HomeMy WebLinkAboutNCG140482_Application_20200416April 10, 2020
Stormwater Permitting Unit Program ANN
Division of Energy, Mineral and Land Resources
1612 Mail Service Center DENR-LAND QUALITY
Raleigh, North Carolina 27699-1612 STJRMWATER PERMITTING
RE: Notice of Intent for Permit No. NCG140000
McCarthy Improvement Company
McCarthy Greensboro Elm Street Concrete Batch Plant
Stormwater Permitting Unit:
Terra Consulting, LLC is submitting the enclosed Notice of Intent (NOI) for General Permit No.
NCG140000 on behalf of McCarthy Improvement Company for the operation of a concrete batch plant to
be located at the I-73/North Elm Street Interchange in the City of Greensboro in Guilford County.
No land disturbance permit is required for this site because the plant will be installed within the permitted
area of the NCDOT Guildford County Greensboro Outer Loop project.
The project is contracted to begin paving operations in June of 2020.
The following items are enclosed:
• Notice of Intent form plus attachments to provide space to adequately answer questions;
• A check for the $100.00 application fee;
• North Carolina Secretary of State Certificate of Authorization;
• Attachment A — Additional Information for Questions;
• Attachment B — Description of Processes Producing Wastewater; and
• 2 copies of the Site Plan including an inset USGS topographic map showing the site location.
If you require additional information please contact me at jacki@terraconsultingllc.com or 770-573-3055
or Kyle Smith at (563) 726-2998 or ksmith@mccarthyimprovement.com.
Sincerely,
2'1-- - '/y'
Jacki Congleton
Senior Project Manager
Enclosure
cc: Kyle Smith, McCarthy Improvement Company, Inc.
P.O. Box 1738 0 Carrollton, GA 30112 0 Office: 770-573-3055 0 www.terraconsultingllc.com
FOR AGENCY USE ONLY
M Division of Energy, Mineral and Land Resources
Stormwater Program
National Pollutant Discharge Elimination System
Environmental Quality NCG140000
NOTICE OF INTENT
Year
to
National Pollutant Discharge Elimination System application for coverage under General Permit NCG140000:
STORMWATER AND PROCESS WASTEWATER DISCHARGES associated with activities classified as:
SIC (Standard Industrial Classification) Code: 3273 and like activities
Ready Mixed Concrete
This NOI may be an application to discharge process wastewater. NCG140000 contains effluent limitations
for process wastewater discharges. Wastewater discharges must meet the requirements of these effluent
limitations. An exceedance of any of these limitations will result in a violation of the permit conditions.
For questions, contact the DEMLR Central Office or Regional Office in your area. (See page 8)
(Please. print or type.)
1) Mailing address of owner/operator (official address to which all permit correspondence will be
mailed):
Legal Company Name McCarthy Improvement Company
(Please attach the most recent Annual Report to the NC Secretary of State showing the current legal name. Alternatively
this permit can be given to an individual.)
Signee's Name (as signed for in question 28 below) Kyle Smith
2)
Street Address 1466 Sullivan Road
City Atlanta
Telephone No. (563)726-2998
Alternate ContactName Austin Klintworth
Alternate Contact Telephone (if different)
Location of facility producing discharge:
Facility Name
Street Address
City
County Facility
Contact
Telephone No.
State GA ZIP Code 30337
Email Ksmith@mccarthyimprovement.com
Email (if different) aklintworth@mccarthyimprovement.com
(563)594-9837
McCarthy Greensboro Elm Street Concrete Batch Plant
1-73/North Elm Street Interchange
Greensboro State NC ZIP Code 27455
Guilford County
Kyle Smith
(563) 726-2998 Email ksmith(EDmccarthyimprovement.can
3) Physical location information:
Please provide narrative directions to the facility (use street names, state road numbers, and distance and
direction from a roadway intersection). See Attachment A
(A copy of a county map or USGS quad sheet with facility clearly located on the map is a required part of this application.)
4) Latitude 36° 08' 19.14" W Longitude 79° 47' 59.89" W (deg., min, sec or decimal)
Page 1 of 8
SWU-NCG14-NOI Last revised 9/01/2017
NCG140000 N.O.I.
5) This NPDES Permit Application applies to the following (check all that apply):
e New or Proposed Facility Date operation is to begin ,June 15, 2020
❑ Existing Facility Date operation began
Consultant's application information:
Consultant: Jacki Congleton
Consulting Firm: Terra Consulting, LLC
Mailing Address: P.O. Box 1738
CItV: Carrollton
State. GA
Phone: (770 ) 573-3055
Email: Jacki@terraconsultingllc.com
Zip Code: 30112
(Optional)
Staple Business Card Here:
7) Provide the 4 digit Standard Industrial Classification Code (SIC Code) that describes the primary
industrial activity at this facility:
SIC Code: 3 2 7 3
8) Provide a brief description of the types of industrial activities and products produced at this facility:
(Attach a site diagram showing the process areas present at this facility.)
See Attachment A and Site Mar).
Stormwater Discharge, Wastewater Treatment & Discharge and Permitting Information
9) Discharge points / Receiving waters:
What is the name of the body or bodies of water (creek, stream, river, lake, etc.) that the facility stormwater
and/or wastewater discharges will end up in? Unnamed tributary to Richland Lake and Richland Lake (also referred to as Lake Jeanette).
To find the waterbody, please see the NC Surface Waterbody Classifications map at
https://deq.nc.gov/about/divisions/water-resources/water-resources-science-data
Receiving water classification(s) for the waters: WS-111; NSW
If the site will discharge to a separate storm sewer system, name the operator of the separate storm sewer
system (e.g. City of Raleigh municipal storm sewer). city of Greensboro
Page 2 of 8
SWU-NCG14-NOI Last revised 8/01/2017
NCG140000 N.O.I.
List discharge points (outfalls) that convey discharge from the site (both on -site and off -site) and location
coordinates. Attach additional sheets if necessary, or note that this information is specified on the site plan.
Be sure to indicate a type for each outfall listed below as Stormwater only, Wastewater only or Wastewater
Commingled with Stormwater
Outfall No. 1 Stormwater only ❑ Wastewater only
Latitude (degrees/minutes/seconds): 36° 08' 19.08" N
Longitude (degrees/minutes/seconds): 79° 48' 03.23" W
Outfall No. 2 Stormwater only
Latitude (degrees/minutes/seconds):
Longitude (degrees/minutes/seconds):
IM
W
❑ Wastewater only
36° 08' 20.41" N N
79' 48' 05.49 W W
Outfall No. 3 Stormwater only ❑ Wastewater only
Latitude (degrees/minutes/seconds): 36° 08' 21.08" N
Longitude (degrees/minutes/seconds): 79° 48' 02.69" W
Outfall No. Stormwater only
Latitude (degrees/minutes/seconds):
Longitude (degrees/minutes/seconds):
Outfall No. Stormwater only
Latitude (degrees/minutes/seconds):
Longitude (degrees/minutes/seconds):
Outfall No. Stormwater only
Latitude (degrees/minutes/seconds):
Longitude (degrees/minutes/seconds):
Outfall No. Stormwater only
Latitude (degrees/minutes/seconds):
Longitude (degrees/minutes/seconds):
❑ Wastewater only
❑ Wastewater only
❑ Wastewater only
❑ Wastewater only
W
N
W
N
M
_ N
W
_ N
W
Wastewater Commingled with Stormwater
Wastewater Commingled with Stormwater
Wastewater Commingled with Stormwater
Wastewater Commingled with Stormwater
Wastewater Commingled with Stormwater
Wastewater Commingled with Stormwater
Wastewater Commingled with Stormwater
Will this facility discharge wastewater to SA (Shellfish) waters? ❑ Yes MNo
Note: Discharge of process wastewater to receiving waters classified as Critical Area (CA) must be
reviewed by the N.C. Division of Water Resources, Public Water Supply Section ahead of
approval. No new discharges of process wastewater are permitted in receiving waters
classified as WS-1 or freshwater ORW.
You must show all discharge points clearly on the submitted site plan. Be advised that
NCDEQ may require you to apply for an individual permit, based on proposed discharge rates
and receiving stream conditions (low flows, impairments, etc.)
Page 3 of 8
SWU-NCG14-NOI Last revised 8/01/2017
NCG140000 N.O.I.
10) Each applicant shall provide the following information (attach additional sheets as necessary):
• Two (2) site plans depicting the facility or site with numbered outfalls which indicate stormwater and
wastewater outfalls. The plans shall legibly show. at a minimum, (existing or proposed):
o Outline of drainage areas with topographical lines and features
o Stormwater/wastewater treatment structures
o Location of numbered stormwater/wastewater outfalls (corresponding to which drainage areas)
o Runoff conveyance structures
o Areas and acreage where materials are stored
o Impervious area acreages
o Location(s) of streams and/or wetlands the site is draining to, and any applicable buffers
o Site property lines, North Arrow, and bar scale
o If applicable, the 100-year floodplain line
o Acreage of each stormwater and wastewater topographical area
o Each of the facilities' wastewater or stormwater source and discharge structures and each of its
hazardous waste treatment, storage, or disposal facilities
o Site location (insert)
Site plans shall be 24" x 36" in size.
• Line drawing and description: A line drawing of the water flow through the facility. A pictorial description
of the nature and amount of any sources of water and any collection and Lredtrnent measures.
• A narrative description and identification of each type of process, operation, or production area which
contributes wastewater to the effluent for each outfall, and a description of the treatment the wastewater
receives (or will receive), including the ultimate disposal of any solid or fluid wastes other than by
discharge. Processes, operations, or production areas may be described in general terms (e.g. "ash
silo").
11) Does the applicant have any unresolved Notice of Violations (NOVs)?
IN No []Yes
Wastewater:
12) What types of wastewater does your facility generate or discharge?
Type of Authorized Wastewater
Generate
Discharge
Sent to WW
Treatment
System
Vehicle and equipment cleaning VE
a
a
❑
Wetting of raw material stockpiles RM
0
0
❑
Mixing drum cleaning MD
❑✓
❑
Further explanation, if necessary: see Attachment B
13) Will your facility spray -down or actively wet aggregate piles?
❑ No Q Yes
14) Does the facility use any of the following on site?
❑ Phosphorus -containing Detergents
❑ Brighteners ❑ Other Cleaning Agents
❑ Non -Phosphorus -containing Detergents
❑ Other: NA
Page 4 of 8
SWU-NCG14-NOI Last revised 8/01/2017
NCG140000 N.O.I.
15) Are wastewater treatment facilities planned in the 100-year flood plain?
ID No ❑ Yes
16) Will your facility build a closed -loop recycle system (CLRSs) that meets design requirements in 15A
NCAC 02T .1000 and hold your facilities' working volume'?
❑ Yes ❑✓ No
If Yes, STOP COMPLETION of this permit. Contact DWR Non -Discharge Permitting Program for permitting
requirements.
17) A wastewater treatment alternatives review is required by 15A NCAC 2H.0105 (c)(2) for any new or
expanding water pollution control facility's discharge in North Carolina. You may attach additional sheets.
a) What wastewaters were considered for this alternatives review? I9 VE N RM ED MD
b) Connection to a Municipal or Regional Sewer Collection System:
i) Are there existing sewer lines within a one -mile radius? ..................................... ❑✓ Yes m No
(1) If Yes, will the wastewater treatment plant (WWTP) accept the wastewater? .... ❑✓ Yes ❑
(a) If No, please attach a letter documenting that the WWTP will not accept the wastewater.
(b) If Yes, is it feasible to connect to the WWTP? Why or why not?*
See Attachment A (17.b)
c) Surface or Subsurface Disposal System (e.g., spray irrigation):
No
i) Is a surface or subsurface disposal technologically feasible (possible)? ....................9 Yes ❑ No
Why or Why not? See Attachment A
ii) Is a surface or subsurface disposal system feasible to implement?*...........................9 Yes ❑ No
Why or Why not? See Attachment A
iii) What is the feasibility of employing a subsurface or surface discharge as compared to a direct
discharge to surface waters?* See Attachment A.
d) Direct Discharge to Surface Waters: Is discharge to surface waters the most environmentally sound
alternative of all reasonably cost-effective options of the wastewaters being considered?*... 8 Yes ❑ No
i) If No, contact DEMLR's Land Application Unit to determine permitting requirements.
e) If this review included all wastewater discharge types, would excluding some types (e.g. raw
stockpile wetting) make any of the above non -discharge options feasible? .............. ❑ Yes IN No
* You may be asked to provide further information to support your answers to these questions after the initial review.
Feasibility should take into account initial and recurring costs.
Page 5 of 8
SWU-NCG14-NOI Last revised 8/01/2017
NCG140000 N.O.I.
Stormwater:
18) Does this facility employ any best management practices for Stormwater control? ❑ No 0 Yes
If yes, please briefly describe: seeAttachmentA
19) Does this facility have. a Stormwater Pollution Prevention Plan? ❑ No 0 Yes
If yes, when was it implemented? The SPPP will be completely implemented before the commencement of operations.
20) Are vehicle maintenance activities (VMA) occurring or planned at this facility? p No ❑Yes
If yes, does your VMA area discharge into your wastewater treatment device? ❑ No ❑ Yes
Other/Permitting:
21) Does this facility have a Division of Land Resources Erosion & Sedimentation Control (E&SC) Permit?
❑✓ No ❑ Yes
If yes, list the permit numbers for all current E&SC permits for this facility:
22) Is your facility subject to Phase II Post -Construction Area? 0 No ❑ Yes
If yes, who is the permitting authority? NA
23) Is your facility located in one of the 20 Coastal Counties? ❑ Yes ❑✓ No
NA
Is your facility adding more than 10,000 ft2 of built -upon area or CAMA Major Permit? ❑ Yes 0 No
24) Is your facility discharging wastewater (treated or untreated) such as water from wetting of aggregate piles, drum
rinse -out, or vehicle and equipment cleaning to a stormwater BMP? ❑ No p Yes
If yes, please attach your approval from the permitting authority to do so. See Attachment A
25) Does this facility have any other NPDES permits? 0 No ❑ Yes
If yes, list the permit numbers for all current NPDES permits for this facility: NA
26) Does this facility have any Non -Discharge permits (ex: recycle permits)? ❑✓ No ❑ Yes
If yes, list the permit numbers for all current Non -Discharge permits for this facility: NA
27) Hazardous Waste:
a) Is this facility a Hazardous Waste Treatment, Storage, or Disposal Facility?
❑✓ No ❑ Yes
b) Is this facility a Small Quantity Generator (less than 1000 kg. of hazardous waste generated per month) of
hazardous waste?
✓❑ No ❑Yes
c) Is this facility a Large Quantity Generator (1000 kg. or more of hazardous waste generated per month) of
hazardous waste?
❑✓ No ❑ Yes
d) Type(s) of waste:
How Is material stored: Used maintenance oils and fluids are removed from the site at the time of the maintenance or maintained
Where Is material stored: in a double -walled used -oil container located at the parts trailer.
Page 6 of 8
SWU-NCG14-NOI Last revised 8/01/2017
NCG140000 N.O.I.
How many disposal shipments per year: _
Name of transport / disposal vendor: TBD
Vendor address: TBD
one
Final Checklist
This application will be returned as incomplete unless all of the following items have been included:
Check for $100 made payable to NCDEQ.
Sa&?"-This completed application and all supporting documentation. See Question 10.
❑ If an Erosion & Sedimentation Control (E&SC) Plan is required from Division of Land Resources (DLR) or
local designee: documentation verifying applicant has developed and submitted that Plan to the governing
agency (required per 15A NCAC 02H .0138).
Rl-"Two (2) site plans depicting the site plan with numbered outfalls which indicate stormwater and wastewater
1- f outfalls. See Question 10.
20 A county map or USGS quad sheet with location of facility clearly marked.
28) Signatory Requirements (per 40 CFR 122.22)
All applications, reports, or information submitted to the Director shall be signed and certified.
a. All notices of intent to be covered under this General Permit shall be signed as follows:
(1) For a corporation: by a responsible corporate officer. For the purpose of this permit, a responsible corporate officer means: (a) a
president, secretary, treasurer or vice president of the corporation in charge of a principal business function, or any other person who
performs similar policy or decision making functions for the corporation, or (b) the manager of one or more manufacturing production or
operating facilities employing more than 250 persons or having gross annual sales or expenditures exceeding 25 million (in second quarter
1980 dollars), if authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures.
(2) For a partnership or sole proprietorship: by a general partner or the proprietor, respectively; or
(3) For a municipality, state, federal, or other public agency: by either a principal executive officer or ranking elected
official.
Certification: North Carolina General Statute 143-215.6 B(i) provides that:
Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other
document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of
a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate
any recording or monitoring device or method required to be operated or maintained under this Article or rules of the [Environmental
Management] Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten
thousand dollars ($10,000).
I hereby request coverage under the referenced General Permit. I understand that coverage under this permit will
constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual
permit.
I certify that I am familiar with the information contained in this application and that to the best of my knowledge
and belief such information is true, complete, and accurate.
Printed Name of P rson Signing: Kyle Smith
Title: Pr ]ect ageC
(Signature of Ap
(Date Signed)
Page 7 of 8
SWU-NCG14-NOI Last revised 8/01/2017
NCG140000 N.O.I.
Notice of Intent must be accompanied by a check or money order for $100.00 made payable to: NCDEQ
Mail the entire package to:
DEMLR - Stormwater Program
Dept. of Environmental Quality
1612 Mail Service Center
Raleigh, North Carolina 27699-1612
Note
The submission of this document does not guarantee the issuance of an NPDES permit.
For questions, please contact the DEMLR Regional Office for your area.
DEMLR Regional Office Contact Information:
Asheville Office ......
(828) 296-4500
Fayetteville Office ...
(910) 433-3300
Mooresville Office...
(704) 663-1699
Raleigh Office ........
(919) 791-4200
Washington Office ...
(252) 946-6481
Wilmington Office ...
(910) 1964215
Winston-Salem ......
(336) 771-5000
Central Office .........
(919) 807-6300
Page 8 of 8
SWU-NCG14-NOI Last revised 8/01/2017
Attachment A
NCG140000 N.O.I. Additional Information for Questions
McCarthy Improvement Company, Inc.
McCarthy Greensboro Elm Street Concrete Batch Plant
3. Physical location information:
The facility is located at the construction site of the Guilford County Greensboro Outer Loop on the northeast side
of Greensboro.
Driving directions to the site:
From Raleigh, NC, proceed approximately 73 miles west on Interstate 40 to Exit 227 and exit onto I-785/840
West. Continue on I-785/840 West to US 29. Merge onto US-29 South (O'Henry Blvd). Proceed 2.4 miles to
the Cone Blvd exit. Turn right onto East Cone Blvd and proceed 1.9 miles to North Elm Street. Turn right onto
North Elm Street, and proceed 2.4 miles to Kenneth Road. Turn left on Kenneth Road, and park in the work area
parking/equipment yard immediately on the right. The batch plant site is located approximately 650 feet to the
northeast of the parking area.
8. Description of Industrial Activities
This batch plant will provide concrete for the paving of the Guilford County Greensboro Loop from US 29, North
of Greensboro, to East of Lawndale.
This facility will manufacture concrete, which is transported by dump truck to the area where lanes are being
paved. The primary components of the facility include the production plant, aboveground storage tanks that
contain diesel fuel and concrete admixtures, storage trailers and a silo that contain cement, as well as sand and
aggregate stored in open stockpiles. The manufacturing process requires moving aggregate and sand from
stockpiles to the processing plant using front-end loaders and conveyors. Cement is pneumatically added to the
sand and aggregate and processed in the mixing drum with water. The concrete is then loaded into dump trucks
for delivery to the paving project.
12. Type of Wastewater
A combination of wastewater and stormwater will be discharged from this facility's outfalls intermittently during
the approximately 6 months the plant is expected to operate at this site. Wastewater from the truck bed and drum
washout will be comingled with stormwater only when the plant is in operation. On the days the plant is
operating, the wastewater described in Attachment B will be generated.
17. Wastewater Treatment Alternatives Review
(b) This facility will be operated at this site for approximately six (6) months. Because of the cost involved
and potential delays to the NCDOT project as a result of permitting and construction required to temporarily
direct the wastewater from the identified sources to the sewer system, this option is not considered feasible for the
short period of time the plant will operate at this location.
(c) Surface or Subsurface Disposal Systems
(i) It is technically possible to use the recycled water from the truck bed washout recycling system for
dust suppression. It is also possible to treat and dispose of wastewater from the site through the existing
sediment basins and underground drainage system installed for the highway construction.
(ii) It is possible to use the recycled water from the truck bed washout recycling system for dust
suppression as well as for re -use in the washout system.
(iii) These methods of surface disposal and re -use are feasible and will be implemented.
18. Best Management Practices (BMP)
(1) Riprap protection has been installed around all catch basins within the plant site.
(2) Sediment basins, check dams, and riprap inlet protection at all catch basins installed by for the highway
construction in and around the plant industrial site will be maintained during the period the plant operates at
this site.
(3) All areas within the plant site that were previously disturbed as part of the highway construction will be
stabilized with 4 to 6 inches of graded aggregate base (GAB) or vegetated with permanent vegetation.
(4) All parts and maintenance oil, grease, and fluids will be stored in closed containers inside the parts trailer or
inside the double -walled used -oil container at all times.
(5) Diesel fuel kept on site to fuel material handling equipment will be stored in a 1,000 gallon double -wall tank
inside of a portable containment dike.
(6) The double -wall steel diesel storage tank used to store fuel for the generator is located inside the generator
trailer.
(7) Regular inspections of potential sources of pollution are conducted.
24. Discharging wastewater to a BMP
The operation of this facility is a NCDOT project and will be discharging to existing sediment basins and
underground drainage system.
2
Attachment B
NCG140000 N.O.I. Additional Information for Questions
McCarthy Improvement Company, Inc.
McCarthy Raleigh Durham Airport Concrete Batch Plant
Description of Processes Producing Wastewater
Three processes at this facility will potentially contribute wastewater to the effluent from the outfall.
Wastewater Source 1:
Wastewater Source 1 is the concrete batch plant mixing drum. The drum on the plant will be washed out once per
day, on days the plant is operating. The wastewater produced from each washout is approximately 800 gallons
per day. This wastewater is captured in the upturned bucket of a front end loader and transported to the closest
truck bed washout recycling pit located on the site, where it is discharged from the bucket.
Wastewater Source 2:
Wastewatei Source 2 is the li uck bed washout used to washout the beds of the dump trucks used to transport the
concrete to the area being paved. The plant anticipates producing a maximum of 180 truckloads per day and the
trucks will be washed out after every second trip. Each washout will use approximately 50 gallons of water. The
anticipated volume of wash water generated will be approximately 4,500 gallons per day. The wash water will be
contained and recycled through a series of three settling pits designed to allow suspended particles to settle out of
the wash water. The dimensions of each pit will be 20 feet by 20 feet by 8 feet deep. The combined holding
capacity of the pits is approximately 200,000 gallons. The water in the third pit will be recycled as wash water or
used for dust suppression on the site. Solids will be removed from each pit when the volume occupied by the
solids equals one half of the designed holding capacity of the pit. The solids are allowed to dry and are properly
disposed of. If wash water is spilled or leaks from the recycling system or the washout area, it would flow to a
sediment basin adjacent to the washout pits, and from there would travel to a drop inlet already installed for the
highway being constructed. From here, it would ultimately be discharged via an underground stormwater pipe to
an unnamed tributary to Richland Lake (also referred to as Lake Jeanette). Fifteen inches of freeboard will be
maintained in the third washout pit at all times to accommodate a 10 year rain event (4.9 inches) over the three
ponds.
Wastewater Source 3:
Wastewater Source 3 includes the aggregate stockpiles. The aggregate stockpiles will be wetted using a lawn
sprinkler and hose. The sprinkler will be rotated around each stockpile during the day to cover all parts of each
pile. Wetting the aggregate stockpiles is done to produce evaporative cooling of the stone. The evaporation of
the water during this sprinkling process reduces the volume of water that ultimately flows away from the
stockpiles. Wetting is not used on the sand stockpile. Per DOT specifications, both the aggregate and sand are
washed prior to being delivered to the site, reducing the potential fines in stormwater runoff from the area covered
by the stockpiles. Wetting of the aggregate stockpile will be conducted up to 24 hours per day when the plant is
operating during summer months. The wastewater from the aggregate stockpile will consist of water from the
wetting of the stone and stormwater that falls on the pile. Wastewater from the sand stockpile will consist of only
stormwater that falls on the pile. Stormwater and wastewater from the stockpiles will flow to a drop inlet already
installed for the highway being constructed where it would ultimately be discharged to an unnamed tributary to
Richland Lake (also referred to as Lake Jeanette).
NORTH CAROLINA
Department of the Secretary of State
'b ^nu a. ve y.US
�roa»w.,w
CERTIFICATE OF AUTHORIZATION
I, Elaine F. Marshall, Secretary of State of the State of North Carolina, do hereby
certify that
MCCARTHY IMPROVEMENT COMPANY
a corporation organized under the laws of Iowa was authorized to transact
business in the State of North Carolina by issuance of a certificate of authority on the 9th
day of April, 2002.
I FURTHER certify that the said corporation's certificate of authority is not
suspended for failure to comply with [lie Revenue Act of the State of North Carolina; that
the said corporation's certificate of authority is not revoked for failure to comply with the
provisions of the North Carolina Business Corporation Act; that its most recent annual
report required by G.S. 55-16-22 has been delivered to the Secretary of State; and that a
certificate of withdrawal has not been issued in the name of the said corporation as of the
date of this certificate.
IN WITNESS WHEREOF, I have hereunto set
my hand and affixed my official seal at the City
of Raleigh, this 8th day of April, 2020.
MAXPRIN "Xi
Scan to verify online.
Certification# 106973527-1 Reference# 16078393- Page: 1 of 1 Secretary of State
Verify this certificate online at http://www.sosnc.gov/verification