HomeMy WebLinkAbout20200475 Ver 1_More Info Received_20200416Strickland, Bev
From: John Hood <JHood @carolinacat.com>
Sent: Thursday, April 16, 2020 9:23 AM
To: Perez, Douglas J
Subject: [External] 151 Old Arborway
Attachments: 20200416_090729.pdf
= External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
M2MMhWnc.,Lov
CAUTION: This email originated from outside of the organization. Do not click links or open attachments
unless you recognize the sender and know the content is safe.
Doug;
Here is signed Catawba form; let me know if you need anything else
Thanks for your help on this. Stay safe
John Hood
Carolina CAT I Used Equipment Manager
T. 704-731-7298 1 C. 704-506-6566 1 Charlotte, NC
ihood@carolinacat.com I carolinacat.com [carolinacat.coml
vaI�M" NC
rlin11M
CATAWBA RIPARIAN BUFFER NOTIFICATION FORM
Project Name/address: ScGtyo County: L
Owner.
Print
Contractor/agent:_Z
Print
The approval is for the purpose and design described in your application. Impacts not indicated in the
application is a violation of the Buffer Rule. Site specific work should be provided in the application. (15A NCAC
02H .0506 and 15A NCAC 02B .0243(8)]
Trees are not allowed to be removed from Zone 1 of the Buffer (within 30 it of the full pond elevation), unless
approved. Exception, those trees that are severely undermined along the immediate shoreline can be removed.
Minimal shaping and sloping along the immediate shoreline is allowed. [15A NCAC 02B .0243(6)]
Benching and grading in the buffer is not allowed. Excessive disturbance of ground cover. [15A NCAC 02B .0243
(6)]
Beaches, impervious patios, impervious walkways, etc. are not allowed in the buffer unless specifically approved
by the Division. There are limitation on size for decks. [15A NCAC 02B .0243(4) and (6)]
Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The
work corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction
material must be outside the buffer. [15A NCAC 02H .0502 and i5A NCAC 02B .0243 (4), (6), (8)]
Stormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater
discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or
sheet flow at non -erosive velocities to the lake. [15A NCAC 02B .0243(5), (6)]
Acknowledgementfrof Nod�bc]�a�tion
(j
I, o R a; � tiFi( C� hereby state that I have been informed of the Catawba
Riparian Buffer Rule. Any work conducted in the buffer, not specifically stated in the application and approved
by the Division of Water Resources (DWR), is a violation and subject to enforcement. Due diligence will be
taken such that the construction will be built within substantial compliance and intent of the 401 Water
Quality Certification and Buffer Rules, the approved plan(s) and specification(s), and other supporting
materials.
Signature (owner): % s� 6 A Date: F fb ZOZ(7