: Approximately 5.35 Ac Total disturbance area is 4.36 Ac FRENCH BROAD RIVER ORDINARY HIGH WATER MARK 1945' (NAVD 88) at time of survey (11/11/19). All aspects of work shall be performed in accordance with all applicable local, state, and federal regulations pertaining to worker safety. LANDSCAPE ARCHITECT: Equinox LANDSCAPE ARCHITECT CONTACT: David Tuch 37 Haywood Street, Suite 100 Asheville, NC 28801 (828) 253-6856 (x202) david@equinoxenvironmental.com CLIENT/OWNER: Town of Woodfin 90 Elk Mountain RD. Woodfin, NC 28804 (828) 253-4887 100% PLAN SET FOR REVIEW S I L V E R - L I N E P A R K GENERAL: 1.LOCATE ALL UTILITIES PRIOR TO DIGGING. 2.SEDIMENTATION OF THE STORMWATER CONTROL MEASURES WILL CAUSE FAILURE, THEREFORE, INSTALL ALL STORMWATER CONTROL MEASURES ONLY AFTER ALL SEDIMENT AND EROSION ON-SITE IS CONTROLLED AND SITE IS STABILIZED AND SEEDED. 3.DURING INSTALLATION, THE CONTRACTOR SHALL NOTIFY EQUINOX OR OWNER OF ANY CONDITIONS WHICH MAY BE HARMFUL TO PLANT LIFE, SUCH AS HAZARDOUS MATERIALS, ETC. EQUINOX SHALL MAKE RECOMMENDATIONS TO ADDRESS THE SPECIFIC SITUATION. 4.WHERE CONFLICTS OCCUR BETWEEN NOTES, DRAWINGS, OR SPECIFICATIONS, THE CONTRACTOR SHALL NOT PROCEED WITH THE AFFECTED WORK UNTIL THE LANDSCAPE ARCHITECT ISSUES A CLARIFICATION. CONSTRUCTION: 5.BURNING IS NOT PERMITTED. 6.EDGE OF WATER AT TIME OF SURVEY SHOWN - ACTUAL WATER ELEVATION MAY VARY. 7.CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL APPLICABLE BUILDING PERMITS, LABOR, MATERIALS, AND EQUIPMENT REQUIRED TO PERFORM THE SPECIFIED WORK. 8.ALL ASPECTS OF WORK SHALL BE PERFORMED IN ACCORDANCE WITH ALL APPLICABLE LOCAL, STATE, AND FEDERAL REGULATIONS PERTAINING TO WORKER SAFETY. 9.ALL PAVING MATERIALS AND WORKMANSHIP SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE STATE'S DOT "STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES." 10.GROUND SURFACE SHALL BE SHAPED TO PROVIDE POSITIVE DRAINAGE. 11.CONTRACTOR SHALL COORDINATE ALL SITE ACTIVITIES WITH OWNER OR DESIGNATED REPRESENTATIVE. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING DELIVERY, STORAGE AND HANDLING OF ALL MATERIALS REQUIRED FOR THE PROJECT. 12.ALL DISTURBED AREAS SHALL BE STABILIZED WITHIN 30 WORKING DAYS FOLLOWING COMPLETION OF LAND DISTURBING ACTIVITIES. IF THERE IS MORE STRINGENT SOIL STABILIZATION GUIDELINES PUT IN PLACE BY LOCAL, COUNTY, STATE OR FEDERAL AGENCIES OR CALLED FOR BASED ON PERMIT REQUIREMENTS THEN THE MORE STRINGENT GUIDELINES SHALL CONTROL AND GOVERN ON THE PROJECT. 13.CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL SPOIL MATERIAL OFF OF THE OWNER’S PROPERTY IN COMPLIANCE WITH ALL FEDERAL, STATE, AND LOCAL ENVIRONMENTAL LAWS AND REGULATIONS AT THE PRE-DETERMINED LANDFILL SITE. LANDFILL FEES SHALL BE INCLUDED IN THE CONTRACTOR’S PROJECT FEE. THIS INCLUDES ALL SURPLUS SOIL MATERIAL, UNSUITABLE TOPSOIL, ROCK, OBSTRUCTIONS, DEMOLISHED MATERIALS AND WASTE MATERIALS (INCLUDING TRASH AND DEBRIS). 14.CONTRACTOR TO FURNISH AND PROVIDE THIRD PARTY MATERIAL TESTING AS PART OF CONSTRUCTION BID. 15.CONTRACTOR TO FURNISH AND PROVIDE THIRD PARTY GEOTECHNICAL EVALUATION OF SUBGRADE TO ENSURE ADEQUATE BEARING. ECS CAN PROVIDE THIS SERVICE. (CONTACT MATT FOGELMAN AT 828.665.2307) 16.CONTRACTOR TO CONFORM TO OWNER'S SAFETY PROTOCOL AND PROVIDE A SITE SPECIFIC SAFETY PLAN AND OTHER DOCUMENTATION AS NECESSARY. 17.FOR PLASTIC SEWER PIPING, STORM AND SANITARY, AN INSULATED COPPER TRACER WIRE OR OTHER APPROVED CONDUCTOR SHALL BE INSTALLED ADJACENT TO AND OVER THE FULL LENGTH OF THE PIPING. THE TRACER WIRE SIZE SHALL BE NOT LESS THAN 14 AWG AND THE INSULATION TYPE SHALL BE LISTED FOR DIRECT BURIAL. 18.ALL FASTENERS TO BE GALVANIZED STEEL UNLESS OTHERWISE SPECIFIED 19.ALL WOOD TO BE PRESSURE TREATED UNLESS OTHERWISE SPECIFIED, SUCH AS THE THERMALLY MODIFIED PINE ON THE BOARDWALK. GRADING: 20.ALL SPOT GRADES AND CONTOURS SHOW FINISH GRADE WITH THE EXCEPTION OF THE PLAYGROUND ENLARGEMENT WHICH SHOWS FINISH ELEVATION AND GROUND SURFACE ELEVATION. 21.ALL CUT SLOPES AND FILL SLOPES TO BE 2:1 AND 3:1 RESPECTIVELY UNLESS OTHERWISE INDICATED. 22.CROSS SLOPES ON SIDEWALKS SHALL NOT EXCEED 1.9% GEOTECHNICAL: 23.REFER TO GEOTECHNICAL ENGINEERING REPORT (BY ECS SOUTHEAST) FOR DETAILED SOIL BORING TESTING ANALYSIS AND CONSTRUCTION RECOMMENDATIONS (SEE SPECIFICATIONS FOR FULL REPORT). 24.IN SOME LOW, WET AREAS ON SITE, UNDERCUTTING OF EXCESSIVELY SOFT MATERIALS MAY BE CONSIDERED INSUFFICIENT. IN SUCH LOW-LYING AREAS, THE USE OF REINFORED BIAXIAL- GEOGRID MAY BE NECESSARY UNDER THE ADVISEMENT OF THE OWNER AND THE GEOTECHNICAL ENGINEER, AS THESE FIELD CONDITIONS MAY ARISE. 25.IF SOFT OR UNSUITABLE SOILS SUCH AS UNDOCUMENTED FILL OR MOISTURE SENSITIVE SOILS ARE OBSERVED, AT FOOTING LOCATIONS OR LOCATIONS REQUIRING COMPACTION, THE UNSUITABLE SOILS SHOULD BE UNDERCUT AND REMOVED. ANY UNDERCUT SHOULD BE BACKFILLED WITH CRUSHED STONE, ENGINEERED FILL, OR LEAN CONCRETE UP TO THE ORIGINAL DESIGN BOTTOM OF THE FOOTING AND/OR SURFACE BASE COURSE. 26.PROOF ROLLING UNDER THE OBSERVATION OF A GEOTECHNICAL ENGINEER SHOULD BE CONDUCTED BEFORE THE LAYING OF ANY BASE LAYER OF PAVING. ECS CAN PROVIDE THIS (CONTACT MATT FOGELMAN AT 828.665.2307) CONCRETE: 27.UNLESS OTHERWISE SPECIFIED, CONCRETE SHALL HAVE NATURAL SAND FINE AGGREGATE, EMBEDDED FIBERGLASS, AND NORMAL WEIGHT COARSE AGGREGATES CONFORMING TO ASTM C33, TYPE I PORTLAND CEMENT CONFORMING TO ASTM C150, AND SHALL HAVE THE FOLLOWING MINIMUM COMPRESSIVE STRENGTH (F’C) AT 28 DAYS: 28.FOOTINGS 3000 PSI W/ (ENTRAINED AIR & FLY ASH OPTIONAL) 29.SLABS 4000 PSI W/ 5% ENTRAINED AIR AND FLY ASH 30.EXTERIOR WALKS 4000 PSI W/ 5% ENTRAINED AIR AND FLY ASH 31.ALL CONCRETE SHALL BE MADE IN ACCORDANCE WITH APPROVED DESIGN MIXES AS REQUIRED FOR THE JOB. 32.SCHEDULE OF CONCRETE FINISHES (UNLESS OTHERWISE SPECIFIED ON PLANS): SLABS: NON-SLIP BROOM FINISH. EXTERIOR SIDEWALKS AND PATHS: NON-SLIP BROOM FINISH. ALL UNEXPOSED CONCRETE SURFACES: U.O.N. ROUGH FORM FINISH. ALL EXPOSED CONCRETE SURFACES: U.O.N. SMOOTH RUBBED FINISH. 33.THE CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING AND INSTALLING ANCHOR BOLTS, CLIPS, INSERTS, CONNECTION PLATES, SLEEVES, SLOTS, AND OTHER REQUIRED ITEMS IN ACCORDANCE WITH THE CONTRACT DRAWINGS, AND IN COOPERATION WITH OTHER TRADES PRIOR TO PLACING THE CONCRETE. 34.CONTROL JOINTS TO BE GROOVED WHEN CONCRETE IS STILL WET AND PLIABLE (1 8" - 1 16" WIDTH BY 1 4" DEEP) AND PLACED AS SHOWN WITH A MINIMUM OF EVERY 5' AND MAXIMUM OF EVERY 12' OF CONCRETE SURFACE OR PAD. CONCRETE REINFORCEMENT: 35.CONCRETE REINFORCEMENT BARS SHALL CONFORM TO ASTM A615, GRADE 60. REINFORCEMENT DESIGNATED AS CONTINUOUS SHALL LAP 36 BAR DIAMETERS AT SPLICES, UNLESS NOTED OTHERWISE. 36.ALL CONCRETE REINFORCEMENT BARS SHALL BE ACCURATELY AND SECURELY TIED AND ANCHORED IN PLACE TO PREVENT DISLOCATION DURING THE CONCRETE PLACEMENT OPERATION. 37.MINIMUM CONCRETE COVER PROTECTION FOR REINFORCEMENT BARS SHALL CONFORM TO THE AMERICAN CONCRETE INSTITUTE COMMITTEE 318, SECTION 7.7, UNLESS NOTED OTHERWISE. 38.CONTRACTOR IS RESPONSIBLE FOR FURNISHING ALL TESTING AS REQUIRED DURING CONSTRUCTION, TO BE APPROVED BY THE OWNER. STONE & ROCK: 39.IF EXISTING STONE AND ROCK MATERIAL ON SITE IS SUITABLE AND EQUIVALENT TO THE MATERIAL SPECIFIED, CONTRACTOR MAY UTILIZE ON SITE MATERIAL INSTEAD OF QUARRY MATERIAL WITH PRIOR APPROVAL REQUIRED BY LANDSCAPE ARCHITECT. 40.SAMPLES OF EACH TYPE OF ROCK, INCLUDING RIVER ROCK, COBBLE, BOULDERS , AND FIELDSTONE ARE TO BE APPROVED ON SITE BY LANDSCAPE ARCHITECT PRIOR TO INSTALLATION. 41.RIVER ROCK/COBBLE TO BE MIXED SIZES UNLESS OTHERWISE SPECIFIED. 42.RIVER ROCK/COBBLE TO BE THE FOLLOWING AVERAGE SIZE: 2"-4" (SMALL); 6"-8" (MEDIUM); AND 10"-12" (LARGE) / NOTIFY LANDSCAPE ARCHITECT IF PRODUCTS VARY FROM THIS SIZE RANGE. 43.ALL ROCK TO BE WASHED IMMEDIATELY BEFORE DELIVERY, UNLESS OTHERWISE SPECIFIED. PLANTING: 44.CALL 811 UTILITY LOCATIONS PRIOR TO DIGGING. 45.CONTRACTOR SHALL VERIFY ALL QUANTITIES, MEASUREMENTS AND SITE CONDITIONS. NO PLANT SUBSTITUTIONS ALLOWED UNLESS WRITTEN PERMISSION FROM EQUINOX IS GIVEN. 46.ALL INVASIVE TREES, SHRUBS AND VINES SHALL BE REMOVED DURING THE SITE DISTURBING ACTIVITY AND DISPOSED OF IN SUCH A WAY TO PREVENT GROWTH AT DISPOSAL LOCATION. 47.ALL PLANTING BEDS ARE TO BE CLEANED OF ROCKS AND DEBRIS >1", TILLED TO 12" DEPTH AND AMENDED WITH 3"OF NATURES HELPER (OR APPROVED EQUAL). THEN THOROUGHLY TILLED TOGETHER. 48.PLANTING SOIL SHALL BE TOPSOIL AMENDED WITH 3" OF NATURES HELPER (OR APPROVED EQUAL) AND THOROUGHLY TILLED TOGETHER. 49.ANY REMAINING DISTURBED, NON-PLANTED AREAS ARE TO BE FINE GRADED AND SEEDED WITH FESCUE BLEND OR MULCHED AS NOTED ON PLAN. 50.ALL PLANTS, MATERIALS, PLANTING AND SEEDING ACTIVITIES SHALL CONFORM TO LANDSCAPE INDUSTRY STANDARDS. COMPLY WITH SIZING AND GRADING STANDARDS OF THE LATEST EDITION OF "AMERICAN STANDARD OF NURSERY STOCK". PROVIDE STOCK TRUE TO BOTANICAL NAME AND LEGIBLY TAGGED. 51.STOCKPILE LOCATION(S) TO BE APPROVED BY LANDSCAPE ARCHITECT. 52.KEEP PLANT SPECIES MOIST AND SHADED UNTIL INSTALLATION. DO NOT LEAVE IN THE SUN OR LET PLANTS DRY OUT. SATURATE PLANTS AFTER INSTALLATION. PLANTS SHALL NOT BE DELIVERED ON-SITE PRIOR TO 5 DAYS BEFORE INSTALLATION. 53.DIG, PACK, TRANSPORT AND HANDLE ALL PLANTS WITH CARE TO ENSURE PROTECTION FROM INJURY. STORE PLANTS IN THE MANNER NECESSARY TO ACCOMMODATE THEIR HORTICULTURAL REQUIREMENTS. HEEL-IN PLANTS IF NECESSARY TO PROTECT ROOT BALLS AND KEEP FROM DRYING OUT. 54.ALL PLANTS TO BE INSPECTED BY EQUINOX PRIOR TO INSTALLATION. IF ANY PLANTS ARE IN POOR CONDITION, UNHEALTHY LOOKING, DISEASED, OR DYING THE CONTRACTOR WILL REPLACE AS REQUESTED BY EQUINOX OR THE OWNER. 55.DURING INSTALLATION, THE CONTRACTOR SHALL NOTIFY EQUINOX OF ANY CONDITIONS WHICH MAY BE HARMFUL TO PLANT LIFE, SUCH AS HAZARDOUS MATERIALS, ETC. EQUINOX SHALL MAKE RECOMMENDATIONS TO ADDRESS THE SPECIFIC SITUATION. 56.CONTRACTOR TO REMOVE ALL STONES OVER 1" IN DIA. AND ALL CONSTRUCTION DEBRIS INCLUDING GRAVEL, CONCRETE, ROOTS, AND OTHER MATERIAL THAT MAY BE HARMFUL OR PREVENT PROPER ESTABLISHMENT AND OR MAINTENANCE OF PLANTING AREAS. 57.IN AREAS WHERE CONSTRUCTION MATERIAL IS EMBEDDED IN THE SOIL, CONTRACTOR SHALL REMOVE CONTAMINATED SOIL TO A DEPTH OF 8" AND ADD FILL WITH CLEAN, WEED-FREE PLANTING SOIL. 58.LARGE MATURING TREES SHALL NOT BE PLANTED UNDER OVERHEAD POWER LINES OR WITHIN SEWER RIGHTS-OF-WAY. CONTRACTOR SHALL CONTACT LANDSCAPE ARCHITECT TO RESOLVE ANY ISSUES BEFORE PLANTING. 59.FOR ALL B&B TREES, ROOT BALL SHALL REMAIN MOIST AT ALL TIMES AND SHOULD RETAIN SHAPE WHEN REMOVING TOP 1/2 -2/3 OF WIRE BASKET FOR TRANSPLANTING. CONTRACTOR SHALL REMOVE TOP 1/2 OF BURLAP FROM ROOT BALL. 60.ALL PLANTINGS TO BE WATERED AFTER PLANTING IMMEDIATELY. 61.ALL CONTAINER AND B&B TREES AND SHRUBS TO BE GUARANTEED FOR 1 YEAR (MINIMUM). 62.ALL PLANTING BEDS, AND CONTAINER TREES AND SHRUBS TO BE MULCHED WITH DOUBLE GROUND HARDWOOD MULCH, UNLESS OTHERWISE SPECIFIED. 63.CONTRACTOR TO WATER PLANTS UNTIL CONSTRUCTION IS COMPLETE OR PLANTS ARE ESTABLISHED. 64.IF THERE IS A DISCREPANCY BETWEEN THE QUANTITY OF PLANTS SHOWN ON THE PLAN AND THE QUANTITIES IN THE PLANT SCHEDULE USE THE HIGHER NUMBER OF PLANTS. IF THIS OCCURS NOTIFY THE PROJECT LANDSCAPE ARCHITECT. 65.AREAS UNDER EXISTING TREE DRIPLINES ARE NOT TO BE TILLED. 66.ALL EXISTING AND PROPOSED TREES WITHIN LIMITS OF DISTURBANCE AND NOT CONTAINED WITHIN A MULCHED BED ARE TO RECEIVE A 5' DIAMETER CIRCLE OF MULCH. 67.ALL MULCH TO BE DOUBLE GROUND HARDWOOD MULCH. EROSION CONTROL MEASURES: 68.STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS PRACTICABLE IN PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED, BUT IN NO CASE MORE THAN FOURTEEN (14) DAYS AFTER WORK HAS CEASED, EXCEPT AS STATED BELOW. -WHERE STABILIZATION BY THE 14TH DAY IS PRECLUDED BY SNOW COVER OR FROZEN GROUND CONDITIONS STABILIZATION MEASURES MUST BE INITIATED AS SOON AS PRACTICABLE. -WHERE CONSTRUCTION ACTIVITY ON A PORTION OF THE SITE IS TEMPORARILY CEASED, AND EARTH-DISTURBING ACTIVITIES WILL BE RESUMED WITHIN 14 DAYS, TEMPORARY STABILIZATION MEASURES DO NOT HAVE TO BE INITIATED ON THAT PORTION OF THE SITE. 69.ALL SEDIMENT AND EROSION CONTROL DEVICES SHALL BE INSPECTED ONCE EVERY CALENDAR WEEK. IF PERIODIC INSPECTION OR OTHER INFORMATION INDICATES THAT A BMP HAS BEEN INAPPROPRIATELY OR INCORRECTLY INSTALLED, THE PERMITTEE MUST ADDRESS THE NECESSARY REPLACEMENT OR MODIFICATION REQUIRED TO CORRECT THE BMP WITHIN 48 HOURS OF IDENTIFICATION. 70.PROVIDE SILT FENCE AND/OR OTHER CONTROL DEVICES, AS MAY BE REQUIRED, TO CONTROL SOIL EROSION DURING UTILITY CONSTRUCTION. ALL DISTURBED AREAS SHALL BE CLEANED, GRADED, AND STABILIZED WITH GRASSING IMMEDIATELY AFTER THE UTILITY INSTALLATION. FILL, COVER, AND TEMPORARY SEEDING AT THE END OF EACH DAY ARE RECOMMENDED. IF WATER IS ENCOUNTERED WHILE TRENCHING, THE WATER SHOULD BE FILTERED TO REMOVE ANY SEDIMENTS BEFORE BEING PUMPED BACK INTO ANY WATERS OF THE STATE. 71.ALL EROSION CONTROL DEVICES SHALL BE PROPERLY MAINTAINED DURING ALL PHASES OF CONSTRUCTION UNTIL THE COMPLETION OF ALL CONSTRUCTION ACTIVITIES AND ALL DISTURBED AREAS HAVE BEEN STABILIZED. ADDITIONAL CONTROL DEVICES MAY BE REQUIRED DURING CONSTRUCTION IN ORDER TO CONTROL EROSION AND/OR OFFSITE SEDIMENTATION. ALL TEMPORARY CONTROL DEVICES SHALL BE REMOVED ONCE CONSTRUCTION IS COMPLETE AND THE SITE IS STABILIZED. 72.THE CONTRACTOR MUST TAKE NECESSARY ACTION TO MINIMIZE THE TRACKING OF MUD ONTO PAVED ROADWAY(S) FROM CONSTRUCTION AREAS AND THE GENERATION OF DUST. THE CONTRACTOR SHALL DAILY REMOVE MUD/SOIL FROM PAVEMENT, AS MAY BE REQUIRED. 73.TEMPORARY DIVERSION BERMS AND/OR DITCHES WILL BE PROVIDED AS NEEDED DURING CONSTRUCTION TO PROTECT WORK AREAS FROM UPSLOPE RUNOFF AND/OR TO DIVERT SEDIMENT-LADEN WATER TO APPROPRIATE TRAPS OR STABLE OUTLETS. 74.ALL WATERS OF THE STATE (WOS), INCLUDING WETLANDS, ARE TO BE FLAGGED OR OTHERWISE CLEARLY MARKED IN THE FIELD. A DOUBLE ROW OF SILT FENCE IS TO BE INSTALLED IN ALL AREAS WHERE A 50-FOOT BUFFER CAN'T BE MAINTAINED BETWEEN THE DISTURBED AREA AND ALL WOS. A 10-FOOT BUFFER SHOULD BE MAINTAINED BETWEEN THE LAST ROW OF SILT FENCE AND ALL WOS. 75.LITTER, CONSTRUCTION DEBRIS, OILS, FUELS, AND BUILDING PRODUCTS WITH SIGNIFICANT POTENTIAL FOR IMPACT (SUCH AS STOCKPILES OF FRESHLY TREATED LUMBER) AND CONSTRUCTION CHEMICALS THAT COULD BE EXPOSED TO STORM WATER MUST BE PREVENTED FROM BECOMING A POLLUTANT SOURCE IN STORM WATER DISCHARGES. 76.A COPY OF THE INSPECTION RECORDS, AND RAINFALL DATA MUST BE RETAINED AT THE CONSTRUCTION SITE OR A NEARBY LOCATION EASILY ACCESSIBLE DURING NORMAL BUSINESS HOURS, FROM THE DATE OF COMMENCEMENT OF CONSTRUCTION ACTIVITIES TO THE DATE THAT FINAL STABILIZATION IS REACHED. 77.INITIATE STABILIZATION MEASURES ON ANY EXPOSED STEEP SLOPE (3H:1V OR GREATER) WHERE LAND-DISTURBING ACTIVITIES HAVE PERMANENTLY OR TEMPORARILY CEASED, AND WILL NOT RESUME FOR A PERIOD OF 7 CALENDAR DAYS. 78.MINIMIZE SOIL COMPACTION AND, UNLESS UNFEASIBLE, PRESERVE TOPSOIL. 79.MINIMIZE THE DISCHARGE OF POLLUTANTS FROM EQUIPMENT AND VEHICLE WASHING, WHEEL WASH WATER, AND OTHER WASH WATERS. WASH WATERS MUST BE TREATED IN A SEDIMENT BASIN OR ALTERNATIVE CONTROL THAT PROVIDES EQUIVALENT OR BETTER TREATMENT PRIOR TO DISCHARGE. 80.MINIMIZE THE DISCHARGE OF POLLUTANTS FROM DEWATERING OF TRENCHES AND EXCAVATED AREAS. THESE DISCHARGES ARE TO BE ROUTED THROUGH APPROPRIATE BMP'S (SEDIMENT BASIN, FILTER BAG, ETC). 81.THE FOLLOWING DISCHARGES FROM SITES ARE PROHIBITED: -WASTEWATER FROM WASHOUT OF CONCRETE, UNLESS MANAGED BY AN APPROPRIATE CONTROL; -WASTEWATER FROM WASHOUT AND CLEANOUT OF STUCCO, PAINT, FORM RELEASE OILS, CURING COMPOUNDS, AND OTHER CONSTRUCTION MATERIALS; -FUELS, OILS, OR OTHER POLLUTANTS USED IN VEHICLE AND EQUIPMENT OPERATION AND MAINTENANCE; AND -SOAPS OR SOLVENTS USED IN VEHICLE AND EQUIPMENT WASHING. 82.AFTER CONSTRUCTION ACTIVITIES BEGIN, INSPECTIONS MUST BE CONDUCTED AT A MINIMUM OF AT LEAST ONCE EVERY CALENDAR WEEK AND MUST BE CONDUCTED UNTIL FINAL STABILIZATION IS REACHED ON ALL AREAS OF THE CONSTRUCTION SITE. NOTES & GENERAL SPECIFICATIONS SEAL DRAWN BY:CHECKED BY: Copyright © 2019, Equinox Environmental Consultation & Design, Inc. 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 DRAWING SCALE NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable.REVISIONSDATEPHASE DATE DRAWING NAME DESIGN BY:NOT FORCONSTRUCTIONAS SHOWNWoodfin, North CarolinaSILVER-LINE PARKTOWN OF WOODFINJS L0.1 INDEX & NOTES April 1, 2020 100% CDS NFC (NOT TO SCALE) SILVER-LINE PARK TERRACE CTWOODFIN AVEEL K M O U N T A I N R DI26 EREESE ST CRESENT ST JONESTOWN RD VINE ST CRE S T F I E L D AVE UNION STMULBERRY STRI V E R S I D E D RGREEN OAK RDLOCUST ST ROSECRE S T S T VI E W S T ROSECREST CTNORTON DR GRO V E S TSHORTVINE STELKWOOD AVENEW WA LNUTSTRHODESSTVICINITY MAP GEOTECHNICAL ENGINEER: ECS Southeast Matt Fogleman 1900 Hendersonville Rd #10, Asheville, NC 28803 (828) 665-2307 ELECTRICAL & UTILITY ENGINEER: McGill Associates P.A. 55 Broad Street Asheville, NC 28801 (828) 252-0575 LANDSCAPE ARCHITECTURE L0.0 COVER SHEET L0.1 INDEX AND NOTES L0.2 SURVEY L1.0 DEMOLITION PLAN L2.0 SITE PLAN L2.1 PHASED SITE PLAN PHASE 1 L3.0 LAYOUT & MATERIALS PLAN L3.1 LAYOUT & MATERIALS PLAN ENLARGEMENTS L4.0 GRADING PLAN L4.1 GRADING PLAN ENLARGEMENT L5.0 STORMWATER PLAN L6.0 L7.0 EROSION CONTROL PLAN L8.0 EROSION CONTROL DETAILS L9.0-L9.5 SITE DETAILS PHASE 2 L10.0 LAYOUT & MATERIALS PLAN L10.1 LAYOUT & MATERIALS PLAN ENLARGEMENTS L11.0 GRADING PLAN L12.0 STORMWATER PLAN L13.0-L13.1 PLANTING PLAN L14.0 EROSION CONTROL PLAN L15.0 EROSION CONTROL DETAILS L16.0-L16.4 SITE DETAILS WW1.0-5.0 BOAT RAMP DETAILS ARCHITECTURE A0.1 SITE PLAN A1.0 FLOOR PLANS A1.1 TRAIN PLATFORM FRAMING PLAN (PHASE 1) A1.2 REFLECTED CEILING PLANS A1.3 ROOF PLANS A2.0 ELEVATIONS- PAVILION (PHASE 2) A2.1 ELEVATIONS- PLATFORM (PHASE 1) A3.0 3D PERSPECTIVE- PAVILION (PHASE 2) A3.1 ELEVATIONS- PLATFORM (PHASE 1) A4.0 BUILDING SECTIONS- PAVILION (PHASE 2) A4.1 BUILDING SECTIONS- PLATFORM (PHASE 1) A5.0 SECTION DETAILS- PLATFORM (PHASE1) A5.1 SECTION DETAILS- PAVILION (PHASE 2) A5.3 MISCELLANEOUS DETAILS UTILITIES P0.0 PLUMBING LEGENDS, NOTES, DETAILS, & SCHEDULES P0.1 PLUMBING SITE PLAN E0.0 ELECTRICAL LEGEND E0.1 ELECTRICAL SITE PLAN E1.0 ELECTRICAL PLANS E5.0 ELECTRICAL DETAILS E6.0 ELECTRICAL SCHEDULES & DIAGRAMS ARCHITECT: PFA Architects, P.A. Mike Hatter 196 Coxe Ave. Asheville, NC 28801 (828) 254-1963 mhatter@pfaarchitects.com OTHER CONTACTS PROFESSIONAL LAND SURVEYOR: Kee Mapping & Surveying 88 Central Avenue, Asheville, NC 28801 (828) 575-9021 SHEET INDEX Know what's below. before you dig.Call R CLIENT:Town of Woodfin CONTACT:Town of Woodfin 90 Elk Mountain Rd Asheville NC 28804 (828) 253-4887 ADDRESS:1054 Riverside Drive Asheville / Woodfin, NC 28804 COUNTY: Buncombe COORDINATES:Latitude: 35.626462° N Longitude: -82.582327° W PIN(s):9730512998; 9730524113 DEED REFERENCE:Book 5027 Page 802 RIVER BASIN:French Broad STREAM CLASSIFICATION:B: Primary Recreation, Fresh Water TOTAL ACREAGE:5.35 AC DISTURBED AREA:4.46 AC PERCENT DISTURBED:83% FEMA PANEL No:370380 PROJECT DATA SSSSSS0'50'100'150' SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHASFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A S F H A SF H A SF H A SFHA S F H A S F H ASSSSSSSSSSSSSSSSSSSSSSSSSSSS S S S S FOC FOC FOC FOC FOC FOC FOC FOC FOCFOCFOCFOCFOCFOCSS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS S S S S SSSSSSSSSSSSSSSSN 72 ° 2 1 ' 3 7 " W 302. 5 1 ' W W W W W W W W W W W W W W W W W W W W W W W W W W OH W OH W OH W O H W OHW O H W O H W 25' SS SFHA W FOC FOC OHW N 73° 3 5 ' 3 9 " W 2 0 6 . 3 8 ' (TOT A L ) N 70 ° 2 0 ' 3 9 " W 200. 0 0 ' N 6 8 ° 5 7 ' 5 9 " W 190. 0 9 'N 19°24'50" E 111.02'(TOTAL)SILVER-LINE PLASTICS CORPORATION PIN: 9730-61-2337 DB: 3383 PG: 338 PB: 42 PG: 143 EASEMENT TWO PER DB: 4532 PG: 452 (SEE NOTE #12) NORFOLK SOUTHERN RAILWAY COMPANY (FORMERLY ASHEVILLE SOUTHERN RAILWAY COMPANY) (DB:180 PG: 499 PARCEL 1) DERAIL TOWN OF WOODFIN PIN: 9730-52-4113 DB: 5445 PG: 436 0.94 ACRE CRAGGY MOUNTAIN LINE, INC. (DB: 4403 PG: 1215) EASEMENT ONE PER DB: 4532 PG: 452 (SEE NOTE #12) GARBAGE DISPOSAL SERVICE, INC PIN: 9730-42-6175 DB: 2355 PG: 343 PB: 22 PG: 33 TOWN OF WOODFIN PIN: 9730-51-2998 DB: 5027 PG: 802 4.25 ACRES (NOT TO SCALE) AN EXISTING CONDITIONS TOPOGRAPHIC SURVEY FOR: "EQUINOX ENVIRONMENTAL, INC" TOPO AREA ONE INCH = FIFTY FEET ELEVATION DATUM: NAVD 88 CONTOUR INTERVAL: 1 FOOT "SILVER LINE PARK" BUNCOMBE COUNTY, NORTH CAROLINA TERRACE CTWOODFIN AVEEL K M O U N T A I N R DI26 EREESE ST CRESENT ST JONESTOWN RD VINE ST CRES T F I E L D AVE UNION STMULBERRY STRIV E R S I D E D RGREEN OAK RDLOCUST STROSECRES T S T VI E W S T ROSECREST CTNORTON DR GRO V E S TSHORTVINE STELKWOOD AVENEW WA LNUTSTRHODESSTVICINITY MAPGRID NORTH NAD 83(2011) CONTROL POINT #500 5/8'' RBC "KEE" STATE PLANE COORDINATES N: 702085.17' E: 935712.97' ELEV: 1961.12' CONTROL POINT #501 5/8'' RBC "KEE" GROUND COORDINATES N: 702283.24' E: 935123.62' ELEV: 1957.28' CF: 0.99980501 *CONTROL POINT 500 BEING LOCATED S 71°25'26" E A DISTANCE OF 621.75' (GRID) FROM CONTROL POINT 501 GRID TIE INFORMATION THIS IS A TOPOGRAPHIC SURVEY INTENDED FOR INFORMATIONAL & DESIGN PURPOSES ONLY. IT SHOULD NOT BE USED FOR CONVEYANCE OR LEGAL PURPOSES. KEE MAPPING & SURVEYING DOES NOT CERTIFY THE SPATIAL ACCURACY FOR GIS DATA SHOWN HERE & MADE PUBLICLY AVAILABLE BY THE NC ONEMAP GEOSPATIAL DATA PORTAL, NORTH CAROLINA'S ONLINE FLOOD RISK INFORMATION SYSTEM & THE CADASTRAL WEB MAP OF BUNCOMBE COUNTY, NC. CONTROL POINT #500 5/8'' RBC "KEE" STATE PLANE COORDINATES N: 702085.17' E: 935712.97' ELEV: 1961.12' CF: 0.99980478 CONTROL POINT #501 5/8'' RBC "KEE" GROUND COORDINATES N: 702283.24' E: 935123.62' ELEV: 1957.28' CONTROL POINT #200 5/8'' RBC "KEE" GROUND COORDINATES N: 702019.90' E: 935046.88' ELEV: 1950.69' BUILDING 8'' STEEL PIPE INV IN: UNKNOWN INV OUT: 1953.25' SMH (8'' VCP) INV IN: 1952.65' INV OUT: 1952.56' BUILDING FFE: 1960.27' FFE: 1957.74' FFE: 1954.03' SMH (8'' VCP) INV IN: 1945.24' (60'' RCP) INV IN: 1938.74' INV OUT: 1938.60' SMH (8'' PVC) INV OUT: 1954.62' 4'' CPP INV IN: UNKNOWN INV OUT: 1946.75' 4'' DUCTILE IRON OVER CREEK TOP ELEV: 1944.52' 36'' CMP INV IN: 1956.97' INV OUT: 1956.92' 2' X 3' CATCH BASIN INV IN: 1957.78' CONCRETE CULVERT INV OUT: 1957.63' SEWER LINE CHANGES DIRECTION SMH (BURIED UNDER ASPHALT) SMH (8'' VCP) INV IN: 1950.39' INV OUT: 1950.21' RIV E R S I D E D R I V E (NO D E E D F O R R / W F O U N D ) (NC D O T C L A I M S M A I N T E N A N C E ) HVAC PAD ELEV: 1956.56' 36'' STEEL PIPE (SIZE UNKNOWN) INV IN: 1952.15' INV OUT: 1953.63' (TOP OF SEDIMENT) FRE N C H B R O A D R I V E R FLO W CONTROL POINT #202 5/8'' RBC "KEE" GROUND COORDINATES N: 701929.39' E: 935447.97' ELEV: 1952.01' 18'' CMP INV IN: UNKNOWN INV OUT: 1951.60' 12'' CMP INV IN: UNKNOWN INV OUT: 1953.35' SFHA (ZONE AE) PER F.I.R.M. MAP NO. 3700973000J SMH (8'' PVC) INV IN: 1952.22' INV OUT: 1952.12 0+000+501+001+502+002+503+003+504+001940 1950 1960 1940 1950 1960 0+000+501+001+502+002+503+003+504+001940 1950 1960 1970 1940 1950 1960 1970 0+000+501+001+502+002+503+003+504+001940 1950 1960 1970 1940 1950 1960 1970 CROSS-SECTION PROFILES CROSS-SECTION #1 (NOT TO SCALE) CROSS-SECTION #2 (NOT TO SCALE) CROSS-SECTION #3 (NOT TO SCALE)CROSS-SECTION #1CROSS-SECTION #2CROSS-SECTION #3SURVEYOR'S NOTES: A TOPOGRAPHIC SURVEY FOR: EQUINOX ENVIRONMENTAL, INCAPPRX. LOCATIONSMH (8'' PVC-TYPE 3 DROP CONNECTION) TOP INV IN: 1940.42' (8" VCP-ABANDONED) INV IN: 1945.81' (6'' PVC) INV IN: 1945.76' (60'' RCP) INV IN: 1937.70' INV OUT: 1937.45' SMH (60'' RCP) INV IN: 1936.63' SMH (6'' PVC) INV IN: 1944.74' 60'' RCP INV IN: 1937.87' INV OUT: 1937.77' 4'' CPPDECK 19 5 5 1955 1955 1955195519551955 1950 19 4 0 195 0 1955 1955 ORDINARY HIGH WATER MARK 1 9 4 5 CONTROL POINT #201 5/8'' RBC "KEE" GROUND COORDINATES N: 701991.07' E: 935248.36' ELEV: 1951.37' ORDINARY HIGH WATER MARK 1' X 1' DROP INLET INV IN: 1952.75' INV OUT: 1952.62' 2' X 2' DROP INLET INV IN: 1949.56' INV OUT: 1949.46' LEGEND: 1900 LINE BEARING DISTANCE L1 S 55°22'12" W 33.69' L2 S 22°58'17" W 72.24' L3 S 24°26'41" W 81.84' L4 S 40°49'23" W 80.31' L5 S 33°07'06" W 71.77' L6 S 81°35'55" W 22.00' L7 S 37°54'41" W 25.79' L8 N 20°14'05" E 21.16' L9 N 12°30'21" E 46.10' L10 N 20°33'26" E 44.28' L11 N 20°55'16" E 40.35' L12 S 43°08'54" W 62.00' L13 N 69°17'34" W 72.73' L14 S 36°17'13" W 42.35' L15 S 19°47'05" W 27.46' METROPOLITAN SEWERAGE DISTRICT (SEE NOTE #8)L12C7 C6 C5 (10.00')L3(8.00')L14C8 C4 C1 L11N 24°39'55" E 170.70'L10L2L13 L9L8L7L6 L5L4(103.02')C9 C3 C2 (196. 3 8 ' ) DUK E E N E R G Y P R O G R E S S (FO R M E R L Y C A R O L I N A P O W E R & L I G H T C O M P A N Y ) (50' R / W P E R D B : 1 1 9 6 P G : 2 3 ) MET R O P O L I T A N S E W E R A G E D I S T R I C T (20' E A S E M E N T P E R D B : 9 4 4 P G : 1 6 1 ) SEAL DRAWN BY:CHECKED BY: Copyright © 2019, Equinox Environmental Consultation & Design, Inc. 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 DRAWING SCALE NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable.REVISIONSDATEPHASE DATE DRAWING NAME DESIGN BY:NOT FORCONSTRUCTIONAS SHOWNWoodfin, North CarolinaSILVER-LINE PARKTOWN OF WOODFINL0.2 EXISTING CONDITIONS April 1, 2020 100% CDS NFC 19551955 19551955 1950 195 5 1955195519 5 5 195 0 1 9 4 5 FLO O D W A Y FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOCFOCFOCFOCFOCFOCFOCFOCFOCFOC100- Y E A R F L O O D P L A I N 30' STREAM BUFFERFLOO D W A Y EXISTING BUILDING FFE: 1954.03'30' STREAM BUFFER500- Y E A R F L O O D P L A I N DNDN 1954 4.0% 1950.45' FFE 1954.55' 15% 1951.95' 1951.64' 1948.84' 1942.84' 4.0% 1951.85' 1950 1954 195 3 195 2 1954 1955 1953 1951 1950 1951 1949 1953195219541952 1951LP 1954.05' + 195 5 1951.80' 1951.98' 1951.98' 1955 1954 1953 19521953195419551955 19551955 1950 195 5 19551955195 5 195 0 1 9 4 5SSSSSSSSSSSSSSSSSSSSSSSS S S FOC FOC FOC FOC FOC FOCFOCFOCFOCSS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS S S S S SSSSSSSSSSSSSSSSSSSSW W W W W W W W W W W W W W W W SEAL DRAWN BY:CHECKED BY: Copyright © 2019, Equinox Environmental Consultation & Design, Inc. 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 DRAWING SCALE NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable.REVISIONSDATEPHASE DATE DRAWING NAME DESIGN BY:NOT FORCONSTRUCTION1"=30'Woodfin, North CarolinaSILVER-LINE PARKTOWN OF WOODFINL0.3 SITE DRAINAGE April 1, 2020 100% CDS NFC PIPE (6) SWALE (ENHANCED TREATMENT SWALE BMP G) SWALE (A) SWALE (C) ALL PROPOSED IMPERVIOUS SURFACES (GRAY HATCHED AREA) BIORETENTION- ENHANCED DRY POND (BMP B) CONSTRUCTED WETLAND (BMP D) BIORETENTION- ENHANCED DRY POND (BMP H) BIORETENTION- DISCONNECTED DOWNSPOUT (BMP E) BIORETENTION- DISCONNECTED DOWNSPOUT (BMP F) 1 2 3 4 5 6 7 8 9 WATERSHED DELINEATION MAP (DRAINAGE PATTERNS) PROPERTY BOUNDARY WATERSHED BOUNDARY PROPERTY BOUNDARY WATERSHED BOUNDARY FRENCH BROAD RIVER RECEIVEING WATER COURSE: 1 2 5 9 7 3 4 8 6 LONGEST HYDRAULIC PATH LONGEST HYDRAULIC PATH OUTLET 1 (PIPED) 0 N 60'30'15' SCALE: 30'-0" Know what's below. before you dig.Call R EXHIBIT B: SCHEMATIC DIAGRAM EXHIBIT A: EXISTING DRAINAGE PATTERNS 19551955 1955 19551955 1950 195 5 1955195519 5 5 195 0 1 9 4 5 FLO O D W A Y FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOCFOCFOCFOCFOCFOCFOCFOCFOCFOCW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W 100- Y E A R F L O O D P L A I N 30' STREAM BUFFERFLOO D W A Y EXISTING BUILDING FFE: 1954.03'30' STREAM BUFFEROHW OH W OHW OH W OH W O H W OHW OH W O H W O H W O H W 500- Y E A R F L O O D P L A I N DNDN + 100-Y E A R F L O O D P L A I N FLO O D W A Y CONSTRUCTED WETLAND TO STORE 1 YR. 24 HR. STORM EVENT (2,800 SF TOTAL) BOARDWALK WITH HELICAL PIERS CONCRETE SIDEWALK CIRCULATION, TYP. STONE EDGE ALONG WETLAND ENHANCED SWALE (450 SF TOTAL) 16-FOOT WIDE ROAD OVER WETLAND WETLAND IMPACT AREA (0.17 AC TOTAL) EXISTING JURISDICTIONAL WETLAND LEGEND Know what's below. before you dig.Call R 0 N 60'30'15' SCALE: 1"= 30'-0" (4) 18" RCP BERM SEPARATING CONSTRUCTED STORMWATER WETLAND FROM JURISDICTIONAL WETLAND WEIR WEIR BERM NOTE: BASE FLOOD ELEVATION (BFE) ACROSS SITE: 1959' ENHANCED & EXPANDED WETLAND BY APPROX. 4,420 SF JURISDICTIONAL INTERMITTENT STREAM (S-02a) FROM THIS LOCATION SOUTH TO FRENCH BROAD RIVER EPHEMERAL STREAM (S-02b) FROM THIS LOCATION NORTH JURISDICTIONAL PERENNIAL STREAM SEAL DRAWN BY:CHECKED BY: Copyright © 2019, Equinox Environmental Consultation & Design, Inc. 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 DRAWING SCALE NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable.REVISIONSDATEPHASE DATE DRAWING NAME DESIGN BY:NOT FORCONSTRUCTION1"=30'Woodfin, North CarolinaSILVER-LINE PARKTOWN OF WOODFINL0.4 WETLAND IMPACTS & FLOODPLAIN April 1, 2020 100% CDS NFC FILL (5,336CY) CUT (3,589CY) 19551955 1955 19551955 1950 195 5 19551955195 5 195 0 1 9 4 5 FLO O D W A Y SSSSSSSSSSSSSSSSSSSSSFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFH A SFHA SFHA SFHA SFHASFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SF H A SF H A SF H A SF H A SF H A S F H A S F H A S F H A S F H ASSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS S S S S S S S S FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOCFOCFOCFOCFOCFOCFOCFOCFOCFOCSS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS S S S S S S S S S S S S S S S S SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W 100- Y E A R F L O O D P L A I N 30' STREAM BUFFERFLOO D W A Y EXISTING BUILDING FFE: 1954.03'30' STREAM BUFFEROHW OH W OHW OH W OH W O H W OHW OH W O H W O H W O H W 500- Y E A R F L O O D P L A I N SEAL DRAWN BY:CHECKED BY: Copyright © 2019, Equinox Environmental Consultation & Design, Inc. 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 DRAWING SCALE NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable.REVISIONSDATEPHASE DATE DRAWING NAME DESIGN BY:NOT FORCONSTRUCTIONAS SHOWNWoodfin, North CarolinaSILVER-LINE PARKTOWN OF WOODFINJS L1.0 DEMOLITION PLAN April 1, 2020 100% CDS NFC REMOVE CONCRETE PADS, TYP. FENCE LINE BOUNDARY LINE ELECTRIC (ROW EXTENT) MAJOR CONTOUR MINOR CONTOUR UNDERGROUND WATERLINE SEWER LINE STREAM RAIL LINE FLOODWAY 100 & 500-YEAR FLOODPLAIN FLOODWAY SEWER CLEANOUT SEWER MANHOLE UTILITY POLE JURISDICTIONAL WETLAND AREA EXISTING TREES TO REMAIN (5-FOOT) (1-FOOT) SS CONCRETE PADS ELECTRIC (OVERHEAD WIRE) W W EASEMENT BOUNDARY EXISTING TREES TO REMOVE REMOVE ASPHALT DRIVE UP TO PROPERTY LINE DUKE TO RELOCATE POLE 40' WEST ALONG THE DISTRIBUTION LINE ITEMS TO BE REMOVED DUKE TO REMOVE POLES ALL DEBRIS PILES TO BE REMOVED, TYP. NOTES: ·STORMWATER STRUCTURES HAVE BEEN INSTALLED SINCE SURVEY. ·REMOVE STORMWATER STRUCTURES FOUND ON SITE. ·STRUCTURES MAY BE RE-USED IF CONDITION ALLOWS. ·ADDITIONAL DEBRIS PILES MAY HAVE BEEN PLACED SINCE SURVEY, REMOVE ALL, TYP. ALL FENCING TO BE REMOVED SIGN TO BE REMOVED WITH APPROVAL FROM THE TOWN OF WOODFIN OR DURING CONSTRUCTION OF PHASE 2 TREES MARKED WITH AN "X" TO BE REMOVED IN PHASE 2, TYP. PRESERVE ALL TREES NOT MARKED WITH AN "X" TREES PROTECTION CLEAR ALL EXCESS AND OVERGROWN VEGETATION ALONG THE FULL LENGTH OF THE BERM EXISTING ASPHALT TO BE SAW CUT AND REMOVED AT EDGE OF PROPOSED LANE AND NORTH TOWARD THE RAILLINE SEE (L3.0) 19551955 1955 19551955 1950 195 5 19551955195 5 195 0 1 9 4 5 FLO O D W A Y SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS S S S S S S S FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOCFOCFOCFOCFOCFOCFOCFOCFOCFOCSS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS S S S S S S S S S S S S S S S S SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W 100- Y E A R F L O O D P L A I N 30' STREAM BUFFERFLOO D W A Y EXISTING BUILDING FFE: 1954.03'30' STREAM BUFFEROHW OH W OHW OH W OH W O H W OHW OH W O H W O H W O H W 500- Y E A R F L O O D P L A I N DNDN LODLO D LOD LODLODLO D R I V E R S I D E D R I V E + SEAL DRAWN BY:CHECKED BY: Copyright © 2019, Equinox Environmental Consultation & Design, Inc. 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 DRAWING SCALE NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable.REVISIONSDATEPHASE DATE DRAWING NAME DESIGN BY:NOT FORCONSTRUCTION1"=30'Woodfin, North CarolinaSILVER-LINE PARKTOWN OF WOODFINL2.0 SITE PLAN April 1, 2020 100% CDS NFC SIDE RAIL (BY OTHERS) UTILIZE EXISTING 2-WAY DRIVE ENTRANCE(S) EXISTING WETLAND PARK ENTRANCE SIGN ASPHALT PARKING (54 CARS, 4 TRAILERS) CONCRETE SIDEWALK CIRCULATION, TYP. CONSTRUCTED WETLAND (2,800 SF TOTAL) TRAIN PLATFORM PICNIC AREA ADA PICNIC TABLE AND GRIILL ADA PARKING (2 SPACES) PLAY FEATURES BOARDWALK WITH BENCHES AND INTERPRATIVE SIGNAGE THROUGH WETLAND CONCRETE SIDEWALK CIRCULATION, TYP. STONE EDGE ALONG WETLAND PLAY AREA LAWN ENHANCEMENT OF EXISTING WETLAND PAVILION GREENWAY ENHANCED SWALE (2,380 SF TOTAL) ORDINARY HIGH WATER LINE PROPOSED GREENWAY EXTENSION TEMPORARY PORTABLE TOILETS W/ SCREENING PEDESTRIAN ENTRANCE ENHANCED SWALE (450 SF TOTAL) BENCH SWING BOULDER TOE BANK STABILIZATION 16-FOOT WIDE ROAD OVER WETLAND RIVERSIDE PICNIC AREA W/ TABLES AND GRILLS TRAIL KIOSK BOAT RAMP AND TURN-AROUND BEACH PLAY AREA PROPOSED GREENWAY EXTENSION NATURAL SURFACE TRAIL NATURAL SURFACE TRAIL WASTE RECEPTACLES 0 N 60'30'15' SCALE: 30'-0" Know what's below. before you dig.Call R DISCONNECTED DOWNSPOUT GARDEN DISCONNECTED DOWNSPOUT GARDEN WASTE RECEPTACLES ONE-WAY DO NOT ENTER GUARDRAIL LEGEND PROPERTY BOUNDARY LIMITS OF DISTURBANCE PIPE SWALE STREAM BUFFER WETLAND TEMPORARY MULCH TRAIL FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOCFOCFOCFOCFOCFOCFOCFOCFOCFOCW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W DNDN LODLO D LOD LODLODLO D R I V E R S I D E D R I V E + PHASE 1 ALL PROJECT ACTIVITY SHALL BE CONFINED TO THE AREA WITHIN THE LIMITS OF DISTURBANCE WORK TASKS: ·ESTABLISH CONSTRUCTION ACCESS, STAGING AREAS, & BORROW/WASTE DISPOSAL AREAS (TO REMAIN UNTIL THE COMPLETION OF PHASE 2 (P2)) ·MARKED POWER POLES TO BE REMOVED BY DUKE ENERGY ·TREE PROTECTION TO BE INSTALLED PRIOR TO ANY CONSTRUCTION IN GENERAL VICINITY OF ‘EXISTING TREES TO REMAIN’ ·INSTALL TEMPORARY EROSION CONTROL MEASURES ·DEMOLITION OF EXISTING FEATURES PER DEMOLITION PLAN (TREES ALONG BERM TO BE REMOVED PRIOR TO P2 CONSTRUCTION, NOT DURING PHASE 1 (P1)) ·CLEAR & GRUB SITE/ROUGH GRADING ·CLEAR ALL EXCESS AND OVERGROWN VEGETATION ALONG THE FULL LENGTH OF THE BERM ·TIMELY APPLICATION OF TEMPORARY/PERMANENT SEEDING AS NECESSARY TO STABILIZE DISTURBED SOILS ·FINE GRADING OF PARK ELEMENTS ·PAVING INCLUDING BASE COURSE FOR ALL AREAS (CIRCULATION & PARKING) TO RECEIVE ASPHALT TREATMENT IN P2, INSTALL CONCRETE PATH ·BOARDWALK ·ADA PARKING SIGNAGE ·TRAFFIC BARRIERS (BOLLARDS, GUARDRAILS) ·PLAYGROUND, PLAY SURFACES, & PLAY ELEMENTS ·PLACE SITE FURNISHINGS TO BE RESTRICTED TO ADA PICNIC AREA (PICNIC TABLES, GRILLS, PORTABLE TOILET SCREENING) ·TRAIN PLATFORM (SEE ARCHITECTURAL DRAWINGS) ·REMOVE ALL TEMPORARY EROSION CONTROLS. CONVERT BMPS A-D & EXPANDED WETLAND TO PERMANENT STORMWATER CONTROLS ONCE DISTURBED AREAS HAVE BEEN STABILIZED AND COMPLETED (CLEAN OUT, PREP SOILS, & PLANT). SEAL DRAWN BY:CHECKED BY: Copyright © 2019, Equinox Environmental Consultation & Design, Inc. 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 DRAWING SCALE NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable.REVISIONSDATEPHASE DATE DRAWING NAME DESIGN BY:NOT FORCONSTRUCTION1"=30'Woodfin, North CarolinaSILVER-LINE PARKTOWN OF WOODFINL2.1 PHASED SITE PLAN April 1, 2020 100% CDS NFC Know what's below. before you dig.Call R 0 N 60'30'15' SCALE: 1"= 30'-0" PRE-CONSTRUCTION WORK TASKS: ·DUKE ENERGY TO RELOCATE POWER POLES ·OBTAIN REQUIRED PERMITS FROM ALL REGULATORY AGENCIES REQUIRING PERMITS PHASE 2 CONTINUE TO USE CONSTRUCTION ACCESS, STAGING AREAS, & BORROW/WASTE DISPOSAL AREAS DESIGNATED IN P1. TREES ALONG BERM TO BE REMOVED PRIOR TO P2 CONSTRUCTION. ALL PROJECT ACTIVITY SHALL BE CONFINED TO THE AREA WITHIN THE LIMITS OF DISTURBANCE. DURING PHASE 2, NO CONSTRUCTION ACTIVITY SHALL IMPACT IMPROVEMENTS COMPLETED AS PART OF PHASE 1 WORK TASKS: ·TREE PROTECTION TO BE INSTALLED PRIOR TO ANY CONSTRUCTION IN GENERAL VICINITY OF ‘EXISTING TREES TO REMAIN’ ·INSTALL TEMPORARY EROSION CONTROL MEASURES, INCLUDING SILT FENCE AS NOTED ALONG SCMS PLANTED IN P1 ·ROUGH GRADING ·BANK STABILIZATION ·TIMELY APPLICATION OF TEMPORARY/PERMANENT SEEDING AS NECESSARY TO STABILIZE DISTURBED SOILS ·FINE GRADING OF PARK ELEMENTS ·BOAT RAMP (SEE ENGINEER DRAWINGS / WW1.0-5.0) ·PLACE LANDSCAPE BOULDERS & STEPPING STONES ·ADDRESS ALL AREAS (CIRCULATION & PARKING) PREPARED IN P1 THAT ARE IN NEED REPAIR, PRIOR TO APPLYING SURFACE COAT OF ASPHALT. ·GREENWAY ·CONCRETE PATHS ·PAVILION (SEE ARCHITECTURAL DRAWINGS / A) ·APPLY FINISH COAT OF ASPHALT ·SURFACE MARKINGS (CROSSWALK, ADA MARKERS, WHEEL STOPS) ·PLACE ALL REMAINING SITE FURNISHINGS (PICNIC TABLES, GRILLS, BENCH SWING) ·SIGNAGE (DIRECTIONAL SIGNAGE, WETLAND SIGN, TRAIN PLATFORM SIGN, ENTRANCE SIGN, TRAIL KIOSK) ·PREPARE & AMEND ALL SOILS FOR PLANTING ·INSTALL ALL PLANTS, APPLY APPROPRIATE TOP DRESSING AND MULCH, WATER-IN ·REMOVE ALL TEMPORARY EROSION CONTROLS. FUTURE PHASE FUT U R E P H A S E EXISTING BUSINESS OUTSIDE PROJECT SCOPE 1955 FLO O D W A Y FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOCFOCFOCFOCFOCFOCFOCFOCFOCFOCW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W 100- Y E A R F L O O D P L A I N 30' STREAM BUFFERFLOO D W A Y EXISTING BUILDING FFE: 1954.03'30' STREAM BUFFER500- Y E A R F L O O D P L A I N DNDN LODLO D LOD LODLODLO D R I V E R S I D E D R I V E + 3° 24' 5'10'-7"TYP. R49'-3" R49'-3" R67'-4" 15'-5"R96' -9" 1955 FLO O D W A Y FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOCFOCFOCFOCFOCFOCFOCFOCFOCFOCW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W 100- Y E A R F L O O D P L A I N 30' STREAM BUFFERFLOO D W A Y EXISTING BUILDING FFE: 1954.03'30' STREAM BUFFER500- Y E A R F L O O D P L A I N DNDN LODLO D LOD LODLODLO D R I V E R S I D E D R I V E + 8'-10"18' 4'-6" 1 ' - 9 " 3 ' - 1 " 24'66'R8'-11"R3' TYP.R5' TYP. R 3 ' T Y P . 120° 150° 30° 9' 57'9' -10" 136°38'-2"71'-7 " 30'-7"34'-2" R 1 2 1 ' - 5 " 73'-9 "12'-2"5'-10"80'-1 " 15' 3'-10 " 83'-6 " 5'-3" 2'-11 " 16' R57'-1" 24'-8"66'-8"13 '1'-5"23'-4 " 22'-2" R36'-1"R50'96'-3" 63'-1"203'-7"R6 ' R5' R5'9'-9"R79' -2 " 6 ' 52'-10" 16'-9"139'-3"257'- 4 "R5'8'9'-6"18' 3' 6'-2"62'-10"9'-2"4 3 ' - 2 " 49'8'-6"5'-6"3'-1"R10'6'-6"22'-4"SEAL DRAWN BY:CHECKED BY: Copyright © 2019, Equinox Environmental Consultation & Design, Inc. 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 DRAWING SCALE NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable.REVISIONSDATEPHASE DATE DRAWING NAME DESIGN BY:NOT FORCONSTRUCTION1"=30'Woodfin, North CarolinaSILVER-LINE PARKTOWN OF WOODFINL3.0 P1 LAYOUT & MATERIALS April 1, 2020 100% CDS NFC 4 L9.5 PICNIC TABLE 2 L9.5ADA PICNIC TABLE 9 L9.4STEPPING STUMPS PLAY ELEMENT 1 L9.0 CONCRETE PATH (ADJACENT TO WETLAND) 8 L9.4CLIMBING BOULDERS PLAY ELEMENT 2 L9.3DROP INLET 1 L9.3OUTFALL PROTECTION 4 L9.2 QUADRUPLE CULVERT HEADWALL TRAIN PLATFORM (SEE SHEET A0.1) 1 L9.5 PORTABLE TOILET SCREENING 3 L9.5 BOLLARD, TYP. MULCH PATH CONSTRUCTED WETLAND7 L9.2 6 L9.2 WEIR 2 L9.0 ASPHALT PAVING (STANDARD CONDITION, TYP.) 5 L9.2 TREATMENT SWALE 5 L9.2TREATMENT SWALE CL CL CL NOTE: ROAD NARROWS HERE DUE TO SITE CONSTRAINTS AND TO HOLD THE EDGE OF THE EXISTING PAVEMENT CL CL 5'-3" 5 L9.5ADA COMPATIBLE STAND UP GRILL 6 L9.4 PEA GRAVEL SURFACE WITH METAL EDGING 8 L9.0TIMBER GUARDRAIL 0 N 60'30'15' SCALE: 30'-0" Know what's below. before you dig.Call R SEE SHEET L3.1 FOR ENLARGEMENTSEE SHEET L3.1 FOR ENLARGEMENT6 L9.2 WEIR 1 L9.0 CONCRETE PATH (WETLAND ADJACENT, TYP.) 1 L9.0 CONCRETE PATH (SUPPORT 80,000 LBS., TYP.) 2 L9.0 ASPHALT PAVING (ADJACENT TO WETLAND, TYP.) 1 L9.0 CONCRETE PATH (STANDARD CONDITION, TYP.) EXISTING ASPHALT TO BE SAW CUT AND REMOVED FROM PROPOSED LANE, NORTH TO EDGE OF PAVEMENT NOTE: ALL ASPHALT PAVING TO INCLUDE INTERMEDIATE COURSE DURING PHASE 1. FOR PHASE 2 ADDRESS ALL AREAS THAT NEED REPAIR BEFORE APPLYING SURFACE COAT. 6 L9.0 ADA PARKING SIGN, TYP. LEGEND PROPERTY BOUNDARY LIMITS OF DISTURBANCE PIPE SWALE STREAM BUFFER WETLAND 43'-2" 49' SS SS SS SS SS SS SS SS SS1953 18'-2" 11' MI N. 6' MI N. 1'-6" 1 ' 3'-3" SEAL DRAWN BY:CHECKED BY: Copyright © 2019, Equinox Environmental Consultation & Design, Inc. 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 DRAWING SCALE NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable.REVISIONSDATEPHASE DATE DRAWING NAME DESIGN BY:NOT FORCONSTRUCTIONTOWN OF WOODFINSILVER-LINE PARKWoodfin, North Carolina100% CDS NFC AS SHOWN L3.1 P1 LAYOUT & MATERIAL ENLARGEMENTS April 1, 2020 SCALE: 1" = 5'-0" BOARDWALK LAYOUT1 SCALE: 1" = 5'-0" PLAY AREA LAYOUT2 27'-3" 28' 11'-7" 20'2'6'6'4'-10"6'R5'1 L9.4 PLAYGROUND SIGN 2 L9.4 STACKED TRUNKS 2 L9.4 CULVERT TUNNEL 3 L9.0 FLUSH CONCRETE CURB EDGING 4 L9.4 RUBBERIZED SURFACE (BLUE: SEE SPECIFICATION PACKAGE) 6 L9.4 SUNKEN PIRATE SHIP 7 L9.4 GROUP SWING 8 L9.4 PLAY BOULDERS 5 L9.4 PEA GRAVEL SURFACE 2 L9.2 UNDERDRAIN, TYP. BOARDWALK SCHEMATIC1 L9.1 R109'- 8" R68'-4" 45'-11" R74'-5" 9'-5" EXISTING UTILITY POLE TO BE REMOVED BY DUKE PRIOR TO CONSTRUCTION LANDSCAPE BOULDER, TYP.8 L9.2 INTERPRETIVE SIGNAGE5 L9.1 FALL ZONE 4'-10"11"6'-5"11"BASIC OMEGA BENCH (SEE SPECIFICATIONS PACKAGE) 0 N 10'5'2.5' SCALE: 1" = 5'-0" 0 N 10'5'2.5' SCALE: 1" = 5'-0" Know what's below. before you dig.Call R FRO N T FRONT3'-5"54' -8 " WETLAND 6 L9.5 DRINKING FOUNTAIN (SEE ALSO P0.0) PORTA-JOHNS 19551955 1955 19551955 1950 195 5 19551955195 5 195 0 1 9 4 5 FLO O D W A Y FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOCFOCFOCFOCFOCFOCFOCFOCFOCFOCW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W 100- Y E A R F L O O D P L A I N 30' STREAM BUFFERFLOO D W A Y EXISTING BUILDING FFE: 1954.03'30' STREAM BUFFER500- Y E A R F L O O D P L A I N DNDN LODLO D LOD LODLODLO D 1954 1952 195 3 195 2 1954 1955 1953 1951 1950 1953195219541952 1951R I V E R S I D E D R I V E +1953FFE: 1960.27' FFE: 1957.74' 1954.84' 1954.96' HP 1953.55' 1954.70' 1955.06' 1954.34' 1953.98'1.0% 1.0% 1.0%1953.64' 1953.30' 1953.64' 1953.64' 1953.44' 1953.44' 1953.53'1953.80' 1951.85' 1952.50' 1953.64' 1953.62' 1952.00' 1953.00' 1957.80' 1955.80' 1953.53' 1953.71' 1954.15' 1953.35' HP 1953.33' LP 1951.84' WEIR 1952.64' WEIR 1952.64' 1953.85' 1953.55' 1952.89' 1952.10' 1952.10' 1950.95' 1953.97' 1953.68' 1953.64' 1953.88' 1954.80' 1954.80' 1.8% 1.0% 1.0% 1.0% 1.0% 1953.75' 1954.30' LP 1954.55' 1963.50' 1953.64' 1954.05' 1954.05' 1954.05' HP 1954.13' 1953.83' 1953.54' 1953.79' 1953.79' 1953.84' SEAL DRAWN BY:CHECKED BY: Copyright © 2019, Equinox Environmental Consultation & Design, Inc. 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 DRAWING SCALE NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable.REVISIONSDATEPHASE DATE DRAWING NAME DESIGN BY:NOT FORCONSTRUCTION1"=30'Woodfin, North CarolinaSILVER-LINE PARKTOWN OF WOODFINL4.0 P1 GRADING PLAN April 1, 2020 100% CDS NFC GENERAL NOTES: 1.TOPOGRAPHY MAY HAVE SHIFTED SINCE SURVEY. 2.SITE VERIFICATION MAY BE NECESSARY DURING CONSTRUCTION. 3.DO NOT GRADE WITHIN 25' OF HIGH TRANSMISSION POLES WITHOUT BARRIER AND 10' OF TRANSMISSION POLE WITH VEHICLE BARRIER AS SHOWN ON PLAN. 4.DO NOT GRADE WITHIN 7 1 2 ' OF DISTRIBUTION POLES AS SHOWN ON PLAN. SEE SHEET L4.1 FOR ENLARGEMENT RIM ELEV.: 1952.75 INV. IN ELEV. 1949.75 INV. OUT ELEV. 1949.25 RIM ELEV.: 1950.50 INV. IN ELEV. 1948.25 INV. OUT ELEV. 1947.00 RIM ELEV.: 1953.00 INV. IN ELEV. 1949.80 INV. OUT ELEV. 1948.20 Know what's below. before you dig.Call R 0 N 60'30'15' SCALE: 1"= 30'-0" "DO NOT GRADE" ZONE PER DUKE ENERGY REGULATIONS, TYP. SEE NOTES ON THIS SHEET LEGEND PROPERTY BOUNDARY LIMITS OF DISTURBANCE PIPE SWALE STREAM BUFFER WETLAND 1953LP GROUND SURFACE ELEV.: 1953.00 GRAVEL SURFACE ELEV.: 1953.50 GROUND SURFACE ELEV.: 1953.84 GRAVEL SURFACE ELEV.: 1954.09 GROUND SURFACE ELEV.: 1953.27 GRAVEL SURFACE ELEV.:1954.20 GROUND SURFACE ELEV.: 1953.82 GRAVEL SURFACE ELEV.: 1954.57 LP GROUND SURFACE ELEV.: 1954.00 GRAVEL SURFACE ELEV.: 1954.28 LP GROUND SURFACE ELEV.:1953.03 GRAVEL SURFACE ELEV.:1953.78 GROUND SURFACE ELEV.: 1953.41 GRAVEL SURFACE ELEV.: 1954.16 GROUND SURFACE ELEV.: 1953.25 GRAVEL SURFACE ELEV.: 1953.35 HP 1954.71 1953.79 1953.86 1954.05 1954.57 1953.35 1953.24 1953.86 LP GROUND SURFACE ELEV.:1953.05 GRAVEL SURFACE ELEV.:1953.60 GROUND SURFACE ELEV.: 1953.27 GRAVEL SURFACE ELEV.: 1954.02 1953.86 1953.86 1953.52 1953.55 HP GROUND SURFACE ELEV.: 1953.82 GRAVEL SURFACE ELEV.: 1954.57 1954.15 1954.25 1953 1952 MIN. 1% MIN. 1% MIN. 1% 1952.85 1952.5 19541953MIN. 1% MIN. 1% 1953.55 SEAL DRAWN BY:CHECKED BY: Copyright © 2019, Equinox Environmental Consultation & Design, Inc. 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 DRAWING SCALE NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable.REVISIONSDATEPHASE DATE DRAWING NAME DESIGN BY:NOT FORCONSTRUCTION1"=5'Woodfin, North CarolinaSILVER-LINE PARKTOWN OF WOODFINL4.1 P1 GRADING PLAN ENLARGEMENTS April 1, 2020 100% CDS NFC GENERAL NOTES: 1.SUB-PEA GRAVEL SURFACE ELEVATIONS ARE NOTED IN ADDITION TO SURFACE SPOTS TO IDENTIFY PRECISE MOVEMENT OF WATER AND FALL ZONE DEPTHS. 2.TOPOGRAPHY MAY HAVE SHIFTED SINCE SURVEY. 3.EXISTING TOPOGRAPHY IS PRELIMINARY. 4.SITE VERIFICATION MAY BE NECESSARY DURING CONSTRUCTION. FALL ZONE, GRAVEL TO HAVE A 9" TO 12" DEPTH 0 N 10'5'2.5' SCALE: 1"= 5'-0" Know what's below. before you dig.Call R 1955 FLO O D W A Y SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFH A SFHA SFHA SFHA SFHASFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SF H A SF H A SF H A SF H A SF H A S F H A S F H A S F H A S F H A FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOCFOCFOCFOCFOCFOCFOCFOCFOCFOC100- Y E A R F L O O D P L A I N 30' STREAM BUFFERFLOO D W A Y EXISTING BUILDING FFE: 1954.03'30' STREAM BUFFEROH W OH W OHW OH W OH W O H W OHW OH W O H W O H W O H W 500- Y E A R F L O O D P L A I N DNDN LODLO D LOD LODLODLO D 1954 1952 195 3 195 2 1954 1955 1953 1951 1950 1953195219541952 1951R I V E R S I D E D R I V E +1953SEAL DRAWN BY:CHECKED BY: Copyright © 2019, Equinox Environmental Consultation & Design, Inc. 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 DRAWING SCALE NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable.REVISIONSDATEPHASE DATE DRAWING NAME DESIGN BY:NOT FORCONSTRUCTION1"=30'Woodfin, North CarolinaSILVER-LINE PARKTOWN OF WOODFINL5.0 P1 STORMWATER PLAN April 1, 2020 100% CDS NFC PIPE (6) SWALE (ENHANCED TREATMENT SWALE BMP G) SWALE (A) SWALE (C) ALL PROPOSED IMPERVIOUS SURFACES (GRAY HATCHED AREA) CONCRETE DROP INLET TYP. (INLET 1) RIM ELEV.: 1952.60 2 L9.3 PIPE (5) CONCRETE DROP INLET TYP. (INLET 2) RIM ELEV.: 1950.50 2 L9.3 PIPE (1) PIPE (2) BIORETENTION- ENHANCED DRY POND (BMP B) CONSTRUCTED WETLAND (BMP D) BIORETENTION- ENHANCED DRY POND (BMP H) DISCONNECTED DOWNSPOUT PLANTED RECEIVING AREA (BMP E) WEIR (2) WEIR (1) PIPE (3) PIPE (4) PIPE (7) CONCRETE DROP INLET TYP. (INLET 3) RIM ELEV.: 1953.00 2 L9.3 NOTE: PIPE TO BE CUT AND ARMORED WITH THE RIPRAP AT THE BOAT RAMP IN PHASE TWO 0 N 60'30'15' SCALE: 30'-0" Know what's below. before you dig.Call R NOTE: SEE SITE DRAINAGE DIAGRAM AND SUB-WATERSHED DIAGRAM ON SHEET L0.3 FRE N C H B R O A D R I V E R 1 L9.3OUTFALL PROTECTION 1 L9.3 OUTFALL PROTECTION CLIENT:Town of Woodfin CONTACT:Town of Woodfin 90 Elk Mountain Rd Asheville NC 28804 (828) 253-4887 ADDRESS:1054 Riverside Drive Asheville / Woodfin, NC 28804 COUNTY: Buncombe COORDINATES:Latitude: 35.626462° N Longitude: -82.582327° W PIN(s):9730512998; 9730524113 DEED REFERENCE:Book 5027 Page 802 RIVER BASIN:French Broad STREAM CLASSIFICATION:B: Primary Recreation, Fresh Water TOTAL ACREAGE:5.35 AC DISTURBED AREA:4.46 AC PERCENT DISTURBED:83% FEMA PANEL No:370380 PROPOSED IMPERVIOUS SURFACE, BOTH PHASES: 0.82 AC LEGEND PROPERTY BOUNDARY LIMITS OF DISTURBANCE PIPE SWALE STREAM BUFFER WETLAND P2 1955 SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS W W W W W W W W W W W DNDN LOD 1954LODFFE 1954.55' LP 1954.05' 1955 1954 1953 195219531954BLACK GUM (NYSS) REDBUD (CERC) INKBERRY HOLLY (ILEG) FOTHERGILLA (FOTG) SWEETSPIRE 'LITTLE HENRY' (ITEV) NINEBARK 'GINGER WINE' (PHYO) BUTTON BUSH (CEPO) ELDERBERRY (SAMN) RED OAK (QUER) RIVER BIRCH (BETN) BLUE GRAMA GRASS 'BLONDE AMBITION' (BOUG) LAWN SEED MIX COMMON RUSH (JUNC) RIVER OATS (CHAL) SALLOW SEDGE (CARL) SWITCHGRASS 'SHENENDOAH' (PANV) THREAD-LEAF BLUE STAR (AMSH) FOX SEDGE (CARV) BLUE FLAG IRIS (IRIV) IRONWEED (VERN) RASPBERRY MONARDA (MOND) SWAMP HIBISCUS (HIBM) NEW ENGLAND ASTER 'PURPLE DOME' (SYMN) GOLDENROD 'FIREWORKS' (SOLR) SEAL DRAWN BY:CHECKED BY: Copyright © 2019, Equinox Environmental Consultation & Design, Inc. 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 DRAWING SCALE NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable.REVISIONSDATEPHASE DATE DRAWING NAME DESIGN BY:NOT FORCONSTRUCTION1"=20'Woodfin, North CarolinaSILVER-LINE PARKTOWN OF WOODFINL6.0 P1 PLANTING PLAN April 1, 2020 100% CDS NFC TREE & SHRUB PLANTING LEGEND 0 N 40'20'10' SCALE: 20'-0" Know what's below. before you dig.Call R HERBACEOUS PLANTING LEGEND 56-CHAL 258 -CARL 21-PANV 1-BETN 116-BOUG 5-ILEG 1-CERC 9-HIBM 241-CARL 60-CHAL 11-SOLR 5-ILEG 9-HIBM 3-SAMN 11-VERN 7-ITEV 1-CEPO 11-SOLR 3-CEPO 7-SOLR 7-ITEV 350-JUNC 874-CARL 282-CARV 18-MOND 1-SAMN 113-CHAL 493-JUNC 616-CARV 453-JUNC 6-HIBM 120-CHAL 269-CARL 7-PANV 3-ILEG 9-MOND 7-SOLR 25-IRIV NOTE: SEE PLANTING DETAILS L16.4 AND PLANTING NOTES L0.1 SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS S S S S S S S S S S S FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOCFOCFOCFOCFOCFOCFOCFOCFOCFOCFOCFOCFOCFOCFOCFOCSS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS S S S S S S S S S S S S S S S S S S S S S S SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSW W W W W W W W LODLO D LOD + BLACK GUM (NYSS) REDBUD (CERC) INKBERRY HOLLY (ILEG) FOTHERGILLA (FOTG) SWEETSPIRE 'LITTLE HENRY' (ITEV) NINEBARK 'GINGER WINE' (PHYO) BUTTON BUSH (CEPO) ELDERBERRY (SAMN) RED OAK (QUER) RIVER BIRCH (BETN) BLUE GRAMA GRASS 'BLONDE AMBITION' (BOUG) LAWN SEED MIX COMMON RUSH (JUNC) RIVER OATS (CHAL) SALLOW SEDGE (CARL) SWITCHGRASS 'SHENENDOAH' (PANV) THREAD-LEAF BLUE STAR (AMSH) FOX SEDGE (CARV) BLUE FLAG IRIS (IRIV) IRONWEED (VERN) RASPBERRY MONARDA (MOND) SWAMP HIBISCUS (HIBM) NEW ENGLAND ASTER 'PURPLE DOME' (SYMN) GOLDENROD 'FIREWORKS' (SOLR) SEAL DRAWN BY:CHECKED BY: Copyright © 2019, Equinox Environmental Consultation & Design, Inc. 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 DRAWING SCALE NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable.REVISIONSDATEPHASE DATE DRAWING NAME DESIGN BY:NOT FORCONSTRUCTION1"=20'Woodfin, North CarolinaSILVER-LINE PARKTOWN OF WOODFINL6.1 P1 PLANTING PLAN April 1, 2020 100% CDS NFC TREE & SHRUB PLANTING LEGEND HERBACEOUS PLANTING LEGEND 28-PANV 3-CEPO 28-CHAL 216-JUNC 3-PHYO 110-CARL 3-ILEG 16-PANV 17-VERN 30-CHAL 824-CARV (ENTIRE SWALE) 7-IRIV 3-ILEG 7-VERN 35-CHAL 11-VERN 22-CHAL 3-ILEG 22-CHAL 3-ILEG 524-JUNC 11-PANV 225-CARV 3-PHYO 52-CHAL 3-ILEG 7-ILEG 30-PANV 8-HIBM 3-CEPO 416-CARV 5-ILEG 3-PHYO 663-CARL 10-ITEV 47-CHAL 375-CARV 22-IRIV 53-CHAL 11-IRIV 7-HIBM 388-JUNC 3-FOTG 48-CHAL 1-CERC 257-BOUG 8-ILEG 23-IRIV 0 N 40'20'10' SCALE: 20'-0" Know what's below. before you dig.Call R NOTE: SEE PLANTING DETAILS L16.4 AND PLANTING NOTES L0.1 19551955 1955 19551955 1950 195 5 19551955195 5 195 0 1 9 4 5 FLO O D W A Y SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFH A SFHA SFHA SFHA SFHASFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SF H A SF H A SF H A SF H A SF H A S F H A S F H A S F H A S F H A FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOCFOCFOCFOCFOCFOCFOCFOCFOCFOC100- Y E A R F L O O D P L A I N 30' STREAM BUFFERFLOO D W A Y EXISTING BUILDING FFE: 1954.03'30' STREAM BUFFEROH W OH W OHW OH W OH W O H W OHW OH W O H W O H W O H W 500- Y E A R F L O O D P L A I N DNDN LODLO D LOD LODLODLO D 1954 1952 195 3 195 2 1954 1955 1953 1951 1950 1953195219541952 1951R I V E R S I D E D R I V E +1953SEAL DRAWN BY:CHECKED BY: Copyright © 2019, Equinox Environmental Consultation & Design, Inc. 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 DRAWING SCALE NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable.REVISIONSDATEPHASE DATE DRAWING NAME DESIGN BY:NOT FORCONSTRUCTION1"=30'Woodfin, North CarolinaSILVER-LINE PARKTOWN OF WOODFINL7.0 P1 EROSION & SEDIMENT CONTROL April 1, 2020 100% CDS NFC GENERAL NOTES: 1.TOPOGRAPHY MAY HAVE SHIFTED SINCE SURVEY. 2.EXISTING SITE TOPOGRAPHY IS PRELIMINARY. 3.SITE VERIFICATION MAY BE NECESSARY DURING CONSTRUCTION. 4.DO NOT GRADE WITHIN 25' OF HIGH TRANSMISSION POLES WITHOUT BARRIER AND 10' OF TRANSMISSION POLE WITH VEHICLE BARRIER. 5.DO NOT GRADE WITHIN 7 1 2 ' OF DISTRIBUTION POLES. SILT FENCE FLARED UP AT ENDS TO CONTAIN SEDIMENT(TYP) OUTLET PROTECTION DISTURBANCE BOUNDARY DESCRIPTIONSYMBOL SEDIMENT TUBE INLET PROTECTION TREE PROTECTION FENCE SILT FENCE PROPOSED DRAINAGE PATTERNS TEMPORARY CHECK DAM EROSION CONTROL LEGEND SEDIMENT TUBE CONSTRUCTION ENTRANCE DTL # TEMPORARY SEED DIVERSION DITCH 0 N 60'30'15' SCALE: 30'-0" Know what's below. before you dig.Call R ROCK CHECK AT PROPOSED WEIR LOCATIONS, (TYP) DURING CONSTRUCTION, DROP INLET TO BE SET 3-6" ABOVE GRADE. FUTURE BIORETENTION CELL AREAS TO BE TEMPORARY SEDIMENT BASINS DURING CONSTRUCTION CONSTRUCTION SEQUENCE 1.ON-SITE PRE-CONSTRUCTION MEETING. 2.CLEARING & GRUBBING ONLY AS NECESSARY FOR INSTALLATION OF PERIMETER CONTROLS (E.G. SILT FENCE AND CONSTRUCTION ENTRANCE). 3.INSTALLATION OF PERIMETER CONTROLS (E.G. SILT FENCE, CONSTRUCTION ENTRANCE, WETLAND). 4.CLEARING AND GRUBBING AS NECESSARY FOR CONSTRUCTION MAINTENANCE AREA INSTALLATION OF STORMWATER CONTROL MEASURES (SCMS). 5.INSTALLATION OF REMAINING EROSION CONTROL MEASURES INCLUDING SCMS 6.SCM OUTFALL STRUCTURES TO BE SET 3-6" ABOVE GRADE DURING CONSTRUCTION AND SURROUNDED BY SEDIMENT CONTROL MEASURES TO REDUCE PONDING. 7.REMAINING CLEARING AND GRUBBING OF SITE AS NECESSARY FOR CONSTRUCTION (SEDIMENT AND EROSION CONTROL MEASURES FOR THESE AREAS MUST ALREADY BE INSTALLED). 8.TEMPORARY SEEDING OF ALL SCMS (SCMS TO ACT AS TEMPORARY SEDIMENT TRAPS DURING CONSTRUCTION) 9.ROUGH AND FINE GRADING OF PARK ELEMENTS 10.MAINTAIN EROSION CONTROL DEVICES INCLUDING SCMS 11.REMOVAL OF TEMPORARY SEDIMENT & EROSION CONTROL MEASURES AFTER ENTIRE AREA DRAINING TO THE STRUCTURE IS STABILIZED. 12.REMOVE EXCESS SEDIMENT IN SCMS A-D AND THE EXPANDED WETLAND AND FINE GRADE SHOWN IN DETAILS AND PLAN. 13.INSTALL PERMANENT OUTFALL STRUCTURES TO PLANNED ELEVATIONS. 14.PLANT SCMS A-D AND EXPANDED WETLAND ACCORDING TO PLANTING PLAN. 15.SUBMIT NOTICE OF TERMINATION WHEN SITE IMPROVEMENTS ARE COMPLETED. CONSTRUCTION STAGING AREA TO INCLUDE CONCRETE WASHOUT L8.6 L8.1 L9.3.1 L9.6.1 L8.5 L8.7 L8.8 L8.2 CLIENT:Town of Woodfin CONTACT:Town of Woodfin 90 Elk Mountain Rd Asheville NC 28804 (828) 253-4887 ADDRESS:1054 Riverside Drive Asheville / Woodfin, NC 28804 COUNTY: Buncombe COORDINATES:Latitude: 35.626462° N Longitude: -82.582327° W PIN(s):9730512998; 9730524113 DEED REFERENCE:Book 5027 Page 802 RIVER BASIN:French Broad STREAM CLASSIFICATION:B: Primary Recreation, Fresh Water TOTAL ACREAGE:5.35 AC DISTURBED AREA:4.46 AC PERCENT DISTURBED:83% FEMA PANEL No:370380 SEAL DRAWN BY:CHECKED BY: Copyright © 2019, Equinox Environmental Consultation & Design, Inc. 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 DRAWING SCALE NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable.REVISIONSDATEPHASE DATE DRAWING NAME DESIGN BY:NOT FORCONSTRUCTIONAS SHOWNWoodfin, North CarolinaSILVER-LINE PARKTOWN OF WOODFINL8.0 P1 EROSION & SEDIMENT CONTROL DETAILS April 1, 2020 100% CDS NFC INSTALLATION: 1.SILT FENCES SHALL BE PLACED ON SLOPE CONTOURS TO MAXIMIZE PONDING EFFICIENCY. 2.INSTALL MINIMUM 10' (OR GREATER AS SPECIFIED ON PLANS) CHECKS (TIE-BACKS) AT END TO PREVENT FLOWS FROM BY-PASSING SILT FENCE, AND EVERY 50'-100' WHERE SILT FENCE IS INSTALLED WITH SLOPE AND CONCENTRATED FLOWS ARE EXPECTED ALONG FENCE. 3.SILT FENCE SLURRY FLOW RATE TO BE 0.3 GPM/FT², LESS THAN THE CLEAR WATER FLOW RATE OF 10 GPM/FT². 1.INSPECT AND REPAIR SILT FENCE AT LEAST ONCE EVERY CALENDAR WEEK.. 2.SEDIMENT SHALL BE REMOVED WHEN IT IS 1/3 THE HEIGHT OF THE SILT FENCE. 3.REMOVED SEDIMENT SHALL BE DEPOSITED TO AN AREA THAT WILL NOT CONTRIBUTE SEDIMENT OFF-SITE AND CAN BE PERMANENTLY STABILIZED. 4.UPON PROJECT COMPLETION, THE SILT FENCE SHALL BE REMOVED AND HAULED OFF-SITE. ANY DEPOSITED SEDIMENT SHALL BE PROPERLY GRADED AND SEEDED. COMPACTED EARTH 24" MIN.18" TO 24"6 F T . M A X I M U M S P A C I N G BURY AT LEAST 12 INCHES OF FILTER FABRIC HEAVY DUTY PLASTIC TIES (EVENLY SPACED, RESTRICTED TO TOP 8 INCHES OF FABRIC) MIRAFI 100X SILT FENCE FABRIC (OR ENGINEERING APPROVED EQUAL - SEE NOTE #3) BACKFILL TRENCH WITH COMPACTED EARTH FILTER FABRIC ISOMETRIC VIEW 1.25 LB./LF STEEL POST SF SF WIRE-BACKED TY P E S ( S E N S I T I V E ) - 4 F T . M A X I M U M S P A C I N G NOTE: TYPE S (SENSITVE) FENCE REQUIRES WOVEN WIRE FENCE OR ALTERNATE BACKING SEE SILT FENCE DETAIL FOR INSTALLATON, INSPECTION, AND MAINTENANCE NOTES. SEE SEDIMENT TUBE DETAIL FOR INSTALLATON, INSPECTION, AND MAINTENANCE NOTES. INSTALLATION: 1.INSTALL SEDIMENT TUBES BY LAYING THEM FLAT ON THE GROUND. CONSTRUCT A SMALL TRENCH TO A DEPTH THAT IS 20% OF THE SEDIMENT TUBE DIAMETER. LAY THE SEDIMENT TUBE IN THE TRENCH AND COMPACT THE UPSTREAM SEDIMENT TUBE SOIL INTERFACE. INSTALL ALL SEDIMENT TUBES SO NO GAPS EXIST BETWEEN THE SOIL TO PREVENT FLOW AND SEDIMENT FROM PASSING THROUGH THE FIELD JOINT. NEVER STACK SEDIMENT TUBES ON TOP OF ONE ANOTHER. 2.SHOULD SEDIMENT TUBE BECOME DAMAGED DURING INSTALLATION, PLACE A STAKE ON BOTH SIDES OF THE DAMAGED AREA TERMINATING THE TUBE SEGMENT AND INSTALL NEW TUBE SEGMENT. 3.INSTALL SEDIMENT TUBES USING WOODEN STAKES (1" X 1") OR STEEL POSTS (STANDARD "U" OR "T" SECTIONS WITH A MINIMUM WEIGHT OF 1.25 POUNDS PER FOOT) A MINIMUM OF 4 FEET IN LENGTH PLACED ON 2' CENTERS. INTERTWINE THE STAKES WITH THE OUTER MESH ON THE DOWNSTREAM SIDE, AND DRIVE THE STAKES INTO THE GROUND TO A MINIMUM DEPTH OF 2' LEAVING LESS THAN 1' OF STAKE ABOVE THE EXPOSED SEDIMENT TUBE. INSPECTION AND MAINTENANCE: 1.INSPECT SEDIMENT TUBES AFTER INSTALLATION FOR GAPS UNDER THE SEDIMENT TUBES AND FOR GAPS BETWEEN THE JOINTS OF ADJACENT ENDS OF SEDIMENT TUBES. REPAIR RILLS, GULLIES, AND ALL UNDERCUTTING NEAR SEDIMENT TUBES. SEDIMENT TUBES SHALL ALSO BE INSPECTED AT LEAST ONCE EVERY CALENDAR WEEK. 2.REMOVE ACCUMULATED SEDIMENT WHEN IT REACHES 1/3 THE HEIGHT OF THE SEDIMENT TUBE. 3.LARGE DEBRIS, TRASH, AND LEAVES SHOULD BE REMOVED FROM IN FRONT OF THE SEDIMENT TUBE WHEN FOUND 4.REMOVE AND/OR REPLACE INSTALLED SEDIMENT TUBES AS REQUIRED TO ADAPT TO CHANGING CONSTRUCTION SITE CONDITIONS. 5.SEDIMENT TUBES SHALL REMAIN IN PLACE UNTIL THE DISTURBED AREAS ARE PERMANENTLY STABILIZED. 6.REMOVE ALL CONSTRUCTION MATERIAL AND SEDIMENT AND DISPOSE PROPERLY. BACKFILL ALL DEPRESSIONS AND GROUND DISTURBANCES CAUSED BY THE REMOVAL OF THE SEDIMENT TUBES. 2' MAX. SPACING 2' MIN.20% OF TUBE DIAMETERCONTECH ERO-MAT OR APPROVED EQUAL INSTALLATION: 1.THE DITCH DEPTH AND BOTTOM WIDTH SHOWN INDICATE THE HYDRAULIC OR UNOBSTRUCTED CROSS SECTIONAL AREA. OVERCUT CHANNEL BY 2" TO ALLOW BULKING DURING SEEDBED PREPARATION. 2.PROVIDE 6" OVERLAP AT ALL SEAM INTERFACES. 3.DITCH SIDE SLOPES TO BE 3:1 UNLESS OTHERWISE SPECIFIED. (SEE PLANS) 4.STABILIZATION OF CONVEYANCE CHANNELS IS TO BE COMPLETED WITHIN 7 DAYS OF CHANNEL CONSTRUCTION. INSPECTION AND MAINTENANCE: 1.THE MAINTENANCE OBJECTIVES FOR GRASS-LINED DITCHES INCLUDE KEEPING UP THE HYDRAULIC AND REMOVAL EFFICIENCY OF THE CHANNEL AND MAINTAINING A DENSE, HEALTHY, GRASS COVER. 2.MAINTENANCE INCLUDES PERIODIC MOWING, WEED CONTROL, WATERING DURING DROUGHT CONDITIONS, RE-SEEDING OF BARE AREAS, AND CLEARING OF DEBRIS AND BLOCKAGES. 3.REMOVE ACCUMULATED SEDIMENT MANUALLY TO AVOID THE TRANSPORT OF RE-SUSPENDED SEDIMENTS IN PERIODS OF LOW FLOW AND TO PREVENT A DAMMING EFFECT FROM SAND BARS. 4.MINIMIZE THE APPLICATION OF FERTILIZERS AND PESTICIDES. 5.REPAIR DAMAGED AREAS WITH THE CHANNEL. 6.RE-SEED AS NECESSARY TO MAINTAIN A HEALTHY, THICK GRASS COVER. UNLESS NOTED OTHERWISE SEE INSTALLATION NOTE 3 BELOW DEPTH AS SHOWN ON PLANS (1' MINIMUM) LONGITUDINAL ANCHOR TRENCH 6" MINIMUM ANCHOR PER MANUFACTURER RECOMMENDATIONS SEDIMENT TUBE INLET PROTECTION NTS1 SEDIMENT TUBE NTS2 TRAPEZOIDAL GRASS-LINED DITCH NTS3 SILT FENCE NTS5 INSTALLATION: 1.STABILIZED CONSTRUCTION ENTRANCES SHOULD BE USED AT ALL POINTS WHERE TRAFFIC WILL EGRESS/INGRESS A CONSTRUCTION SITE ONTO A PUBLIC ROAD OR ANY IMPERVIOUS SURFACE, SUCH AS A PARKING LOT. 2.INSTALL A NON-WOVEN GEOTEXTILE FABRIC PRIOR TO PLACING ANY STONE. 3.INSTALL A CULVERT PIPE ACROSS THE ENTRANCE WHERE NEEDED TO PROVIDE POSITIVE DRAINAGE. 4.LIMESTONE MAY NOT BE USED FOR THE STONE PAD. INSPECTION AND MAINTENANCE: 1.INSPECT THE CONSTRUCTION ENTRANCE AT LEAST ONCE PER CALENDAR WEEK. CHECK FOR MUD AND SEDIMENT BUILDUP AND PAD INTEGRITY. INSPECTIONS MAY BE NEEDED TO BE MORE FREQUENT DURING LONG PERIODS OF WET WEATHER. 2.THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION THAT WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC RIGHT-OF-WAYS. THIS MAY REQUIRE TOP DRESSING, REPAIR AND/OR CLEAN OUT OF ANY MEASURES USED TO TRAP SEDIMENT. 4.WHEN NECESSARY, WHEELS SHALL BE CLEANED PRIOR TO ENTRANCE ONTO PUBLIC RIGHT-OF-WAY, 5.IMMEDIATELY REMOVE ANY MUD OR SEDIMENT TRACKED ONTO ADJACENT IMPERVIOUS SURFACES BY BRUSHING OR SWEEPING. FLUSHING SHOULD ONLY BE USED WHEN THE WATER IS DIRECTED TO A SEDIMENT TRAP OR BASIN. 6.REMOVE CONSTRUCTION ENTRANCE ONLY AFTER THE SITE HAS REACHED FINAL STABILIZATION. PERMANENT VEGETATION SHOULD REPLACE AREAS WHERE THE CONSTRUCTION ENTRANCE HAS BEEN REMOVED UNLESS THE AREA WILL BE CONVERTED TO AN IMPERVIOUS SURFACE TO SERVE POST-CONSTRUCTION. PUBLI C R O A D LEN G T H STONE DIAMETER 2" TO 3" AVERAGE, 6-INCH MINIMUM DEPTH EDGES SHALL BE TAPERED OUT TOWARD ROAD TO PREVENT TRACKING OF MUD ON THE EDGES UNDERLYING NON-WOVEN GEOTEXTILE FABRIC WIDT H CONSTRUCTION ENTRANCE NTS7 INSTALLATION: 1.TEMPORARY SEDIMENT TRAPS SHALL HAVE A MAXIMUM DESIGN DEPTH OF 5.0'. 1.SEDIMENT SHALL BE REMOVED AND THE TRAP RESTORED TO ITS ORIGINAL DIMENSION WHEN THE SEDIMENT REACHES THE (1') MARK ON THE CLEANOUT STAKE. SEDIMENT SHALL BE DEPOSITED IN A SUITABLE AREA AND IN SUCH A MANNER THAT IT WILL MINIMIZE FURTHER EROSION. 2.THE TRAP SHALL BE INSPECTED ONCE EVERY CALENDAR WEEK AND REPAIRED MADE AS NEEDED. 3.UPON CONSTRUCTION COMPLETION, THE TRAP SHALL BE REMOVED BY GRADING THE AREA WITH A MINIMUM SLOPE OF 0.5%. ALL RIP RAP AND ASSOCIATED MATERIALS SHALL BE HAULED OFF THE SITE. FILTER FABRIC INLET PROTECTION NTS4 TEMPORARY CHECK DAM NTS6 SUMMERFALLTEMPORARY SEEDING MUST OCCUR WHEN DENUDED AREAS WILL NOT BE BROUGHT TO FINAL GRADE WITHIN 7 CALENDAR DAYS (SEE NOTE 3 ABOVE). TEMPORARY SEEDING SCHEDULE SEEDING MIXTURE: SPECIES RATE (LB/ACRE) GERMAN MILLET 40 PARTRIDGE PEA 10 A small-stemmed sudangrass may be substituted for Partridge Pea at a rate of 50 lb/acre. SEEDING DATES: May 15-Aug 15 SEEDING MIXTURE: SPECIES RATE (LB/ACRE) ANNUAL (WINTER) RYE GRASS 60 PARTRIDGE PEA 10 SEEDING DATES: Feb 1-May 15 A small-stemmed sudangrass may be substituted for Partridge Pea at a rate of 50 lb/acre. SEEDING MIXTURE: SPECIES RATE (LB/ACRE) ANNUAL (WINTER) RYE GRASS 60 PARTRIDGE PEA 10 SEEDING DATES: Aug 15-Dec 30 A small-stemmed sudangrass may be substituted for Partridge Pea at a rate of 50 lb/acre. SOIL AMENDMENTS: Physically or chemically treat all exotic invasive plants before amending soil. Apply lime and organic fertilizer according to soil tests or apply 4,000 lb/acre ground agricultural limestone or as recommended by soil test results. SOIL PREPARATION: Preparation for stabilization shall not begin until all construction and utility work is complete. A North Carolina Department of Agriculture Test (or equal) shall be obtained for all areas to be seeded. Recommended fertilizer and pH adjusting products shall be incorporated into the prepared areas. Soil impacted by construction must be loosened prior to seeding by means of disking or raking. Seedbed shall be well-pulvarized, loose, and uniform. All stones larger than three (3) inches, sticks, roots, and other extraneous materials shall be removed. Apply seed uniformly with a cyclon seeder, drop-type spreader, drill or hydro-seeder. Cover broadcast seed by lightly raking, then firm surface with roller or cultipacker. Cut or disc temporary seeding cover crop prior to seeding. SEED PREPARATION: If banks exceed 4:1, see additional hydroseeding notes. MULCH: Use a spray-on growth (mulch) matrix (Flexterra FGM or equal) for all permanent seeding for all slopes greater than 3:1. For all other areas, mulch with weed free straw at 4,000 lbs per acre. MAINTENANCE: Mow or cut back no more than once a year. Reseed in the second year unless growth is fully adequate. Add topsoil or organic amendments if needed, till, and reseed and mulch damaged areas immediately. Weed during first 2 years of establishment.WINTER &EARLY SPRINGGENERALSUMMERFALLTEMPORARY SEEDING MUST OCCUR WHEN DENUDED AREAS WILL NOT BE BROUGHT TO FINAL GRADE WITHIN 7 CALENDAR DAYS (SEE NOTE 3 ABOVE). TEMPORARY SEEDING SCHEDULE SEEDING MIXTURE: SPECIES RATE (LB/ACRE) GERMAN MILLET 40 PARTRIDGE PEA 10 A small-stemmed sudangrass may be substituted for Partridge Pea at a rate of 50 lb/acre. SEEDING DATES: May 15-Aug 15 SEEDING MIXTURE: SPECIES RATE (LB/ACRE) ANNUAL (WINTER) RYE GRASS 60 PARTRIDGE PEA 10 SEEDING DATES: Feb 1-May 15 A small-stemmed sudangrass may be substituted for Partridge Pea at a rate of 50 lb/acre. SEEDING MIXTURE: SPECIES RATE (LB/ACRE) ANNUAL (WINTER) RYE GRASS 60 PARTRIDGE PEA 10 SEEDING DATES: Aug 15-Dec 30 A small-stemmed sudangrass may be substituted for Partridge Pea at a rate of 50 lb/acre.WINTER &EARLY SPRINGSEE SPECIFICATIONS FOR SEED MIX DETAILS. THE SEED MIXES ABOVE IS AVAILABLE AT ERNST CONSERVATION SEEDS (800.873.3321). LOCAL SOURCES OF SIMILAR SEED MIX MAY BE USED WITH LANDSCAPE ARCHITECT APPROVALGENERAL 1.TO ENSURE SURVIVABILITY, WATER GRASS AT LEAST WEEKLY DURING DROUGHT. 2.CONTRACTOR TO KEEP RECORD OF SEED PURCHASE AND APPLICATION RATES FOR FINAL INSPECTION (BAGS & RECEIPTS). 3.GROUND STABILIZATION REQUIRED IN (7) SEVEN DAYS ON PERIMETER AREAS AND SLOPES GREATER THAN 3:1, AND GROUND STABILIZATION IN (14) DAYS ON OTHER AREAS 4.ALL AREAS DISTURBED DURING CONSTRUCTION TO SEEDED AND STABILIZED.SUMMERFALLTEMPORARY SEEDING MUST OCCUR WHEN DENUDED AREAS WILL NOT BE BROUGHT TO FINAL GRADE WITHIN 7 CALENDAR DAYS (SEE NOTE 3 ABOVE). TEMPORARY SEEDING SCHEDULE SEEDING MIXTURE: SPECIES RATE (LB/ACRE) GERMAN MILLET 40 PARTRIDGE PEA 10 A small-stemmed sudangrass may be substituted for Partridge Pea at a rate of 50 lb/acre. SEEDING DATES: May 15-Aug 15 SEEDING MIXTURE: SPECIES RATE (LB/ACRE) ANNUAL (WINTER) RYE GRASS 60 PARTRIDGE PEA 10 SEEDING DATES: Feb 1-May 15 A small-stemmed sudangrass may be substituted for Partridge Pea at a rate of 50 lb/acre. SEEDING MIXTURE: SPECIES RATE (LB/ACRE) ANNUAL (WINTER) RYE GRASS 60 PARTRIDGE PEA 10 SEEDING DATES: Aug 15-Dec 30 A small-stemmed sudangrass may be substituted for Partridge Pea at a rate of 50 lb/acre. SOIL AMENDMENTS: Follow recommendation of soil tests. Use only amendments safe for riparian areas. MULCH: Apply 4,000 lb/acre straw. Anchor straw by tacking. MAINTENANCE: Refertilize if growth is not fully adequate. Topdress with 50 lb/acre of nitrogen in March (if applicable). If it is necessary to extend temporary cover beyond June 15th overseed with mixes provided. Reseed, re-fertilize and mulch immediately following erosion or other damage. PERMANENT SEEDING SCHEDULEWINTER &EARLY SPRINGPERMANENT SEEDING MUST OCCUR WITHIN 14 CALENDAR DAYS OF FINAL GRADING. COVER CROPS (TEMPORARY SEEDING) TO BE ADDED TO PERMANENT SEEDING MIXES IF NO TEMPORARY SEEDING HAS BEEN PLACED PREVIOUSLY . SEEDING MIXES: RATE (LB/ACRE) CONSERVATION MIX (ERNMX 114)20GENERAL SEEDING SCHEDULE NTS8 CONCRETE CURB GROUND OR PAVEMENT SURFACE (SURFACES VARY, SEE PLAN)12" (MIN.) CABC STONE 6" (MIN.) R=1" ADJACENT CONDITION 31"21"41"6' SPACING (TYPICAL)FRONT ELEVATION POST CONNECTION NOT TO SCALE TYPICAL GUARDRAIL SECTION 1:10 SLOPE OR FLATTER *(SEE NOTE 3 FOR STEEPER SLOPES) NOTES: USE TIMBARRIER™ STREETGUARD™ (OR APPROVED EQUAL) 1.INSTALLATION TO BE COMPLETED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. 2.DO NOT SCALE DRAWINGS. 3.IF TOP OF SLOPE IS CLOSER THAN 24" INCREASE POST LENGTH TO 7'. 4.DRIVE POST OR AUGER, BACKFILL WITH NATIVE SOIL AND COMPACT EVERY 12". 5.ALL TIMBER #1 S4S SOUTHERN PINE, PRESSURE TREATED: AWPA-C14, WOOD FOR USE IN HWY. CONSTRUCTION. 6.TYP. POST 8"X8"X6' - TYP. RAIL: 4"X12"X11'-11 1 2". 7.FASTENSERS: ASTM A307; A242; F436 TYPE 3; A563 DH3. 8.TIMBERBARRIER™ SPLICE PLATE AND PLATE WASHER ASTM-A588. 9.UNDER EACH BOLT HEAD ON FACE OF RAIL, INSTALL ONE 7 8" WASHER. 10.REFER TO MANUFACTURER'S DRAWINGS ON TERMINAL DETAILS. 11.THIS GUARDRAIL IS DESIGNED FOR STREET WITH A MAXIMUM DESIGN OF 25 MPH. HANDICAP PARKING U-CHANNEL POST MOUNT WITH 5/16"x2 1/4" BOLTS TOP & BOTTOM OF SIGN SIGN TYPE R7-8A METAL POST FINISH GRADE CONCRETE FOOTING SIGN TYPE R7-8D, 1 REQ. AT EACH H-CAP SPACE STEEL ENCASED CONCRETE BOLLARD PAINTED SAFETY YELLOW 4" WHITE REFLECTIVE TAPE U-CHANNEL POST MOUNT WITH 5/16"x2 1/4" BOLTS TOP & BOTTOM OF SIGN SEE PLAN FOR SIGN TYPE METAL POST FINISH GRADE CONCRETE FOOTING SIGNS: 1.ALL SIGNS TO BE ENGINEERING GRADE, REFLECTIVE. 2.SEE PLAN FOR MUTCD NAME SEAL DRAWN BY:CHECKED BY: Copyright © 2019, Equinox Environmental Consultation & Design, Inc. 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 DRAWING SCALE NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable.REVISIONSDATEPHASE DATE DRAWING NAME DESIGN BY:NOT FORCONSTRUCTIONAS SHOWNWoodfin, North CarolinaSILVER-LINE PARKTOWN OF WOODFINL9.0 P1 PAVING DETAILS April 1, 2020 100% CDS NFC ASPHALT PAVING NTS2 CONCRETE PATH NTS1 BROOM FINISH CONCRETE FIBER MIXED INTO CONCRETE FOR REINFORCEMENT 4"2"CABC COMPACTED SUBGRADE NOTES: 1.CONCRETE WALKS AND PADS TO BE FLUSH WITH FINISH GROUND ELEVATION. 2.NATURAL OR COMPACTED FILL SUBGRADE MATERIALS SHALL HAVE A LIQUID LIMIT (LL) LESS THAN 50 AND A PLASTICITY INDEX (PI) OF LESS THAN 10. 3.PLACE A 1 8" SAW JOINT AS SPECIFIED ON PLAN TO 1 1 2" DEPTH. 4.PLACE A 1 8" EXPANSION JOINT EVERY 48-52' AND FILL WITH PRE-MOULDED EXPANSION 5.SLOPE SLAB TO DRAIN 1-2% MAXIMUM PER SITE CONDITIONS. 6.CONCRETE STRENGTH SHALL BE 4000 PSI. 7.BROOM FINISH EXPOSED CONCRETE SURFACE PERPENDICULAR TO PEDESTRIAN TRAFFIC FLOW. 8.THIS DETAIL REFERENCES PATHWAYS, SIDEWALKS, AND PADS NOT OTHERWISE NOTED AS ADJACENT TO WETLAND OR NEEDING TO SUPPORT LARGE VEHICLES 9.SEE THE LAYOUT & MATERIALS PLAN FOR CONTROL JOINT LOCATIONS. EXTEND BASE COURSE 6" BEYOND EDGE OF ASPHALT 12" COMPACTED SUBGRADE TO 95% ASTM D 698, (TYP.) PRIME COAT 6" 8" AGGREGATE BASE COURSE (TYPE "ABC") TACK COAT PROPOSED 2.5" ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE I19.0B PROPOSED 1.5" ASPHALT CONCRETE SURFACE COURSE, TYPE SF9.5A 4" NOTES: 1.ALL PAVING WORKMANSHIP AND MATERIALS SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF D. O. T. STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES. 2.ALL ASPHALT PAVEMENT AND STONE BASE THICKNESS SPECIFIED SHALL BE AFTER COMPACTION. 3.SUBGRADE AND STONE BASE SHALL BE MECHANICALLY COMPACTED (ROLLED) TO THE DENSITY OF NATURAL AND UNDISTURBED SOILS (APPROX. 95% OF THE MAXIMUM DENSITY IN ACCORDANCE WITH ASTM D698, MODIFIED PROCTOR.). 4. PAVEMENT SECTION FOR PAVING UP TO NCDOT RIGHT OF WAY LIMIT. STANDARD CONDITION ADJACENT TO WETLAND SUPPORT 80,000 LB. LOAD STANDARD CONDITION ADJACENT TO WETLAND FLUSH CONCRETE CURB EDGING NTS3 BROOM FINISH CONCRETE FIBER MIXED INTO CONCRETE FOR REINFORCEMENT 4"2"CABC NOTES: 1.CONCRETE WALKS AND PADS TO BE FLUSH WITH FINISH GROUND ELEVATION. 2.NATURAL OR COMPACTED FILL SUBGRADE MATERIALS SHALL HAVE A LIQUID LIMIT (LL) LESS THAN 50 AND A PLASTICITY INDEX (PI) OF LESS THAN 10. 3.PLACE A 1 8" SAW JOINT AS SPECIFIED ON PLAN TO 1 1 2" DEPTH. 4.SLOPE SLAB TO DRAIN 1-2% MAXIMUM PER SITE CONDITIONS. 5.CONCRETE STRENGTH SHALL BE 4000 PSI. 6.BROOM FINISH EXPOSED CONCRETE SURFACE PERPENDICULAR TO PEDESTRIAN TRAFFIC FLOW. 7.THIS DETAIL REFERENCES PATHWAYS AND SIDEWALKS ADJACENT TO THE WETLAND 8.SEE THE LAYOUT & MATERIALS PLAN FOR CONTROL JOINT LOCATIONS AND LOCATIONS FOR USE OF GEOTEXTILE. BROOM FINISH CONCRETE FIBER MIXED INTO CONCRETE FOR REINFORCEMENT 5"2"CABC COMPACTED SUBGRADE NOTES: 1.CONCRETE WALKS AND PADS TO BE FLUSH WITH FINISH GROUND ELEVATION. 2.NATURAL OR COMPACTED FILL SUBGRADE MATERIALS SHALL HAVE A LIQUID LIMIT (LL) LESS THAN 50 AND A PLASTICITY INDEX (PI) OF LESS THAN 10. 3.PLACE A 1 8" SAW JOINT AS SPECIFIED ON PLAN TO 1 1 2" DEPTH. 4.PLACE A 1 8" EXPANSION JOINT EVERY 48-52' AND FILL WITH PRE-MOULDED EXPANSION 5.SLOPE SLAB TO DRAIN 1-2% MAXIMUM PER SITE CONDITIONS. 6.CONCRETE STRENGTH SHALL BE 4000 PSI. 7.BROOM FINISH EXPOSED CONCRETE SURFACE PERPENDICULAR TO PEDESTRIAN TRAFFIC FLOW. 8.THIS DETAIL REFERENCES PATHWAYS, SIDEWALKS, AND PADS NEEDING TO SUPPORT LARGE VEHICLES 9.SEE THE LAYOUT & MATERIALS PLAN FOR CONTROL JOINT LOCATIONS. MIRAFI HP 270 WOVEN GEOTEXTILE OR APPROVED EQUAL EXTEND BASE COURSE 6" BEYOND EDGE OF ASPHALT 12" COMPACTED SUBGRADE TO 95% ASTM D 698, (TYP.) PRIME COAT 6" 8" AGGREGATE BASE COURSE (TYPE "ABC") TACK COAT PROPOSED 2.5" ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE I19.0B PROPOSED 1.5" ASPHALT CONCRETE SURFACE COURSE, TYPE SF9.5A 4" NOTES: 1.ALL PAVING WORKMANSHIP AND MATERIALS SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF D. O. T. STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES. 2.ALL ASPHALT PAVEMENT AND STONE BASE THICKNESS SPECIFIED SHALL BE AFTER COMPACTION. 3.SUBGRADE AND STONE BASE SHALL BE MECHANICALLY COMPACTED (ROLLED) TO THE DENSITY OF NATURAL AND UNDISTURBED SOILS (APPROX. 95% OF THE MAXIMUM DENSITY IN ACCORDANCE WITH ASTM D698, MODIFIED PROCTOR.). 4. PAVEMENT SECTION FOR PAVING UP TO NCDOT RIGHT OF WAY LIMIT. 5. GEOTEXTILE FABRIC TO BE USED FROM MIDLINE OF PARKING TOWARD WETLAND. MIRAFI HP 270 WOVEN GEOTEXTILE OR APPROVED EQUAL ADA PARKING SIGN NTS4 MUTCD PARKING SIGN NTS5 TIMBER GUARDRAIL NTS6 NOTE: PHASE 1 TO INCLUDE BASE COARSE AND INTERMEDIATE COURSE. SURFACE COURSE WILL BE ADDRESSED IN PHASE 2 5'-8"8'8'5'-6"1'1'-6"1'-6"1'-6"1'-6"11"9'-4"9'-5"7'-7"7'-7"6'-4"6'-4"15'-2"4'-9"6'-5"4'-9"2'1'-8"R0.2 5 "4'-2"6"4"4"1.5"1.5"0.38" 3 8" CORTEN STEEL 3 8" X 2-1/4" STEEL BOLTS WITH NUTS NOTES: ·USE COR-TEN/LYTEN, NOT MILD STEEL. ·DO NOT USE RUST ACTIVATORS. ·USE STAINLESS STEEL (MIN. GRADE 304) OR TYPE III STEEL FASTENERS. ·USE PLASTIC OR RUBBER SPACERS TO KEEP CORTEN FROM TOUCHING OTHER MATERIALS. ·MAKE CHANGES IN DIRECTION BY BENDING. USE JIGS TO PRODUCE UNIFORM CURVATURE. MAINTAIN CROSS SECTION THROUGH ENTIRE BEND ·DRILL BOLT HOLES USING A "PECK DARLING" TECHNIQUE. ·GRIND ALL DRILL HOLES TO SMOOTH FINISH. THIS DETAIL IS INTENDED TO BE A GUIDE FOR SIGN MANUFACTURERS. ANY ALTERATION SHOULD BE APPROVED BY THE CLIENT OR EQUINOX. 150° WOODEN BUMPER RESIN PLACARD (SIGN INFO) TO BE EPOXY ATTACHED IN PHASE 2 SEAL DRAWN BY:CHECKED BY: Copyright © 2019, Equinox Environmental Consultation & Design, Inc. 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 DRAWING SCALE NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable.REVISIONSDATEPHASE DATE DRAWING NAME DESIGN BY:NOT FORCONSTRUCTIONAS SHOWNWoodfin, North CarolinaSILVER-LINE PARKTOWN OF WOODFINL9.1 BOARDWALK DETAILS April 1, 2020 100% CDS NFC NTS BOARDWALK SCHEMATIC1 NTS BOARDWALK HEADWALL3 NTS BOARDWALK FRAMING LAYOUT2 CHANCE HELICAL PIER UNDERPINNING SYSTEM OR APPROVED EQUAL (SEE SPECIFICATION PACKAGE) NOTE: FINAL CALCULATION, ASSEMBLY, AND INSTALLATION REQUIRED FOR HELICAL PIERS TO BE DETERMINED BY INSTALLER 2X3 THERMALLY MODIFIED PINE BUMPER 2 X 6 THERMALLY MODIFIED PINE DECKING WITH SPACING BETWEEN 1 8" AND 1 4" 6x6 PT PINE BEAMS 2x6 PT PINE JOISTS 6x6 BEAMS 2x6 JOISTS 18" O.C OUTSIDE JOIST HUNG FLUSH WITH BEAM WITH FACE-MOUNT CONCEALED-FLANGE JOIST HANGER. INSIDE JOISTS HUNG FLUSH WITH BEAM WITH ANY SUITABLE JOIST HANGER. WOODEN BUMPER 2x8 WOODEN DECKING FLUSH WITH CONCRETE HEADWALL NOTCHED CONCRETE HEADWALL CONCRETE SIDEWALK GRAVEL SUB-BASE 3 L11.0 BOARDWALK HEADWALL 2 L11.0 BOARDWALK FRAMING LAYOUT 2X3X6 BUMPER SPACERS SET 3' O.C. NOTCHED CONCRETE HEADWALL ON GRADE WITH DECKING 4 L11.0 BENCH SEAT NTS BENCH SEAT4 2x10 BENCH POST 2X4 STRIP TO ATTACH DECKING NOTES: ·ALL FASTENERS TO BE GALVANIZED STEEL 5 L11.0 HELICAL PIERS JOIST 2X4 STRIP ATTACHED TO POST TO ATTACH DECKING TO 2X6 DECKING 2X10 BENCH POST TO ATTACH TO JOIST 2X4 CROSS MEMBER 2X4 FASCIA BOARD 2X6 BENCH DECKING TO OVERHANG 2"ALL SIDES NTS INTERPRETIVE SIGNAGE (ATTACHED TO BOARDWALK)5 5 L6.1 INTERPRETIVE SIGNAGE 1 2" X 6" HEX BOLTS WITH NUTS AND WASHERS EXPANSION JOINT FIELDSTONE BOULDER WITH FLAT/LEVEL TOP BOULDER TO HAVE MOSTLY ROUNDED EDGES 12" MIN. 15" - 36" RANGE VARIES (SEE PLAN FOR APPROX. DIMENSIONS) BOULDER NOTES: -BOULDERS TO BE FREE OF MACHINE MARKINGS AND BLEMISHES. -STONE TO BE TN, NC, OR VA FIELDSTONE ORIGIN WITH ROUNDED EDGES -LANDSCAPE ARCHITECT TO APPROVE BOULDERS AND LOCATION (FLAGGED) BEFORE PLACEMENT -BOULDERS TO BE EMBEDDED IN GROUND BETWEEN 1 3 - 1 2 OF OVERALL HEIGHT. BURY APPROX. 1 3 OF BOULDER MIN. LANDSCAPE BOULDER NTS3 ROUNDED TOP FREE OF SHARP ANGLES SEAL DRAWN BY:CHECKED BY: Copyright © 2019, Equinox Environmental Consultation & Design, Inc. 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 DRAWING SCALE NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable.REVISIONSDATEPHASE DATE DRAWING NAME DESIGN BY:NOT FORCONSTRUCTIONAS SHOWNWoodfin, North CarolinaSILVER-LINE PARKTOWN OF WOODFINL9.2 P1 STORMWATER CONTROL MEASURE DETAILS April 1, 2020 100% CDS NFC UNDERDRAIN AT PLAYGROUND NTS2 QUADRUPLE CULVERT HEADWALL NTS4 TREATMENT SWALE NTS5 SCREW CAP, TYP. 4" PERFORATED PIPE UNDER PLAY SURFACE PLAN 4" SOLID PIPE TO OUTFALL (ALL AREAS NOT UNDER PLAY SURFACE) ZIP TIE FABRIC TO SEAL ZIP TIE FABRIC TO SEAL AROUND PIPE 4" POP-UP DRAIN EMITTER COMPACTED SUBGRADE NOTE: CONTRACTOR SHALL GRADE SUBGRADE AND INSTALL PIPE TO DRAIN @ 0.5% SLOPE MIN. 4" HDPE JOINT IF APPLICABLE TO CONNECT WITH 4" PIPE TO DRAIN EMITTER PIPE (0.5% SLOPE MIN.) LAWN OUTFALL SECTION WEIR NTS6 NTS CONSTRUCTED WETLAND / STORMWATER WETLAND7 WETLAND OUTFALL SECTION PIPE (0.5% SLOPE MIN.) 4" HDPE COMPACTED SUBGRADE FINISH GRADE SIZES VARY (SEE PLAN) (HIGH WATER LEVEL) SUBGRADE 3:1 - 10:1 SIDE SLOPES 3:1 MAX. PLANTINGS (SEE PLANTING PLAN) STORAGE VOLUME BENTONITE CLAY LINER* (SEE WETLAND CONSTRUCTION NOTES) STORMWATER WETLAND CONSTRUCTION NOTES: ·DURING EXCAVATION OF THE CONSTRUCTED WETLAND CONTACT PROJECT LANDSCAPE ARCHITECT IF GRADING REVEALS PROBLEMATIC CONDITIONS FOR HOLDING WATER SUCH AS SANDY SOILS, GRAVEL, DRAIN TILES, ETC. PROJECT REFINEMENTS MAY BE NECESSARY TO CREATE A FUNCTIONING WETLAND. ·CONTRACTOR SHALL CONSTRUCT THE WETLAND IN A WAY THAT REDUCES THE POTENTIAL FOR EROSION WHICH MAY INCLUDE TEMPORARY DIVERSION DITCHES ·STRIP AND STOCKPILE TOPSOIL IF PRESENT. SOILS UNCOVERED DURING EXCAVATION THAT CONTAINS CLAY OR LOAM SOILS CAN BE USED WITHIN THE WETLAND AREA. NO SAND, GRAVEL, OR ROCK MAY BE USED WITHIN THE WETLAND. ·OVER EXCAVATION MAY BE NECESSARY TO REMOVE SILT, SEDIMENT, SAND, GRAVEL OR CONDITIONS THAT WOULD IMPACT WETLAND FUNCTION. ·EQUINOX TO OVERSEE FINE GRADING OF CONSTRUCTED WETLAND (HIGH POINTS AND LOW POINTS GIVEN ON PLAN FOR GENERAL DIRECTION). ·ALL BOTTOM AREAS WITHIN "HIGH WATER BOUNDARY" TO BE TILLED WITH BENTONITE CLAY LAYER UNLESS WATER IS PRESENT (FROM HIGH WATER TABLE). ··BENTONITE POWDER TO BE TILLED AT A RATE OF 1-2 LBS PER SQUARE FOOT, WETTED WITH SPRINKLER, AND ROLLED TO COMPACT CLAY PARTICLES (FINAL SOIL COMPOSITION SHOULD BE A MIN OF 20% CLAY). ··ADD WATER WHILE CLAY SOIL LAYER IS WET - DO NOT ALLOW WETLAND TO DRY OUT AND CRACK, OR SEAL WILL BE COMPROMISED. ··ALTERNATIVELY, A CLAY LINER MAY BE ALSO BE USED (FOLLOW MANUFACTURER'S INSTALLATION REQUIREMENTS). ·REMOVED SOIL TO BE MIXED WITH TOPSOIL (OR APPROVED PLANTING MIX) AND ADDED ABOVE PREPARED CLAY BOTTOM AND LIGHTLY COMPACTED IN 6" LIFTS ABOVE CLAY LINER. NO SAND, GRAVEL, OR ROCK MAY BE USED WITH THE SOIL LIFTS. ·SPREAD SOIL MIX AND SMOOTH OVER THE BOTTOM AND SIDES OF THE COMPLETED WETLAND AND UP THE INSIDE SLOPES OF THE WETLAND TO A DEPTH OF 12" AND SHALL MEET PROPOSED FINISHED GRADE SHOWN ON PLAN. ·MULCH WITH HYDROSEEDING AFTER PLANTING. PREPARED SOIL MIX (5 PARTS NATIVE SOIL:1 PART TOPSOIL THOROUGHLY MIXED)12" MIN.3"-6" DEPTH(VARIES)FINISH GRADE CELL SIZES & SLOPES VARY 6" STORAGE DEPTH MINIMUM AND 9" MAXIMUM (9" TYPICAL) (HIGH WATER LEVEL) DECOMPACTED SUBGRADE 5:1 TYP.3:1 MAX. SEE GRADING PLAN 2" x 4" KEY 0.6 H WEIR NOTCH REINFORCED CONCRETE CANTILEVERED WALL 36" H 5 8 REBAR WEIR NOTCH ELEVATION FLOW 10"3"18" DISCONNECTED DOWNSPOUT GARDEN NTS1 FOREBAY SHALLOW POOL/ SHALLOW WATER ZONE DEEP POOL WETLAND CONSTRUCTION NOTES: ·WETLAND SHOULD BE GRADED SO THAT WATER ENTERS FOREBAY FIRST ·BEYOND THE FOREBAY, THE WETLAND SHALL BE GRADED TO HAVE LOWER AND HIGHER ELEVATIONS (SHALLOW POOL AND DEEPER POOL) FOR PROPER WETLAND FUNCTION ·SIDE WALLS SHALL BE A MAXIMUM OF 3:1 WITH AN AVERAGE OF 8:1 4" POP-UP DRAIN EMITTER COMPACTED SUBGRADE NOTE: CONTRACTOR SHALL GRADE SUBGRADE AND INSTALL PIPE TO DRAIN @ 0.5% SLOPE MIN. SEE STORM PLAN FOR PIPE LOCATIONS SEE ARCHITECTUAL FOR EXACT LOCATION OF DOWNSPOUTS 4" HDPE JOINT IF APPLICABLE TO CONNECT WITH 4" PIPE TO DRAIN EMITTER PIPE (0.5% SLOPE MIN.) DOWNSPOUT GARDEN OUTFALL SECTION PLANTING (SEE PLANTING PLAN) COBBLE AROUND EMITTER (EMITTER SHOULD HAVE A 2' RADIUS FREE FROM PLANTINGS PERMENANT POOL 1952.69' TEMPORARY INDUNDATION 1953.00' VARIES, SEE GRADING PLAN SHEET L4.0 SEAL DRAWN BY:CHECKED BY: Copyright © 2019, Equinox Environmental Consultation & Design, Inc. 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 DRAWING SCALE NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable.REVISIONSDATEPHASE DATE DRAWING NAME DESIGN BY:NOT FORCONSTRUCTIONAS SHOWNWoodfin, North CarolinaSILVER-LINE PARKTOWN OF WOODFINL9.3 P1 STORMWATER CONTROL MEASURE DETAILS April 1, 2020 100% CDS NFC PIPE OUTFALL PROTECTION NTS1 PIPE INSTALLATION NTS3 CONCRETE DROP INLET NTS2 OF GRATE FROM TOP MEASURED OUT (TYP.) TO INVERT 36"Ø MINIMUM SECTIONAL ELEVATION 6" VARIES 32"-48" OR 64" RISERS 5" HEIGHT 12"-16"-24" GRATE SIZE & PLAN FLAT TOP FTT 7" STD. SHAPE MAY VARY IRON GRATE & FRAME NOT SHOWN 48"Ø MINIMUM 5" SECTIONAL ELEVATION FLAT TOP FTB NOTES: 1.MANUFACTURED PER ASTM C-478. 2.CONCRETE - 4000 psi 3.PLASTIC COATED STEEL ROD STEPS PROVIDED AT 16" CC WHEN HEIGHT OF STRUCTURE EXCEEDS 4'-0". 4.ALL ASSEMBLY JOINTS TO BE MORTAR FILLED UNLESS OTHERWISE SPECIFIED. 5.STRUCTURE DIAMETERS MAY VARY ACCORDING TO PIPE SIZES AND CONFIGURATIONS. 6.LIFT HOLES OR INSERTS PROVIDED IN ALL BASE AND RISER SECTIONS. 24"x24" D = PIPE DIA. IN INCHES T = CLASS B RIP RAP D 2xD D 1 2 FILTER FABRIC 4xD FILTER FABRIC T 9-12" IN FALL ZONE 2" MIN. IN NON FALL ZONE --2" CRUSHED STONE WITH FINES--5'-2"2'-9"2'-6"3'-11"78° 6X6 PINE TIMBER (ADD ALTERNATE: THERMALLY MODIFIED PINE) 29"H x 22"W X 1" THICK SAND BLASTED HDU BOARD POST ANCHORS SET IN CONCRETE PATH, LOCATION SHOWN ON PLAN CONCRETE PATH 1 2" X 4" GALVANIZED CARRIAGE BOLT, TYP. SEAL DRAWN BY:CHECKED BY: Copyright © 2019, Equinox Environmental Consultation & Design, Inc. 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 DRAWING SCALE NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable.REVISIONSDATEPHASE DATE DRAWING NAME DESIGN BY:NOT FORCONSTRUCTIONAS SHOWNWoodfin, North CarolinaSILVER-LINE PARKTOWN OF WOODFINL9.4 PLAYGROUND DETAILS April 1, 2020 100% CDS NFC NTS PLAYGROUND SIGN1 NTS STACKED TRUNKS (DESIGN BUILD)2 NTS CULVERT TUNNEL (DESIGN BUILD)3 NTS PEA GRAVEL SURFACE W/ METAL EDGING5 NTS SUNKEN PIRATE SHIP (DESIGN BUILD)6 NTS GROUP SWING (SEE SPECS. OR APPROVED EQUAL)7 NTS CLIMBING BOULDERS (DESIGN BUILD)8 NTS STEPPING STUMPS9 Z:\ED\G&P\Jackson Co_Savannah Park_069D15-02\Photos\Design Ideas\Natural-Playground.jpg STUMPS TO BE SET 1 2 TO 2 3 IN TOTAL LENGTH IN THE GROUND TOP VIEW COMMERCIAL GRADE STEEL EDGING WHERE NOTED ON PLAN 5" DEPTH (WITH ADDITIONAL 3.7" GROUND SPIKES), 2.5 MM THICK, STAKED INTO PLACE RECOMMENDED EVEREDGE OR EQUIVALENT, WHICH MUST BE APPROVED BY LANDSCAPE ARCHITECT/OWNER TRUNKS TO BE SECURED IN PLACE (FIXED TO THE GROUND WITH FOOTERS SET 18" BELOW GRADE AND TO EACH OTHER) NO EXPOSED HARDWARE, FASTENERS, OR ATTATCHMENTS ANY BOULDER NOT PLACED DIRECTLY ON THE GROUND TO BE MORTARED IN PLACE NO NEED FOR BOULDERS DIRECTLY ON TOP OF THE CONCRETE CULVERT. SEE PLAN FOR GENERAL LAYOUT AND LENGTH 1 3 TO 1 2 OF BOULDER'S TOTAL HEIGHT TO BE BURIED FOR STABILITY AND EASE OF ACCESS HDU BOARD PLACARD IN STOPPED DADO SLOT PLACARD BOLTED TO POST ELEVATION MAJOR FONT: MATURA MT SCRIPT CAPITALS FONT SIZE: 260 PT, MIN. 2.5" FONT RELIEF OF 1 4", PAINTED WHITE, BOTH SIDES MINOR FONT: MATURA MT SCRIPT CAPITALS SIZE: 72 PT, MIN. 3/4" FONT RELIEF OF 1 4", PAINTED WHITE SKULL AND CROSS BONES IMAGE (TO BE PROVIDED) RELIEF OF 1 4", PAINTED WHITE, BOTH SIDES HDU BOARD DETAIL NOTE: SIGN TEXT TO BE APPROVED BY CLIENT BEFORE PRODUCTION NOTE:TO BE DESIGNED AND CONSTRUCTED BY WOOD SCULPTOR NOTE: SEE SPECIFICATIONS PACKAGE, DESIGN BUILD SUNKEN PIRATE SHIP, CONCEPTUAL SKETCHES ARE IN SPECIFICATION PACKAGE NTS RUBBERIZED SURFACE4 NOTE: FOR GROUND CONTACT BOULDERS REFER TO L9.2.3 SEAL DRAWN BY:CHECKED BY: Copyright © 2019, Equinox Environmental Consultation & Design, Inc. 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 DRAWING SCALE NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable.REVISIONSDATEPHASE DATE DRAWING NAME DESIGN BY:NOT FORCONSTRUCTIONAS SHOWNWoodfin, North CarolinaSILVER-LINE PARKTOWN OF WOODFINL9.5 PLAYGROUND DETAILS April 1, 2020 100% CDS NFC PORTABLE TOILET SCREENING NTS1 CONCRETE FOOTER8'1" X 3" WOOD SLATS WITH BETWEEN 1/8TH AND 3/8THS" GAPS (ALL SIDES) 5'-9" FRONT REMAINS OPEN FOR PORTABLE TOILET ACCESS 6" FASCIA ON CORNERS (ALL SIDES) 4" X 4" POST AT EACH CORNER ON INTERIOR, TYP. SIDE ELEVATION 1" X 3" WOOD SLATS (ALL SIDES), TYP. 2" X 4" CROSS MEMBERS TO SUPPORT SLATS, TYP. 5'11'-6"7'-4"ADA ACCESSIBLE PORTABLE TOILET ENTRANCE FLUSH WITH CONCRETE SIDEWALK 18" READY MIX CONCRETE FOOTING, 3,000 PSI LEVEL BASE WITH NON-SHRINK GROUT STEEL TABS FOR PADLOCK WELDED RECTANGULAR STEEL BASE 4" x 7-5/8" x 7-5/8" I.D., PRIMED & PAINTED BLACK WELDED STEEL PIN 8" x 8" PT STAINED WOOD POST, SMOOTH FINISH 12" ROUTED CHANNELS PAINTED WHITE ANGLED TOP (12 DEG.) WITH 1 4" CHAMFERED EDGES STEEL HINGE 16" SQ. STEEL BASE PRE-DRILLED FOR 12" BOLTS 4: 8" x 3 4" BOLTS; SET IN POUR TOP VIEW 16" 8" 2" 12" BOLTS EDGE OF FOOTER BOLLARD NTS3 ROUTED CHANNEL TAPPERS BACK TO SURFACE (VERTICLE ROUTED CHANNELS FACE PEDESTRIAN AREA AND ROAD) ADA PICNIC TABLE NTS2 96" 29" 17" CROSS BRACES 24" CENTER BRACKET 59 1/4" 9 1/4" END BRACKET 29" 96" 29" 17" CROSS BRACES CENTER BRACKET 59 1/4" 9 1/4" PICNIC TABLE NTS4 36" 16" 34" MAX. TO COOKING SURFACE STAND-UP ADA GRILL (PILOT ROCK MODEL ASW-20 OR APPROVED EQUAL) 3/8" EXPANSION JOINT WITH SEALANT WHERE ADJACENT TO CONC. PAVEMENT FINISHED GRADE 3,000 PSI CONCRETE FOOTING SUBGRADE COMPACTED ACCORDING TO MANUFACTURER'S SPECIFICATIONS 1 2" 15 3/8" MIN. ADA COMPATABLE STAND UP GRILL NTS5 POST ANCHOR CONCRETE PAD TO EXTEND 2" ON SCREEN SIDES, TYP. 77 ° NTS DRINKING FOUNTAIN ELEVATION PLAN SIT COLUNA DRINKING FOUNTAIN (SEE SPECS PACKAGE) POURED IN PLACE CONCRETE PEDESTAL TO MATCH COLOR AND FINISH OF THE FOUNTAIN EXPANSION JOINT 9"1'-6"9"6 NOTE: DRINKING FOUNTAIN TO HAVE ACCESSIBLE VALVES FOR WINTERIZATION (SEE P0.0) NOTE: USE JAMESTOWN ADVANCED PRODUCTS PICNIC TABLES OR EQUIVALENT. SEAL DRAWN BY:CHECKED BY: Copyright © 2019, Equinox Environmental Consultation & Design, Inc. 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 DRAWING SCALE NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable.REVISIONSDATEPHASE DATE DRAWING NAME DESIGN BY:NOT FORCONSTRUCTIONAS SHOWNWoodfin, North CarolinaSILVER-LINE PARKTOWN OF WOODFINL9.6 PLANTING DETAILS April 1, 2020 100% CDS NFC TREE PROTECTION DETAIL NTS 1 DECIDUOUS TREE PLANTING DETAIL NTS 2 EVERGREEN PLANTING DETAIL NTS 3 MULTI-STEM TREE PLANTING DETAIL NTS 4 SHRUB PLANTING DETAIL NTS 5 OPEN PLANTING HOLE LARGE ENOUGH TO ACCOMMODATE ROOTS. COVER ROOTS WITH SOIL AND LIGHTLY TAMP TO ELIMINATE AIR POCKETS IN PLANTING HOLE. LEAVES AND ROOT CROWN TO REMAIN UNDAMAGED DURING PLANTING 2" MULCH AFTER PLANTING IS COMPLETE PLANT ROOTS TO BE STRAIGHT & UNDAMAGED BY INSTALLATION ROOT CROWN LEVEL WITH FINISH GRADE PLANTINGS NOTES: 1.WATER THOROUGHLY IMMEDIATELY AFTER PLANTING AND WATER WEEKLY UNTIL ESTABLISHED. 2.NO FERTILIZER IS NECESSARY DURING PLANTING. PERENNIAL PLANTING (TYPICAL SECTION) NTS6 FLO O D W A Y FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOCFOCFOCFOCFOCFOCFOCFOCFOCFOCW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W 100- Y E A R F L O O D P L A I N 30' STREAM BUFFERFLOO D W A Y EXISTING BUILDING FFE: 1954.03'30' STREAM BUFFER500- Y E A R F L O O D P L A I N DNDN LODLO D LOD LODLODLO D R I V E R S I D E D R I V E + 3° 24' 5' R8 ' R24'-6" R 8 R30'-9" 1 5 6 ' - 2 " R10'R5' R5'R58'-3"56'-9"3'-7"R8 5 ' - 5 " 13'-4"30'-5"14'-5"R57 ' - 4 " R30'-2" 78'-7"R50' 35'-5" 37'-10" 19'-9" 15'-6" 49'-10"118'-10"10'-8" 6'53'34'-6"6'-3"6'-4"12'24'-1"79'-3" 24'-4" 22'-3 " 20'-1 " 4'-2"9'-11"67'-5" 2 0 ' - 2 " 31'- 5 "30'-9"96'-3"R79' -2 " 24'-4"24'-0"24'- 0 " SEAL DRAWN BY:CHECKED BY: Copyright © 2019, Equinox Environmental Consultation & Design, Inc. 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 DRAWING SCALE NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable.REVISIONSDATEPHASE DATE DRAWING NAME DESIGN BY:NOT FORCONSTRUCTION1"=30'Woodfin, North CarolinaSILVER-LINE PARKTOWN OF WOODFINL10.0 P2 LAYOUT & MATERIALS April 1, 2020 100% CDS NFC 4 L16.0 1 L16.2PICNIC TABLE, TYP. 2 L16.2GROUP STAND UP GRILL, TYP. 3 L16.2BENCH SWING 4 L16.2KIOSK 1 L16.3RIVER BANK BOULDER TOE 4 L16.1 ARROW STRIPING, TYP. 3 L16.1 CROSS WALK 3 L16.3 LANDSCAPE BOULDER, TYP. 1 L6.0 CONCRETE PATH (SUPPORT 80,000 LBS., TYP) 3 L16.2 CROSS WALK 2 L16.0NATURAL SURFACE TRAIL 7 16.0 ONE-WAY DO NOT ENTER (R5-1) CL CL CL PROPERTY PIN CL CL 5 L16.0CONCRETE STEPPING STONES 0 N 60'30'15' SCALE: 30'-0" Know what's below. before you dig.Call R GREENWAY 1 L16.0 CONCRETE PATH (STANDARD CONDITION) 3 L16.0 ASPHALT PAVING (FINISH COURSE) 5 L16.2 ENTRANCE SIGN 1 16.1 ADA MARKINGS BOAT RAMP (SEE SHEET WW 1.0-3.0) 5 L16.1 CONCRETE WHEEL STOP, TYP. PAVILION (SEE SHEET 1.0) 7 L16.0 STOP SIGN (R1-1) 19551955 19551955 1950 195 5 19551955195 5 195 0 1 9 4 5 FLO O D W A Y SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFH A SFHA SFHA SFHA SFHASFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SF H A SF H A SF H A SF H A SF H A S F H A S F H A S F H A S F H A FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOCFOCFOCFOCFOCFOCFOCFOCFOCFOC100- Y E A R F L O O D P L A I N 30' STREAM BUFFERFLOO D W A Y EXISTING BUILDING FFE: 1954.03'30' STREAM BUFFEROH W OH W OHW OH W OH W O H W OHW OH W O H W O H W O H W 500- Y E A R F L O O D P L A I N DNDN LODLO D LOD 1954 LODLODLO D 4.0% 1950.45' FFE 1954.55' 15% 1951.95' 1951.64' 1948.84' 1942.84' 4.0% 1951.85' 1950 1951 1949 LP 1954.05' R I V E R S I D E D R I V E + 195 5 1951.80' 1951.98' 1951.98' 1955 1954 1953 195219531954SEAL DRAWN BY:CHECKED BY: Copyright © 2019, Equinox Environmental Consultation & Design, Inc. 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 DRAWING SCALE NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable.REVISIONSDATEPHASE DATE DRAWING NAME DESIGN BY:NOT FORCONSTRUCTION1"=30'Woodfin, North CarolinaSILVER-LINE PARKTOWN OF WOODFINL11.0 P2 GRADING PLAN April 1, 2020 100% CDS NFC GENERAL NOTES: 1.TOPOGRAPHY MAY HAVE SHIFTED SINCE SURVEY. 2.EXISTING SITE TOPOGRAPHY IS PRELIMINARY. 3.SITE VERIFICATION MAY BE NECESSARY DURING CONSTRUCTION. 4.DO NOT GRADE WITHIN 25' OF HIGH TRANSMISSION POLES WITHOUT BARRIER AND 10' OF TRANSMISSION POLE WITH VEHICLE BARRIER. 5.DO NOT GRADE WITHIN 7 1 2 ' OF DISTRIBUTION POLES. RIM ELEV.: 1952.60 INV. OUT ELEV. 1930.54 RIM ELEV.: 1950.50 INV. OUT ELEV. 1948.50 0 N 60'30'15' SCALE: 30'-0" Know what's below. before you dig.Call R UNDULATE TRAIL TO PROVIDE ROLLING GRADE REVERSALS FOR PROPER DRAINAGE APPROX. EVERY 25' 1955 FLO O D W A Y SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFH A SFHA SFHA SFHA SFHASFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SF H A SF H A SF H A SF H A SF H A S F H A S F H A S F H A S F H A FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOCFOCFOCFOCFOCFOCFOCFOCFOCFOC100- Y E A R F L O O D P L A I N 30' STREAM BUFFERFLOO D W A Y EXISTING BUILDING FFE: 1954.03'30' STREAM BUFFEROH W OH W OHW OH W OH W O H W OHW OH W O H W O H W O H W 500- Y E A R F L O O D P L A I N DNDN LODLO D LOD LODLODLO D 1954 1952 195 3 195 2 1954 1955 1953 1951 1950 1953195219541952 1951R I V E R S I D E D R I V E +1953SEAL DRAWN BY:CHECKED BY: Copyright © 2019, Equinox Environmental Consultation & Design, Inc. 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 DRAWING SCALE NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable.REVISIONSDATEPHASE DATE DRAWING NAME DESIGN BY:NOT FORCONSTRUCTION1"=30'Woodfin, North CarolinaSILVER-LINE PARKTOWN OF WOODFINL12.0 P2 STORMWATER PLAN April 1, 2020 100% CDS NFC SWALE (ENHANCED TREATMENT SWALE BMP G) SWALE (A) SWALE (C) ALL PROPOSED IMPERVIOUS SURFACES (GRAY HATCHED AREA) CONCRETE DROP INLET TYP. (INLET 1) RIM ELEV.: 1952.60 2 L6.3 PIPE (5) PIPE (1) PIPE (2) BIORETENTION- ENHANCED DRY POND (BMP B) CONSTRUCTED WETLAND (BMP D) BIORETENTION- ENHANCED DRY POND (BMP H) BIORETENTION- DISCONNECTED DOWNSPOUT (BMP E) WEIR (2) WEIR (1) PIPE (3) PIPE (4) PIPE (7) CONCRETE DROP INLET TYP. (INLET 3) RIM ELEV.: 1953.00 2 L6.3 0 N 60'30'15' SCALE: 30'-0" NOTE: PIPE TO BE CUT AND ARMORED WITH THE RIPRAP AT THE BOAT RAMP CLIENT:Town of Woodfin CONTACT:Town of Woodfin 90 Elk Mountain Rd Asheville NC 28804 (828) 253-4887 ADDRESS:1054 Riverside Drive Asheville / Woodfin, NC 28804 COUNTY: Buncombe COORDINATES:Latitude: 35.626462° N Longitude: -82.582327° W PIN(s):9730512998; 9730524113 DEED REFERENCE:Book 5027 Page 802 RIVER BASIN:French Broad STREAM CLASSIFICATION:B: Primary Recreation, Fresh Water TOTAL ACREAGE:5.35 AC DISTURBED AREA:4.46 AC PERCENT DISTURBED:83% FEMA PANEL No:370380 LEGEND PROPERTY BOUNDARY LIMITS OF DISTURBANCE PIPE SWALE STREAM BUFFER WETLAND Know what's below. before you dig.Call R DISCONNECTED DOWNSPOUT PLANTED RECEIVING AREA (BMP F) PIPE (6) CONCRETE DROP INLET TYP. (INLET 2) RIM ELEV.: 1950.50 2 L6.3 1955 SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS W W W W W W W W W W W DNDN LODLODBLACK GUM (NYSS) REDBUD (CERC) INKBERRY HOLLY (ILEG) FOTHERGILLA (FOTG) SWEETSPIRE 'LITTLE HENRY' (ITEV) NINEBARK 'GINGER WINE' (PHYO) BUTTON BUSH (CEPO) ELDERBERRY (SAMN) RED OAK (QUER) RIVER BIRCH (BETN) BLUE GRAMA GRASS 'BLONDE AMBITION' (BOUG) LAWN SEED MIX COMMON RUSH (JUNC) RIVER OATS (CHAL) SALLOW SEDGE (CARL) SWITCHGRASS 'SHENENDOAH' (PANV) THREAD-LEAF BLUE STAR (AMSH) FOX SEDGE (CARV) BLUE FLAG IRIS (IRIV) IRONWEED (VERN) RASPBERRY MONARDA (MOND) SWAMP HIBISCUS (HIBM) NEW ENGLAND ASTER 'PURPLE DOME' (SYMN) GOLDENROD 'FIREWORKS' (SOLR) SEAL DRAWN BY:CHECKED BY: Copyright © 2019, Equinox Environmental Consultation & Design, Inc. 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 DRAWING SCALE NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable.REVISIONSDATEPHASE DATE DRAWING NAME DESIGN BY:NOT FORCONSTRUCTION1"=20'Woodfin, North CarolinaSILVER-LINE PARKTOWN OF WOODFINL13.0 P2 PLANTING PLAN April 1, 2020 100% CDS NFC TREE & SHRUB PLANTING LEGEND Know what's below. before you dig.Call R HERBACEOUS PLANTING LEGEND 37-PANV 5-FOTG 38-CHAL 6-SAMN 7-CEPO 42-PANV 9-AMSH 3-ILEG 28-FOTG 3-ILEG 1-SAMN 5-ILEG 12-FOTG 3-SAMN 31-PANV 10-FOTG 5-ILEG 11-MOND 9-PANV 1-CEPO 1-BETN 22-CHAL 76-CARV 1-QUER 1-QUER 11-PANV 9-MOND 9-CHAL 28-CARV 1-BETN 1-QUER 1-CERC 1-BETN SOD LAWN (SEE NOTES THIS SHEET) WETLAND AREA PLANTED DURING PHASE 1 NOTE: SEE PLANTING DETAILS L16.4 AND PLANTING NOTES L0.1 1.LAY SOD WITHIN 24 HOURS OF HARVESTING UNLESS A SUITABLE PRESERVATION METHOD IS ACCEPTED BY OWNER PRIOR TO DELIVERY TIME. DO NOT LAY SOD IF DORMANT OR IF GROUND IS FROZEN OR MUDDY. 2.LAY SOD TO FORM A SOLID MASS WITH TIGHTLY FITTED JOINTS. BUTT ENDS AND SIDES OF SOD; DO NOT STRETCH OR OVERLAP. STAGGER SOD STRIPS OR PADS TO OFFSET JOINTS IN ADJACENT COURSES. AVOID DAMAGE TO SOIL OR SOD DURING INSTALLATION. TAMP AND ROLL LIGHTLY TO ENSURE CONTACT WITH SOIL, ELIMINATE AIR POCKETS, AND FORM A SMOOTH SURFACE. WORK SIFTED SOIL OR FINE SAND INTO MINOR CRACKS BETWEEN PIECES OF SOD; REMOVE EXCESS TO AVOID SMOTHERING SOD AND ADJACENT GRASS. 3.SATURATE SOD WITH FINE WATER SPRAY WITHIN TWO HOURS OF PLANTING. DURING FIRST WEEK AFTER PLANTING, WATER DAILY OR MORE FREQUENTLY AS NECESSARY TO MAINTAIN MOIST SOIL TO A MINIMUM DEPTH OF 1-1/2 INCHES (38 MM) BELOW SOD. AVOID WATERLOGGED SOILS. 4.BARRIER SUCH AS ORANGE TREE PROTECTION FENCING OR APPROVED EQUAL SHALL BE INSTALLED AROUND THE PERIMETER OF THE SOD UNTIL ESTABLISHMENT AND WITH OWNERS APPROVAL TO REMOVE PROTECTIVE FENCING. “PLEASE KEEP OF THE GRASS” SIGNS TO BE LOCATED ALONG THE FENCING. 0 N 40'20'10' SCALE: 20'-0" SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS S S S S S S S S S S S FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOCFOCFOCFOCFOCFOCFOCFOCFOCFOCFOCFOCFOCFOCFOCFOCSS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS S S S S S S S S S S S S S S S S S S S S S S SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSW W W W W W W W LODLO D LOD + BLACK GUM (NYSS) REDBUD (CERC) INKBERRY HOLLY (ILEG) FOTHERGILLA (FOTG) SWEETSPIRE 'LITTLE HENRY' (ITEV) NINEBARK 'GINGER WINE' (PHYO) BUTTON BUSH (CEPO) ELDERBERRY (SAMN) RED OAK (QUER) RIVER BIRCH (BETN) BLUE GRAMA GRASS 'BLONDE AMBITION' (BOUG) LAWN SEED MIX COMMON RUSH (JUNC) RIVER OATS (CHAL) SALLOW SEDGE (CARL) SWITCHGRASS 'SHENENDOAH' (PANV) THREAD-LEAF BLUE STAR (AMSH) FOX SEDGE (CARV) BLUE FLAG IRIS (IRIV) IRONWEED (VERN) RASPBERRY MONARDA (MOND) SWAMP HIBISCUS (HIBM) NEW ENGLAND ASTER 'PURPLE DOME' (SYMN) GOLDENROD 'FIREWORKS' (SOLR) SEAL DRAWN BY:CHECKED BY: Copyright © 2019, Equinox Environmental Consultation & Design, Inc. 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 DRAWING SCALE NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable.REVISIONSDATEPHASE DATE DRAWING NAME DESIGN BY:NOT FORCONSTRUCTION1"=20'Woodfin, North CarolinaSILVER-LINE PARKTOWN OF WOODFINL13.1 P2 PLANTING PLAN April 1, 2020 100% CDS NFC TREE & SHRUB PLANTING LEGEND HERBACEOUS PLANTING LEGEND 13-PANV 1-CERC 148-BOUG 3-AMSH 17-PANV 5-FOTG 3-AMSH 3-AMSH 5-FOTG 9-PANV 17-PANV 5-FOTG 3-AMSH 5-AMSH 54-BOUG 5-FOTG 21-PANV 3-CERC 1-BETN 129-BOUG 3-ILEG 15-SOLR 10-FOTG 7-ILEG 5-ILEG 9-SOLR 9-PANV 193-BOUG 3-NYSS 11-FOTG 4-ILEG 8-SYMN 15-SOLR 1-CERC 5-PYHO 10-SYMN 74-BOUG 3-ILEG 17-MOND 6-PANV 158-BOUG 8-AMSH 5-FOTG 1-QUER 1-QUER 3-BETN 14-MOND 273-CARL 3-ILEG 60-CHAL 8-IRIV 346-CARV 10-MOND 8-IRIV 3-ILEG 23-CHAL 182-CARL 173-CARV 14-IRIV 46-CHAL 284-JUNC 5-ILEG 359-JUNC 10-IRIV 10-MOND 550-CARL 348-CARV 30-CHAL 17-MOND 11-IRIV WETLAND AREA PLANTED DURING PHASE 1 GRAVEL VERGE 0 N 40'20'10' SCALE: 20'-0" NOTE: SEE PLANTING DETAILS L16.4 AND PLANTING NOTES L0.1 19551955 1955 19551955 1950 195 5 19551955195 5 195 0 1 9 4 5 FLO O D W A Y SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFHA SFH A SFHA SFHA SFHA SFHASFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SFH A SF H A SF H A SF H A SF H A SF H A S F H A S F H A S F H A S F H A FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOCFOCFOCFOCFOCFOCFOCFOCFOCFOC100- Y E A R F L O O D P L A I N 30' STREAM BUFFERFLOO D W A Y EXISTING BUILDING FFE: 1954.03'30' STREAM BUFFEROH W OH W OHW OH W OH W O H W OHW OH W O H W O H W O H W 500- Y E A R F L O O D P L A I N DNDN LODLO D LOD 1954 LODLODLO D 4.0% 1950.45' FFE 1954.55' 15% 1951.95' 1951.64' 1948.84' 1942.84' 4.0% 1951.85' 1950 1954 1952 195 3 195 2 1954 1955 1953 1951 1950 1951 1949 1953195219541952 1951LP 1954.05' R I V E R S I D E D R I V E +1953195 5 1951.80' 1951.98' 1951.98' 1955 1954 1953 195219531954SEAL DRAWN BY:CHECKED BY: Copyright © 2019, Equinox Environmental Consultation & Design, Inc. 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 DRAWING SCALE NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable.REVISIONSDATEPHASE DATE DRAWING NAME DESIGN BY:NOT FORCONSTRUCTION1"=30'Woodfin, North CarolinaSILVER-LINE PARKTOWN OF WOODFINL14.0 P2 EROSION & SEDIMENT CONTROL April 1, 2020 100% CDS NFC 0 N 60'30'15' SCALE: 30'-0" Know what's below. before you dig.Call R GENERAL NOTES: 1.TOPOGRAPHY MAY HAVE SHIFTED SINCE SURVEY. 2.EXISTING SITE TOPOGRAPHY IS PRELIMINARY. 3.SITE VERIFICATION MAY BE NECESSARY DURING CONSTRUCTION. 4.DO NOT GRADE WITHIN 25' OF HIGH TRANSMISSION POLES WITHOUT BARRIER AND 10' OF TRANSMISSION POLE WITH VEHICLE BARRIER. 5.DO NOT GRADE WITHIN 7 1 2 ' OF DISTRIBUTION POLES. SILT FENCE FLARED UP AT ENDS TO CONTAIN SEDIMENT(TYP) WITH ROCK CHECK OUTLET PROTECTION DISTURBANCE BOUNDARY DESCRIPTIONSYMBOL FILTER FABRIC INLET PROTECTION TREE PROTECTION FENCE SILT FENCE PROPOSED DRAINAGE PATTERNS TEMPORARY CHECK DAMS EROSION CONTROL LEGEND CONSTRUCTION ENTRANCE DTL # TEMPORARY SEED CONSTRUCTION SEQUENCE 1.ON-SITE PRE-CONSTRUCTION MEETING. 2.CLEARING & GRUBBING ONLY AS NECESSARY FOR INSTALLATION OF PERIMETER CONTROLS (E.G. SILT FENCE AND CONSTRUCTION ENTRANCE). 3.INSTALLATION OF PERIMETER CONTROLS (E.G. SILT FENCE, CONSTRUCTION ENTRANCE, WETLAND). 4.CLEARING AND GRUBBING AS NECESSARY FOR CONSTRUCTION. 5.INSTALLATION OF REMAINING EROSION CONTROL MEASURES 6.SCM OUTFALL STRUCTURES TO BE SET 3-6" ABOVE GRADE DURING CONSTRUCTION AND SURROUNDED BY SEDIMENT CONTROL MEASURES TO REDUCE PONDING. 7.REMAINING CLEARING AND GRUBBING OF SITE AS NECESSARY FOR CONSTRUCTION OF PHASE 2 (SEDIMENT AND EROSION CONTROL MEASURES FOR THESE AREAS MUST ALREADY BE INSTALLED). 8.TEMPORARY SEEDING OF ALL SCMS (SCMS TO ACT AS TEMPORARY SEDIMENT TRAPS DURING CONSTRUCTION) 9.ROUGH AND FINE GRADING OF PARK ELEMENTS 10.MAINTAIN EROSION CONTROL DEVICES INCLUDING SCMS 11.REMOVAL OF TEMPORARY SEDIMENT & EROSION CONTROL MEASURES AFTER ENTIRE AREA DRAINING TO THE STRUCTURE IS STABILIZED. 12.REMOVE EXCESS SEDIMENT IN SCMS (BMP F - H) AND FINE GRADE SHOWN IN DETAILS. 13.INSTALL PERMANENT OUTFALL STRUCTURES TO PLANNED ELEVATIONS. 14.PLANT SCMS ACCORDING TO PLANTING PLAN. 15.REMOVE TREE PROTECTION ONCE ALL HEAVY EQUIPMENT IS CLEARED FROM THE SITE. 16.SUBMIT NOTICE OF TERMINATION WHEN SITE IMPROVEMENTS ARE COMPLETED. CONSTRUCTION STAGING AREA TO INCLUDE CONCRETE WASHOUT L15.4 L15.1 L6.3.1 L16.4.1 L15.3 L15.5 L15.6 SILT FENCE FLARED UP AT ENDS TO CONTAIN SEDIMENT(TYP) SILT FENCE FLARED UP AT ENDS TO CONTAIN SEDIMENT(TYP) WITH ROCK CHECK SEDIMENT TUBE L15.2 SILT FENCE TO PROTECT WETLAND DURING ASPHALT SURFACING SEAL DRAWN BY:CHECKED BY: Copyright © 2019, Equinox Environmental Consultation & Design, Inc. 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 DRAWING SCALE NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable.REVISIONSDATEPHASE DATE DRAWING NAME DESIGN BY:NOT FORCONSTRUCTIONAS SHOWNWoodfin, North CarolinaSILVER-LINE PARKTOWN OF WOODFINL15.0 P2 EROSION & SEDIMENT CONTROL DETAILS April 1, 2020 100% CDS NFC INSTALLATION: 1.SILT FENCES SHALL BE PLACED ON SLOPE CONTOURS TO MAXIMIZE PONDING EFFICIENCY. 2.INSTALL MINIMUM 10' (OR GREATER AS SPECIFIED ON PLANS) CHECKS (TIE-BACKS) AT END TO PREVENT FLOWS FROM BY-PASSING SILT FENCE, AND EVERY 50'-100' WHERE SILT FENCE IS INSTALLED WITH SLOPE AND CONCENTRATED FLOWS ARE EXPECTED ALONG FENCE. 3.SILT FENCE SLURRY FLOW RATE TO BE 0.3 GPM/FT², LESS THAN THE CLEAR WATER FLOW RATE OF 10 GPM/FT². 1.INSPECT AND REPAIR SILT FENCE AT LEAST ONCE EVERY CALENDAR WEEK.. 2.SEDIMENT SHALL BE REMOVED WHEN IT IS 1/3 THE HEIGHT OF THE SILT FENCE. 3.REMOVED SEDIMENT SHALL BE DEPOSITED TO AN AREA THAT WILL NOT CONTRIBUTE SEDIMENT OFF-SITE AND CAN BE PERMANENTLY STABILIZED. 4.UPON PROJECT COMPLETION, THE SILT FENCE SHALL BE REMOVED AND HAULED OFF-SITE. ANY DEPOSITED SEDIMENT SHALL BE PROPERLY GRADED AND SEEDED. COMPACTED EARTH 24" MIN.18" TO 24"6 F T . M A X I M U M S P A C I N G BURY AT LEAST 12 INCHES OF FILTER FABRIC HEAVY DUTY PLASTIC TIES (EVENLY SPACED, RESTRICTED TO TOP 8 INCHES OF FABRIC) MIRAFI 100X SILT FENCE FABRIC (OR ENGINEERING APPROVED EQUAL - SEE NOTE #3) BACKFILL TRENCH WITH COMPACTED EARTH FILTER FABRIC ISOMETRIC VIEW 1.25 LB./LF STEEL POST SF SF WIRE-BACKED TY P E S ( S E N S I T I V E ) - 4 F T . M A X I M U M S P A C I N G NOTE: TYPE S (SENSITVE) FENCE REQUIRES WOVEN WIRE FENCE OR ALTERNATE BACKING SEE SILT FENCE DETAIL FOR INSTALLATON, INSPECTION, AND MAINTENANCE NOTES. INSTALLATION: 1.INSTALL SEDIMENT TUBES BY LAYING THEM FLAT ON THE GROUND. CONSTRUCT A SMALL TRENCH TO A DEPTH THAT IS 20% OF THE SEDIMENT TUBE DIAMETER. LAY THE SEDIMENT TUBE IN THE TRENCH AND COMPACT THE UPSTREAM SEDIMENT TUBE SOIL INTERFACE. INSTALL ALL SEDIMENT TUBES SO NO GAPS EXIST BETWEEN THE SOIL TO PREVENT FLOW AND SEDIMENT FROM PASSING THROUGH THE FIELD JOINT. NEVER STACK SEDIMENT TUBES ON TOP OF ONE ANOTHER. 2.SHOULD SEDIMENT TUBE BECOME DAMAGED DURING INSTALLATION, PLACE A STAKE ON BOTH SIDES OF THE DAMAGED AREA TERMINATING THE TUBE SEGMENT AND INSTALL NEW TUBE SEGMENT. 3.INSTALL SEDIMENT TUBES USING WOODEN STAKES (1" X 1") OR STEEL POSTS (STANDARD "U" OR "T" SECTIONS WITH A MINIMUM WEIGHT OF 1.25 POUNDS PER FOOT) A MINIMUM OF 4 FEET IN LENGTH PLACED ON 2' CENTERS. INTERTWINE THE STAKES WITH THE OUTER MESH ON THE DOWNSTREAM SIDE, AND DRIVE THE STAKES INTO THE GROUND TO A MINIMUM DEPTH OF 2' LEAVING LESS THAN 1' OF STAKE ABOVE THE EXPOSED SEDIMENT TUBE. INSPECTION AND MAINTENANCE: 1.INSPECT SEDIMENT TUBES AFTER INSTALLATION FOR GAPS UNDER THE SEDIMENT TUBES AND FOR GAPS BETWEEN THE JOINTS OF ADJACENT ENDS OF SEDIMENT TUBES. REPAIR RILLS, GULLIES, AND ALL UNDERCUTTING NEAR SEDIMENT TUBES. SEDIMENT TUBES SHALL ALSO BE INSPECTED AT LEAST ONCE EVERY CALENDAR WEEK. 2.REMOVE ACCUMULATED SEDIMENT WHEN IT REACHES 1/3 THE HEIGHT OF THE SEDIMENT TUBE. 3.LARGE DEBRIS, TRASH, AND LEAVES SHOULD BE REMOVED FROM IN FRONT OF THE SEDIMENT TUBE WHEN FOUND 4.REMOVE AND/OR REPLACE INSTALLED SEDIMENT TUBES AS REQUIRED TO ADAPT TO CHANGING CONSTRUCTION SITE CONDITIONS. 5.SEDIMENT TUBES SHALL REMAIN IN PLACE UNTIL THE DISTURBED AREAS ARE PERMANENTLY STABILIZED. 6.REMOVE ALL CONSTRUCTION MATERIAL AND SEDIMENT AND DISPOSE PROPERLY. BACKFILL ALL DEPRESSIONS AND GROUND DISTURBANCES CAUSED BY THE REMOVAL OF THE SEDIMENT TUBES. 2' MAX. SPACING 2' MIN.20% OF TUBE DIAMETERSEDIMENT TUBE NTS2 SILT FENCE NTS3 INSTALLATION: 1.STABILIZED CONSTRUCTION ENTRANCES SHOULD BE USED AT ALL POINTS WHERE TRAFFIC WILL EGRESS/INGRESS A CONSTRUCTION SITE ONTO A PUBLIC ROAD OR ANY IMPERVIOUS SURFACE, SUCH AS A PARKING LOT. 2.INSTALL A NON-WOVEN GEOTEXTILE FABRIC PRIOR TO PLACING ANY STONE. 3.INSTALL A CULVERT PIPE ACROSS THE ENTRANCE WHERE NEEDED TO PROVIDE POSITIVE DRAINAGE. 4.LIMESTONE MAY NOT BE USED FOR THE STONE PAD. INSPECTION AND MAINTENANCE: 1.INSPECT THE CONSTRUCTION ENTRANCE AT LEAST ONCE PER CALENDAR WEEK. CHECK FOR MUD AND SEDIMENT BUILDUP AND PAD INTEGRITY. INSPECTIONS MAY BE NEEDED TO BE MORE FREQUENT DURING LONG PERIODS OF WET WEATHER. 2.THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION THAT WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC RIGHT-OF-WAYS. THIS MAY REQUIRE TOP DRESSING, REPAIR AND/OR CLEAN OUT OF ANY MEASURES USED TO TRAP SEDIMENT. 4.WHEN NECESSARY, WHEELS SHALL BE CLEANED PRIOR TO ENTRANCE ONTO PUBLIC RIGHT-OF-WAY, 5.IMMEDIATELY REMOVE ANY MUD OR SEDIMENT TRACKED ONTO ADJACENT IMPERVIOUS SURFACES BY BRUSHING OR SWEEPING. FLUSHING SHOULD ONLY BE USED WHEN THE WATER IS DIRECTED TO A SEDIMENT TRAP OR BASIN. 6.REMOVE CONSTRUCTION ENTRANCE ONLY AFTER THE SITE HAS REACHED FINAL STABILIZATION. PERMANENT VEGETATION SHOULD REPLACE AREAS WHERE THE CONSTRUCTION ENTRANCE HAS BEEN REMOVED UNLESS THE AREA WILL BE CONVERTED TO AN IMPERVIOUS SURFACE TO SERVE POST-CONSTRUCTION. PUBLI C R O A D LEN G T H STONE DIAMETER 2" TO 3" AVERAGE, 6-INCH MINIMUM DEPTH EDGES SHALL BE TAPERED OUT TOWARD ROAD TO PREVENT TRACKING OF MUD ON THE EDGES UNDERLYING NON-WOVEN GEOTEXTILE FABRIC WIDT H CONSTRUCTION ENTRANCE NTS5 INSTALLATION: 1.TEMPORARY SEDIMENT TRAPS SHALL HAVE A MAXIMUM DESIGN DEPTH OF 5.0'. 1.SEDIMENT SHALL BE REMOVED AND THE TRAP RESTORED TO ITS ORIGINAL DIMENSION WHEN THE SEDIMENT REACHES THE (1') MARK ON THE CLEANOUT STAKE. SEDIMENT SHALL BE DEPOSITED IN A SUITABLE AREA AND IN SUCH A MANNER THAT IT WILL MINIMIZE FURTHER EROSION. 2.THE TRAP SHALL BE INSPECTED ONCE EVERY CALENDAR WEEK AND REPAIRED MADE AS NEEDED. 3.UPON CONSTRUCTION COMPLETION, THE TRAP SHALL BE REMOVED BY GRADING THE AREA WITH A MINIMUM SLOPE OF 0.5%. ALL RIP RAP AND ASSOCIATED MATERIALS SHALL BE HAULED OFF THE SITE. FILTER FABRIC INLET PROTECTION NTS1 TEMPORARY CHECK DAM NTS4 SUMMERFALLTEMPORARY SEEDING MUST OCCUR WHEN DENUDED AREAS WILL NOT BE BROUGHT TO FINAL GRADE WITHIN 7 CALENDAR DAYS (SEE NOTE 3 ABOVE). TEMPORARY SEEDING SCHEDULE SEEDING MIXTURE: SPECIES RATE (LB/ACRE) GERMAN MILLET 40 PARTRIDGE PEA 10 A small-stemmed sudangrass may be substituted for Partridge Pea at a rate of 50 lb/acre. SEEDING DATES: May 15-Aug 15 SEEDING MIXTURE: SPECIES RATE (LB/ACRE) ANNUAL (WINTER) RYE GRASS 60 PARTRIDGE PEA 10 SEEDING DATES: Feb 1-May 15 A small-stemmed sudangrass may be substituted for Partridge Pea at a rate of 50 lb/acre. SEEDING MIXTURE: SPECIES RATE (LB/ACRE) ANNUAL (WINTER) RYE GRASS 60 PARTRIDGE PEA 10 SEEDING DATES: Aug 15-Dec 30 A small-stemmed sudangrass may be substituted for Partridge Pea at a rate of 50 lb/acre. SOIL AMENDMENTS: Physically or chemically treat all exotic invasive plants before amending soil. Apply lime and organic fertilizer according to soil tests or apply 4,000 lb/acre ground agricultural limestone or as recommended by soil test results. SOIL PREPARATION: Preparation for stabilization shall not begin until all construction and utility work is complete. A North Carolina Department of Agriculture Test (or equal) shall be obtained for all areas to be seeded. Recommended fertilizer and pH adjusting products shall be incorporated into the prepared areas. Soil impacted by construction must be loosened prior to seeding by means of disking or raking. Seedbed shall be well-pulvarized, loose, and uniform. All stones larger than three (3) inches, sticks, roots, and other extraneous materials shall be removed. Apply seed uniformly with a cyclon seeder, drop-type spreader, drill or hydro-seeder. Cover broadcast seed by lightly raking, then firm surface with roller or cultipacker. Cut or disc temporary seeding cover crop prior to seeding. SEED PREPARATION: If banks exceed 4:1, see additional hydroseeding notes. MULCH: Use a spray-on growth (mulch) matrix (Flexterra FGM or equal) for all permanent seeding for all slopes greater than 3:1. For all other areas, mulch with weed free straw at 4,000 lbs per acre. MAINTENANCE: Mow or cut back no more than once a year. Reseed in the second year unless growth is fully adequate. Add topsoil or organic amendments if needed, till, and reseed and mulch damaged areas immediately. Weed during first 2 years of establishment.WINTER &EARLY SPRINGGENERALSUMMERFALLTEMPORARY SEEDING MUST OCCUR WHEN DENUDED AREAS WILL NOT BE BROUGHT TO FINAL GRADE WITHIN 7 CALENDAR DAYS (SEE NOTE 3 ABOVE). TEMPORARY SEEDING SCHEDULE SEEDING MIXTURE: SPECIES RATE (LB/ACRE) GERMAN MILLET 40 PARTRIDGE PEA 10 A small-stemmed sudangrass may be substituted for Partridge Pea at a rate of 50 lb/acre. SEEDING DATES: May 15-Aug 15 SEEDING MIXTURE: SPECIES RATE (LB/ACRE) ANNUAL (WINTER) RYE GRASS 60 PARTRIDGE PEA 10 SEEDING DATES: Feb 1-May 15 A small-stemmed sudangrass may be substituted for Partridge Pea at a rate of 50 lb/acre. SEEDING MIXTURE: SPECIES RATE (LB/ACRE) ANNUAL (WINTER) RYE GRASS 60 PARTRIDGE PEA 10 SEEDING DATES: Aug 15-Dec 30 A small-stemmed sudangrass may be substituted for Partridge Pea at a rate of 50 lb/acre.WINTER &EARLY SPRINGGENERAL1.TO ENSURE SURVIVABILITY, WATER GRASS AT LEAST WEEKLY DURING DROUGHT. 2.CONTRACTOR TO KEEP RECORD OF SEED PURCHASE AND APPLICATION RATES FOR FINAL INSPECTION (BAGS & RECEIPTS). 3.GROUND STABILIZATION REQUIRED IN (7) SEVEN DAYS ON PERIMETER AREAS AND SLOPES GREATER THAN 3:1, AND GROUND STABILIZATION IN (14) DAYS ON OTHER AREAS 4.ALL AREAS DISTURBED DURING CONSTRUCTION TO SEEDED AND STABILIZED.SUMMERFALLTEMPORARY SEEDING MUST OCCUR WHEN DENUDED AREAS WILL NOT BE BROUGHT TO FINAL GRADE WITHIN 7 CALENDAR DAYS (SEE NOTE 3 ABOVE). TEMPORARY SEEDING SCHEDULE SEEDING MIXTURE: SPECIES RATE (LB/ACRE) GERMAN MILLET 40 PARTRIDGE PEA 10 A small-stemmed sudangrass may be substituted for Partridge Pea at a rate of 50 lb/acre. SEEDING DATES: May 15-Aug 15 SEEDING MIXTURE: SPECIES RATE (LB/ACRE) ANNUAL (WINTER) RYE GRASS 60 PARTRIDGE PEA 10 SEEDING DATES: Feb 1-May 15 A small-stemmed sudangrass may be substituted for Partridge Pea at a rate of 50 lb/acre. SEEDING MIXTURE: SPECIES RATE (LB/ACRE) ANNUAL (WINTER) RYE GRASS 60 PARTRIDGE PEA 10 SEEDING DATES: Aug 15-Dec 30 A small-stemmed sudangrass may be substituted for Partridge Pea at a rate of 50 lb/acre. SOIL AMENDMENTS: Follow recommendation of soil tests. Use only amendments safe for riparian areas. MULCH: Apply 4,000 lb/acre straw. Anchor straw by tacking. MAINTENANCE: Refertilize if growth is not fully adequate. Topdress with 50 lb/acre of nitrogen in March (if applicable). If it is necessary to extend temporary cover beyond June 15th overseed with mixes provided. Reseed, re-fertilize and mulch immediately following erosion or other damage. PERMANENT SEEDING SCHEDULEWINTER &EARLY SPRINGPERMANENT SEEDING MUST OCCUR WITHIN 14 CALENDAR DAYS OF FINAL GRADING. COVER CROPS (TEMPORARY SEEDING) TO BE ADDED TO PERMANENT SEEDING MIXES IF NO TEMPORARY SEEDING HAS BEEN PLACED PREVIOUSLY . SEEDING MIXES: RATE (LB/ACRE) CONSERVATION MIX (ERNMX 114)20GENERAL SEEDING SCHEDULE NTS6 SEE SPECIFICATIONS FOR SEED MIX DETAILS. THE SEED MIXES ABOVE IS AVAILABLE AT ERNST CONSERVATION SEEDS (800.873.3321). LOCAL SOURCES OF SIMILAR SEED MIX MAY BE USED WITH LANDSCAPE ARCHITECT APPROVAL HANDICAP PARKING U-CHANNEL POST MOUNT WITH 5/16"x2 1/4" BOLTS TOP & BOTTOM OF SIGN SIGN TYPE R7-8A METAL POST FINISH GRADE CONCRETE FOOTING SIGN TYPE R7-8D, 1 REQ. AT EACH H-CAP SPACE STEEL ENCASED CONCRETE BOLLARD PAINTED SAFETY YELLOW 4" WHITE REFLECTIVE TAPE U-CHANNEL POST MOUNT WITH 5/16"x2 1/4" BOLTS TOP & BOTTOM OF SIGN SEE PLAN FOR SIGN TYPE METAL POST FINISH GRADE CONCRETE FOOTING SIGNS: 1.ALL SIGNS TO BE ENGINEERING GRADE, REFLECTIVE. 2.SEE PLAN FOR MUTCD NAME SEAL DRAWN BY:CHECKED BY: Copyright © 2019, Equinox Environmental Consultation & Design, Inc. 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 DRAWING SCALE NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable.REVISIONSDATEPHASE DATE DRAWING NAME DESIGN BY:NOT FORCONSTRUCTIONAS SHOWNWoodfin, North CarolinaSILVER-LINE PARKTOWN OF WOODFINL16.0 P2 PAVING DETAILS April 1, 2020 100% CDS NFC ASPHALT PAVING NTS3 CONCRETE PATH NTS1 NATURAL SURFACE TRAIL NTS2 2" MIN .5% MIN. 3' PATH MEET EXISTING GRADE 3-5% CROSS-SLOPE LIGHTLY COMPACTED SUBGRADE 5% MIN. MAINTAIN POSITIVE DRAINAGE ACROSS TRAIL / 3-5% CROSS SLOPE HARDWOOD MULCH, SOIL STABILIZER, OR SIMILAR, LIGHTLY COMPACTED BROOM FINISH CONCRETE FIBER MIXED INTO CONCRETE FOR REINFORCEMENT 4"2" AGG. BASE COMPACTED SUBGRADE NOTES: 1.CONCRETE WALKS AND PADS TO BE FLUSH WITH FINISH GROUND ELEVATION. 2.NATURAL OR COMPACTED FILL SUBGRADE MATERIALS SHALL HAVE A LIQUID LIMIT (LL) LESS THAN 50 AND A PLASTICITY INDEX (PI) OF LESS THAN 10. 3.PLACE A 1 8" SAW JOINT AS SPECIFIED ON PLAN TO 1 1 2" DEPTH. 4.PLACE A 1 8" EXPANSION JOINT EVERY 48-52' AND FILL WITH PRE-MOULDED EXPANSION 5.SLOPE SLAB TO DRAIN 1-2% MAXIMUM PER SITE CONDITIONS. 6.CONCRETE STRENGTH SHALL BE 4000 PSI. 7.BROOM FINISH EXPOSED CONCRETE SURFACE PERPENDICULAR TO PEDESTRIAN TRAFFIC FLOW. 8.THIS DETAIL REFERENCES PATHWAYS, SIDEWALKS, AND PADS NOT OTHERWISE NOTED AS ADJACENT TO WETLAND OR NEEDING TO SUPPORT LARGE VEHICLES 9.SEE THE LAYOUT & MATERIALS PLAN FOR CONTROL JOINT LOCATIONS. EXTEND BASE COURSE 6" BEYOND EDGE OF ASPHALT 12" COMPACTED SUBGRADE TO 95% ASTM D 698, (TYP.) PRIME COAT 6" 8" AGGREGATE BASE COURSE (TYPE "ABC") TACK COAT PROPOSED 2.5" ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE I19.0B PROPOSED 1.5" ASPHALT CONCRETE SURFACE COURSE, TYPE SF9.5A 4" NOTES: 1.ALL PAVING WORKMANSHIP AND MATERIALS SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF D. O. T. STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES. 2.ALL ASPHALT PAVEMENT AND STONE BASE THICKNESS SPECIFIED SHALL BE AFTER COMPACTION. 3.SUBGRADE AND STONE BASE SHALL BE MECHANICALLY COMPACTED (ROLLED) TO THE DENSITY OF NATURAL AND UNDISTURBED SOILS (APPROX. 95% OF THE MAXIMUM DENSITY IN ACCORDANCE WITH ASTM D698, MODIFIED PROCTOR.). 4. PAVEMENT SECTION FOR PAVING UP TO NCDOT RIGHT OF WAY LIMIT. GREENWAY NTS4 1' MIN 10' NON-WOVEN GEOTEXTILE (WHERE NEEDED BASED ON GEOTECH) 6" CABC STONE DOROLITE CONDUIT OR APPROVED EQUAL COMPACTED SUBGRADE (6" 97% MP) EXISTING SUBGRADE 2%2% 2" SF 9.5B ASPHALT BASE COURSE 1" SF 9.5B SURFACE COURSE CABC STONE BASE EXTENDS 1' ON BOTH SIDES OF TRAIL 1' x 2" CRUSHED GRANITE ON BOTH SIDES (TO BE APPROVED BY LANDSCAPE ARCHITECT) STANDARD CONDITION STANDARD CONDITION ADJACENT TO WETLAND CONCRETE STEPPING STONES NTS5 18" X 9" X 4' STEPPING STONES RIVER COBBLE AROUND STONES BROOM FINISH CONCRETE FIBER MIXED INTO CONCRETE FOR REINFORCEMENT 5"2"AGG. BASE COMPACTED SUBGRADE NOTES: 1.CONCRETE WALKS AND PADS TO BE FLUSH WITH FINISH GROUND ELEVATION. 2.NATURAL OR COMPACTED FILL SUBGRADE MATERIALS SHALL HAVE A LIQUID LIMIT (LL) LESS THAN 50 AND A PLASTICITY INDEX (PI) OF LESS THAN 10. 3.PLACE A 1 8" SAW JOINT AS SPECIFIED ON PLAN TO 1 1 2" DEPTH. 4.PLACE A 1 8" EXPANSION JOINT EVERY 48-52' AND FILL WITH PRE-MOULDED EXPANSION 5.SLOPE SLAB TO DRAIN 1-2% MAXIMUM PER SITE CONDITIONS. 6.CONCRETE STRENGTH SHALL BE 4000 PSI. 7.BROOM FINISH EXPOSED CONCRETE SURFACE PERPENDICULAR TO PEDESTRIAN TRAFFIC FLOW. 8.THIS DETAIL REFERENCES PATHWAYS, SIDEWALKS, AND PADS NEEDING TO SUPPORT LARGE VEHICLES 9.SEE THE LAYOUT & MATERIALS PLAN FOR CONTROL JOINT LOCATIONS. EXTEND BASE COURSE 6" BEYOND EDGE OF ASPHALT 12" COMPACTED SUBGRADE TO 95% ASTM D 698, (TYP.) PRIME COAT 6" 8" AGGREGATE BASE COURSE (TYPE "ABC") TACK COAT PROPOSED 2.5" ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE I19.0B PROPOSED 1.5" ASPHALT CONCRETE SURFACE COURSE, TYPE SF9.5A 4" NOTES: 1.ALL PAVING WORKMANSHIP AND MATERIALS SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF D. O. T. STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES. 2.ALL ASPHALT PAVEMENT AND STONE BASE THICKNESS SPECIFIED SHALL BE AFTER COMPACTION. 3.SUBGRADE AND STONE BASE SHALL BE MECHANICALLY COMPACTED (ROLLED) TO THE DENSITY OF NATURAL AND UNDISTURBED SOILS (APPROX. 95% OF THE MAXIMUM DENSITY IN ACCORDANCE WITH ASTM D698, MODIFIED PROCTOR.). 4. PAVEMENT SECTION FOR PAVING UP TO NCDOT RIGHT OF WAY LIMIT. 5. GEOTEXTILE FABRIC TO BE USED FROM MIDLINE OF PARKING TOWARD WETLAND. GEOTEXTILE FABRIC NOTES: 1.THE TRAIL SHALL BE ALIGNED TO AVOID REMOVAL OF TREES GREATER THAN 6" IN DIAMETER BREAST HEIGHT WHERE POSSIBLE. 2.STUMPS LOCATED IN THE TRAIL TREAD SHALL BE COMPLETELY REMOVED. THOSE LOCATED IN THE TRAIL CORRIDOR TO BE CUT FLUSH TO THE GROUND. 3.WORK SHALL BE PERFORMED WITH HAND TOOLS OR LOW IMPACT MECHANIZED EQUIPMENT WITH A FOOTPRINT NO WIDER THAN THE SPECIFIED TRAIL TREAD UNLESS APPROVED BY THE PROJECT MANAGER. 4.UNLESS OTHERWISE SPECIFIED, THE TRAIL SHALL BE CONSTRUCTED WITH A "FULL BENCH CUT". 5.THE TRAIL BACKSLOPE SHALL TRANSITION SMOOTHLY TO THE BERMSIDE. 6.ALL VEGETATIVE/ROOT MATTER IN THE TRAIL TREAD SHALL BE REMOVED EXCEPT FOR LARGE FEEDER ROOTS. 7.THE TRAIL SHALL HAVE A COMPACTED SOIL SURFACE. COMPACTION SHALL BE COMPLETED USING A MECHANIZED TAMPER SUCH AS A VIBRATING PLATE COMPACTOR. THE TRAIL SHALL BE SHAPED TO LEAVE A UNIFORM SURFACE FREE FROM INDENTATIONS OR PROTRUSIONS. THE GRADING OF THE TREAD, BACK SLOPE, AND DRAINAGE FEATURES SHALL BE FINISHED TO A SMOOTH, STABLE SURFACE. 8.TRAILS CONSTRUCTED WITHIN 100FT OF A STREAM SHALL BE COMPLETED AND STABALIZED BY THE END OF EACH WORK DAY. 9.GRADE REVERSALS AND GRADE DIPS SHALL BE CONSTRUCTED TO REMOVE WATER FROM THE TRAIL TREAD. ALL NEEDED GRADE REVERSALS AND/OR DIPS WILL BE DONE ACCORDING TO IMBA STANDARDS AS SPECIFIED IN THEIR BOOK TRAIL SOLUTIONS. 10.GRADES SHALL NOT EXCEED 10%. NOTES: STONE TO BE FLAT FIELDSTONE WITH SURFACE TO MATCH BOULDERS USED ON SITE OR CONCRETE STEPPING STONES ADA PARKING SIGN NTS6 MUTCD PARKING SIGN NTS7 SUPPORT 80,000 LB. LOAD 6" END OF PARKING SPACE 45° 3' 6'-0" 30" 3" 10-12" 6" 2-#4 REBARS (MINIMUM) PRECAST CONCRETE WHEEL STOP PLACEMENT PLAN CENTER IN STALL EDGE OF GRAVEL 10"-12" 6' LONG PRECAST CONCRETE WHEEL STOP W/2-#4 BARS CONT. 5'-9" LONG PARKING SURFACE AS SPECIFIED 2-#6 BARS THRU WHEEL STOP & GRAVEL MIN 30" LONG. INTO GRAVEL GRAVEL PARKING SURFACE NOTE: WHEEL STOPS TO BE USED ONLY WHERE SHOWN ON PLANS 2-#6 REBARS COUNTERSINK AND GROUT *PREFABRICATED RECYCLED CONCRETE WHEEL STOPS ARE PREFERRED. INSTALL BY MANUFACTURER SPECIFICATIONS, IF APPLICABLE. ACTUAL DIMENSIONS MAY VARY SLIGHTLY. 6" 3'-0" NOTES: 1.CENTER CROSSWALKS TO THEIR CORRESPONDING CONNECTIONS, BUT DO NOT SET THEM WITHIN THE INTERSECTION AREA ESTABLISHED BY BISECTING THE INTERSECTION RADII 2.FOLLOW MANUFACTURERS RECOMMENDATIONS FOR APPLICATION OF THERMOPLASTIC 3.SETBACK DISTANCE FROM INSIDE CROSSWALK MARKING TO NEAREST TRAVEL LANE IS 4' MIN 4.A CLEAR SPACE OF 4' MIN. SHALL BE PROVIDED WITHIN THE CROSSWALK 5.CROSSWALK AT BOAT RAMP, 10' MIN. WIFTH. CROSSWALK ACROSS DRIVEWAY, 6' MIN.6'-0" TO 10'0"2'-0" 4'-0" TOTAL DISTANCE VARIES SEE PLAN 2'-0" WHITE THEMOPLASTIC PAVEMENT MARKINGS 4'-0"EDGE OF PAVEMENTCLEAR SPACE TYP. SEAL DRAWN BY:CHECKED BY: Copyright © 2019, Equinox Environmental Consultation & Design, Inc. 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 DRAWING SCALE NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable.REVISIONSDATEPHASE DATE DRAWING NAME DESIGN BY:NOT FORCONSTRUCTIONAS SHOWNWoodfin, North CarolinaSILVER-LINE PARKTOWN OF WOODFINL16.1 SURFACE MARKING DETAILS April 1, 2020 100% CDS NFC ARROW STRIPING NTS4 CROSSWALK NTS3 NTS CONCRETE WHEEL STOP5 STRIPING TO BE PAINTED IN 4" STRIPS AT 60° ANGLE WITH 24" SPACING BETWEEN STRIPES AND 4" BORDER AROUND SPACE 8' MIN. (SEE PLAN FOR DIMENSIONS) 8' MIN ( VAN) 5' MIN (CAR) STRIPING SURFACE SHOULD BE LEVEL AND ALIGNED FLUSH WITH WALKWAY, IF APPLICABLE 5 L7.0 ADA PARKING SIGNAGE 4 L7.0 WHEEL STOP ADA PARKING NTS 1 SEE PLAN FOR PARKING LOCATIONS STRIPING NOTES: 1.PAINT TO BE NCDOT APPROVED, BLUE (TRAFFIC) PAINT. 2.SEE PLAN FOR ALL PARKING STALL AND AISLE DIMENSIONS. 3.SEE PLAN FOR ADA MARKERS AND SIGN LOCATIONS. GRADING NOTES (CONCRETE PAD): 1.MAXIMUM CROSS SLOPE 2%. 2.MAXIMUM LONGITUDINAL SLOPE 2%. 3.SEE GRADING PLAN FOR LOCATIONS. PAINT WITH TRAFFIC PAINT 4"8" 20° 1'-0"4"2"R1'-0"2" 86°4"3"4"4" R4"8"8"STRIPING NOTES: 1.PAINT TO BE NCDOT APPROVED, BLUE (TRAFFIC) PAINT. 2.SEE PLAN FOR ADA MARKERS LOCATIONS. NTS ADA MARKER2 NOTES: 1.USE THE COLOR WHITE FOR ALL PAVEMENT MARKING SYMBOLS. 2.SEE PLAN FOR ALL PARKING STALL AND AISLE DIMENSIONS. 3.SEE PLAN FOR ADA MARKERS AND SIGN LOCATIONS. 4.DO NOT LOCATE PAVEMENT MARKING SYMBOLS AS ENCROACH INTO INTERSECTION AREAS SILVER-LINE PARK3"SEALDRAWN BY:CHECKED BY:Copyright © 2019, Equinox EnvironmentalConsultation & Design, Inc.37 Haywood St.Suite 100Asheville, NC 28801t 828.253.6856f 828.253.8256DRAWING SCALENOTE: If this drawing is not 24x36" it has been revisedfrom its original size and the scales noted ondrawings/details are no longer applicable.REVISIONS DATEPHASEDATEDRAWING NAMEDESIGN BY:N O T F O RCONSTRUCTIONAS SHOWNWoodfin, North Carolina SILVER-LINE PARK TOWN OF WOODFINL16.2PICNIC DETAILSApril 1, 2020100% CDS NFC29"96"29" NOM.17" NOM.CROSS BRACESCENTER BRACKET59 1/4"9 1/4"NOMINALPICNIC TABLENTS1GROUP GRILL WITH SURFACE MOUNT36" MAX. TOCOOKING SURFACE3,000 PSI CONCRETEFOOTING36"FINISHED GRADEMOUNTED INTO CONCRETEFOOTING WITH ANCHORBOLTS(SUPPLIED BYMANUFACTURER)LARGE GROUP GRILLWITH SIDE SHELF(KAY MODEL SPD450OR APPROVED EQUAL)12"BENCH SWINGNTS34" X 8" BEAM4" X 8" POST4" X 8" x 16"SPACER4" X 8" x 24"SPACER4" X 8" BEAM12" x 6" GALVANIZEDSTEEL BOLTS, TYP.10'3'10'6' BENCH SWINGCONCRETE FOOTER18"KIOSKNTS4ENTRANCE SIGNNTS5NTSSTAND UP GRILL2POST ANCHOR, TYP.GALVANIZED STEEL STANDING SEAM ROOFWITH KYNAR 500 OR EQ FINISH OVER 3" THICKAND 6" WIDE KILN DRIED AND PT TOUNG ANDGROOVE STRUCTURAL WOOD DECKING3" X 6" TONGUE AND GROOVE DECKING RUNNINGLONGITUDINAL WITH THE SLOPE OF THE ROOF2" X 3" JOIST KILN DRIED AND PT WITHTAPERED ENDS, 2' O.C.2" X 10" PT BEAMS SET IN NOTCH IN POST ANDBOLTED USING 34" X 4" GALVANIZED BOLTS (POSTNOTCH TO BE CUT AT ANGLE SPECIFIED)2" X 4" PT CROSS MEMBER SETBETWEEN TWOSPACERS AND BOLTED USING 34" X 10"GALVANIZED BOLTS4' X4' PLACARD (BOTH SIDES) TO BE BOLTEDTO CROSS MEMBERS.NOTE: PLACARD DESIGN TO BE DONE IN AFUTURE PHASE.BENCH, SEE THIS DETAIL FOR FRAMINGDETAILCONCRETE PAD6" X 6" PT POSTS1'-6"2'-8"3'-4"7'-4"1'9'-2"1'7°GALVANIZED STEEL STANDING SEAM ROOF,18" SEAM SPACING, CONCEALED FASTENERS3" X 6" TONGUE AND GROOVE DECKING RUNNINGLONGITUDINAL WITH THE SLOPE OF THE ROOF2" X 3" JOIST KILN DRIED AND PT WITHTAPERED ENDS, 2' O.C.2" X 10" PT BEAMS SET IN NOTCH IN POST ANDBOLTED USING 34" X 4" GALVANIZED BOLTS6" X 6" PT POSTS TO BE CUT FLUSH WITH THEBEAMS AT THE TOP AND TO SIT ON AND BESECURED TO A POST ANCHOR AT THE BOTTOM2" X 4" SPACER, TYP.2" X 4" CROSS MEMBER, TYP.34" X 10" GALVANIZED BOLTS.PLACARD IN THE BACKGROUNDBENCH, SEE FRAMING DETAIL IN THIS DETAILKNIFE PLATE CONNECTION TO CONCRETE USINGCONCRETE ANCHORS TO SECURE PLATE TO CONCRETEAND BOLTS TO 12" BOLTS TO SECURE TO WOODCONCRETE PADPOST ANCHORSCONCRETE FOOTER TO EXTEND 6" BEYONDANCHORS IN ALL DIRECTIONS AND 18" DEEPBASE COURSECOMPACTED SUB-BASE TO MEETGEOTECHNICAL SPECIFICATIONSTO THE RIVERFRONT ELEVATION FACING WESTSECTION THROUGH TALLER POSTS FACING RIVERKIOSK BENCH FRAMING PLAN6" X 6" KIOSK POSTS1" X 4" FASCIA BOARDSWITH 45 DEG. MITERJOINTS FLUSH WITHBENCH DECKING2" X 4" CROSS MEMBERS,ATTACHED TO POSTSWITH 12" X 4" GALVANIZEDSTEEL BOLTS, TYP. BOTHSIDES OF ALL POSTSAND CUT TO BE FLUSHWITH FASCIA BOARDS2" X 8" BEAMS (TYP. OFPERPENDICULAR POSTS),ATTACHED TOCONCRETE USING KNIFEPLATE2" X 10" BEAMS (TYP. OFANGLED POSTS),ATTACHED TOCONCRETE USING KNIFEPLATE2" X 6" STRUCTURALDECKING TO BE CUT AT45 DEG. AT CORNERS9"12.5"3"3"3"6'1"9°EQEQ12.5"2'-6"4'CROSS BAR JOINT SECTIONB: LONGITUDINAL SECTIONFRONT ELEVATION LOOKING EASTA: CROSS SECTIONGALVANIZED STEEL STANDINGSEAM ROOF WITH KYNAR 500OR EQ FINISH, CONCEALEDFASTENERS24 GA. GALV. STEEL DRIP EDGE4X6 SPACER (ABOVE AND BELOW CROSS BEAM4" X 8" PT WOOD CAP, ENDATTACHED TO POST TO BECUT FLUSH WITH POSTPOST CREATED FROM (2)2X10 PT BOARDSSANDWICHING 4" WIDESPACERS (SEE SECTION INTHIS DETAIL)WOODFIN LOGO (RELIEF ANDCOLOR DETAILS TO BEDETERMINED BY CLIENTPRIOR TO PRODUCTION)PARK NAME, 4" AERIAL TEXTWITH 1/2-3/4" RELIEF ONSAND BLASTED HDU BOARD2" RELIEF EDGE AS SHOWN6X6 CROSS BEAMFASTENED TOBOULDER W/ KNIFEPLATE AND BOULDERANCHORSAB24 GA. GALV. STEELDRIP EDGE12" X 6" COUNTERSUNKBOLTS SECURINGCAP TO POST4X6 PT SPACER2X10 PT FACE BOARDOF POST (BOTH SIDES)NOTCHED CROSS BEAM34" X 6" BOLTS, TYP.4X6 PT SPACERPOST ANCHOR34" BOLT WITH NUT ANDWASHERS, TYP.24 GA. GALV. STEEL DRIP EDGE ALLSIDES12"X4" COUNTERSUNK BOLTDADO JOINT FOR HDU BOARD, HDUBOARD TO BE 1 12" THICK AT EDGESMEETING DADO JOINTSAPPROX. 1" GAP SO SPACERS SIT FLUSH WITHOUTSIDE EDGES4X4 SPACER TO RUN THE FULL LENGTH OF THEPOST12" X 6" BOLTS, COUNTER SUNK12"X5 12" NOTCH IN CROSS BEAM(BOTH SIDES)POST FACE BOARD (BOTH SIDES)GAP BETWEEN SPACERSFOOTER, TO EXTEND 6" FROMPOST ALL SIDES AND 24" DEEP6" CABC AROUND ALL SIDES OFFOOTERCOMPACTED SUB GRADE UNDERFOOTER AND BOULDER4'-6" 12"MIN.14°6'6"2"EQEQR6"EQEQ1'9"14" HEAVY DUTY GALVANIZEDSTEEL CHAIN RATED TO A MIN.500LB. WEIGHT CAPACITY, TYP.4X6PT POST12"X5 12" NOTCH IN CROSS BEAM(BOTH SIDES)2X6 POST FACE BOARD (BOTHSIDES)4X6 SPACER SITS ON TOP ANDBELOW CROSS BEAM, FULLLENGTH OF POST AS PART OF THEPOSTCROSS BEAM EXTENDS 3" PASTPOST FIELDSTONE BOULDER WITH FLAT/LEVEL TOP BOULDER TO HAVE MOSTLY ROUNDED EDGES 12" MIN. 15" - 36" RANGE VARIES (SEE PLAN FOR APPROX. DIMENSIONS) BOULDER NOTES: -BOULDERS TO BE FREE OF MACHINE MARKINGS AND BLEMISHES. -STONE TO BE TN, NC, OR VA FIELDSTONE ORIGIN WITH ROUNDED EDGES -LANDSCAPE ARCHITECT TO APPROVE BOULDERS AND LOCATION (FLAGGED) BEFORE PLACEMENT -BOULDERS TO BE EMBEDDED IN GROUND BETWEEN 1 3 - 1 2 OF OVERALL HEIGHT. BURY APPROX. 1 3 OF BOULDER MIN. CLASS A RIPRAP BOULDER (3' X 4' X 5') NON-WOVEN GEOTEXTILE FILTER FABRIC EXISTING RIVER BED NATURAL GROUND CLASS B RIPRAP 2' DEPTH 3" TOPSOIL 1:1 OR FLATTER NON-WOVEN GEOTEXTILE FILTER FABRIC SEAL DRAWN BY:CHECKED BY: Copyright © 2019, Equinox Environmental Consultation & Design, Inc. 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 DRAWING SCALE NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable.REVISIONSDATEPHASE DATE DRAWING NAME DESIGN BY:NOT FORCONSTRUCTIONAS SHOWNWoodfin, North CarolinaSILVER-LINE PARKTOWN OF WOODFINL16.3 P2 STORMWATER CONTROL MEASURE DETAILS April 1, 2020 100% CDS NFC TREATMENT SWALE NTS4 WEIR NTS5 LANDSCAPE BOULDER NTS3 FINISH GRADE SIZES VARY (SEE PLAN) (HIGH WATER LEVEL) SUBGRADE 3:1 - 10:1 SIDE SLOPES 3:1 MAX. PLANTINGS (SEE PLANTING PLAN) STORAGE VOLUME BENTONITE CLAY LINER* (SEE WETLAND CONSTRUCTION NOTES) WETLAND CONSTRUCTION NOTES: ·DURING EXCAVATION OF THE CONSTRUCTED WETLAND CONTACT PROJECT LANDSCAPE ARCHITECT IF GRADING REVEALS PROBLEMATIC CONDITIONS FOR HOLDING WATER SUCH AS SANDY SOILS, GRAVEL, DRAIN TILES, ETC. PROJECT REFINEMENTS MAY BE NECESSARY TO CREATE A FUNCTIONING WETLAND. ·CONTRACTOR SHALL CONSTRUCT THE WETLAND IN A WAY THAT REDUCES THE POTENTIAL FOR EROSION WHICH MAY INCLUDE TEMPORARY DIVERSION DITCHES ·STRIP AND STOCKPILE TOPSOIL IF PRESENT. SOILS UNCOVERED DURING EXCAVATION THAT CONTAINS CLAY OR LOAM SOILS CAN BE USED WITHIN THE WETLAND AREA. NO SAND, GRAVEL, OR ROCK MAY BE USED WITHIN THE WETLAND. ·OVER EXCAVATION MAY BE NECESSARY TO REMOVE SILT, SEDIMENT, SAND, GRAVEL OR CONDITIONS THAT WOULD IMPACT WETLAND FUNCTION. ·EQUINOX TO OVERSEE FINE GRADING OF CONSTRUCTED WETLAND (HIGH POINTS AND LOW POINTS GIVEN ON PLAN FOR GENERAL DIRECTION). ·ALL BOTTOM AREAS WITHIN "HIGH WATER BOUNDARY" TO BE TILLED WITH BENTONITE CLAY LAYER UNLESS WATER IS PRESENT (FROM HIGH WATER TABLE). ··BENTONITE POWDER TO BE TILLED AT A RATE OF 1-2 LBS PER SQUARE FOOT, WETTED WITH SPRINKLER, AND ROLLED TO COMPACT CLAY PARTICLES (FINAL SOIL COMPOSITION SHOULD BE A MIN OF 20% CLAY). ··ADD WATER WHILE CLAY SOIL LAYER IS WET - DO NOT ALLOW WETLAND TO DRY OUT AND CRACK, OR SEAL WILL BE COMPROMISED. ··ALTERNATIVELY, A CLAY LINER MAY BE ALSO BE USED (FOLLOW MANUFACTURER'S INSTALLATION REQUIREMENTS). ·REMOVED SOIL TO BE MIXED WITH TOPSOIL (OR APPROVED PLANTING MIX) AND ADDED ABOVE PREPARED CLAY BOTTOM AND LIGHTLY COMPACTED IN 6" LIFTS ABOVE CLAY LINER. NO SAND, GRAVEL, OR ROCK MAY BE USED WITH THE SOIL LIFTS. ·SPREAD SOIL MIX AND SMOOTH OVER THE BOTTOM AND SIDES OF THE COMPLETED WETLAND AND UP THE INSIDE SLOPES OF THE WETLAND TO A DEPTH OF 12" AND SHALL MEET PROPOSED FINISHED GRADE SHOWN ON PLAN. ·MULCH WITH HYDROSEEDING AFTER PLANTING. PREPARED SOIL MIX (5 PARTS NATIVE SOIL:1 PART TOPSOIL THOROUGHLY MIXED)12" MIN.3"-6" DEPTH(VARIES)FINISH GRADE CELL SIZES & SLOPES VARY 6" STORAGE DEPTH MINIMUM AND 9" MAXIMUM (9" TYPICAL) (HIGH WATER LEVEL) DECOMPACTED SUBGRADE 5:1 TYP.3:1 MAX. SEE GRADING PLAN 2" x 4" KEY 0.6 H WEIR NOTCH REINFORCED CONCRETE CANTILEVERED WALL 36" X 5 8 REBAR WEIR NOTCH ELEVATION FLOW 10"3"18" DOWNSPOUT GARDEN NTS2 FOREBAY SHALLOW POOL/ SHALLOW WATER ZONE DEEP POOL WETLAND CONSTRUCTION NOTES: ·WETLAND SHOULD BE GRADED SO THAT WATER ENTERS FOREBAY FIRST ·BEYOND THE FOREBAY, THE WETLAND SHALL BE GRADED TO HAVE LOWER AND HIGHER ELEVATIONS (SHALLOW POOL AND DEEPER POOL) FOR PROPER WETLAND FUNCTION ·SIDE WALLS SHALL BE A MAXIMUM OF 3:1 WITH AN AVERAGE OF 8:1 4" POP-UP DRAIN EMITTER COMPACTED SUBGRADE NOTE: CONTRACTOR SHALL GRADE SUBGRADE AND INSTALL PIPE TO DRAIN @ 0.5% SLOPE MIN. SEE STORM PLAN FOR PIPE LOCATIONS 4" HDPE JOINT IF APPLICABLE TO CONNECT WITH 4" PIPE TO DRAIN EMITTER PIPE (0.5% SLOPE MIN.) DOWNSPOUT GARDEN OUTFALL SECTION PLANTING (SEE PLANTING PLAN) COBBLE AROUND EMITTER (EMITTER SHOULD HAVE A 2' RADIUS FREE FROM PLANTINGS PERMENANT POOL 1952.69' TEMPORARY INDUNDATION 1953.00' 6' RIVER BANK BOULDER TOE NTS1 1' 4'4' CONSTRUCTED WETLAND NTS6 SEAL DRAWN BY:CHECKED BY: Copyright © 2019, Equinox Environmental Consultation & Design, Inc. 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 DRAWING SCALE NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable.REVISIONSDATEPHASE DATE DRAWING NAME DESIGN BY:NOT FORCONSTRUCTIONAS SHOWNWoodfin, North CarolinaSILVER-LINE PARKTOWN OF WOODFINL16.4 PLANTING DETAILS April 1, 2020 100% CDS NFC TREE PROTECTION DETAIL NTS 1 DECIDUOUS TREE PLANTING DETAIL NTS 2 EVERGREEN PLANTING DETAIL NTS 3 MULTI-STEM TREE PLANTING DETAIL NTS 4 SHRUB PLANTING DETAIL NTS 5 OPEN PLANTING HOLE LARGE ENOUGH TO ACCOMMODATE ROOTS. COVER ROOTS WITH SOIL AND LIGHTLY TAMP TO ELIMINATE AIR POCKETS IN PLANTING HOLE. LEAVES AND ROOT CROWN TO REMAIN UNDAMAGED DURING PLANTING 2" MULCH AFTER PLANTING IS COMPLETE PLANT ROOTS TO BE STRAIGHT & UNDAMAGED BY INSTALLATION ROOT CROWN LEVEL WITH FINISH GRADE PLANTING MATERIAL NOTES: 1.WATER THOROUGHLY IMMEDIATELY AFTER PLANTING AND WATER WEEKLY UNTIL ESTABLISHED. 2.NO FERTILIZER IS NECESSARY DURING PLANTING. PERENNIAL PLANTING (TYPICAL SECTION) SCALE: NOT TO SCALE6 Silver -Line Park Boat Ramp Buncombe County, North Carolina Town of Woodfin Vicinity Map Rogersville _ Johnson City 0 ristawn Cherokee B°one Greeneville National Forest Wilkesboro Blowing Rock o 42, m Woodfin, NC � Lenoir S9a h Statesville National Forest Morganton Hickory o dry a Marion Sali: Asheville 32, Mooresville o 0 64 rokee Waynesville _ 4 @ Lake Lure Concord Sylvia © ° Hendersonville o Shelby 74 a Gastonia 22, Charlotte a Matthews �n Gaffney o Greer Spartanburg n Rock Hill Greenville a Easley Simpsonville Seneca Go gle Location Map Jyi ytf::.Vyw SILVER. -LINE PARK (MOT TO SCALE) Contact Information Client/Owner: Town of Woodfin (828)253-4887 jasonyoung@woodfin-nc.gov Landscape Architect - Equinox (828)253-6856 david@equinoxenvironmental.com IN THE EVENT OF A FUEL OR CHEMICAL SPILL: CALL 911 IN THE EVENT OF THE RELEASE OF A PLUME OF SEDIMENT: NC DEQ (919)707-9129 IN THE EVENT OF AN INJURY THAT REQUIRES URGENT MEDICALATTENTION: CALL 911 March 26, 2020 GENERAL NOTES Design Sheet List Table Sheet Number Sheet Title WW-1.0 Title Page Boat Ramp - Site WW-2.0 Plan Boat Ramp - Profile WW-3.0 and Cross -Section Boat Ramp - WW-4.0 Cross -Sections Boat Ramp - Notes WW-5.0 and Details 1. THE CONTRACTOR SHALL LOCATE ALL UTILITIES ON -SITE, COORDINATE CONSTRUCTION WITH ALL UTILITY OWNERS, AND BE RESPONSIBLE FOR PROTECTING ALL UTILITIES DURING CONSTRUCTION. THE CONTRACTOR MUST SCHEDULE ANY REQUIRED UTILITY ADJUSTMENT WITH THE UTILITY OWNER TO ELIMINATE CONFLICTS. 2. THE CONTRACTOR SHALL CONFORM TO ALL PLAN AND SPECIFICATIONS SHOWN HEREIN AND NOTIFY THE ENGINEER (S20) IMMEDIATELY UPON THE DISCOVERY OF CONFLICTS OR CHANGES NOT CONSISTENT WITH THE CONTRACT DOCUMENTS. 3. THE CONTRACTOR SHALL HAVE COPIES OF ANY REQUIRED PERMITS ON SITE AT ALL TIMES AND COMPLY WITH ALL REQUIREMENTS OF THE PERMITS AT ALL TIMES. 4. S20 RECOMMENDS THE PERMITTING AUTHORITY OF THE PROJECT CONTACT ANDREW MOORE (828)296-4500 OF THE NCDEQ ASHEVILLE REGIONAL OFFICE ABOUT WATER QUALITY REGULATIONS, AS WELL AS AMANDA JONES (828)271-7980 FROM THE ARMY CORPS OF ENGINEERS ABOUT PERMIT REQUIREMENT THRESHOLDS. NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY (NC DEQ) STATES THAT BOAT RAMPS MAY BE CONSTRUCTED UNDER A CAMA GENERAL PERMIT GIVEN THE SPECIFIC CONDITIONS LISTED IN 15A NCAC 07H .1300. NORTH CAROLINA DEPARTMENT OF NATURAL RESOURCES (DNR) DIVISION OF WATER QUALITY (DWQ) REQUIRES BOAT RAMP PROJECTS TO BE IN COMPLIANCE WITH THE GENERAL PERMIT CONDITIONS AND PROVISIONS OF 15A NCAC 2H .1000, SESSION LAW 2006-246, AND SESSION LAW 2008-211 FOR STORMWATER MANAGEMENT. 5. THE CONTRACTOR IS RESPONSIBLE FOR, BUT NOT LIMITED TO, SUBMITTING PLANS FOR DELIVERY AND STORAGE OF MATERIALS AND SITE EQUIPMENT AS WELL AS FOR SITE ACCESS, EROSION CONTROL, TRAFFIC CONTROL, WATER CONTROL AND DE -WATERING PLANS, PRIOR TO CONSTRUCTION. 6. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING ALL EXISTING SITE INFRASTRUCTURE AND VEGETATION AS DIRECTED BY THE ENGINEER (S20), INCLUDING BUT NOT LIMITED TO, CONCRETE, ASPHALT, SITE CIRCULATION PATHS, CURB AND GUTTER, TREES, SHRUBS, GRASSES, AND ALL SOFT OR HARDSCAPE OUTSIDE OF THE IMMEDIATE CONSTRUCTION AREA AND ITS REPLACEMENT IN THE EVENT IF DAMAGE TO EQUAL OR BETTER CONDITION. 7. THE CONTRACTOR IS RESPONSIBLE FOR CONSTRUCTION SURVEY INCLUDING BUT NOT LIMITED TO CONSTRUCTION STAKING AND ESTABLISHMENT OF CONTROL POINT LOCATIONS AND ELEVATIONS. 8. IN AREAS OF DISTURBANCE, THE CONTRACTOR SHALL ADHERE TO THE REVEGETATION PLAN PER EQUINOX ENVIRONMENTAL WITH CONCERNS TO TOPSOIL REMOVAL, STOCKPILE, AND SPECIAL TREATMENT OF RIPARIAN AREAS. 9. IF PREVIOUSLY UNKNOWN HISTORIC OR ARCHEOLOGICAL REMAINS ARE DISCOVERED DURING CONSTRUCTION, THE CONTRACTOR MUST IMMEDIATELY STOP WORK AND NOTIFY BOTH THE OWNER'S REPRESENTATIVE AND S20 OF THESE ITEMS AND WORK MAY NOT COMMENCE UNTIL WRITTEN APPROVAL IS GIVEN TO PROCEED. 10. THE CONTRACTOR MUST BE AVAILABLE AND PROVIDE ALL NECESSARY RESOURCES FOR PERIODIC INSPECTIONS FROM REGULATORY AGENCIES, INCLUDING BIT NOT LIMITED TO THE UNITES STATES ARMY CORPS OF ENGINEERS OF THE NORTH CAROLINA DEPARTMENT OF PUBLIC HEALTH, AT ANY TIME DURING THE CONSTRUCTION TIME PERIOD. THIS PERIOD INCLUDES PRE -CONSTRUCTION AND POST -CONSTRUCTION. 11. THE CONTRACTOR MUST MEET ALL REQUIREMENTS FOR BMP'S AS DESCRIBED IN THE CONSTRUCTION SPECIFICATIONS. 12. THE CONTRACTOR IS RESPONSIBLE FOR MANAGING A SAFE SITE ON ACCORDANCE WITH LOCAL CODES AND REGULATIONS. 13. ALL STAGING AND STOCKPILING AREAS SHALL ADHERE TO THE FLOODPLAIN PERMITTING REGULATIONS AND REQUIREMENTS. 14. THE CONTRACTOR IS RESPONSIBLE FOR MONITORING ALL SITE SAFETY REQUIREMENTS AND REGULATIONS THROUGH THE ENTIRE DURATION OF ON -SITE CONSTRUCTION ACTIVITIES. MATERIAL SPECIFICATIONS: Bedding Material A. Bedding material consisting of a well graded 3" to 4" cobble and sand mixture or approved native alluvium shall be placed to a depth no greater than 12 inches, on top of all installed filter fabric, prior to the placement of boulder so as to prevent tearing or ripping. Boulder A. B. C C F2 F Individual stone boulders shall be dense, sound and free from cracks, seams and other defects conducive to accelerated weathering. The boulders shall be weathered to sub -rounded in shape. At a minimum exposed rock should have one flat surface and this should be the only exposed surface. Boulders shall be sound, hard, durable particles free from silt, clay, shale, sandstone, flaky particles, topsoil, organic matter, and other deleterious materials. a.The Contractor shall remove silt, clay, topsoil and other deleterious materials from the surfaces of the boulders in such a way as to prevent excess turbidity levels within the river or inhibit the bond with concrete, prior to transporting the boulders to the site. The Contractor shall stockpile the materials on -site in a manner that requires the minimum amount of material handling and that prevents the contamination of the boulders with underlying soils. a.Placement of a gravel bed may be necessary as directed by the Engineer. All boulder shall have the following properties: a.Bulk specific gravity (saturated surface -dry basis) not less than 2.5. b.Absorption not more than 2% by weight. c.Rock that fails to meet these requirements may be accepted only if similar rock from the same source has been demonstrated to be sound after five years or more of service under conditions of weather, wetting and drying, and erosive forces similar to those anticipated. Alternatively native or imported stone, already at the site and meeting the standards outlined above, may be used. d.The ratio of maximum to minimum boulder dimensions shall not exceed 3.0. Boulders shall be fieldstone with the following gradation: Effective Particle Size Diameter (ft) Percent Passing by Mass I%) 2.5 0-40 3.0 40-60 3.5 60-100 G. All boulder supplied by the contractor shall comply with the following standards: Unified Compressive Strength of Drilled AASHTO T 24 2500 psi, minimum Cement Type GU, general use Portland cement, with a total alkali content less than .65% (na2o equivalent) and a compressive strength o psi or greater as d spele . A. All cement shall be derived from a single manufacturing source for the duration of the contract for consistent quality and compatibility of all concrete materials. Filter Fabric A. The Contractor shall furnish all non -woven filter fabric as described in the Construction Documents (or an equivalent approved by the Engineer in writing). B. Filter fabrics shall be installed per manufacturer's recommendations. C. Filter fabrics shall be placed in direct contact with undisturbed bank materials. D. Filter Fabric shall be free of tears of rips prior to and following boulder installation. E. To protect filter fabrics during construction a layer of bedding material, with a 6 inch minimum depth, shall be placed over all filter fabrics prior to receiving boulder installations. CONSTRUCTION SEQUENCE: 1. Call 811 (North Carolina) OR 1-800-632-4949 from anywhere in the U.S for utility information. Call 2 business days in advance before you begin construction, grade or excavate for marking of underground member utilities. 2. Review and maintain all necessary construction permits. 3. Notify Owner's Representative and Engineer of anticipated start date. 4. Perform all specified Site Documentation. 5. Prepare and submit all specified Submittals; 6. Prepare and post all site safety and construction protocols; 7. Identify construction access, staging, stockpiling, and oiling areas for Engineers approval; 8. Install BMPs, barrier fencing, signs, and safety protocols; 9. Locate and clearly mark, all onsite utilities-, 10. Protect in Place all permanent site features (i.e. trees, infrastructure, buildings, utilities, etc.); 11. Locate and install all applicable temporary facilities; 12. Establish all necessary Survey Control, locations to be approved by the Engineer prior to installation-, and 13. Perform rough survey stakeout of in -channel activities sufficient to describe feature locations. 14. Install a cofferdam around the base of the ramp if water level is higher than the ordinary high water elevation at the time of construction. 15. Pump out any remaining water form the site. 16. Excavate site to the lines, grades, slopes, and elevations shown in the drawings or as needed to place structure or foundation rock. 17. Place any bank stabilization and sub -grade aggregate road base per the construction plans. 18. Mix and pour concrete per material specifications on page WW-5.0. 19. Install footer structures and boulders per details on page WW-5.0 20. When final grades have been achieved and concrete had been solidified and tested, remove all construction equipment from the site and permanently stabilized any disturbed area per the Silver -line Park plans. S20 Design and Engineering Scott Shipley, P.E. 318 Mcconnell Drive Lyons CO, 80540, USA (303) 819-3985 Client Town of Woodfin Project Name: Silver -Line Boat Ramp St,qtl tS' 100% CDs Drawing Name: Title Page Revisions: Drawn By: Sydney Salzwedel Checked By. Scott Shipley Dati 03/26/2020 Vertical Datum: NADD 88 Stamp: REUSE OF DOCUMENT: THIS DOCUMENT IS THE PROPERTY OF S20 DESIGN AND ENGINEERING. THE IDEAS, DESIGN AND CONTENT INCORPORATED ON THIS DOCUMENT IS AN INSTRUMENT OF PROFESSIONAL SERVICE AND SHALL NOT BE USED FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF S20 DESIGN AND ENGINEERING. Scale: I Sheet: ww- 1. 0 ;D J Y z J Y J D N D z Y J 5 D n Y i z J J n J Z 11 J J n z D z :D n D i Y i J r2 1 n n Y J PROPOSED STORM DRAIN PIPE \ PROPOSED SITE TRAIL \ \ \ 40 O . .\ l \ THE ELEVATION ALONG THIS CROSS-SECTION, PERPENDICULAR TO THE BOAT RAMP ALIGNMENT SHOULD BE AT A CONSISTENT ELEVATION OF: 1944.29' I 10 WE Feet C), \ \ ROPOSED CONTOURS THE ELEVATION ALONG THIS PERPENDICULAR TO THE B� SHOULD BE AT A CONSIS, 1947.68' 4.0% KEL SS<.SECTION, AMP�CLIGNMENT EVATION'nF: TIE-IN ELEVATION AT 1948.84' THE ELEVATION ALONG THIS CROSS-SECTION, PERPENDICULAR TO THE BOAT RAMP ALIGNMENT SHOULD BE AT A C-ON SI STEN T ELEVATION OF: 1945.81' i S20 Design and Engineering Scott Shipley, P.E. 318 Mcconnell Drive Lyons CO, 80540, USA (303) 819-3985 Client Town of Woodfin Project Name - Silver -Line Boat Ramp St'qtlI!;- 100% CDs Drawing Name: Site Plan Revisions: 0/0000-\ \ Drawn By: \ f - Sydney Salzwedel \ \ i Checked By: \ Scott Shipley \7-yo, �1 q Datr \ 03/26/2020 SAE Vertical DatumC NADD 88 N � � Q �v Stamp: _ \ TIE-IN ELEVATION AT 1942.84' C 4 00 REUSE OF DOCUMENT: THIS DOCUMENT IS THE PROPERTY OF S20 DESIGN AND ENGINEERING. THE IDEAS, DESIGN AND CONTENT INCORPORATED ON THIS DOCUMENT IS AN INSTRUMENT OF PROFESSIONAL SERVICE AND SHALL NOT BE USED FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF S20 DESIGN AND ENGINEERING. Scale: I Sheet: D J_ 1J Y z J Y J D :V D Z_ Y D 5 z D sel Y 1 Z_ J JJ > J D z J J n :n Z BOAT RAMP PROFILE S20 Design and Engineering Scott Shipley, P.E. 318 Mcconnell Drive Lyons CO, 80540, USA (303) 819-3985 GRADE BREAK STA = 1+12.05 VERTICAL CURVE ELEV = 1942.840 -3 99% 241-10" GRADE BREAK STA = 0+79.61 ELEV = 1947.711 Client F-r, 19 5 F19 50 Town of Woodfin Q O D 1960 If�'I�'161 1940 1930-16- -50 GRADE BREAK STA = 0+00.00 ELEV = 1951.678 -40 UPLAND PER EQUINOX. REFER TO SHEET L6.0 FOR VEGETATION PLAN EXISTING SUBGRADE GRADE BREAK STA = 0+54.68 ELEV = 1949.498 BOAT RAMP ELEVATION AT 1947.68' EXISTING STORM DRAIN PIPE -30 SIDE & TOP FOOTING -20 SECTION A' -A STA: 0+80.00 ELEV:1947.65 anon SECTION A'A ml=zip; :a:.l I .::: I:::I I I ICI �:::.I IJI I.::::I I,.I I — -10 YC " CONCRETE OAT RAMP SS 6 ROADBAS 6" LIFT COMPACTED T 98% STANDARD PROCTOR COMPACT SUBGRADE O 98% STANDARD PROCTOR OR UNDISTURBED -ALLUVIUM 0 10 SECTION B'-B STA: 0+90.00 ELEV: 1946.12 SECTION C'-C STA: 1 +00.00 ELEV: 1944.65 BOAT RAMP ELEVATION AT 1947.68' 7 #4 REBAR ON 12" CENTERS EACH WAY 20 5- 02% 1 +10 0 POSED GRADE INSTALL 12" MINIMUM ALLUVIAL RIPRAP -INSTALL 36" DIAMETER BOULDER INSTALL FILTER FABRIC (DIRECT CONTACT W/ UNDISTURBED SU GRADE) 30 40 1940 1+25 0 6 12 Feet HORIZONTAL & VERTICAL SCALE 1960 1950 1940 -61930 50 0 5 10 Feet HORIZONTAL & VERTICAL SCALE Project Name - Silver -Line Boat Ramp Stat! IS' 100% CDs Drawing Name: Profile and Cross Section Revisions: Drawn By: Sydney Salzwedel Checked By: Scott Shipley Datr 03/26/2020 Vertical Datum: NADD 88 Stamp: REUSE OF DOCUMENT: THIS DOCUMENT IS THE PROPERTY OF S20 DESIGN AND ENGINEERING. THE IDEAS, DESIGN AND CONTENT INCORPORATED ON THIS DOCUMENT IS AN INSTRUMENT OF PROFESSIONAL SERVICE AND SHALL NOT BE USED FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF S20 DESIGN AND ENGINEERING. Scale: Sheet: WW_3.0 .D J_ 1J Y Z J Y 1J J 7) D .N D i J) .D Z Y J 5 n JJ Y z J 1' JJ > J J Z 1J J J n 5 :n J 7) 1J J) X 1 Y i J 3- 7 ✓J n Y ii 7) J 1960 1�`16191 1940 1950 1930 50 SIDE & TOP p 1 FOOTING EXISTING SUBGRADE SECTION B'-B D 1 6" CONCRETE BOAT RAMP CLASS 6 ROADBASE 6" LIFT COMPACTED TO 98% STANDARD PROCTOR COMPACT SUBGRADE TO 98% STANDARD PROCTOR OR UNDISTURBED ALLUVIUM -40 -30 -20 -10 0 BOULDER TOE BANK STAILIZATION PER EQUINOX. REFER TO SHEET L15.3 FOR DETAIL 40 30 SIDE & TOP D-1 FOOTING EXISTING SUBGRADE 20 -10 SECTION C'-C 10 BOAT RAMP ELEVATION AT 1945.81' EXISTING GRADE — -- PROPOSED GRADE UPLAND PER EQUINOX. REFER TO SHEET L6.0 FOR —INSTALL 12" MINIMUM VEGETATION PLAN ALLUVIAL RIPRAP INSTALL 36" DIAMETER BOULDER INSTALL FILTER FABRIC (DIRECT CONTACT W/ UNDISTURBED SUBGRADE) #4 REBAR ON 12" CENTERS EACH WAY 20 30 40 BOAT RAMP ELEVATION AT 1944.29' EX STING GRADE PROPOSED GRADE 1 k INSTALL 12" MINIMUM ALLUVIAL RIPRAP D 1 6" CONCRETE BOAT RAMP — CLASS 6 ROADBAS 6" LIFT COMPACTED T 98% STANDARD PR INSTALL 36" DIAMETER BOULDER COMPACT SUBGRADE O 98% STANDARD PROCTOR INSTALL FILTER FABRIC (DIREC OR UNDISTURBED ALLUVIUM p 1 #4 REBAR ON 12" CONTACT W/ UNDISTURBED SU GRADE) CENTERS EACH WAY 0 10 20 30 REINVENTING WHITEWA 1960 S20 Design and Engineering Scott Shipley, P.E. 318 Mcconnell Drive Lyons CO, 80540, USA (303) 819-3985 Client 1950 Town of Woodfin 1940 Project Name - Silver -Line Boat Ramp 1930 St'qttI!;' 50 100% CDs 0 5 10 Feet HORIZONTAL & VERTICAL SCALE Drawing Name: Cross Sections UPLAND PER EQUINOX. REFER TO SHEET L6.0 FOR VEGETATION PLAN 40 1960 1950 1940 -61930 50 0 5 10 Feet HORIZONTAL & VERTICAL SCALE Revisions: Drawn By: Sydney Salzwedel Checked By. Scott Shipley Datr 03/26/2020 Vertical Datum: NADD 88 Stamp: REUSE OF DOCUMENT: THIS DOCUMENT IS THE PROPERTY OF S20 DESIGN AND ENGINEERING. THE IDEAS, DESIGN AND CONTENT INCORPORATED ON THIS DOCUMENT IS AN INSTRUMENT OF PROFESSIONAL SERVICE AND SHALL NOT BE USED FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF S20 DESIGN AND ENGINEERING. Scale: Sheet: ww- 4. 0 %8" x 1" DEEP SAW CUT, FILL W/ SPECIFIED EPDXY JOINT FILLER SLEEVE OR PRE -ATTACHED POLYETHYLENE COVERING APPLY BOND BREAKER 1 /2" O X 24" LONG SMOOTH DOWELS @ 12" O.C. SET AT MID DEPTH OF SLAB (#4 REBAR @ 12" O.C. EACH WAY NOT SHOWN) 1 5/8" 2 3/8" 4" _� r _� �_ �_� RAD. 1" #4 REBAR @ 12" O.C. EACH WAY 6" 6" CLASS 4 AGGRAGATE ROADBASE MIRAFI 180N — FILTER FABRIC #4 REBAR @ 12" O.C. EACH WAY EXISTING NATIVE ALLUVIUM 12'' - 18" k 1/O 24" t� I 12" J I BACKFILL CUT W/ NATIVE 12" KEYWAY MINUS ALLUVIUM STACK BOULDERS (36" DIA MIN) #4 REBAR @ 12" O.C. EACH WAY CLASS 4 AGGRAGATE ROAD BASE CONSTRUCTION JOINT (OPTIONAL) 2 SURFACE CORRUGATIONS 3 END FOOTING 4 SIDE & TOP FOOTING SECTION SCALE 1 "=2' D-1 SECTION SCALE 1 "=1' D-1 SECTION SCALE 1 "=2' D-1 SECTION SCALE 1 "=2' Portland Cement Concrete Pavement (Section 700 NC 2018 Standards and Specifications for Roads and Structures) PREPARATION OF SUBGRADE AND BASE: - Prepare the subgrade and base beneath Portland cement concrete pavement in accordance with the applicable sections of these Specifications and with a grading tolerance of ± 1/4 inch from the established grade on mainline lanes and a grading tolerance of ± 1/2 inch in all other areas. Use approved automatically controlled grading and paving equipment to produce final subgrade and base surfaces meeting the lines, grades and cross sections required by the plans or as directed. When in the judgment of the Engineer the use of such equipment is impractical, this requirement will be waived. - Dampen the surface of the base at the time the concrete is placed. Sprinkle the base when necessary to provide a damp surface. Ensure that no free water or ponding is present at the time of concrete placement. Correct all damaged areas in the subgrade or base before placing concrete. - Do not allow traffic on the underlying asphalt courses other than necessary local traffic and essential construction equipment as authorized by the Engineer. - Unless otherwise approved, use and maintain a braided metal cable stringline reference to control the profile and alignment of the concrete pavement. Monitor the stringline for accuracy and tautness. Set pins at a distance no farther than 50 feet apart. When located on a vertical curve, set pins no farther than 25 feet apart. PLACING CONCRETE (A) General Use a slip form paver to place concrete except where impractical due to irregular areas or areas of existing pavement adjacent to the proposed pavement. Place concrete only in the presence of the Engineer or his authorized representative. Handle concrete so as to prevent segregation and keep free from mud, soil or any other foreign matter. Where finishing operations must be completed after dark, provide acceptable artificial light in accordance with Section 1413. Do not pave when any of the following conditions exist: (1) A descending air temperature at the location of the concrete paving operation and away from artificial heat reaches 35°F. Paving may resume when the weather forecast is projected to reach a high of 40°F on that day's operation and the morning ambient temperature is above 32°F. (2) The subgrade or base course is frozen. (3) Aggregates to be used in the mix contain frozen particles. (4) Air temperature in the shade is 90°F and rising or the concrete temperature is greater than 95°F. Where additional pavement, aggregate or soil must be placed adjacent to new pavement by machine methods, do not place it until the concrete has attained a compressive strength of at least 3,000 psi. Construction equipment or hauling equipment will not be allowed over the pavement until the concrete has attained a compressive strength of 3,000 psi. Spread the concrete uniformly over the entire area without segregation. Perform the spreading with a mechanical spreader independent of the paver except where hand methods are necessary due to pavement design, equipment breakdown or other emergencies CONSTRUCTION METHOD - Construct concrete pavement in accordance with Section 700. (above) - Place concrete in 2 lane minimum widths in a single operation except as follows: (A) Where the total number of lanes is an odd number, in which case one of the lanes may be placed in a separate operation. (B) Areas such as ramps or auxiliary lanes where the total width is less than 2 lanes. INSTALL FOOTER STRUCTURES - Stone boulders shall be placed as shown on the drawings, without any gaps, so that each boulder is in direct contact with all surrounding boulder. - Each stone shall be placed to the final position by suitable equipment for handling material and, if necessary, the stone shall be picked up and repositioned. - Boulder to be placed on subgrade compacted to 95% of maximum as determined by the standard proctor method (ASTM d-698-66t or AASHTO t 99) or undisturbed native alluvium. - Non -woven 8oz filter fabric (Mirafi 180n or equivalent) shall be placed in intimate contact with undisturbed bank materials and overlain with a minimum depth of 6 inches of bedding material prior to the placement of all boulder within the active river channel. BOAT RAMP PLAN NOTE: 4 1. TYPICAL CORRUGATION PATTERN SHOWN. ACTUAL CORRUGATION PATTERN MAY VARY WITH ENGINEERS APPROVAL. 5 2. CONTROL JOINTS SHALL BE CUT PARALLEL WITH CORRUGATION PATTERN AND SHALL NOT CROSS BETWEEN RIDGES. 3. PORTLAND CEMENT CONCRETE 4500 PSI (COMPRESSION) 28 DAY STRENGTH uurl\muh/A 1 Iu1140 I vv I Irvv #4 REBAR EPDXY COATED TYPE 3A OR POLYESTER RESIN RAMP AND FOOTING TO BE CAST MONOLITHIC. 30'-0" SCALE 1"=3' S20 Design and Engineering Scott Shipley, P.E. 318 Mcconnell Drive Lyons CO, 80540, USA (303) 819-3985 Client Town of Woodfin Project Name - Silver -Line Boat Ramp StatlIs- 100% CDs Drawing Name: Notes and Details Revisions: Drawn By: Sydney Salzwedel Checked By. Scott Shipley Datr 03/26/2020 Vertical Datum: NADD 88 Stamp: REUSE OF DOCUMENT: THIS DOCUMENT IS THE PROPERTY OF S20 DESIGN AND ENGINEERING. THE IDEAS, DESIGN AND CONTENT INCORPORATED ON THIS DOCUMENT IS AN INSTRUMENT OF PROFESSIONAL SERVICE AND SHALL NOT BE USED FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF S20 DESIGN AND ENGINEERING. Scale: I Sheet: ww- 5.0 SEAL DRAWN BY:CHECKED BY: Copyright © 2019, Equinox Environmental Consultation & Design, Inc. 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 DRAWING SCALE NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable.REVISIONSDATEPHASE DATE DRAWING NAME DESIGN BY:NOT FORCONSTRUCTIONAS SHOWNWoodfin, North CarolinaSILVER-LINE PARKTOWN OF WOODFINA0.1 SITE PLAN April 1, 2020 100% CDS NFC SEAL DRAWN BY:CHECKED BY: Copyright © 2019, Equinox Environmental Consultation & Design, Inc. 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 DRAWING SCALE NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable.REVISIONSDATEPHASE DATE DRAWING NAME DESIGN BY:NOT FORCONSTRUCTIONAS SHOWNWoodfin, North CarolinaSILVER-LINE PARKTOWN OF WOODFINA1.0 FLOOR PLANS April 1, 2020 100% CDS NFC SEAL DRAWN BY:CHECKED BY: Copyright © 2019, Equinox Environmental Consultation & Design, Inc. 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 DRAWING SCALE NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable.REVISIONSDATEPHASE DATE DRAWING NAME DESIGN BY:NOT FORCONSTRUCTIONAS SHOWNWoodfin, North CarolinaSILVER-LINE PARKTOWN OF WOODFINA1.1 TRAIN PLATFROM FRAMING PLAN April 1, 2020 100% CDS NFC SEAL DRAWN BY:CHECKED BY: Copyright © 2019, Equinox Environmental Consultation & Design, Inc. 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 DRAWING SCALE NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable.REVISIONSDATEPHASE DATE DRAWING NAME DESIGN BY:NOT FORCONSTRUCTIONAS SHOWNWoodfin, North CarolinaSILVER-LINE PARKTOWN OF WOODFINA1.2 REFLECTED CEILING PLANS April 1, 2020 100% CDS NFC SEAL DRAWN BY:CHECKED BY: Copyright © 2019, Equinox Environmental Consultation & Design, Inc. 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 DRAWING SCALE NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable.REVISIONSDATEPHASE DATE DRAWING NAME DESIGN BY:NOT FORCONSTRUCTIONAS SHOWNWoodfin, North CarolinaSILVER-LINE PARKTOWN OF WOODFINA1.3 ROOF PLANS April 1, 2020 100% CDS NFC SEAL DRAWN BY:CHECKED BY: Copyright © 2019, Equinox Environmental Consultation & Design, Inc. 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 DRAWING SCALE NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable.REVISIONSDATEPHASE DATE DRAWING NAME DESIGN BY:NOT FORCONSTRUCTIONAS SHOWNWoodfin, North CarolinaSILVER-LINE PARKTOWN OF WOODFINA2.0 ELEVATIONS PAVILION April 1, 2020 100% CDS NFC SEAL DRAWN BY:CHECKED BY: Copyright © 2019, Equinox Environmental Consultation & Design, Inc. 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 DRAWING SCALE NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable.REVISIONSDATEPHASE DATE DRAWING NAME DESIGN BY:NOT FORCONSTRUCTIONAS SHOWNWoodfin, North CarolinaSILVER-LINE PARKTOWN OF WOODFINA2.1 ELEVATIONS TRAIN PLATFORM April 1, 2020 100% CDS NFC SEAL DRAWN BY:CHECKED BY: Copyright © 2019, Equinox Environmental Consultation & Design, Inc. 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 DRAWING SCALE NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable.REVISIONSDATEPHASE DATE DRAWING NAME DESIGN BY:NOT FORCONSTRUCTIONAS SHOWNWoodfin, North CarolinaSILVER-LINE PARKTOWN OF WOODFINA3.0 3D PERSPECTIVE PAVILION April 1, 2020 100% CDS NFC SEAL DRAWN BY:CHECKED BY: Copyright © 2019, Equinox Environmental Consultation & Design, Inc. 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 DRAWING SCALE NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable.REVISIONSDATEPHASE DATE DRAWING NAME DESIGN BY:NOT FORCONSTRUCTIONAS SHOWNWoodfin, North CarolinaSILVER-LINE PARKTOWN OF WOODFINA3.1 3D PERSPECTIVE TRAIN PLATFORM April 1, 2020 100% CDS NFC SEAL DRAWN BY:CHECKED BY: Copyright © 2019, Equinox Environmental Consultation & Design, Inc. 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 DRAWING SCALE NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable.REVISIONSDATEPHASE DATE DRAWING NAME DESIGN BY:NOT FORCONSTRUCTIONAS SHOWNWoodfin, North CarolinaSILVER-LINE PARKTOWN OF WOODFINA4.0 BUILDING SECTIONS PAVILION April 1, 2020 100% CDS NFC SEAL DRAWN BY:CHECKED BY: Copyright © 2019, Equinox Environmental Consultation & Design, Inc. 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 DRAWING SCALE NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable.REVISIONSDATEPHASE DATE DRAWING NAME DESIGN BY:NOT FORCONSTRUCTIONAS SHOWNWoodfin, North CarolinaSILVER-LINE PARKTOWN OF WOODFINA4.1 BUILDING SECTIONS TRAIN PLATFORM April 1, 2020 100% CDS NFC SEAL DRAWN BY:CHECKED BY: Copyright © 2019, Equinox Environmental Consultation & Design, Inc. 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 DRAWING SCALE NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable.REVISIONSDATEPHASE DATE DRAWING NAME DESIGN BY:NOT FORCONSTRUCTIONAS SHOWNWoodfin, North CarolinaSILVER-LINE PARKTOWN OF WOODFINA5.0 TRAIN PLATFORM SECTION DETAILS April 1, 2020 100% CDS NFC SEAL DRAWN BY:CHECKED BY: Copyright © 2019, Equinox Environmental Consultation & Design, Inc. 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 DRAWING SCALE NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable.REVISIONSDATEPHASE DATE DRAWING NAME DESIGN BY:NOT FORCONSTRUCTIONAS SHOWNWoodfin, North CarolinaSILVER-LINE PARKTOWN OF WOODFINA5.1 PAVILION SECTION DETAILS April 1, 2020 100% CDS NFC SEAL DRAWN BY:CHECKED BY: Copyright © 2019, Equinox Environmental Consultation & Design, Inc. 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 DRAWING SCALE NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable.REVISIONSDATEPHASE DATE DRAWING NAME DESIGN BY:NOT FORCONSTRUCTIONAS SHOWNWoodfin, North CarolinaSILVER-LINE PARKTOWN OF WOODFINA5.2 MISC. DETAILS April 1, 2020 100% CDS NFC LEGEND PIPING SYMBOLS COMPANION FLANGE UNION ^r BALL VALVE Its HB SS ow ow W w mmimmimmim FLOODWAY O 0 GATE VALVE PRESSURE REDUCING VALVE REDUCED PRESSURE BACKFLOW PREVENTOR ASSEMBLY HOSE BIBB PIPE CAP MAJOR CONTOUR (5—FOOT) MINOR CONTOUR (1—FOOT) BOUNDARY LINE SEWER LINE PROPOSED SEWER LINE FENCE LINE ELECTRIC (ROW EXTENT) ELECTRIC (OVERHEAD WIRE) UNDERGROUND WATERLINE PROPOSED UNDERGROUND WATERLINE RAIL LINE STREAM FLOODWAY 100 & 500—YEAR FLOODPLAIN POTENTIAL WETLAND AREA EASEMENT BOUNDARY CONCRETE PADS SEWER CLEANOUT SEWER MANHOLE UTILITY POLE EXISTING TREES TO REMAIN GENERAL NOTES MISCELLANEOUS SYMBOLS AND ABBREVIATIONS ODRAWING NOTES A# REVISION NOTES BF BARRIER FREE CENTER LINE CO CLEANOUT D DRAIN LINE DCW DOMESTIC COLD WATER HB HOSE BIBB HCP HANDICAP INV INVERT ELEVATION PRV PRESSURE REDUCING VALVE RBG RUN BELOW GRADE RP RECIRCULATING PUMP RPBP REDUCED PRESSURE BACKFLOW PREVENTER SS SEWER LINE TYP TYPICAL VLV VALVE W WATER LINE E.C. ELECTRICAL CONTRACTOR G.C. GENERAL CONTRACTOR M.C. MECHANICAL CONTRACTOR P.C. PLUMBING CONTRACTOR 1. PLUMBING WORK SHALL BE INSTALLED IN ACCORDANCE WITH THE 2018 EDITION OF THE NORTH CAROLINA STATE PLUMBING CODE. 2. SITE PIPING SHALL BE COORDINATED WITH OTHER TRADES TO AVOID CONFLICTS, INTERFERENCES AND TO PROVIDE A CODE COMPLIANT INSTALLATION. 3. ALL FIXTURES AND EQUIPMENT SHALL BE APPROVED BY THE ARCHITECT AND OWNER PRIOR TO ORDERING. 4. INSTALL ALL FIXTURES AND EQUIPMENT PER MANUFACTURER'S INSTRUCTIONS. 5. REFER TO UTILITY NOTES ON SHEET P0.1. PLUMBING SUMMARY DRAINAGE FIXTURE UNITS: .5 DOMESTIC WATER SUPPLY FIXTURE UNITS: .5 DOMESTIC WATER SUPPLY DEMAND: 1.5 GPM PLUMBING FIXTURE - EQUIPMENT CONNECTION SPECIFICATION SCHEDULE ITEM DESCRIPTION WASTE VENT CW HW SPECIFICATION MANUFACTURER MODEL SEE NOTE SEE NOTE SEE NOTE CONCRETE, CONCRETE COLOR, SINGLE BOWL. PEDESTAL MOUNTED, OUTDOOR. PROVIDE 2" P—TRAP, DF DRINKING FOUNTAIN 3 4 5 — AND VALVE BOX FOR DOMESTIC WATER SUPPLY SHUT—OFF VALVE ACCESS (SIZE AS REQUIRED). SIT REF. 370 - COLUNA INSTALL FIXTURE PER MANUFACTURER'S INSTRUCTIONS. NOTES: 1. FIXTURE SELECTION AS INDICATED. SEE SPECIFICATION FOR OTHER ACCEPTABLE MANUFACTURERS. 2. ALL PLUMBING FIXTURES, EQUIPMENT, VALVES, FITTINGS, AND ACCESSORIES IN DOMESTIC WATER SYSTEM MEANT FOR HUMAN CONSUMPTION ARE REQUIRED TO MEET ALL APPLICABLE LEAD FREE REQUIREMENTS. 3. WASTE OPENING IS 32 MM PVC. PROVIDE TRANSITION TO 2" PVC AT OPENING. INSTALL PER NC PLUMBING CODE FOR COMBINATION WASTE AND VENT REQUIREMENTS. 4. INDIVIDUAL VENT IS OMITTED IN LIEU OF DVW SYSTEM. 5. DOMESTIC WATER SUPPLY CONNECTION IS 16 MM PEX. PROVIDE TRANSITION TO 1/2" TYPE 'L' COPPER AT OPENING. 6. FOR HEATED INSULATED ENCLOSURE, PROVIDE UL LISTED HEAT CABLE THAT HAS BEEN INDEPENDENTLY CERTIFIED FOR DAMP OR WET CONDITIONS. SPECIALTIES: SELECTION BASED ON WATTS AND SAFE—T—COVER. SEE SPECIFICATION FOR OTHER ACCEPTABLE MANUFACTURERS. CLEANOUTS HOSE BIBBS PRESSURE REDUCING VALVE REDUCED PRESSURE BACKFLOW PREVENTER HEATED INSULATED ENCLOSURE HEATED INSULATED ENCLOSURE HE 3/4" REDUCED PRESSURE BACKFLOW PREVENTER ASSEMBLY 3/4" PRESSURE REDUCING VALVE P P 3/4"— DRAIN VIA ENCLOSURE PANEL 3/4"—/ STRAINER PRESSURE REDUCING VALVE ASSEMBLY DETAIL SCALE: NONE 18"x18"x16" THICK CONCRETE PAD CROWN TO SHED WATER FINISH GRADE OR PAVING ili DEPTH OF BURY SHALL BE IN ACCORDANCE WITH LOCAL AUTHORITY CO WATTS SERIES CO-260 IN 18"X18"X4" THICK PAD HB WATTS 3/4" LFSC-3 W/ LF813 VACUUM BREAKER PRV WATTS 3/4" SERIES LF25AUB—Z3 RPBP WATTS 3/4" SERIES LF007 HE 3/4" SAFE—T—COVER 20OS—AL (SEE NOTE 6) PRESSURE GAUGE (TYP.) BALL VALVE (TYP.) !� HOSE BIBB /_ NAME OF SERVICE CAST IN TOP COVER ADJUSTABLE CAST IRON VALVE BOX SLEEVE WITH COVER CAST IRON VALVE BOX BASE 12"x12"x4" THICK CONCRETE BLOCK ZZ"WATER MAIN — SEE PLAN 1 FOR SIZE AND LOCATION 4ND SPECIFICATIONS FOR SIZE AND TYPE OF VALVE DRAWING NOTES: 1. FOUNTAIN SHALL BE INSTALLED WITH HORIZONTAL DOMESTIC WATER PIPING 2'-0" BELOW GRADE SLOPED AT MINIMUM 2% TO LOW POINT. VALVE BOX SHALL BE OPEN —BOTTOM, MINIMUM 2'-0" BELOW GRADE WITH 4" GRAVEL AND BALL —VALVE SHUT—OFF & HOSE BIBB. 2. FROST LINE SHALL BE CONSIDERED 18 INCHES BELOW GRADE PER BUNCOMBE COUNTY PERMITS AND INSPECTIONS DEPARTMENT. VALVE BOX AT FOUNTAIN SHUT-OFF DETAIL SCALE: NONE CONCRETE PAD 55 Broad Street Asheville, NC 28801 828.252.0575 Cg NC Firm License # C-0459 mcgillassociates.com �� EQUINOX 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 SEAL N C q R 0�iii���// . o C_ S E A L �- - r - = 045507 • •q.. •.H SIGNED AND DATED %/ ////111 Ilhllally\signed by James A. James A. Hubbard Hubbard Dale: 2020.03.26 14:26:40-04'00' THIS DOCUMENT HAS BEEN DIGITALLY SIGNED AND SEALED IN ACCORDANCE WITH THE STANDARD CERTIFICATION REQUIREMENTS FOUND IN NC ADMINISTRATIVE CODE 21-56.1103(E). THIS DIGITAL SIGNATURE HAS BEEN FOUND BY THE NC BOARD OF EXAMINERS FOR ENGINEERS AND SURVEYORS TO MEET THESE STANDARDS. PLEASE CONTACT THE SIGNER IF YOU NEED ASSISTANCE IN VALIDATING THE SIGNATURE. DESIGN BY: DRAWN BY: CHECKED BY: LU Q 0 1n z O LU n W Z Jcv z I � 0 o CID p LU O LL o � z > O J � z 0 O VJ 0 Copyright ©2019, Equinox Environmental Consultation & Design, Inc. PHASE Bid Set DATE 03/26/2020 DRAWING SCALE AS SHOWN NOTE: If this drawing is not 2436" it has been revised from its original size and the scales noted on drawings/details are no longer applicable. DRAWING NAME LEGENDS, NOTES, DETAILS, AND SCHEDULES POOO ® �NM 3/4" RPZ ASSEMBLY AND PRV IN HEATED ENCLOSURE HE - SEE 1 /PO.0. SET ENCLOSURE ON CONCRETE PAD, AND PROVIDE TRAFFIC BOLLARDS FOR PROTECTION, COORDINATE EXACT LOCATION WITH OWNER. FOR ENCLOSURE WPA' INf_ TPl7Wr I-IIPIC_ F70P MIKIM IIT Mill PI F(:TPIr1AI PAMPI Tr) FN(:I (1CI IRF AS THEIR EXISTENCE AND LOCATION WERE KNOWN AT THE TIME OF THE PREPARATION OF THE DRAWINGS. HOWEVER, NOTHING IN THESE CONTRACT DOCUMENTS SHALL BE CONSTRUED AS A GUARANTEE THAT SUCH UTILITIES ARE IN 8. WHEN WATER MAIN IS ABOVE SEWER, BUT WITH LESS THAT 18" CLEARANCE, OR WHEN THE SEWER IS ABOVE THE THE LOCATION INDICATED OR THAT THEY ACTUALLY EXIST, OR THAT OTHER UTILITIES ARE NOT WITHIN THE AREA OF WATER MAIN, BOTH WATER MAIN & SEWER LINE SHALL BE CONSTRUCTED OF FERROUS MATERIALS WITH JOINTS OPERATIONS. THE CONTRACTOR SHALL MAKE ALL NECESSARY INVESTIGATIONS TO DETERMINE THE EXISTENCE AND EQUIVALENT TO WATER MAIN STANDARDS FOR A MIN. LATERAL DISTANCE, MEASURED AT RIGHT ANGLES TO THE LOCATIONS OF SUCH UTILITIES. THE CONTRACTOR SHALL PAY FOR ANY DAMAGE TO AND FOR ANY MAINTENANCE SEWER, OF 10' EACH SIDE OF THE CROSSING WITH FULL SECTIONS CENTERED AT THE POINT OF CROSSING. AND PROTECTION OF EXISTING UTILITIES AND STRUCTURES. 3. THE CONTRACTOR SHALL OBTAIN &PAY FOR, PRIOR TO THE BEGINNING OF ANY WORK, ALL PERMITS &LICENSES 9' DURING CONSTRUCTION OR DEMOLITION, CONTRACTOR SHALL PROVIDE VEHICLE ACCESS FOR FIRE FIGHTING PURPOSES NECESSARY TO ACCOMPLISH WORK. AND A WATER SUPPLY FOR FIRE PROTECTION IS REQUIRED. PROTECTION SHALL BE MADE SERVICEABLE PRIOR TO AND DURING THE TIME OF CONSTRUCTION. SEE 06 NORTH CAROLINA BUILDING CODE CHAPTER 33 (SAFEGUARDS 4. ANY CONTRACTOR PERFORMING WORK ON THIS PROJECT SHALL FAMILIARIZE HIMSELF WITH THE JOB SITE & DURING CONSTRUCTION) AND SECTIONS 06 NORTH CAROLINA FIRE PROTECTION CODE CHAPTER 14 (FIRE SAFETY LOCATION OF ALL EXISTING FACILITIES & UNDERGROUND UTILITIES SHOWN OR NOT SHOWN ON THESE PLANS. THE DURING CONSTRUCTION AND DEMOLITION) THAT WOULD BE APPLICABLE FOR THIS PROJECT. CONTRACTOR WILL BE UNILATERALLY RESPONSIBLE FOR ANY DAMAGE DONE TO EXISTING FACILITIES OR 10. ALL UTILITY WORK SHALL BE PERFORMED BY A NORTH CAROLINA LICENSED UTILITY CONTRACTOR. UNDERGROUND UTILITIES THAT ARE SHOWN OR NOT SHOWN ON THESE PLANS; & IF DAMAGED, THEY SHALL BE REPAIRED OR REPLACED TO THE SATISFACTION OF THE OWNER AT NO COST TO THE OWNER. I Fri 55 Broad Street N M Asheville, NC 28801 1 PLUMBING SITE PLAN 828.252.0575 P0.1 1" = 30'-0" F1 Cg NC Firm License # C-0459 0' 15' 30' 60' mcgillassociates.com `s EQUINOX 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 SEALICI IA 0l � O .LESS/0•• _ S E A L _ 045507 _= SIGNED AND DATED�I UgiI1Iry\ned b\y James A. James A. Hubbard Hubbard Date: 2020.03.26 14:34:06-04'00' THIS DOCUMENT HAS BEEN DIGITALLY SIGNED AND SEALED IN ACCORDANCE WITH THE STANDARD CERTIFICATION REQUIREMENTS FOUND IN NC ADMINISTRATIVE CODE 21-56.1103(E). THIS DIGITAL SIGNATURE HAS BEEN FOUND BY THE NC BOARD OF EXAMINERS FOR ENGINEERS AND SURVEYORS TO MEET THESE STANDARDS. PLEASE CONTACT THE SIGNER IF YOU NEED ASSISTANCE IN VALIDATING THE SIGNATURE. DESIGN BY: DRAWN BY: CHECKED BY: w Q 0 U) z O w FT fy n W Z_ ICU Z I S 0�0 0 O U O -C � o ILL. >Z O J � Z 0 0001-- . Copyright ©2019, Equinox Environmental Consultation & Design, Inc. PHASE Bid Set DATE 03/26/2020 DRAWING SCALE AS SHOWN NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable. DRAWING NAME PLUMBING SITE PLAN Pool LIGHTING MOUNTING AS NOTED SYMBOL DESCRIPTION ® CEILING MOUNTED FLUORESCENT FIXTURE; LETTER INSIDE OR BESIDE DENOTES FIXTURE TYPE CEILING MOUNTED FLUORESCENT LIGHTING FIXTURE, WIRED FOR ® NORMAL/STANDBY POWER OPERATION; LETTER INSIDE OR BESIDE FIXTURE DENOTES FIXTURE TYPE WALL MOUNTED FLUORESCENT FIXTURE Q CEILING MOUNTED INCANDESCENT OR H.I.D. FIXTURE 10 WALL MOUNTED INCANDESCENT OR H.I.D. FIXTURE 0-0 0-0 POLE STANDARD LIGHT FIXTURE UNIT - SINGLE ARM 0-0-0 0--0-0 POLE STANDARD LIGHT FIXTURE UNIT - DOUBLE ARM ® POLE LANTERN TYPE LIGHT FIXTURE UNIT ® EXIT SIGN Z EXIT SIGN (DOUBLE FACE) ZEXIT SIGN WITH DIRECTIONAL ARROW EMERGENCY BATTERY PACK UNIT Ali I REMOTE HEAD FOR EMERGENCY BATTERY PACK UNIT SWITCHING SYMBOL MOUNTING DESCRIPTION S 48"AFF SWITCH, SINGLE POLE S 48"AFF SWITCH, DOUBLE POLE S 48"AFF SWITCH, 3-WAY S 48"AFF SWITCH, 4-WAY S 48"AFF SWITCH, DIMMER S 48"AFF SWITCH WITH PILOT LIGHT S 48"AFF SWITCH, MANUAL MOTOR STARTER, RATING AND THERMAL OVERLOADS TO MATCH MOTOR NAME PLATE DATA S 48"AFF SWITCH, MANUAL MOTOR STARTER WITH IVORY, ILLUMINATED HANDLE S 48"AFF SWITCH, MANUAL MOTOR STARTER WITH PILOT LIGHT S 48"AFF MANUAL MOTOR STARTER SWITCH FRACTIONAL HORSEPOWER O AS NOTED PHOTOELECTRIC CONTROL El R1 48"AFF LIGHTING CONTACTOR �— DESIGNATION LIGHTING CONTACTOR REMOTE PUSH-BUTTON LC-1 "ON -OFF" CONTROL REPRESENTS LIGHTING CONTACTOR BEING CONTROLLED El AS NOTED DOOR SWITCH MC AS NOTED MOTION CONTROL OCEILING MOTION SENSOR OS CEILING OCCUPANCY SENSOR PANELBOARDS SYMBOL MOUNTING DESCRIPTION TOP BREAKER 6'-0"AFF = TOP BREAKER 6'-0"AFF NEW PANELBOARD - SURFACE MOUNTED NEW PANELBOARD - FLUSH MOUNTED EXISTING PANELBOARD - SURFACE MOUNTED EXISTING PANELBOARD - FLUSH MOUNTED DUCTBANK SYMBOL KEY NEW CONDUIT, TYP. O ® � O EXISTING CONDUIT, TYP. NOTE: REFER TO DUCTBANK SCHEDULE & PLANS FOR EXACT NUMBER & SIZE OF CONDUITS. POWER SYMBOL MOUNTING DESCRIPTION WPC 36"AFF DUPLEX RECEPTACLE, 20A RATED � FOOTNOTE DELINEATES SPECIFIC DEVICE DENOTES MOUNTED 6" ABOVE COUNTERTOP REQUIREMENT - SEE ABBREVIATIONS 36"AFF SPECIAL PURPOSE OUTLET (SIZE INDICATED ON PLANS) 36"AFF SINGLE RECEPTACLE, 20A RATED 36"AFF DUPLEX RECEPTACLE -FLUSH -WITH GROUND FAULT CIRCUIT INTERRUPTER 36"AFF QUADRAPLEX RECEPTACLE, 20A RATED 18"AFF DUPLEX RECEPTACLE -FLUSH - SURGE -PROTECTIVE ]i DEVICE (SPD) FLOOR DUPLEX RECEPTACLE- FLOOR BOX -FLUSH FLOOR DUPLEX RECEPTACLE- FLOOR BOX -FLUSH - SPD SURGE -PROTECTIVE DEVICE (SPD) ® FLOOR COMBINATION DUPLEX RECEPTACLE (SPD)/VOICE OUTLET SPD PORT- (# DESIGNATES NUMBER OF VOICE PORTS) - FLOOR BOX -FLUSH `® 48"AFF COMBINATION DISCONNECT SWITCH/MOTOR STARTER MSE DESIGNATION AS NOTED MOTOR (HORSEPOWER INDICATED ON PLANS) Q AS NOTED JUNCTION BOX TRANSFORMER T-1 DESIGNATION CM AS NOTED CIRCUIT MONITOR VR 2 AS NOTED VOLTAGE REGULATOR SPD AS NOTED SURGE -PROTECTIVE DEVICE F9 48"AFF EMERGENCY POWER SHUT-OFF SWITCH Q 48"AFF LOCKABLE ON -OFF -AUTO SELECTOR SWITCH W/RED INDICATOR LIGHT EY 48"AFF DISCONNECT SWITCH DSA DESIGNATION J 480V 50KVA TRANSFORMER 1 _SIZE 120V I I I I VOLTAGES �MJ SHIELDED ISOLATION TYPE TRANSFORMER (-Y-m O EQUIPMENT CONNECTION TYPICAL ANNOTATION ODRAWING KEYNOTE CGMDP-701 PROCESS EQUIPMENT TAG ❑1 DEMOLITION KEYNOTE SF Q REVISION TAG HVAC EQUIPMENT TAG HW1 DREVISION CLOUD AREA NEMA DESIGNATION TAG F1 E-1 AAA INSTRUMENTATION TAG SAFETY SWITCH DESIGNATOR 240/30/3/15 D.E./1 VOLTAGE AMPERAGE #POLES FUSE SIZE AND TYPE NF = NON -FUSED NPL = PER NAMEPLATE OF EQUIPMENT SERVED NEMA RATING SAFETY SWITCH NOTES: 1. INSTALL ALL FUSES SO THAT LABELS ARE RIGHT -SIDE UP AND FACING OUTWARD. 2. INSTALL OXIDATION INHIBITING COMPOUND SUCH AS PENETROX IN ALL FUSE CLIPS OF SAFETY SWITCHES LOCATED OUTDOORS OR IN WET ENVIRONMENTS. CONDUIT FEEDERS AND BRANCH CIRCUITS SYMBOL DESCRIPTION E E PE PE SE SE T T FO FO CTV CTV ----EU---- ---- PEU ---- ---- SEU---- ---- TU---- ---- FOU---- ----CTVU---- -XX XX- -G G - E E NE NE OVERHEAD ELECTRIC SERVICE OVERHEAD PRIMARY ELECTRIC SERVICE OVERHEAD SECONDARY ELECTRIC SERVICE OVERHEAD TELEPHONE SERVICE OVERHEAD FIBER OPTIC OVERHEAD TELEVISION SERVICE CONDUIT - EMBEDDED IN FLOOR OR EARTH UNDERGROUND ELECTRIC SERVICE UNDERGROUND PRIMARY ELECTRIC SERVICE UNDERGROUND SECONDARY ELECTRIC SERVICE UNDERGROUND TELEPHONE SERVICE UNDERGROUND FIBER OPTIC UNDERGROUND TELEVISION SERVICE CONDUIT - IN WALL, CEILING OR EXPOSED CONDUIT WITH IDENTIFIER GROUND GRID CONDUIT TURNED UP CONDUIT TURNED DOWN CONDUIT CAPPED BRANCH CIRCUIT WIRING CIRCUIT HOME RUN IN -LINE HOME RUN — CIRCUIT NUMBER EMERGENCY ONLY CIRCUIT NORMAL EMERGENCY CIRCUIT DEVICES ON SAME CIRCUIT, SEPARATELY CONTROLLED ELECTRIC FEEDER LEGEND INDICATION ABBREVIATIONS A OR AMP AMPERE H.I.D. HIGH INTENSITY DISCHARGE P # OF POLES IN CIRCUIT BREAKER A.C. ALTERNATING CURRENT HP HORSEPOWER PH OR 0 PHASE AF FRAME AMPERE H.P.S. HIGH PRESSURE PUMP STATION PM POWER MONITOR A.F.F. ABOVE FINISHED FLOOR HSPS HIGH SERVICE PUMP STATION PMT PAD MOUNTED TRANSFORMER A.F.G. ABOVE FINISHED GRADE HVAC HEAT -VENT -AIR CONDITIONING PNL PANEL A.I.C. AMPERE INTERRUPTING CURRENT I.G. ISOLATED GROUND PSI POUNDS PER SQUARE INCH AS AMMETER SELECTOR SWITCH I.D. INNER DIAMETER PT POTENTIAL TRANSFORMER AT TRIP AMPERE IMC INTERMEDIATE METAL CONDUIT PVC POLYVINYL CHLORIDE ATL ACROSS -THE -LINE IND. INDUSTRIAL REPL REPLACE A.T.S. AUTOMATIC TRANSFER SWITCH JB JUNCTION BOX QTY. QUANTITY AUTO AUTOMATIC J.I.C. JOINT INDUSTRIAL COUNCIL RGS RIGID GALVANIZED STEEL AWG AMERICAN WIRE GAUGE KA KILOAMPERE RVSS REDUCED VOLTAGE SOLID STATE B.F.G. BELOW FINISHED GRADE KCMIL 1000 CIRCULAR MILS SC SURGE CAPACITOR BLDG. BUILDING KV KILOVOLT SCC SYSTEM CONTROL CENTER C OR COND. CONDUIT KVA KILOVOLT AMPERE SER SERVICE ENTRANCE RATED CB CIRCUIT BREAKER KW KILOWATT SM SUB -METER CKT CIRCUIT LA LIGHTNING ARRESTOR SP SPARE CID CONTROL PANEL LC LIGHTING CONTACTOR SPD SURGE -PROTECTIVE DEVICE CPT CONTROL PANEL TRANSFORMER LTG LIGHTING S.S. STAINLESS STEEL CR CONTROL RELAY MAX MAXIMUM SWBD SWITCHBOARD DESIG DESIGNATION MCB MAIN CIRCUIT BREAKER TBA TO BE ABANDONED DIA. DIAMETER mA MILI-AMP TBR TO BE REMOVED DIV. DIVISION MC MANUFACTURER'S CABLE TCC TELECOMMUNICATIONS CLOSET DPDT DOUBLE POLE, DOUBLE THROW MCC MOTOR CONTROL CENTER TDC TELECOMMUNICATIONS DISTRIBUTION CLOSET DS DISCONNECT SWITCH MFR MANUFACTURER TYP. TYPICAL E.C. ELECTRICAL CONTRACTOR MIN. MINIMUM UE UNDERGROUND ELECTRIC EHH ELECTRIC HANDHOLE M.L.O. MAIN LUG ONLY UH UNIT HEATER EMH ELECTRIC MANHOLE M.O.D. MOTOR OPERATED DAMPER UL UNDERWRITERS LABORATORY EP EXPLOSION PROOF MS MOTOR STARTER U.O.N. UNLESS OTHERWISE NOTED EUH ELECTRIC UNIT HEATER MTD. MOUNTED UT UNDERGROUND TELEPHONE E.W. EACH WAY N/A NOT APPLICABLE UV ULTRAVIOLET EX EXISTING TO REMAIN N.C. NORMALLY CLOSED V VOLT EXH EXHAUST FAN NEC NATIONAL ELECTRICAL CODE VAC VOLTS ALTERNATING CIRCUIT FU FUSE NEMA NATIONAL ELECTRICAL MANUFACTURER'S ASSOCIATION VFD VARIABLE FREQUENCY DRIVE FIRE FIBERGLASS REINFORCED EPDXY NID NETWORK INTERFACE DEVICE (4 POSITION) VS VOLTMETER SELECTOR SWITCH G.C. GENERAL CONTRACTOR N.O. NORMALLY OPEN W WIRE GEN GENERATOR NO. NUMBER W/ WITH GFCI GROUND FAULT CIRCUIT INTERRUPTER NPT NOMINAL PIPE THREADS WP WEATHERPROOF GND. OR GRID. GROUND OE OVERHEAD ELECTRIC XFMR TRANSFORMER GENERAL NOTES: A. DRAWINGS ARE DIAGRAMMATIC IN NATURE, CONTRACTOR SHALL VERIFY DIMENSIONS PRIOR TO INSTALLATION. CONTRACTOR SHALL COORDINATE ALL WORK WITH OTHER DIVISION TRADES TO PROVIDE A COMPLETE AND OPERABLE SYSTEM. LOCATE FIXTURES, DEVICES, ETC. IN ORDER TO AVOID INTERFERENCES. B. ALL WORK SHALL BE PERFORMED AS REQUIRED BY APPLICABLE SECTION OF THE NATIONAL ELECTRICAL CODE, LATEST EDITION, AND ALL GOVERNING LOCAL CODES, LAWS, AND/OR REGULATIONS. C. SYSTEM AND EQUIPMENT GROUNDING CONTINUITY SHALL BE ASSURED AS REQUIRED BY APPLICABLE SECTIONS OF THE NATIONAL ELECTRICAL CODE. D. ALL WIRING SHALL BE TYPE "THHN-THWN" U.O.N.; MINIMUM WIRING SHALL BE #12 (POWER WIRE). ALL WIRE SHALL BE COPPER. MINIMUM CONDUIT SIZE FOR METALLIC CONDUIT TO BE 3/4" AND 1" FOR PVC. E. ALL CIRCUIT PROTECTIVE DEVICES SHALL HAVE THE REQUIRED RATING INTERRUPTING CAPACITY EQUAL TO OR GREATER THAN THE AVAILABLE SHORT-CIRCUIT CURRENT AT ITS SUPPLY TERMINAL; MINIMUM INTERRUPTING CAPACITY. SHALL BE 10,000 AMPS, SYMMETRICAL A.I.C. FOR 120/208V SYSTEMS AND 14,000 AMPS, SYMMETRICAL A.I.C. FOR 277/480V SYSTEMS. REFER TO PANEL SCHEDULES FOR A.I.C. RATINGS. F. ALL OUTDOOR EXPOSED CONDUIT TO BE RIGID GALVANIZED STEEL. TRANSITION FROM UNDERGROUND TO EXPOSED SHALL BE RIGID GALVANIZED STEEL. G. ALL UNDERGROUND CONDUITS TO BE SCHEDULE 40 PVC UNLESS OTHERWISE INDICATED. ALL SPARE CONDUITS SHALL INCLUDE A NYLON PULL CORD. SCHEDULE OF DRAWINGS EO.0 . . . . ELECTRICAL LEGEND EO.1 . . . . ELECTRICAL SITE PLAN E1.0 . . . . ELECTRICAL FLOOR PLANS E5.0 . . . . ELECTRICAL DETAILS E6.0 . . . . ELECTRICAL SCHEDULES AND DIAGRAMS I IPA 55 Broad Street Asheville, NC 28801 828.252.0575 Cg NC Firm License # C-0459 mcgillassociates.com " j46 EQUINOX 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 SEAL CARO//���'/%�,, \\\ \�����•Q�pFESSIO/V;. G 036 40 = �i/� ••. FNG I NEEF;.•• ��� of i l l ll\0 NOTE: Drawings are invalid without signed stamp by professional DESIGN BY: DRAWN BY: CHECKED BY: W.FLEMING S.ROBERTS N.HUFFMAN w Q 0 U) Z O cn w W Z I Z I � Er0 o(U O U O � � > o � Z O J � Z 0 O � 0 Copyright ©2019, Equinox Environmental Consultation & Design, Inc. PHASE Bid Set DATE 03/26/2020 DRAWING SCALE NO SCALE NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable. DRAWING NAME ELECTRICAL LEGEND EOnO —'------ 2 METERBASE- MCB (SPD BELOW) LP1—,, 3/4"x10' COPPER CLAD GROUND ROD (MINIMUM 6' APART) KEYNOTES: OUNDERGROUND PIPE TO BE INSTALLED BEFORE ELECTRICAL BRANCH CIRCUIT. BRANCH CIRCUIT TO BE BURIED NO DEEPER THAN 24" AT INTERSECTION OF WATERPIPE. COORDINATE WITH PIPE INSTALLATION CONTRACTOR. ROUTE BRANCH CIRCUIT TO THE OUTSIDE OF WETLAND AND CONCRETE SIDEWALK CIRCULATION AS SHOWN ON SHEET L2.0. DO NOT ROUTE ANY BRANCH CIRCUITS THROUGH DESIGNATED WETLAND AS SHOWN ON SHEET L2.0. OCOORDINATE UTILITY SERVICE ROUTE WITH UTILITY COMPANY. OPROVIDE UL LISTED SELF REGULATING HEAT TRACE CABLE LISTED FOR WET CONDITIONS. HEAT TRACE CABLE SHALL BE A MINIMUM OF 18' LONG, 120V PLUG IN STYLE. CABLE SHALL MEET ASSE STANDARD 1060 FOR USE AS FREEZE PROTECTION. OPROVIDE ELECTRICAL HANDHOLE SIZED PER NEC 314.28. OROUTE GFCI RECEPTACLE BRANCH CIRCUIT ON THE INSIDE OF LIMIT OF DISTURBANCE LINE SHOWN. ELECTRICAL SITE PLAN 1 " = 30'-0" aft Lon a sift LOD amn IPA55 Broad Street N m Asheville, NC 28801 828.252.0575 F-1 Cg IINC Firm License # C-0459 0' 15' 30' 60' mcgillassociates.com EQUINOX 37 Haywood St. Suite 100 Asheville, INC 28801 t 828.253.6856 f 828.253.8256 SEAL \\\\ 0IIIIIIII►/////�� CARp��%,� •• ; O ESSI' i SE G 4/- 036 40 = •,/////� �� SI I ICI 111„��\\\\\�. NOTE: Drawings are invalid without signed stamp by professional DESIGN BY: DRAWN BY: CHECKED BY: W.FLEMING &ROBERTS N.HUFFMAN w 1-- 0 Z 0 cn w F—T] ry I..L W Z_ J cB z I � E r-y 0 Q(U 0 W U O � LL > o LL z O J � Z 0 O VJ 0 Copyright ©2019, Equinox Environmental Consultation & Design, Inc. PHASE Bid Set DATE 03/26/2020 DRAWING SCALE 1 " = 30'-0" NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable. DRAWING NAME ELECTRICAL SITE PLAN EOml LP1-1 LP1-2 O A GFCI, WP A -ELECTRICAL FLOOR PLAN - TRAIN PLATFORM 1 /4" = 1'-01, T 1 LP1-5 O LP1- ELECTRICAL FLOOR PLAN - PAVILION 1 /4" = V-0" 2 i fC LP1-9 LP1- 3 I - - T GFCI, WP 1.1 KEYNOTES: v PROVIDE A PHOTOCELL SWITCH WITH CIRCUITS LP1-1 AND LP1-5. LIGHT FIXTURES CONNECTED TO THESE CIRCUITS SHALL PROVIDE CONSTANT NIGHTTIME OPERATION. OELECTRICAL CONDUIT, RECEPTACLE BOXES, AND LIGHT SWITCHES SHALL BE EMBEDDED IN TIMBER POSTS. SEE ARCHITECTURAL DRAWINGS. OTYPE B FIXTURE SHALL BE PENDENT MOUNTED SO THAT BOTTOM OF FIXTURE IS 10' AFF. PROVIDE SWIVEL STYLE PENDANTS OF VARIOUS LENGTHS SO THAT ALL TYPE B FIXTURES ARE MOUNTED ON THE SAME PLANE. OPROVIDE A PHOTOCELL SWITCH AND TIMER IN ADDITION TO MANUAL LIGHT SWITCHES FOR LIGHT CIRCUITS LP1-3, LP1-7 AND LP1-9. I Fri 55 Broad Street N m Asheville, NC 28801 828.252.0575 F-1 I Cg IINC Firm License # C-0459 0' 2' 4' 8' 16' mcgillassociates.com ` ftl W 7 a�`� EQUINOX 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 SEAL \�yy1111111111/////// CARDS ''/'% SE 036�40 = :� - 'i � •. FNG I NEER ����� l qS / C. . ///////111111111111y�\\ NOTE: Drawings are invalid without signed stamp by professional DESIGN BY: DRAWN BY: CHECKED BY: W.FLEMING S.ROBERTS N.HUFFMAN w Q 0 fn z 0 w ry Q n W Z Z I � o � Q (U 0 W U O � > o ILLZ O J � Z o 0 O VJ Copyright ©2019, Equinox Environmental Consultation & Design, Inc. PHASE Bid Set DATE 03/26/2020 DRAWING SCALE 1 /4" = 1'-0" NOTE: If this drawing is not 2436" it has been revised from its original size and the scales noted on drawings/details are no longer applicable. DRAWING NAME ELECTRICAL FLOOR PLANS El ■ 0 0 0 a; J Q U w w ii W co Z_ Q 0 Y a a w Z_ J IY W > J 0 C) Z w x 0 Z 0 w 0 0 SERVICE BONDING JUMPER (NEC 250-94) LENGTH AS REQUIRED PANEL "A" DISC AHU#1 120 / 208V, 304W, 100A FED SERVICE ENCLOSURE METERBASE 3" GALVANIZED SCHEDULE 40 120/208V, 304W, 225A FED PIPE WITH GALVANIZED STEEL FROM MDP-21 INSTALLED FROM MDP-14 INSTALLED PIPE CAP, FILL WITH 12/23/2018 12/23/2018 SERVICE GROUNDING IN • G CONCRETE ELECTRODE CONDUCTOR BOND JUMPER METAL CONDUIT LiMCB LP1 GALVANIZED STEEL UNISTRUT —0 (LOCATE AS REQUIRED FOR — SPD EQUIPMENT MOUNTING) w of r BOND BUSHING ON Na ...................................... CONDUIT PANEL "AA" (NEC 250-64e) LIGHT DIMMER O 2 120/208V, 304W, 225A SUB -FED UNSPLICED SERVICE GROUNDING w CIRCUIT BOX FROM PANEL "A" INSTALLED ELECTRODE CONDUCTOR RUN TO 1. METALLIC COLD WATER PIPE = O 12/23/2018 2. STEEL FRAME OF BUILDING. 3. GROUND RODS. BONDING HUB ON CONDUIT (NEC 250-64e) a ° a a �, FINISHED GRADE a a° < a SERVICE GROUNDING ELECTRODE \ /\\\\\\ \ jj\ j\\ j NOTES: 1. REFER TO SPECIFICATION SECTION 260553 FOR ADDITIONAL INFORMATION. 2. SUBMIT COMPLETE LIST OF PROPOSED NAMEPLATES TO ARCHITECT/ENGINEER FOR APPROVAL PRIOR TO FABRICATION. FRONT 1 TYPICAL NAME PLATE DETAIL 2 SERVICE ENTRANCE EQUIPMENT GROUNDING E5.0 NOT TO SCALE a , a E5 0 NOT TO SCALE I I I I a #6 GRID. TO EQUIPMENT ° 4 a a GROUND BUS a 4 M #10 NEUTRAL TO � a a ° a a NEUTRAL BUS a a P � a #10 PHASE CONDUCTORS PNL LPA a a MAIN LUGS OF FEEDER TYPE 'GT' CADWELD TAP AS REQUIRED PLAN NOTE: 1" RGS CONDUIT ENCLOSURE O BOTTOM OF ALL PANELS SHALL BE LOCATED A MINIMUM OF 2' ABOVE O o DOOR FLOOD PLAIN. FLOOD PLAIN AT SWITCHRACK LOCATION IS 1959' ASL. GROUNDING ELECTRODE o o TOP OF ALL PANELS SHALL BE LOCATED NO HIGHER THAN 6'-7" CONDUCTOR A0 ABOVE CONCRETE PAD. ADJUST WIDTH AND HEIGHT OF SWITCHRACK SPD PANEL PROTECTION UNIT TO ACCOMMODATE MOUNTING REQUIREMENTS. WITH "NORMAL" AND "COMMON" B0 MODE PROTECTION AND\ PROVIDE A DIMMER FOR TRAIN PLATFORM TYPE A FIXTURES IN A DISCONNECTING MEANS K3'�SWITCHRACK DETAIL NEMA 3R LOCKABLE BOX. co E5 0 NOT TO SCALE 3/4" x 10'-0" COPPERCLAD STEEL GROUND ROD 0 0 O O PANELBOARD/ENCLOSED CIRCUIT BREAKER 5 CABLE TO GROUND ROD CONNECTION 6 SPD DETAIL E5 0 NOT TO SCALE E5.0 NOT TO SCALE METALLIC EQUIPMENT ENCLOSURE FINISHED GRADE \��\�� ��\�� EQUIPMENT GROUND I I I —I I —III I I —I I I —I I I=I COPPER LUG RATED FOR (— CONDUCTOR III —III —III III=III—III— SUITABLE BACKFILL CONDUIT BOND 1 /4" GALVANIZED BOLT III —III —III —III —III —I I =_ ELECTRICAL WARNING TAPE cV IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII COMPACTED WASHED STONE SCREENINGS SCHEDULE 40 PVC CONDUITS. NUMBER OF Z CONDUITS AS INDICATED ON DRAWING NUT UNDISTURBED ROCK OR SOIL 3" 3" 3" LOCK WASHER MIN. MIN. MIN. NOTES: 1. ALL TRENCHING, BEDDING, AND BACKFILLING BY THE SITE CONTRACTOR. 2. ELECTRICAL CONDUIT AND CONDUCTORS SHALL BE INSTALLED BY THE ELECTRICAL CONTRACTOR. NOTES: 1. ONE WIRE PER LUG HOLE. USE MULTIPLE BARREL LUGS AS REQUIRED. 3. CONTRACTOR TO RESTORE SITE TO EXISTING CONDITION. 2. SCRAPE PAINT FROM UNDER LUG TO ASSURE METAL CONTACT. 55 Broad Street Asheville, NC 28801 9 TYPICAL EQUIPMENT GROUNDING E TYPICAL SITE ELECTRICAL TRENCH DETAIL 828.252.0575 NC Firm License # C-0459 10 NOT TO SCALE E5.0 NOT TO SCALE mcgillassociates.com ,00 EQUINOX 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 SEAL 00t�CARO//���'/%�,, \\\ \�����•Q�pFESSIpN9C•�!i'9 �ii S 036 �40 = 1'''\••. FNG I NEEF;.•• � 4 S C . \���` NOTE: Drawings are invalid without signed stamp by professional DESIGN BY: DRAWN BY: CHECKED BY: W.FLEMING S.ROBERTS N.HUFFMAN w Q 0 U) Z O c� W Q W Z J (B ill Cp � 0 Cp O W U O 3: o ILL.Z > O J � Z 0 O � Copyright ©2019, Equinox Environmental Consultation & Design, Inc. PHASE Bid Set DATE 03/26/2020 DRAWING SCALE AS SHOWN NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable. DRAWING NAME ELECTRICAL DETAILS E5n0 LUMINAIRE SCHEDULE TYPE MANUFACTURER CATALOG NUMBER LAMPS INPUT WATTS MT. HEIGHT REMARKS VOLTS NO. TYPE WATTS TECH LIGHTING 7000WSN02-11—Z—LEDWD 28 TO BE LOCATED ON TRAIN PLATFORM A ULTRALIGHTS 19415—CB—OA-02—DIMO-10 8 LED 17 10' WET LISTED 120 WAC DS—WD05—S-35S—BZ 25 PROVIDE WITH 0-10V DIMMING GOTHAM — — — — — — UZI U— WL—DN A 15 TO BE LOCATED AT PAVALION B LIGHTOLIER C6PDL-10835MZ-10UCCA 12 LED 22 10' WET LISTED 120 SPECTRUM C0611XT-10L-35K—MD—DS10X—WL—TCY—NL—PM—PT 1 18 PROVIDE WITH 0-10V DIMMING NOTES: PROVIDE CONTROL WIRES FOR DIMMING CONTROL IN 3/4" C FOR ALL LIGHTING CIRCUITS 240/120V SINGLE PHASE SERVICE 1 BY UTILITY 25KVA XFMR 1(A #8 AWG GRC ELECTRODE CONDUCTOR 3/4%10' COPPI CLAD GROUND ROD (TYPICAL) 'u SPD NEMA 3R 6 G, 1" C " C SILVERLINE PARK ONE -LINE NOT TO SCALE KEYNOTES: OCOORDINATE UTILITY SERVICE WITH UTILITY COMPANY. 55 Broad Street Asheville, NC 28801 828.252.0575 NC Firm License # C-0459 mcgillassociates.com EQUINOX 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 SEAL �CARO//�/'/,,, \�����•Q�pFESSIpN9C•�!i'9 �ii SE 036 �40 = �///111111111\\\\ NOTE: Drawings are invalid without signed stamp by professional DESIGN BY: DRAWN BY: CHECKED BY: W.FLEMING S.ROBERTS N.HUFFMAN w Q 0 U) z 0 cn w I y n W Z_ J cB Z I � E ry 0 Q(U O W U O � > o LL z O J � Z 0 O � 0 Copyright ©2019, Equinox Environmental Consultation & Design, Inc. PHASE Bid Set DATE 03/26/2020 DRAWING SCALE NO SCALE NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable. DRAWING NAME ELECTRICAL SCHEDULES AND DIAGRAMS E6n0