Loading...
HomeMy WebLinkAbout20190559 Ver 2_Stormwater Report_2019-04-23_20200414 kimley-horn.com 421 Fayetteville Street, Suite 600, Raleigh, North Carolina 27601 919.677.2000 STORMWATER AND EROSION CONTROL IMPACT ANALYSIS FOR IGLESIA DE DIOS PRIMEROS FRUTOS LOCATED IN: BARBER MILL ROAD AND DAIRY ROAD CLAYTON, NORTH CAROLINA 27520 PREPARED FOR: PROUTEY CONSTRUCTION PREPARED BY: KIMLEY-HORN AND ASSOCIATES, INC. 421 FAYETTEVILLE ST. SUITE 600 RALEIGH, NORTH CAROLINA 27601 NC CERT. OF AUTH: F-010 KHA PROJECT #015057000 4/23/2019 kimley-horn.com 421 Fayetteville Street, Suite 600, Raleigh, North Carolina 27601 919.677.2000 Disclosure Statement: This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc. kimley-horn.com 421 Fayetteville Street, Suite 600, Raleigh, North Carolina 27601 919.677.2000 TABLE OF CONTENTS OVERVIEW Background Proposed Development Stormwater Analysis Water Quality Water Quantity Results APPENDICES Appendix A – FEMA Flood Insurance Rate Map NCRS WSS Soil Survey Map Johnston County Soil Survey Map USGS Quadrangle Map Town of Clayton Storm Intensities Chart Town of Clayton Storm Depth Charts Appendix B – Pre-Development Drainage Area Map (P-1) Post Development Drainage Area Map (P-2) Stormwater BMP Calculations NCDOT Drainage Swale Dimensions Calculations NCDOT Culvert Sizing Calculations Appendix C – Pre-Development Nutrient Map (N-3) Post-Development Nutrient Map (N-4) Nutrient Loading Calculations Appendix D – Inlet Drainage Areas Map (DA-5) StormCAD Network Diagram StormCAD Pipe Flow Report StormCAD HGL Profiles Appendix E - Skimmer Basin Calculations Rip-Rap Sizing Calculations Appendix F – Subsurface Exploration Report DWR Buffer Call kimley-horn.com 421 Fayetteville Street, Suite 600, Raleigh, North Carolina 27601 919.677.2000 OVERVIEW Background This report contains the approach and results of a stormwater and erosion control impact analysis conducted for the proposed Iglesia de Dios Primeros Frutos project. The project site is located at the southeast corner of the intersection of Barber Mill Road and Dairy Road, in the Town of Clayton, North Carolina in Johnston County. The site is bounded to the North by Dairy Road, to the West by Barber Mill Road and to the South and East by adjacent residential parcels. The proposed development will be located on a partially wooded and vegetated vacant 1.42 acre lot. The project will disturb approximately 1.54 acres. This is about 0.12 acres more than the lot size due to required grading and utility connections with the NCDOT right of way. From the Johnston County Soil Survey, the on-site near surface area soils are classified as Bibb Sandy Loam Bb and Wedowee Sandy Loam WoB. Per the NRCS Soil Survey Database for Wake County, these soils are in hydrologic group B and D (Refer to Appendix A). The property is not within a defined floodplain area (FEMA FIRM - Appendix A). Proposed Development This development proposes to construct a 7,650 square feet prefabricated church building with associated parking lot and one access driveway that connects to Dairy Road. The development will increase the overall impervious coverage in the property boundary area from 0.000 to 0.71 acres (50% impervious). The drainage resulting from the proposed improvements will be conveyed using a combination of catch basins, pipes and an oversized underground sand filter to treat and attenuate flow. The system will discharge into an existing offsite drainage swale within NCDOT right of way. A proposed offsite sidewalk required by the Town of Clayton on NCDOT right of way will require the existing roads’ shoulder drainage swale to be resized. Refer to Appendix B for swale sizing calculations. The proposed access driveway connection to Dairy Road will require for a new culvert to be installed at the existing road shoulder swale. Refer to Appendix B for culvert sizing calculations. Stormwater Analysis Stormwater management measures shall be designed in accordance with the Town of Clayton Stormwater Guidelines and the Neuse River Basin Regulations. In accordance with the stormwater quantity requirements of the Town of Clayton, the peak stormwater runoff leaving the site for the 1 -year, 24-hour storm shall be no greater for post-development than pre-development conditions for on-site improvements. If the flow rates are increased above this threshold, the post developme nt flow will be reduced to the pre-development flow rate via use of Stormwater Control Measures (SCM’s). Per the Town of Clayton stormwater quality requirements, any new impervious area will require an evaluation of the Total Nitrogen (TN) Export from the project site in lb/ac/yr. If results indicate the overall TN Export from the site exceeds 10 lb/ac/yr, BMP’s must be utilized to reduce below 10 lb/ac/yr, with a target loading of less than 3.6 lb/ac/yr. Once below 10 pounds per acre per year, an offset payment may be made through the North Carolina Ecosystem Enhancement Program (NCEEP) or approved private Mitigation Bank if available. kimley-horn.com 421 Fayetteville Street, Suite 600, Raleigh, North Carolina 27601 919.677.2000 Water Quality Stormwater Quality analysis was performed by utilizing the NCDEQ Method 2 for quantifying TN Export (refer to Appendix C) to calculate the Proposed Nitrogen Exportation. Using a sand filter SCM the site produced a TN export of 8.03 lb/ac/yr which is below the 10 lbs/ac/yr requirement per the Neuse Stormwater Rule (15A NCAC 2B .0235) of the “Neuse River Basi n: Model Stormwater Program for Nitrogen Control”, August, 1999. Refer to Appendix C for impervious areas takeoffs exhibits for Nutrient loading calculations. Water Quantity One (1) downstream point of analysis (POA) encompasses the impacted site area. The undetained flow rates at the point of analysis were evaluated using the SCS Method. The time of concentration for the POA was calculated using the methods prescribed in TR-55. Developed areas were assumed to have a time of concentration of 5 minutes. The project proposes one (1) oversized underground sand filter box SCM for water quality treatment and flow attenuation. Bentley’s Pondpack software was utilized to model the proposed SCM. The 1-year, 24-hour storm event was analyzed using a rainfall depth of 2.96 inches per the Town of Clayton Depth Chart (refer to Appendix B). Using the underground sand filter box the site will detain the 1-year, 24-hour storm event to at or below the pre-development peak runoff rate. Refer to Appendix B for stormwater quantity calculations. A summary of the results are as follows: *Refer to Appendix B for pre-development and post-development drainage area maps and PondPack analysis. An on-site storm sewer collection system was designed to capture and convey the 10-year and 25-year storm event for the proposed development. Per local design standards, the Rational Method (Q=CIA) and Manning’s Equation were used in the design of this on-site storm sewer system using Bentley’s StormCAD software. A Manning’s n value of 0.013 will be used for the reinforced concrete pipe. The runoff coefficients (C) used for pervious and impervious are 0.40 and 0.95, respectively. Refer to Appendix D for StormCAD stormwater calculations, and the 10 and 25-year Hydraulic Grade Line (HGL) profiles. Erosion Control Erosion and sedimentation control measures shall be designed in accordance with 15A NCAC, Chapter 4 (NC Sedimentation Pollution Control Act of 1973) to minimize the amount of sediment laden runoff exiting the site. Erosion control measures will be required to be placed before any other site construction begins. Measures include silt fencing around the inside limits of disturbance, rock check dams in temporary diversion ditches as needed, concrete washout stations, and inlet protection at each inlet. Temporary diversion ditches will convey sediment laden runoff to a skimmer basin during the early *Pre vs. Post Peak Flow to POA - A 1-Year (ft3/s) Pre-Development POA - A 0.95 Post-Development POA- A (w/ SCM) 0.83 kimley-horn.com 421 Fayetteville Street, Suite 600, Raleigh, North Carolina 27601 919.677.2000 clearing and grading activities. The skimmer basin was sized to meet both the volume and surface area requirements set forth by the Town of Clayton and NCDENR. Construction entrances will be placed to minimize sediment entering Dairy Road. As new storm structures are inst alled, inlet protection will be placed at each inlet to reduce sediment laden runoff from entering the stormwater system. Rip -rap aprons will be utilized at pipe discharges to dissipate erosive velocities. Refer to Appendix E for erosion control calculations. Results The proposed stormwater management measures will be sized and designed using methods prescribed by the aforementioned Town of Clayton and NCDENR resources. The calculations indicate that the proposed development will comply with local and state stormwater requirements. One water quality and quantity structural SCM is utilized to meet detention and treatment requirements. Water quality regulations will be satisfied with the aforementioned one-time TN Nutrient Offset Payment. Erosion control measures as listed above, will minimize sediment laden runoff from exiting the site. kimley-horn.com 421 Fayetteville Street, Suite 600, Raleigh, North Carolina 27601 919.677.2000 APPENDIX A FLOOD HAZARD INFORMATION SPECIAL FLOODHAZARD AREAS OTHER AREAS OFFLOOD HAZARD OTHERAREAS GENERALSTRUCTURES Without Base Flood Elevation (BFE) With BFE or Depth Regulatory Floodway Areas Determined to be Outside the 0.2% Annual Chance Floodplain Non-accredited Levee, Dike, or Floodwall Zone A,V, A99 Zone AE, AO, AH, VE, AR Zone X HTTP://FRIS.NC.GOV/FRIS THE INFORMATION DEPICTED ON THIS MAP AND SUPPORTINGDOCUMENTATION ARE ALSO AVAILABLE IN DIGITAL FORMAT AT NORTH CAROLINA FLOODPLAIN MAPPING PROGRAM FLOOD INSURANCE RATE MAPNORTH CAROLINA PANEL MAP NUMBER MAP REVISED SEE FIS REPORT FOR ZONE DESCRIPTIONS AND INDEX MAP Cross Sections with 1% Annual ChanceWater Surface Elevation (BFE) Coastal Transect OTHERFEATURES Profile Baseline Hydrographic Feature Limit of Study Limit of Moderate Wave Action (LiMWA) Jurisdiction Boundary Accredited or Provisionally AccreditedLevee, Dike, or Floodwall Coastal Transect Baseline SCALE 1 inch = 500 feet Map Projection:North Carolina State Plane Projection Feet (Zone 3200)Datum: NAD 1983 (Horizontal), NAVD 1988 (Vertical) PANEL LOCATOR LOGO LOGO NOTES TO USERS For information and questions about this map, available products associated with this FIRM including historic versions of this FIRM, how to order products or the National Flood Insurance Program in general,please call the FEMA Map Information eXchange at 1-877-FEMA-MAP (1-877-336-2627) or visit the FEMA Map Service Center website at http://msc.fema.gov. An accompanying Flood Insurance Study report, Letter of MapRevision (LOMR) or Letter of Map Amendment (LOMA) revising portions of this panel, and digital versions of thisFIRM may be available. Visit the North Carolina Floodplain Mapping Program website at http://www.ncfloodmaps.com,or contact the FEMA Map Service Center. Communities annexing land on adjacent FIRM panels must obtain a current copy of the adjacent panel as well asthe current FIRM Index. These may be ordered directly from the Map Service Center at the number listed above. For community and countywide map dates refer to the Flood Insurance Study report for this jurisdiction. To determine if flood insurance is available in the community, contact your Insurance agent or call the NationalFlood Insurance Program at 1-800-638-6620. Base map information shown on this FIRM was provided in digital format by the North Carolina FloodplainMapping Program (NCFMP). The source of this information can be determined from the metadata available in thedigital FLOOD database and in the Technical Support Data Notebook (TSDN). ACCREDITED LEVEE NOTES TO USERS: If an accredited levee note appears on this panel check with your localcommunity to obtain more information, such as the estimated level of protection provided (which may exceed the1-percent-annual-chance level) and Emergency Action Plan, on the levee system(s) shown as providing protection.To mitigate flood risk in residual risk areas, property owners and residents are encouraged to consider floodinsurance and floodproofing or other protective measures. For more information on flood insurance, interestedparties should visit the FEMA Website at http://www.fema.gov/business/nfip/index.shtm. PROVISIONALLY ACCREDITED LEVEE NOTES TO USERS: If a Provisionally Accredited Levee (PAL) noteappears on this panel, check with your local community to obtain more information, such as the estimated level ofprotection provided (which may exceed the 1-percent-annual-chance level) and Emergency Action Plan, on thelevee system(s) shown as providing protection. To maintain accreditation, the levee owner or community isrequired to submit the data and documentation necessary to comply with Section 65.10 of the NFIP regulations.If the community or owner does not provide the necessary data and documentation or if the data and documentationprovided indicates the levee system does not comply with Section 65.10 requirements, FEMA will revise the floodhazard and risk information for this area to reflect de-accreditation of the levee system. To mitigate flood risk inresidual risk areas, property owners and residents are encouraged to consider flood insurance and floodproofingor other protective measures. For more information on flood insurance, interested parties should visit the FEMAWebsite at http://www.fema.gov/business/nfip/index.shtm. LIMIT OF MODERATE WAVE ACTION NOTES TO USERS: For some coastal flooding zones the AE Zonecategory has been divided by a Limit of Moderate Wave Action (LiMWA). The LiMWA represents the approximatelandward limit of the 1.5-foot breaking wave. The effects of wave hazards between the VE Zone and the LiMWA(or between the shoreline and the LiMWA for areas where VE Zones are not identified) will be similar to, but lesssevere than those in the VE Zone. COASTAL BARRIER RESOURCES SYSTEM (CBRS) NOTE This map may include approximate boundaries of the CBRS for informational purposes only. Flood insurance is notavailable within CBRS areas for structures that are newly built or substantially improved on or after the date(s)indicated on the map. For more information see http://www.fws.gov/habitatconservation/coastal_barrier.html, theFIS Report, or call the U.S. Fish and Wildlife Service Customer Service Center at 1-800-344-WILD. CBRS Area Otherwise Protected Area Channel, Culvert, or Storm Sewer 0.2% Annual Chance Flood Hazard, Areas of 1% Annual Chance Flood with Average Depth Less Than One Foot or With Drainage Areas of Less Than One Square MileFuture Conditions 1% Annual Chance Flood HazardArea with Reduced Flood Risk due to LeveeSee Notes Zone X Zone X Zone X 16581:6,000 %,012 18.2 !(8 2150000 FEET 680000 FEET 2150000 FEET690000 FEET 2160000 FEET 690000 FEET 2160000 FEET 680000 FEET This digital Flood Insurance Rate Map (FIRM) was produced through a uniquecooperative partnership between the State of North Carolina and the FederalEmergency Management Agency (FEMA). The State of North Carolina hasimplemented a long term approach to floodplain management to decrease thecosts associated with flooding. This is demonstrated by the State's commitmentto map flood hazard areas at the local level. As a part of this effort, the State ofNorth Carolina has joined in a Cooperating Technical State agreement withFEMA to produce and maintain this digital FIRM. NATIONAL FLOOD INSURANCE PROGRAM ZONE AE ZONE AE ZONE AEAmelia Church RdLynn DrPinecroft DrGuy Rd Brandon DrBenningwood C t R ockyBranchDrMeadowRunLa k e v i ewDrBarber Mill RdWM oss Creek Dr CanyonRd Kil d a i r e C tSumac CtLeah CirLin's PlWynstonWay SNikolWayBluebell CtWill Ct Jenny CirHocutt DrHo l l y P o i n t P l TimothyRdg Vog u e S t Hunt er Wa y Meadow Ct JasperDr Shauna CirWa l nu t CreekDrD arfield CtGro ve w o o d DrStone PlCheltenham DrLennox DrD u rha m St Chestnut Dr Roscom m on Ln Gregory D r Stephan ie L n Harvard St Wexford Dr Woodbr i a r RdMe lis saCtWoodlawn W a y Creeksid e C t Sunset Ln Roundtree Ct CorvinaDr Vinyard DrBetsyCtTrestlewood Ln CoxwoodsRd Morning D o v e C t Chardonney DrBreezewood Ln Ses DrN Nikol Wa y Gracie L n BrowningCt Horseshoe L nWe s t woodPlMerlot C t C o untry L n Scott CtBelhav e n D r Butternut L n BrookviewCt Thorn w oodCtPollyPlEastwood Dr Green Ln Equine LnCardinal Ct F rin g e Tree Ln Parkside Village DrS to n e b r o o k Dr Angus C t Stonehe n g e D r MckinnonDr Pa r k P l Co n c o r d C t LeeSt CabinBranchDrL e e C t CoveCirBentwood Ln Woodbend Ct MarshCtAmeliaChurchRd Breeze Ln BrightLeafDrBenningtonDrG len gariffLnRegen c y Dr CabernetCtB rig a d o o n D r Corbett RdShortJohnsonRd Dai r y R d Trailwood DrH o w a r d s E statesMhpPonderosa Dr Woodb r iarSt M a r r i a n D r ButtonwoodLn Satinwood D r Waterford Dr Cricket Hollow RunChristy Ci rWindi ngWoodDrHereford Dr MitchellAveB r itt a n y D rSleepy Creek DrAlder LnFernw oodStLaur elRidgeDrE T iff a ny Cir KellyLnLocket DrStoneLnHor s e ma ns Ri d g e DrW T i f f an y C i rStateAve Nc 42 Hwy W S Lombard St ¬«42 ¬«42 £¤70 i360 i326i376 i408 i35 2 i451 i384 i399i417 i392 i342 i435 i444 i428TOWN OFCLAYTON370139 TOWN OFCLAYTON370139 TOWN OFCLAYTON370139 TOWN OFCLAYTON ETJ370139 TOWN OFCLAYTON ETJ370139 TOWN OFCLAYTON ETJ370139 TOWN OFCLAYTON ETJ370139 203.5216.9 227.1 20 7 . 8244.8218.6 224.1233.3222.4 206.4 237.8 240.5 236.4 LittleCreek LittleCreek 78°28'0"W 78°28'0"W 78°28'30"W 78°28'30"W 78°29'0"W 78°29'0"W 78°29'30"W 78°29'30"W 35°38'30"N 35°38'30"N 35°38'0"N 35°38'0"N 35°37'30"N 35°37'30"N NASH COUNTY WAKE COUNTY WAYNE COUNTY HARNETT COUNTY SAMPSON COUNTY 0684 1605 1615 1625 1635 1645 1655 1665 1675 1685 1695 2605 2615 2624 2645 2655 2665 2675 1640 1650 2640 2650 2715 2725 2704 2714 2724 1783 1793 2703 2713 272217721782179227022712 2742 1751 1761 1771 1780 2700 2720 27401740175017601770 1639 1649 1659 1669 1679 1689 1699 2609 2619 2629 2639 2648162816381648165816681678168816982608261826282638 1617 1627 1637 1647 1657 1667 1677 1687 1697 2607 2617 2627 2637 2647 2657 26661606161616261636164616561666167616861696260626162626263626462656 1604 1614 1624 1634 1644 1654 1664 1674 1684 1694 2604 2614 2644 2654 2664 0682 1602 1622 1642 1662 1682 2602 2622 2643 2653 266226422652 1600 1620 1641 1651 1660 1680 2600 2620 2641 2651 1528 1548 1568 1588 2508 2528 2548 1537 1546 1566 1586 2506 2527 2537 1536 1544 1564 1584 2505 I 0 500 1,000250Feet 0 150 30075Meters BM5510 D North Carolina Geodetic Survey bench mark BM5510 ?BM5510z National Geodetic Survey bench markContractor Est. NCFMP Survey bench mark Panel Contains: COMMUNITY CID PANEL SUFFIX 1658CLAYTON, TOWN OF 370139 J 3720165800J 12/02/05 PROJECTLOCATION PROJECT LOCATION BARBER MILL ROADDA I R Y R O A D Hydrologic Soil Group—Johnston County, North Carolina (Iglesia De Dios Primeros Frutos) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 4/14/2017 Page 1 of 439466403946650394666039466703946680394669039467003946710394672039466503946660394667039466803946690394670039467103946720728710728720728730728740728750728760728770728780728790728800728810728820728830728840728850728860 728720 728730 728740 728750 728760 728770 728780 728790 728800 728810 728820 728830 728840 728850 728860 35° 38' 16'' N 78° 28' 26'' W35° 38' 16'' N78° 28' 20'' W35° 38' 13'' N 78° 28' 26'' W35° 38' 13'' N 78° 28' 20'' WN Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 17N WGS84 0 20 40 80 120 Feet 0 5 10 20 30 Meters Map Scale: 1:425 if printed on B landscape (17" x 11") sheet. Soil Map may not be valid at this scale. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons A A/D B B/D C C/D D Not rated or not available Soil Rating Lines A A/D B B/D C C/D D Not rated or not available Soil Rating Points A A/D B B/D C C/D D Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Johnston County, North Carolina Survey Area Data: Version 20, Sep 19, 2016 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Feb 14, 2011—Mar 3, 2011 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Hydrologic Soil Group—Johnston County, North Carolina (Iglesia De Dios Primeros Frutos) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 4/14/2017 Page 2 of 4 Hydrologic Soil Group Hydrologic Soil Group— Summary by Map Unit — Johnston County, North Carolina (NC101) Map unit symbol Map unit name Rating Acres in AOI Percent of AOI Bb Bibb sandy loam, 0 to 2 percent slopes, frequently flooded A/D 0.7 60.5% WoB Wedowee sandy loam, 2 to 8 percent slopes B 0.5 39.5% Totals for Area of Interest 1.2 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Hydrologic Soil Group—Johnston County, North Carolina Iglesia De Dios Primeros Frutos Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 4/14/2017 Page 3 of 4 Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified Tie-break Rule: Higher Hydrologic Soil Group—Johnston County, North Carolina Iglesia De Dios Primeros Frutos Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 4/14/2017 Page 4 of 4 PROJECT LOCATION NON-JURISDICTIONAL FEATURE PROJECT LOCATION ENLARGED SOIL SURVEY MAP NON-JURISDICTIONAL FEATURE Imagery................................................NAIP, January 2010Roads..............................................©2006-2010 Tele AtlasNames...............................................................GNIS, 2010Hydrography.................National Hydrography Dataset, 2010Contours............................National Elevation Dataset, 2010 ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│ ―│―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│ ―│ ―│ ―│ ―│―│ ―│―│ ―│ ―│ ―│―│―│―│―│ ―│―│―│―│―│ ―│―│―│―│―│ ―│―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│―│ ―│―│―│―│―│ ―│―│―│―│―│ ―│―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│ ―│―│ ―│ ―│ ―│―│ ―│―│ ―│―│ ―│ ―│ ―│ ―│ ―│ ―│ ―│ ―│―│ ―│―│ ―│―│ ―│ ―│ ―│ ―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│―│ ―│―│―│―│―│ ―│―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│ ―│―│―│ ―│―│ ―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│―│ ―│―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│ ―│ ―│ ―│ ―│―│ ―│―│ ―│ ―│ ―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│―│ ―│―│―│ ―│―│ ―│―│ ―│―│―│ ―│―│―│ ―│―│ ―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│ ―│―│―│―│―│―│ ―│―│―│―│―│―│ ―│―│―│―│―│―│ ―│―│―│―│―│―│ ―│―│―│―│―│―│ ―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│ ―│―│―│―│―│―│ ―│―│―│―│―│―│ ―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│ ―│―│ ―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│ ―│―│―│―│―│―│ ―│―│―│―│―│―│ ―│―│―│―│―│―│ ―│―│―│―│―│―│ ―│―│―│―│―│―│ ―│―│―│―│―│―│ ―│―│―│―│―│―│ ―│―│―│―│―│―│ ―│―│―│―│―│―│ ―│―│―│―│―│―│ ―│―│―│―│―│―│ ―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│ ―│―│―│―│―│―│ ―│―│―│―│―│―│ ―│―│―│―│―│―│ ―│―│―│―│―│―│ ―│―│―│―│―│―│ ―│―│―│―│―│―│ ―│―│―│―│―│―│ ―│―│―│―│―│―│ ―│―│―│―│―│―│ ―│―│―│―│―│―│ ―│―│―│―│―│―│ ―│―│―│―│―│―│ ―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│ ―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│ ―│ ―│ ―│ ―│―│ ―│―│ ―│ ―│ ―│―│―│ ―│―│―│ ―│―│ ―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│ ―│ ―│ ―│ ―│ ―│ ―│ ―│ ―│ ―│ ―│ ―│ ―│ ―│ ―│ ―│ ―│―│―│―│―│ ―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│ ―│ ―│―│ ―│―│ ―│ ―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│ ―│―│ ―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│―│ ―│―│―│―│―│ ―│―│―│―│―│ ―│―│―│―│―│ ―│―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│ ―│―│ ―│―│ ―│ ―│ ―│ ―│―│ ―│―│ ―│―│ ―│ ―│ ―│ ―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│―│ ―│―│―│ ―│―│ ―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│ ―│―│ ―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│ ―│―│―│―│―│ ―│―│―│―│―│ ―│―│―│―│―│ ―│―│―│―│―│ ―│―│―│―│―│ ―│―│―│―│―│ ―│―│―│―│―│ ―│―│―│―│―│ ―│―│―│―│―│ ―│―│―│―│―│ ―│―│―│―│―│ ―│―│―│―│―│ ―│―│―│―│―│ ―│―│―│―│―│ ―│―│―│―│―│ ―│―│―│―│―│ ―│―│―│―│―│ ―│―│―│―│―│―│ ―│―│―│―│―│―│ ―│―│―│―│―│―│ ―│―│―│―│―│―│ ―│―│―│―│―│―│ ―│―│―│―│―│―│ ―│―│―│―│―│―│ ―│―│―│―│―│―│ ―│―│―│―│―│―│ ―│―│―│―│―│ ―│―│―│―│―│ ―│―│―│―│―│ ―│―│―│―│―│ ―│―│―│―│―│ ―│―│―│―│―│ ―│―│―│―│―│ ―│―│―│―│―│ ―│―│―│―│―│ ―│―│ ―│ ―│―│ ―│―│ ―│ ―│ ―│―│―│ ―│ ―│―│ ―│―│ ―│ ―│ ―│―│―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│ ―│―│ ―│―│ ―│ ―│ ―│ ―│ ―│―│ ―│―│ ―│ ―│ ―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│ ―│―│ ―│ ―│ ―│―│ ―│―│ ―│ ―│ ―│ ―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│―│―│―│―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│―│ ―│―│―│ ―│―│ ―│―│ ―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│―│ ―│―│―│―│―│ ―│―│―│―│―│ ―│―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│―│ ―│―│―│―│―│ ―│―│―│―│―│ ―│―│―│―│―│ ―│―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│ ―│―│―│ ―│―│―│ ―│―│ ―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│ ―│―│ ―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│ ―│ ―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│―│ ―│―│―│ ―│―│ ―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│―│―│ ―│―│ ―│―│―│ ―│―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│―│ ―│―│―│ ―│―│ ―│―│ ―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│―│―│―│ ―│―│―│ ―│―│―│―│ ―│―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│ ―│―│ ―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│ ―│ ―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│―│ ―│―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│―│ ―│―│―│ ―│―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│ ―│―│―│ ―│―│―│ ―│―│ ―│―│ ―│―│ #!" #!" #!" #!" #!" #!" #!" #!" #!" #!" #!" ▄▄OP #!" #!" #!" ¥^ █n █n █n █n █n █n █n █n F F F F 3 5 0 2 0 0 350350 350300 2 0 0 3502 5 0 150 2 0 0 30 0 30 0 200250 25 0 3 0 0 300200200300200 200200250250 300 200 250300 300 300300300350 20025025 0 200250 250 250250300 150250200 200 25030 0 3002 5 0 250300 250 2002503 0 0 250150300300200150200250200300 200200 300200 200 2503002503503 0 0 250300 200300 250 30030 0 30 0 200300 300 200150 300 250 250300 300 300250300300 3 0 0 250 350250200200350300300200 200 150250300250 1 5 0 300 250 200 1502 0 0250 250 200200200 250 300300150 250 200250 300300 200150 300250250 300150200 20 0 200250 30 0 2 5 0 300 25 0 200 150 200 200200 250200200 15 0 150300 250 250 250 250250300300300 200 300250 250 250300 250 150200250300 2 0 0 250 200200200300200 300250 150200 2003 0 0 150 30 0 30030 0 250 250250 300200250 200350300 250 200250200 200200 150300250250 2 0 0 250200350 300 300 300300 250200 250 2 0 0 3003501 5 0 300300 250 250 300250 250200 250 250 200250 300300 300250 2 0 0300300 300 300 250300200£¤Bus70 £¤Bus70 £¤Bus70 £¤Bus70 ¬«42 ¬«42 ¬«42 ¬«42 ¬«42 GUY RD OLD BAUCO M R D MOSS CREEK D R OLD US HWY 70 W STON E BROOK DRSTATE A V E GARRISON AVE STONE LNT R DRHARVEST MILL CTB R IT T A N Y D RVOGUE S T W MAIN ST W STALLINGS ST CITY RDBROOKHILL DRWILDWOOD DRWALDEN WAYSARAZEN DRPLEASANTS RDMEDLIN RDH O P E L N LAFOY DR VINSON RD KENSINGTON CTFA IRW A Y DRSHORT JOHNSON RDGATEWAY D R LAUREL RIDGE DRFONT H ILLS LN W A T E RFORD DRRYANS LN LIBERTY LNOLD MEDLIN FARM RDSHAWAN RD PARKRIDGE DRWOODS T O NE DR WESTLAKE DRMAGGIE WAYCOVEY LN EASON DRRIVER CHASE DR C O U N T R Y L NHUNTER WAYCOVERED BRIDGE R DSTONEWOOD PINES DRALAN LNSHY BABY LNVIRGINIA DARE PL CR O O K E D C R E EK RDE FRONT ST O L D S T A T E H W Y 4 2 EDEER TRLCHRI ST OP H ER DR NELSON LN ATHLETIC CLUB BLVDO A K A L L E Y TRLFALLS DR PALMER DRM UIRFIELD LNN E U SE RIDGE DR GREENLYN DRHARDING DR N FARM DR S MU R P H R E Y R D ENGLEWOOD DRCREEKVIEW DRM A N D T F A R M R D CONCORD CT RIDGE DRGRAHA M S T O N E RD MULBERRY RD KENMORE D RSHOTWELL RDKENTUCKY DERBY DRMIAL PLANTATION RDPAGE STJOHN STCAMEL STMIAL STCLAIRE DRC AT F I S H L N MA N T L E D RBASS RDC O L L IN S W O R T H D R GL EN LAUR E L RDMARCELLUS WAYLOOP RD WINDLESS TRL LYNNSHIRE AVEAMSTERDAM DR RIVER HILLS DRDAFFODIL LNWINDSOR GREEN DRHOCUTT FARM DR FLORENCE DRHICKORY TREE PLBATTLE BRIDGE RD FORT DR TOWN C E N T R E B L V DBATTLE BRID G E RD REUSE DR WI NDI NG WOOD DRGRACIE LNATKINSON STS MOORE STHILLTOP RD C ARL WILLIAMSON RDKIRK POND RDBARBOUR STW F R O N T S T A V E R A S B O R O D R LI T T L E C R E E K C H U R C H R D SWANN T R L MCCARTHY D R STANSBURY LNBLACK FOREST DRRIVERWOOD DRSADDLEBROOK DRMOHAWK TRLGLEN LAUREL RDE S C H O O L R D HUNT VALLEY TRL PINE HOLLOW DRPINE TRLORCHARD FARM LN PINE TRLSHOTWELL RDCHURCHILL DOWNS DR W HORNE STW 2ND STS SMITH STN CHURCH STN FAYETTEVILLE STLORD NELSON DRSHADY M E A D O W L NDURHAM STFAWN LNRAYMOND DR CASTLEBERRY RDCOLONIAL DRAINSLEY CT HEIN DRTOWNSEND DRM O T O R C Y C L E R D N FARM DR C OX W OO D S RDBROWNFIELD RDCORBETT RDFOREST DRBETHLEHEM RDM EADOW RUNGROV EWOOD D R S ROBERTSON STS FAYETTEVILLE STBOBBITT RDQUEEN CHARLOTTE PL E 2 N D S T RANDOL P H D R DOVE LNC H A RLESTON DR TURNIPSEED RDSEEDLING STPAYTON DR TRANTHAM TRL FONTANA D R VINSON RIDGE LNNEUSE RIVER PKWYWAVERLY DRMANCHESTER TRLSTOTTS MILL RD GENO A L N MOTORC Y C L E R D WINSTON RD PINECROFT DRROCK CIRC O U NTRY LNCAROL DRC H A P E L D R CRICKET HOLLOW RUNPOPLAR CREE K TRL DAIRY RDCHARLES STC R E S T D A L E D R Y ORKSHIRE DR W E S T M I NSTER DR E STALLINGS STSMITH DRMAJOR SLADE RDDEERFIEL D D R FOREST OAKS DR MILLSTONE DRBIRKDAL E D RCH E S T N U T R I DGE QUEEN ANN DR SIER R A RID G E D RHELENA LNCASTLEBERRY RDNEUSE COLONY DRRUFUS LNWI NDGATE DRWAKE COJOHNSTON COWAKE COWAKE COJOHNSTON COWAKEJOHNSTON COJOHNSTON COCOUnion CarbidePond R E Earp Pond Mill CrLittle Cr Little CrMi l l CrMarks CrMarks CrPoplar CrMarks CrB i g A r m C r N e u s e R i v e r Neu s e R i v e r Neuse River Neuse River Neuse River Neuse RiverLakeWheeler Smith PondNumber Two LakeRaleigh MacGregorDowns Lake BrownsPond CarolinaLake YatesMillpond RothgebPond NCSU PondNumber One AtkinsonLake MaplewoodCem Gay Cem HorneCem SmithCem StephensonCem McCullersCem DavisCem Doub Cem HintonCem Wall Cem Wodd Cem SasserCem Wall Cem Wale Cem CLAYTON CLAYTON CLAYTON Shotwell BaucomsBridge 78°30' 39 39 150 7 7 25' 25' 7 78° 50 40' 51 53 39 720 5739 37' 30" 39 78° 39 39 52 54 39 28 7 30" FEET 7 000m 37 78° 22' 30" 39 55 39 30" 45' 59 47 27 29 30 7 180 7 47 39 42' 000m 35° FEET 000m 39 30" 39 58 30' 000mE 7 7 31 32 32 7 35° 39 58 59 35° 30" 000 39 56 2 28 30 27'30" 337 34 7 36 2 37 46 39 FEET 35° 690 39 49 39 39 57 7 35 7 22' 49 52 37' 45' 50 39 55 000 7 27' 733 35 000 39 39 39 39 39 N 40' 42' 46 48 51 53 39 N FEET 29 7 731 7 E 39 48 39 54 56 000 30" NORTHCAROLINA QUADRANGLE LOCATION CLAYTON QUADRANGLENORTH CAROLINA7.5-MINUTE SERIES CLAYTON, NC 2016 Expressway Local Connector ROAD CLASSIFICATION Ramp 4WD Secondary Hwy Local Road Interstate Route State RouteUS RouteWX./H CLAYTON, NC 2016 ROAD CLASSIFICATION Check with local Forest Service unitfor current travel conditions and restrictions. FS Primary Route FS High Clearance RouteFS PassengerRouteª«­▬Interstate Route State RouteUS RouteWX./H Expressway Local Connector Ramp 4WD Secondary Hwy Local Road U.S. DEPARTMENT OF THE INTERIOR U.S. GEOLOGICAL SURVEY 1 Raleigh East 8 Selma 2 Knightdale3 Zebulon4 Garner5 Flowers6 Edmondson7 Powhatan ADJOINING QUADRANGLES 1 2 3 4 5 6 7 8 This map was produced to conform with the National Geospatial Program US Topo Product Standard, 2011.A metadata file associated with this product is draft version 0.6.19 CONTOUR INTERVAL 10 FEETNORTH AMERICAN VERTICAL DATUM OF 1988 SCALE 1:24 000 1000 500 0 METERS 1000 2000 21KILOMETERS00.51 1 0.5 0 MILES 1 1000 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 FEET Imagery..................................................NAIP, June 2014Roads................................ U.S. Census Bureau, 2015 - 2016Names..........................................................GNIS, 2016Hydrography....................National Hydrography Dataset, 2014Contours............................National Elevation Dataset, 2008Boundaries............Multiple sources; see metadata file 1972 - 2016 Wetlands.........FWS National Wetlands Inventory 1977 - 2014 North American Datum of 1983 (NAD83)World Geodetic System of 1984 (WGS84). Projection and1 000-meter grid: Universal Transverse Mercator, Zone 17S Produced by the United States Geological Survey 10 000-foot ticks: North Carolina Coordinate System of 1983 This map is not a legal document. Boundaries may begeneralized for this map scale. Private lands within governmentreservations may not be shown. Obtain permission beforeentering private lands. North American Datum of 1983 (NAD83)World Geodetic System of 1984 (WGS84). Projection and1 000-meter grid: Universal Transverse Mercator, Zone 17S Produced by the United States Geological Survey 10 000-foot ticks: North Carolina Coordinate System of 1983 This map is not a legal document. Boundaries may begeneralized for this map scale. Private lands within governmentreservations may not be shown. Obtain permission beforeentering private lands. Imagery<IMG_LEADER><IMG_CITATION>Roads<TRANS_LEADER> U.S. Census Bureau, 2015 - 2016Roads within US Forest Service Lands.............FSTopo Data with limited Forest Service updates, 2012 - 2016Names...............................................................GNIS, 2016Hydrography<HYDRO_LEADER>National Hydrography Dataset, <HYDRO_DATE>Contours<HYPSO_LEADER><HYPSO_CITATION>Boundaries............Multiple sources; see metadata file 1972 - 2016<OPTIONAL_CITATIONS>Wetlands.........FWS National Wetlands Inventory 1977 - 2014 U.S. National Grid 100,000-m Square ID Grid Zone Designation QV 17S ^ ØMN GN UTM GRID AND 2016 MAGNETIC NORTHDECLINATION AT CENTER OF SHEET 1° 30´27 MILS 9° 17´165 MILS *7643016378624*NSN.7643016378624NGA REF NO.USGSX24K9017PROJECT LOCATION NON-JURISDICTIONAL FEATURE ENLARGED U.S.G.S. QUADRANGLE MAP NON-JURISDICTIONAL FEATURE Stormwater Design Manual Page 13 involved so computer programs such as HEC-1, TR-20, TR-55, and HYDRAIN may be utilized. 2.4.1.4 PRECIPITATION DATA Design storm rainfall can be described in terms of area of study, frequency, duration and distribution of intensity with time. The distribution of design rainfall with respect to time is handled by the HEC-1 program by assuming a symmetrical, single -peaked design hyetograph (storm distribution). The engineer's choice of storm frequency and duration is dependent upon the physical characteristics and location of the watershed, as well as the study objectives. In most cases, design computations will be based on a 24-hour duration storm event. See the North Carolina Erosion & Sedimentation Control Planning and Design Manual for I-D-F curves and 24-hour Rainfall data Wilmington or utilize TP-40 to develop I-D-F curves for the Clayton area. A. I-D-F Table/Curve Point precipitation estimates for Clayton were derived from the Upper Neuse Watershed reporting station (03020201) located at the coordinates provided below and is based on the latest rainfall data as of this printing. However, the Town Engineer or Stormwater Administrator may require, on a case by case basis, the designer to verify the data to ensure the rainfall data is consistent with the latest data. In Table 2.2, the total precipitation in inches per year is shown. Both an I-D-F Table and Curve have been provided. To ensure consistency in the analysis among all local designers, the data provided in Table 2.3, from which the I-D-F curve (Figure 2.3) has been created shall be used for selection of rainfall (inches/hour). Where the time of concentration for a particular study event falls somewhere between the tabulated storm duration values shown in Table 2.3, the I-D-F Curve (Figure 2.3) may be used to determine the rainfall data. Table 2.2 Point Precipitation Frequency Estimates From NOAA Atlas 14 Smithfield, North Carolina (31-7994) 35.5164 N 78.3458 W 164 feet Precipitation Frequency Estimates (inches) ARI' 5 10 15 30 60 2hr 3 hr 6 hr 12 hr 24 hr ears min min min min min 1 0.43 0.68 0.85 1.17 1.45 1.70 1.81 2.16 2.54 2.96 1 2 0.50 0.79 1.00 1.38 1.73 2.04 2.16 2.58 3.03 3.59 5 0.57 0.91 1.15 1.63 2.09 2.50 2.66 3.19 3.76 4.60 10 0.64 1.02 1.29 1.87 2.43 2.95 3.17 3.80 4.50 5.43 25 0.71 1.13 1.44 2.13 2.83 3.51 3.81 4.58 5.47 6.6011 50 0.77 1.23 1.55 L2.34 3.17 4.00 4.39 5.29 6.36 7.57 100 0.83 1.31 1.66 L2.54 3.50 4.49 4.98 6.03 7.29 8.60 _ 500 0.94 1.48 1 1.86 4.26 5.71 6.50 7.93 9.75 11.29 _ 1000 0.99 1 1.56 _L2.97 1 1.96 1 3.17 4.63 6.34 7.32 8.96 11.09 12.60 'These precipitation frequency estimates are based on a partial duration series. ARI is the Average Recurrence Interval. Town of Clayton, NC - Stormwater Design Manual June 2010 Stormwater Design Manual Page 14 Table 2.3 I-D-F Table Return Period (years) Duration 5 min 10 min 15 min 30 min 60 min 2hr 3 hr 6 hr 12 hr 24 hr 1-Year (in-hr) 5.16 4.08 3.40 2.34 1.45 0.85 0.60 0.36 0.21 0.12 2-Year (in-hr) 6.00 4.74 4.00 2.76 1.73 1.02 0.72 0.43 0.25 0.15 5-Year (in-hr) 6.84 5.46 4.60 3.26 2.09 1.25 0.89 0.53 0.31 0.19 10-Year in-hr 7.68 6.12 5.16 3.74 2.43 1.48 1.06 0.63 0.38 0.23 25-Year (in-hr) 8.52 6.78 5.76 4.26 2.83 1.76 1.27 0.76 0.46 0.28 50-Year (in-hr) 9.24 7.38 6.20 4.68 3.17 2.00 1.46 0.88 0.53 0.32 100-Year (in-hr) 9.96 7.86 6.64 5.08 3.50 2.25 1.66 1.01 0.61 0.36 500-Year (in-hr) 11.28 8.88 7.44 5.94 4.26 2.86 2.17 1.32 0.81 0.47 1000-Year (in-hr) 11.88 9.36 7.84 6.34 4.63 3.17 2.44 1.49 0.92 0.53 F- I-D-F Curve Town of Clayton 14 12 --W 1-Year (in-hr) 10 f 2-Year (in-hr) f 5-Year (in-hr) 8 f 10-Year (in-hr) 25-Year (in-hr) 50-Year (in-hr) 6 100-Year (in-hr) 500-Year (in-hr) 4 1000-Year (in-hr) 2 0 5 min 10 min 15 min 30 min 60 min Figure 2.3: I-D-F Curve 2.4.1.5 COMPUTER MODELING 2hr 3 hr 6 hr 12 hr 24 hr Computer models, such as PondPack°, can be used by engineers to analyze and design simple and complex watershed networks. They can be used to analyze pre - Town of Clayton, NC - Stormwater Design Manual June 2010 kimley-horn.com 421 Fayetteville Street, Suite 600, Raleigh, North Carolina 27601 919.677.2000 APPENDIX B NORTH P-1 ©IGLESIA DE DIOSPRIMEROS FRUTOSPOST-DEVELOPMENTDRAINAGE AREAS MAP REF.DWUPUPUPNORTH P-2 ©IGLESIA DE DIOSPRIMEROS FRUTOSPOST-DEVELOPMENTDRAINAGE AREAS MAP Project Information Project Name: KHA Project #: Designed by:DS Date:6/23/2017 Revised by:DMH Date:4/19/2019 Checked by:WJB Date:4/15/2019 Design Resource:NCDENR - Stormwater Best Management Practices (JANUARY 2017) Site Information Sub Area Location:DA-01,02,03 See Inlet Area Map DA-5 Drainage Area (DA) = 1.02 Acres Impervious Area (IA) = 0.69 Acres Percent Impervious (I) = 67.6 % Water Quality Volume (WQV and WQVadj) Design Storm = 1 inch Determine Rv Value = 0.66 in/in WQV = 2,439 cf WQVadj=1,830 cf Minimum SA requirements: Surface Area of Sedimentation Basin (As)=161 sf Surface Area of Sand Filter Bed (Af)=310 sf Minimum SA requirements: Depth of Sand Filter Bed (df)=1.50 ft (Min. 1.5 ft) Coefficient of Permeability for Sand Filter Bed (k)=3.50 ft/day (taken from DWQ manual) Time Required to Drain (t)=1.66 days (40 hrs) As provided=1,383 sf (Min. 161 sf) Surface Area of Sand Filter Bed (Af)=336 sf (Min. 310 sf) hMaxFilter=1.06 ft (Max. 6 ft) HA=0.53 ft Provided Containment Volume=1830 cf >= 1830 cf Underdrain Sizing*: Flow into Underdrains (Ir / 12) * (0/60/60) = 0.01 cfs Factor of Safety (SF=2-10) = 10 If D is less than # of 4" pipes If D is less than # of 6" pipes Underdrain Design Flow (Q=Flow*SF) = 0.14 cfs 5.13 2 7.84 2 Pipe Slope (S) = 0.50 %5.95 3 9.11 3 Diameter of Underdrain Pipes (D) = 1.59 in 6.66 4 10.13 4 # of 6" pipes = 1 7.22 5 7.75 6 * Underdrain to meet the requirements of the MDC Manual 8.20 7 D = 16 * [ (Q*0.011) / (S^0.5) ]^3/8 PROPOSED SAND FILTER 015057000 0.05 + .009 (I) = Iglesia de Dios Primeros Frutos Table 5-1 Number of Pipes Required in the Underdrain PONDPACK NETWORK DIAGRAM Table of Contents 24Outlet Input Data, 2 yearsComposite Outlet Structure - 2 23Elevation-Area Volume Curve, 1 yearsSAND FILTER 20Time vs. Elevation, 100 years 17Time vs. Elevation, 1 years SAND FILTER (OUT) 15Unit Hydrograph Equations 14Runoff CN-Area, 2 years Pre DA - A 13Runoff CN-Area, 2 years POST OFFSITE DA 12Runoff CN-Area, 2 years POST DA BYPASS 11Runoff CN-Area, 2 years POST DA 9Time of Concentration Calculations, 2 years Pre DA - A 7Time of Concentration Calculations, 2 years POST OFFSITE DA 5Time of Concentration Calculations, 2 years POST DA BYPASS 3Time-Depth Curve, 2 yearsTown of Clayton 1Master Network Summary IGLESIA DE DIOS PRIMEROS FRUTOS Subsection: Master Network Summary Catchments Summary Peak Flow (ft³/s) Time to Peak (hours) Hydrograph Volume (ac-ft) Return Event (years) ScenarioLabel 2.1712.1000.18011-yearPOST DA 4.1211.9000.23222-yearPOST DA 10.9311.9000.649100100-yearPOST DA 0.9512.2000.10511-yearPre DA - A 2.3012.0500.16222-yearPre DA - A 11.1312.0500.754100100-yearPre DA - A 0.4812.1500.04311-yearPOST DA BYPASS 0.9612.0000.06022-yearPOST DA BYPASS 3.2812.0000.210100100-yearPOST DA BYPASS 0.0212.5000.00611-yearPOST OFFSITE DA 0.1112.1000.01322-yearPOST OFFSITE DA 1.5512.0500.106100100-yearPOST OFFSITE DA Node Summary Peak Flow (ft³/s) Time to Peak (hours) Hydrograph Volume (ac-ft) Return Event (years) ScenarioLabel 0.8312.1500.18511-yearPOST POA - A 3.8712.0000.25922-yearPOST POA - A 14.8211.9500.914100100-yearPOST POA - A 0.9512.2000.10511-yearPre POA - A 2.3012.0500.16222-yearPre POA - A 11.1312.0500.754100100-yearPre POA - A Pond Summary Maximum Pond Storage (ac-ft) Maximum Water Surface Elevation (ft) Peak Flow (ft³/s) Time to Peak (hours) Hydrograph Volume (ac-ft) Return Event (years) ScenarioLabel (N/A)(N/A)2.1712.1000.18611-yearSAND FILTER (IN) 0.151297.880.4512.5500.14311-yearSAND FILTER (OUT) (N/A)(N/A)4.1311.9000.24522-yearSAND FILTER (IN) 0.163298.192.9212.0500.20022-yearSAND FILTER (OUT) (N/A)(N/A)11.7811.9000.755100100-yearSAND FILTER (IN) Page 1 of 2627 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 4/23/2019 Bentley PondPack V8i [08.11.01.56] Bentley Systems, Inc. Haestad Methods Solution CenterIglesia_De_Dios.ppc IGLESIA DE DIOS PRIMEROS FRUTOS Subsection: Master Network Summary Pond Summary Maximum Pond Storage (ac-ft) Maximum Water Surface Elevation (ft) Peak Flow (ft³/s) Time to Peak (hours) Hydrograph Volume (ac-ft) Return Event (years) ScenarioLabel 0.184298.7211.6811.9500.704100100-yearSAND FILTER (OUT) Page 2 of 2627 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 4/23/2019 Bentley PondPack V8i [08.11.01.56] Bentley Systems, Inc. Haestad Methods Solution CenterIglesia_De_Dios.ppc IGLESIA DE DIOS PRIMEROS FRUTOS Storm Event: 2-yearLabel: Town of Clayton Return Event: 2 yearsSubsection: Time-Depth Curve Time-Depth Curve: 2-year 2-yearLabel hours0.000Start Time hours0.100Increment hours24.000End Time years2Return Event CUMULATIVE RAINFALL (in) Output Time Increment = 0.100 hours Time on left represents time for first value in each row. Depth (in) Depth (in) Depth (in) Depth (in) Depth (in) Time (hours) 0.00.00.00.00.00.000 0.00.00.00.00.00.500 0.10.00.00.00.01.000 0.10.10.10.10.11.500 0.10.10.10.10.12.000 0.10.10.10.10.12.500 0.10.10.10.10.13.000 0.20.20.20.20.13.500 0.20.20.20.20.24.000 0.20.20.20.20.24.500 0.30.20.20.20.25.000 0.30.30.30.30.35.500 0.30.30.30.30.36.000 0.30.30.30.30.36.500 0.40.40.40.40.47.000 0.40.40.40.40.47.500 0.50.50.40.40.48.000 0.50.50.50.50.58.500 0.60.60.60.50.59.000 0.60.60.60.60.69.500 0.70.70.70.70.710.000 0.80.80.80.80.710.500 1.00.90.90.90.811.000 2.01.61.31.11.011.500 2.62.62.52.52.412.000 2.82.72.72.72.612.500 2.92.82.82.82.813.000 2.92.92.92.92.913.500 3.03.03.03.03.014.000 3.13.13.03.03.014.500 3.13.13.13.13.115.000 3.23.23.13.13.115.500 3.23.23.23.23.216.000 3.23.23.23.23.216.500 Page 3 of 2627 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 4/23/2019 Bentley PondPack V8i [08.11.01.56] Bentley Systems, Inc. Haestad Methods Solution CenterIglesia_De_Dios.ppc IGLESIA DE DIOS PRIMEROS FRUTOS Storm Event: 2-yearLabel: Town of Clayton Return Event: 2 yearsSubsection: Time-Depth Curve CUMULATIVE RAINFALL (in) Output Time Increment = 0.100 hours Time on left represents time for first value in each row. Depth (in) Depth (in) Depth (in) Depth (in) Depth (in) Time (hours) 3.33.33.33.33.217.000 3.33.33.33.33.317.500 3.33.33.33.33.318.000 3.43.43.43.43.318.500 3.43.43.43.43.419.000 3.43.43.43.43.419.500 3.43.43.43.43.420.000 3.53.53.53.53.520.500 3.53.53.53.53.521.000 3.53.53.53.53.521.500 3.53.53.53.53.522.000 3.63.63.53.53.522.500 3.63.63.63.63.623.000 3.63.63.63.63.623.500 (N/A)(N/A)(N/A)(N/A)3.624.000 Page 4 of 2627 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 4/23/2019 Bentley PondPack V8i [08.11.01.56] Bentley Systems, Inc. Haestad Methods Solution CenterIglesia_De_Dios.ppc IGLESIA DE DIOS PRIMEROS FRUTOS Storm Event: 2-yearLabel: POST DA BYPASS Return Event: 2 yearsSubsection: Time of Concentration Calculations Time of Concentration Results Segment #1: TR-55 Sheet Flow ft100.00Hydraulic Length 0.150Manning's n ft/ft0.020Slope in3.62 Year 24 Hour Depth ft/s0.18Average Velocity hours0.154Segment Time of Concentration Segment #2: TR-55 Shallow Concentrated Flow ft255.00Hydraulic Length FalseIs Paved? ft/ft0.030Slope ft/s2.79Average Velocity hours0.025Segment Time of Concentration Time of Concentration (Composite) hours0.179Time of Concentration (Composite) Page 5 of 2627 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 4/23/2019 Bentley PondPack V8i [08.11.01.56] Bentley Systems, Inc. Haestad Methods Solution CenterIglesia_De_Dios.ppc IGLESIA DE DIOS PRIMEROS FRUTOS Storm Event: 2-yearLabel: POST DA BYPASS Return Event: 2 yearsSubsection: Time of Concentration Calculations ==== SCS Channel Flow R = Qa / Wp V = (1.49 * (R**(2/3)) * (Sf**-0.5)) / n (Lf / V) / 3600 Tc = R= Hydraulic radius Aq= Flow area, square feet Wp= Wetted perimeter, feet V= Velocity, ft/sec Sf= Slope, ft/ft n= Manning's n Tc= Time of concentration, hours Lf= Flow length, feet Where: ==== SCS TR-55 Shallow Concentration Flow Unpaved surface: V = 16.1345 * (Sf**0.5) Paved Surface: V = 20.3282 * (Sf**0.5) (Lf / V) / 3600 Tc = V= Velocity, ft/sec Sf= Slope, ft/ft Tc= Time of concentration, hours Lf= Flow length, feet Where: Page 6 of 2627 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 4/23/2019 Bentley PondPack V8i [08.11.01.56] Bentley Systems, Inc. Haestad Methods Solution CenterIglesia_De_Dios.ppc IGLESIA DE DIOS PRIMEROS FRUTOS Storm Event: 2-yearLabel: POST OFFSITE DA Return Event: 2 yearsSubsection: Time of Concentration Calculations Time of Concentration Results Segment #1: TR-55 Sheet Flow ft100.00Hydraulic Length 0.300Manning's n ft/ft0.030Slope in3.62 Year 24 Hour Depth ft/s0.12Average Velocity hours0.228Segment Time of Concentration Segment #2: TR-55 Shallow Concentrated Flow ft115.00Hydraulic Length FalseIs Paved? ft/ft0.043Slope ft/s3.35Average Velocity hours0.010Segment Time of Concentration Time of Concentration (Composite) hours0.237Time of Concentration (Composite) Page 7 of 2627 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 4/23/2019 Bentley PondPack V8i [08.11.01.56] Bentley Systems, Inc. Haestad Methods Solution CenterIglesia_De_Dios.ppc IGLESIA DE DIOS PRIMEROS FRUTOS Storm Event: 2-yearLabel: POST OFFSITE DA Return Event: 2 yearsSubsection: Time of Concentration Calculations ==== SCS Channel Flow R = Qa / Wp V = (1.49 * (R**(2/3)) * (Sf**-0.5)) / n (Lf / V) / 3600 Tc = R= Hydraulic radius Aq= Flow area, square feet Wp= Wetted perimeter, feet V= Velocity, ft/sec Sf= Slope, ft/ft n= Manning's n Tc= Time of concentration, hours Lf= Flow length, feet Where: ==== SCS TR-55 Shallow Concentration Flow Unpaved surface: V = 16.1345 * (Sf**0.5) Paved Surface: V = 20.3282 * (Sf**0.5) (Lf / V) / 3600 Tc = V= Velocity, ft/sec Sf= Slope, ft/ft Tc= Time of concentration, hours Lf= Flow length, feet Where: Page 8 of 2627 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 4/23/2019 Bentley PondPack V8i [08.11.01.56] Bentley Systems, Inc. Haestad Methods Solution CenterIglesia_De_Dios.ppc IGLESIA DE DIOS PRIMEROS FRUTOS Storm Event: 2-yearLabel: Pre DA - A Return Event: 2 yearsSubsection: Time of Concentration Calculations Time of Concentration Results Segment #1: TR-55 Sheet Flow ft100.00Hydraulic Length 0.250Manning's n ft/ft0.030Slope in3.62 Year 24 Hour Depth ft/s0.14Average Velocity hours0.197Segment Time of Concentration Segment #2: TR-55 Shallow Concentrated Flow ft515.00Hydraulic Length FalseIs Paved? ft/ft0.060Slope ft/s3.95Average Velocity hours0.036Segment Time of Concentration Time of Concentration (Composite) hours0.233Time of Concentration (Composite) Page 9 of 2627 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 4/23/2019 Bentley PondPack V8i [08.11.01.56] Bentley Systems, Inc. Haestad Methods Solution CenterIglesia_De_Dios.ppc IGLESIA DE DIOS PRIMEROS FRUTOS Storm Event: 2-yearLabel: Pre DA - A Return Event: 2 yearsSubsection: Time of Concentration Calculations ==== SCS Channel Flow R = Qa / Wp V = (1.49 * (R**(2/3)) * (Sf**-0.5)) / n (Lf / V) / 3600 Tc = R= Hydraulic radius Aq= Flow area, square feet Wp= Wetted perimeter, feet V= Velocity, ft/sec Sf= Slope, ft/ft n= Manning's n Tc= Time of concentration, hours Lf= Flow length, feet Where: ==== SCS TR-55 Shallow Concentration Flow Unpaved surface: V = 16.1345 * (Sf**0.5) Paved Surface: V = 20.3282 * (Sf**0.5) (Lf / V) / 3600 Tc = V= Velocity, ft/sec Sf= Slope, ft/ft Tc= Time of concentration, hours Lf= Flow length, feet Where: Page 10 of 2627 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 4/23/2019 Bentley PondPack V8i [08.11.01.56] Bentley Systems, Inc. Haestad Methods Solution CenterIglesia_De_Dios.ppc IGLESIA DE DIOS PRIMEROS FRUTOS Storm Event: 2-yearLabel: POST DA Return Event: 2 yearsSubsection: Runoff CN-Area Runoff Curve Number Data Adjusted CNUC (%) C (%) Area (acres) CNSoil/Surface Description 98.0000.00.00.69098.000Impervious Areas - Paved parking lots, roofs, driveways, Streets and roads - Soil B 80.0000.00.00.33080.000Open space (Lawns,parks etc.) - Good condition; grass cover > 75% - Soil D 92.176(N/A)(N/A)1.020(N/A)COMPOSITE AREA & WEIGHTED CN ---> Page 11 of 2627 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 4/23/2019 Bentley PondPack V8i [08.11.01.56] Bentley Systems, Inc. Haestad Methods Solution CenterIglesia_De_Dios.ppc IGLESIA DE DIOS PRIMEROS FRUTOS Storm Event: 2-yearLabel: POST DA BYPASS Return Event: 2 yearsSubsection: Runoff CN-Area Runoff Curve Number Data Adjusted CNUC (%) C (%) Area (acres) CNSoil/Surface Description 80.0000.00.00.38680.000Open space (Lawns,parks etc.) - Good condition; grass cover > 75% - Soil D 98.0000.00.00.01498.000Impervious Areas - Paved parking lots, roofs, driveways, Streets and roads - Soil D 80.630(N/A)(N/A)0.400(N/A)COMPOSITE AREA & WEIGHTED CN ---> Page 12 of 2627 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 4/23/2019 Bentley PondPack V8i [08.11.01.56] Bentley Systems, Inc. Haestad Methods Solution CenterIglesia_De_Dios.ppc IGLESIA DE DIOS PRIMEROS FRUTOS Storm Event: 2-yearLabel: POST OFFSITE DA Return Event: 2 yearsSubsection: Runoff CN-Area Runoff Curve Number Data Adjusted CNUC (%) C (%) Area (acres) CNSoil/Surface Description 55.0000.00.00.40055.000Woods - good - Soil B 55.000(N/A)(N/A)0.400(N/A)COMPOSITE AREA & WEIGHTED CN ---> Page 13 of 2627 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 4/23/2019 Bentley PondPack V8i [08.11.01.56] Bentley Systems, Inc. Haestad Methods Solution CenterIglesia_De_Dios.ppc IGLESIA DE DIOS PRIMEROS FRUTOS Storm Event: 2-yearLabel: Pre DA - A Return Event: 2 yearsSubsection: Runoff CN-Area Runoff Curve Number Data Adjusted CNUC (%) C (%) Area (acres) CNSoil/Surface Description 55.0000.00.00.74155.000Woods - good - Soil B 80.0000.00.01.07980.000Pasture, grassland, or range - good - Soil D 69.821(N/A)(N/A)1.820(N/A)COMPOSITE AREA & WEIGHTED CN ---> Page 14 of 2627 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 4/23/2019 Bentley PondPack V8i [08.11.01.56] Bentley Systems, Inc. Haestad Methods Solution CenterIglesia_De_Dios.ppc IGLESIA DE DIOS PRIMEROS FRUTOS Subsection: Unit Hydrograph Equations Unit Hydrograph Method (Computational Notes) Definition of Terms Total area (acres): At = Ai+ApAt Impervious area (acres)Ai Pervious area (acres)Ap Runoff curve number for impervious areaCNi Runoff curve number for pervious areaCNp f loss constant infiltration (depth/time)fLoss Saturated Hydraulic Conductivity (depth/time)gKs Volumetric Moisture DeficitMd Capillary Suction (length)Psi Horton Infiltration Decay Rate (time^-1)hK Initial Infiltration Rate (depth/time)fo Ultimate(capacity)Infiltration Rate (depth/time)fc Initial Abstraction (length)Ia Computational increment (duration of unit excess rainfall) Default dt is smallest value of 0.1333Tc, rtm, and th (Smallest dt is then adjusted to match up with Tp) dt User specified override computational main time increment (only used if UDdt is => .1333Tc) UDdt Point on distribution curve (fraction of P) for time step tD(t) 2 / (1 + (Tr/Tp)): default K = 0.75: (for Tr/Tp = 1.67)K Hydrograph shape factor = Unit Conversions * K: = ((1hr/3600sec) * (1ft/12in) * ((5280ft)**2/sq.mi)) * K Default Ks = 645.333 * 0.75 = 484 Ks Lag time from center of excess runoff (dt) to Tp: Lag = 0.6TcLag Total precipitation depth, inchesP Accumulated rainfall at time step tPa(t) Incremental rainfall at time step tPi(t) Peak discharge (cfs) for 1in. runoff, for 1hr, for 1 sq.mi. = (Ks * A * Q) / Tp (where Q = 1in. runoff, A=sq.mi.) qp Unit hydrograph ordinate (cfs) at time step tQu(t) Final hydrograph ordinate (cfs) at time step tQ(t) Accumulated runoff (inches) at time step t for impervious areaRai(t) Accumulated runoff (inches) at time step t for pervious areaRap(t) Incremental runoff (inches) at time step t for impervious areaRii(t) Incremental runoff (inches) at time step t for pervious areaRip(t) Incremental weighted total runoff (inches)R(t) Time increment for rainfall tableRtm S for impervious area: Si = (1000/CNi) - 10Si S for pervious area: Sp = (1000/CNp) - 10Sp Time step (row) numbert Time of concentrationTc Time (hrs) of entire unit hydrograph: Tb = Tp + TrTb Time (hrs) to peak of a unit hydrograph: Tp = (dt/2) + LagTp Time (hrs) of receding limb of unit hydrograph: Tr = ratio of TpTr Page 15 of 2627 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 4/23/2019 Bentley PondPack V8i [08.11.01.56] Bentley Systems, Inc. Haestad Methods Solution CenterIglesia_De_Dios.ppc IGLESIA DE DIOS PRIMEROS FRUTOS Subsection: Unit Hydrograph Equations Unit Hydrograph Method Computational Notes Precipitation Time for time step tColumn (1) D(t) = Point on distribution curve for time step tColumn (2) Pi(t) = Pa(t) - Pa(t-1): Col.(4) - Preceding Col.(4)Column (3) Pa(t) = D(t) x P: Col.(2) x PColumn (4) Pervious Area Runoff (using SCS Runoff CN Method) Rap(t) = Accumulated pervious runoff for time step t If (Pa(t) is <= 0.2Sp) then use: Rap(t) = 0.0 If (Pa(t) is > 0.2Sp) then use: Rap(t) = (Col.(4)-0.2Sp)**2 / (Col.(4)+0.8Sp) Column (5) Rip(t) = Incremental pervious runoff for time step t Rip(t) = Rap(t) - Rap(t-1) Rip(t) = Col.(5) for current row - Col.(5) for preceding row. Column (6) Impervious Area Runoff Did not specify to use impervious areas.Column (7 & 8)... Incremental Weighted Runoff R(t) = (Ap/At) x Rip(t) + (Ai/At) x Rii(t) R(t) = (Ap/At) x Col.(6) + (Ai/At) x Col.(8) Column (9) SCS Unit Hydrograph Method Q(t) is computed with the SCS unit hydrograph method using R(t) and Qu(t). Column (10) Page 16 of 2627 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 4/23/2019 Bentley PondPack V8i [08.11.01.56] Bentley Systems, Inc. Haestad Methods Solution CenterIglesia_De_Dios.ppc IGLESIA DE DIOS PRIMEROS FRUTOS Storm Event: 1-yearLabel: SAND FILTER (OUT) Return Event: 1 yearsSubsection: Time vs. Elevation Time vs. Elevation (ft) Output Time increment = 0.050 hours Time on left represents time for first value in each row. Elevation (ft) Elevation (ft) Elevation (ft) Elevation (ft) Elevation (ft) Time (hours) 295.50295.50295.50295.50295.500.000 295.50295.50295.50295.50295.500.250 295.50295.50295.50295.50295.500.500 295.50295.50295.50295.50295.500.750 295.50295.50295.50295.50295.501.000 295.50295.50295.50295.50295.501.250 295.50295.50295.50295.50295.501.500 295.50295.50295.50295.50295.501.750 295.50295.50295.50295.50295.502.000 295.50295.50295.50295.50295.502.250 295.50295.50295.50295.50295.502.500 295.50295.50295.50295.50295.502.750 295.50295.50295.50295.50295.503.000 295.50295.50295.50295.50295.503.250 295.50295.50295.50295.50295.503.500 295.50295.50295.50295.50295.503.750 295.50295.50295.50295.50295.504.000 295.50295.50295.50295.50295.504.250 295.50295.50295.50295.50295.504.500 295.50295.50295.50295.50295.504.750 295.50295.50295.50295.50295.505.000 295.50295.50295.50295.50295.505.250 295.50295.50295.50295.50295.505.500 295.50295.50295.50295.50295.505.750 295.50295.50295.50295.50295.506.000 295.51295.51295.51295.51295.516.250 295.51295.51295.51295.51295.516.500 295.52295.52295.52295.51295.516.750 295.52295.52295.52295.52295.527.000 295.53295.53295.53295.53295.527.250 295.54295.54295.54295.53295.537.500 295.55295.55295.55295.54295.547.750 295.56295.56295.56295.56295.558.000 295.58295.58295.57295.57295.578.250 295.60295.59295.59295.59295.588.500 295.62295.61295.61295.60295.608.750 295.64295.64295.63295.63295.629.000 295.67295.66295.66295.65295.659.250 295.70295.70295.69295.68295.689.500 295.74295.73295.72295.72295.719.750 295.78295.77295.76295.76295.7510.000 Page 17 of 2627 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 4/23/2019 Bentley PondPack V8i [08.11.01.56] Bentley Systems, Inc. Haestad Methods Solution CenterIglesia_De_Dios.ppc IGLESIA DE DIOS PRIMEROS FRUTOS Storm Event: 1-yearLabel: SAND FILTER (OUT) Return Event: 1 yearsSubsection: Time vs. Elevation Time vs. Elevation (ft) Output Time increment = 0.050 hours Time on left represents time for first value in each row. Elevation (ft) Elevation (ft) Elevation (ft) Elevation (ft) Elevation (ft) Time (hours) 295.83295.82295.81295.80295.7910.250 295.89295.88295.86295.85295.8410.500 295.95295.94295.93295.91295.9010.750 296.03296.01296.00295.98295.9711.000 296.13296.11296.09296.07296.0511.250 296.31296.26296.22296.19296.1611.500 296.74296.62296.53296.44296.3711.750 297.59297.47297.29297.10296.9112.000 297.86297.84297.80297.75297.6812.250 297.85297.86297.87297.88297.8712.500 297.76297.78297.80297.82297.8312.750 297.66297.68297.70297.72297.7413.000 297.56297.58297.60297.62297.6413.250 297.46297.48297.50297.52297.5413.500 297.36297.38297.40297.42297.4413.750 297.28297.29297.31297.33297.3514.000 297.20297.21297.23297.24297.2614.250 297.12297.14297.15297.17297.1814.500 297.06297.07297.08297.10297.1114.750 297.00297.01297.02297.03297.0515.000 296.94296.95296.96296.98296.9915.250 296.90296.91296.92296.93296.9415.500 296.86296.87296.88296.88296.8915.750 296.83296.84296.84296.85296.8616.000 296.80296.81296.81296.82296.8216.250 296.78296.78296.79296.79296.8016.500 296.76296.76296.77296.77296.7816.750 296.74296.75296.75296.75296.7617.000 296.73296.73296.74296.74296.7417.250 296.72296.72296.72296.72296.7317.500 296.71296.71296.71296.71296.7117.750 296.70296.70296.70296.70296.7018.000 296.69296.69296.69296.69296.6918.250 296.68296.68296.68296.68296.6918.500 296.67296.67296.68296.68296.6818.750 296.67296.67296.67296.67296.6719.000 296.66296.66296.67296.67296.6719.250 296.66296.66296.66296.66296.6619.500 296.66296.66296.66296.66296.6619.750 296.65296.65296.65296.65296.6620.000 296.65296.65296.65296.65296.6520.250 Page 18 of 2627 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 4/23/2019 Bentley PondPack V8i [08.11.01.56] Bentley Systems, Inc. Haestad Methods Solution CenterIglesia_De_Dios.ppc IGLESIA DE DIOS PRIMEROS FRUTOS Storm Event: 1-yearLabel: SAND FILTER (OUT) Return Event: 1 yearsSubsection: Time vs. Elevation Time vs. Elevation (ft) Output Time increment = 0.050 hours Time on left represents time for first value in each row. Elevation (ft) Elevation (ft) Elevation (ft) Elevation (ft) Elevation (ft) Time (hours) 296.65296.65296.65296.65296.6520.500 296.64296.65296.65296.65296.6520.750 296.64296.64296.64296.64296.6421.000 296.64296.64296.64296.64296.6421.250 296.64296.64296.64296.64296.6421.500 296.64296.64296.64296.64296.6421.750 296.63296.63296.64296.64296.6422.000 296.63296.63296.63296.63296.6322.250 296.63296.63296.63296.63296.6322.500 296.63296.63296.63296.63296.6322.750 296.63296.63296.63296.63296.6323.000 296.63296.63296.63296.63296.6323.250 296.62296.62296.62296.62296.6323.500 296.62296.62296.62296.62296.6223.750 (N/A)(N/A)(N/A)(N/A)296.6224.000 Page 19 of 2627 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 4/23/2019 Bentley PondPack V8i [08.11.01.56] Bentley Systems, Inc. Haestad Methods Solution CenterIglesia_De_Dios.ppc IGLESIA DE DIOS PRIMEROS FRUTOS Storm Event: 100-yearLabel: SAND FILTER (OUT) Return Event: 100 yearsSubsection: Time vs. Elevation Time vs. Elevation (ft) Output Time increment = 0.050 hours Time on left represents time for first value in each row. Elevation (ft) Elevation (ft) Elevation (ft) Elevation (ft) Elevation (ft) Time (hours) 295.50295.50295.50295.50295.500.000 295.50295.50295.50295.50295.500.250 295.50295.50295.50295.50295.500.500 295.50295.50295.50295.50295.500.750 295.50295.50295.50295.50295.501.000 295.50295.50295.50295.50295.501.250 295.50295.50295.50295.50295.501.500 295.50295.50295.50295.50295.501.750 295.50295.50295.50295.50295.502.000 295.51295.51295.50295.50295.502.250 295.52295.51295.51295.51295.512.500 295.53295.52295.52295.52295.522.750 295.54295.54295.54295.53295.533.000 295.56295.55295.55295.55295.543.250 295.58295.57295.57295.57295.563.500 295.60295.60295.59295.59295.583.750 295.63295.62295.62295.61295.614.000 295.65295.65295.64295.64295.634.250 295.69295.68295.67295.67295.664.500 295.72295.71295.71295.70295.694.750 295.76295.75295.74295.74295.735.000 295.80295.79295.78295.78295.775.250 295.85295.84295.83295.82295.815.500 295.89295.88295.87295.86295.855.750 295.94295.93295.92295.91295.906.000 296.00295.99295.98295.97295.956.250 296.06296.04296.03296.02296.016.500 296.12296.10296.09296.08296.076.750 296.18296.17296.16296.14296.137.000 296.25296.24296.22296.21296.197.250 296.32296.31296.29296.28296.267.500 296.39296.38296.36296.35296.337.750 296.47296.46296.44296.42296.418.000 296.56296.54296.52296.51296.498.250 296.65296.63296.61296.60296.588.500 296.72296.71296.69296.68296.668.750 296.79296.78296.76296.75296.749.000 296.84296.83296.82296.81296.809.250 296.89296.88296.87296.86296.859.500 296.94296.93296.92296.91296.909.750 296.99296.98296.97296.96296.9510.000 Page 20 of 2627 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 4/23/2019 Bentley PondPack V8i [08.11.01.56] Bentley Systems, Inc. Haestad Methods Solution CenterIglesia_De_Dios.ppc IGLESIA DE DIOS PRIMEROS FRUTOS Storm Event: 100-yearLabel: SAND FILTER (OUT) Return Event: 100 yearsSubsection: Time vs. Elevation Time vs. Elevation (ft) Output Time increment = 0.050 hours Time on left represents time for first value in each row. Elevation (ft) Elevation (ft) Elevation (ft) Elevation (ft) Elevation (ft) Time (hours) 297.06297.05297.03297.02297.0110.250 297.15297.13297.11297.09297.0810.500 297.26297.24297.21297.19297.1710.750 297.42297.38297.35297.32297.2911.000 297.65297.60297.55297.50297.4611.250 298.19298.07297.91297.79297.7111.500 298.72298.67298.52298.39298.2811.750 298.19298.27298.42298.58298.6812.000 298.07298.09298.10298.12298.1412.250 298.03298.04298.04298.05298.0612.500 298.02298.02298.03298.03298.0312.750 298.01298.01298.02298.02298.0213.000 298.01298.01298.01298.01298.0113.250 298.00298.00298.00298.00298.0113.500 297.99298.00298.00298.00298.0013.750 297.96297.97297.98297.98297.9914.000 297.92297.93297.94297.95297.9614.250 297.88297.89297.90297.91297.9214.500 297.83297.84297.85297.86297.8714.750 297.78297.79297.80297.81297.8215.000 297.72297.73297.74297.75297.7715.250 297.66297.67297.68297.69297.7115.500 297.59297.61297.62297.63297.6515.750 297.53297.54297.55297.57297.5816.000 297.46297.48297.49297.50297.5116.250 297.41297.42297.43297.44297.4516.500 297.36297.37297.38297.39297.4016.750 297.31297.32297.33297.34297.3517.000 297.26297.27297.28297.29297.3017.250 297.22297.23297.24297.25297.2517.500 297.18297.19297.20297.21297.2117.750 297.15297.15297.16297.17297.1818.000 297.11297.12297.13297.13297.1418.250 297.08297.09297.09297.10297.1118.500 297.05297.06297.06297.07297.0718.750 297.02297.02297.03297.04297.0419.000 296.99297.00297.00297.01297.0119.250 296.96296.97296.97296.98296.9819.500 296.94296.95296.95296.95296.9619.750 296.92296.92296.93296.93296.9420.000 296.90296.91296.91296.91296.9220.250 Page 21 of 2627 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 4/23/2019 Bentley PondPack V8i [08.11.01.56] Bentley Systems, Inc. Haestad Methods Solution CenterIglesia_De_Dios.ppc IGLESIA DE DIOS PRIMEROS FRUTOS Storm Event: 100-yearLabel: SAND FILTER (OUT) Return Event: 100 yearsSubsection: Time vs. Elevation Time vs. Elevation (ft) Output Time increment = 0.050 hours Time on left represents time for first value in each row. Elevation (ft) Elevation (ft) Elevation (ft) Elevation (ft) Elevation (ft) Time (hours) 296.89296.89296.90296.90296.9020.500 296.88296.88296.88296.89296.8920.750 296.87296.87296.87296.88296.8821.000 296.86296.86296.87296.87296.8721.250 296.86296.86296.86296.86296.8621.500 296.85296.85296.85296.85296.8521.750 296.85296.85296.85296.85296.8522.000 296.84296.84296.84296.84296.8422.250 296.84296.84296.84296.84296.8422.500 296.83296.83296.83296.84296.8422.750 296.83296.83296.83296.83296.8323.000 296.83296.83296.83296.83296.8323.250 296.82296.82296.82296.83296.8323.500 296.82296.82296.82296.82296.8223.750 (N/A)(N/A)(N/A)(N/A)296.8224.000 Page 22 of 2627 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 4/23/2019 Bentley PondPack V8i [08.11.01.56] Bentley Systems, Inc. Haestad Methods Solution CenterIglesia_De_Dios.ppc IGLESIA DE DIOS PRIMEROS FRUTOS Storm Event: 1-yearLabel: SAND FILTER Return Event: 1 yearsSubsection: Elevation-Area Volume Curve Volume (Total) (ac-ft) Volume (ac-ft) A1+A2+sqr (A1*A2) (acres) Area (acres) Planimeter (ft²) Elevation (ft) 0.0000.0000.0000.0390.0294.00 0.2340.2340.1170.0390.0300.00 Page 23 of 2627 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 4/23/2019 Bentley PondPack V8i [08.11.01.56] Bentley Systems, Inc. Haestad Methods Solution CenterIglesia_De_Dios.ppc IGLESIA DE DIOS PRIMEROS FRUTOS Storm Event: 2-yearLabel: Composite Outlet Structure - 2 Return Event: 2 yearsSubsection: Outlet Input Data Requested Pond Water Surface Elevations ft294.00Minimum (Headwater) ft0.50Increment (Headwater) ft300.00Maximum (Headwater) Outlet Connectivity E2 (ft) E1 (ft) OutfallDirectionOutlet IDStructure Type 300.00296.56Culvert - 1ForwardOrifice - 1Orifice-Circular 300.00298.00Culvert - 1ForwardWeir - 1Rectangular Weir 300.00294.00TWForwardCulvert - 1Culvert-Circular (N/A)(N/A)TailwaterTailwater Settings Page 24 of 2627 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 4/23/2019 Bentley PondPack V8i [08.11.01.56] Bentley Systems, Inc. Haestad Methods Solution CenterIglesia_De_Dios.ppc IGLESIA DE DIOS PRIMEROS FRUTOS Storm Event: 2-yearLabel: Composite Outlet Structure - 2 Return Event: 2 yearsSubsection: Outlet Input Data Structure ID: Culvert - 1 Structure Type: Culvert-Circular 1Number of Barrels in18.0Diameter ft20.00Length ft20.01Length (Computed Barrel) ft/ft0.025Slope (Computed) Outlet Control Data 0.013Manning's n 0.200Ke 0.018Kb 0.000Kr ft0.00Convergence Tolerance Inlet Control Data Form 1Equation Form 0.0045K 2.0000M 0.0317C 0.6900Y 0.000T1 ratio (HW/D) 1.185T2 ratio (HW/D) -0.500Slope Correction Factor Use unsubmerged inlet control 0 equation below T1 elevation. Use submerged inlet control 0 equation above T2 elevation In transition zone between unsubmerged and submerged inlet control, interpolate between flows at T1 & T2... ft294.00T1 Elevation ft³/s7.58T1 Flow ft295.78T2 Elevation ft³/s8.66T2 Flow Page 25 of 2627 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 4/23/2019 Bentley PondPack V8i [08.11.01.56] Bentley Systems, Inc. Haestad Methods Solution CenterIglesia_De_Dios.ppc IGLESIA DE DIOS PRIMEROS FRUTOS Storm Event: 2-yearLabel: Composite Outlet Structure - 2 Return Event: 2 yearsSubsection: Outlet Input Data Structure ID: Orifice - 1 Structure Type: Orifice-Circular 1Number of Openings ft296.56Elevation in4.0Orifice Diameter 0.600Orifice Coefficient Structure ID: Weir - 1 Structure Type: Rectangular Weir 1Number of Openings ft298.00Elevation ft6.00Weir Length (ft^0.5)/s3.00Weir Coefficient Structure ID: TW Structure Type: TW Setup, DS Channel Free OutfallTailwater Type Convergence Tolerances 30Maximum Iterations ft0.01Tailwater Tolerance (Minimum) ft0.50Tailwater Tolerance (Maximum) ft0.01Headwater Tolerance (Minimum) ft0.50Headwater Tolerance (Maximum) ft³/s0.001Flow Tolerance (Minimum) ft³/s10.000Flow Tolerance (Maximum) Page 26 of 2627 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 4/23/2019 Bentley PondPack V8i [08.11.01.56] Bentley Systems, Inc. Haestad Methods Solution CenterIglesia_De_Dios.ppc NCDOT DRAINAGE SWALECALCULATIONS * * * DISCLAIMER * * * Johnston County assumes no legal responsibility for the information represented here. Scale: 1:720 - 1 in. = 60 feet (The scale is only accurate when printed landscape on a 11 x 17 size sheet with no page scaling.) Johnston County GIS June 26, 2017 Powered by TCPDF (www.tcpdf.org) 11,149 sf 18,291 sf PERVIOUS AREA TO SWALE: 0.420 ACRES C VALUE: 0.40 IMPERVIOUS AREA TO SWALE: 0.26 ACRES C VALUE: 0.95 REVISED ROAD DRAINAGE SWALE. SEE PLANS FOR GRADING DETAILS FLOW CALCULATIONS: FLOW THROUGH SWALE (Q) Q = CIA C = (0.42x0.40 + 0.26x0.95)/(0.42+0.26) = 0.61 I = 25-YEAR STORM INTENSITY: 8.32 IN/HR A = 0.42 + 0.26 = 0.68 ACRES Q = 0.61 x 8.32 x 0.68 = 3.45 cfs See next sheet for swale sizing calculations LEGEND PERVIOUS AREA IMPERVIOUS AREA Project Description Friction Method Manning Formula Solve For Normal Depth Input Data Roughness Coefficient 0.030 Channel Slope 0.05000 ft/ft Left Side Slope 3.00 ft/ft (H:V) Right Side Slope 3.00 ft/ft (H:V) Discharge 3.45 ft³/s Results Normal Depth 0.52 ft Flow Area 0.80 ft² Wetted Perimeter 3.26 ft Hydraulic Radius 0.24 ft Top Width 3.09 ft Critical Depth 0.61 ft Critical Slope 0.02094 ft/ft Velocity 4.33 ft/s Velocity Head 0.29 ft Specific Energy 0.81 ft Froude Number 1.50 Flow Type Supercritical GVF Input Data Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 GVF Output Data Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 0.52 ft Critical Depth 0.61 ft Channel Slope 0.05000 ft/ft Critical Slope 0.02094 ft/ft Dairy Road Drainage Swale 6/26/2017 2:02:09 PM Bentley Systems, Inc. Haestad Methods Solution CenterBentley FlowMaster V8i (SELECTseries 1) [08.11.01.03] 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 1of1Page Project Description Friction Method Manning Formula Solve For Normal Depth Input Data Roughness Coefficient 0.030 Channel Slope 0.05000 ft/ft Normal Depth 0.52 ft Left Side Slope 3.00 ft/ft (H:V) Right Side Slope 3.00 ft/ft (H:V) Discharge 3.45 ft³/s Cross Section Image Dairy Road Drainage Swale Cross Section 6/26/2017 2:05:48 PM Bentley Systems, Inc. Haestad Methods Solution CenterBentley FlowMaster V8i (SELECTseries 1) [08.11.01.03] 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 1of1Page X Y Display Graph Design Culvert Diameter 15 in Discharge X 5.349808 3.3149 5.349808 3.3149 5.349808 2.655375 Number of Pipes 1 6.612342 4.06285 5.349808 10.53485 Design Flow Rate 3.45 cfs X Y cfs n 9.441356 5.738814 6.612342 3.06414 Entrance Type 3 Flow Rate Low 6.612342 3.959894 3 4 9.984426 5.738814 6.612342 10.51227 Flow Rate High 6.612342 4.188685 4 5 10.50224 5.738814 9.441356 3.15111 9.441356 9.819714 X Y Δ cfs Δ x-y 9.984426 3.275581 Flow Rate X 6.612342 4.06285 1 0.228791 9.984426 10.23684 Headwater-Depth 0.86 ft 10.50224 3.212204 Headwater 1.08 ft m 10.50224 10.10626 Design Line 0.59242 X Y Turn Line 9.441356 5.738814 X Y HW-D n Δ HW-D Δ x-y ET 1 9.441356 5.738814 0.896575 0.05 0.222011 ET1 Low 9.441356 5.53201 0.85 8 ET1 High 9.441356 5.75402 0.9 9 X Y HW-D Δ HW-D Δ x-y ET 2 9.984426 5.738814 0.852891 0.05 0.245794 ET1 Low 9.984426 5.7246 0.85 8 ET1 High 9.984426 5.970394 0.9 9 X Y HW-D Δ HW-D Δ x-y ET 3 10.50224 5.738814 0.86197 0.05 0.248763 ET1 Low 10.50224 5.67926 0.85 8 ET1 High 10.50224 5.928023 0.9 9 Design Parameters 3 - groove end projecting 2 - groove end with headwall 1 - square edge with headwall CULVERT SIZING CALCULATION FOR DAIRY ROAD SWALE OKAY kimley-horn.com 421 Fayetteville Street, Suite 600, Raleigh, North Carolina 27601 919.677.2000 APPENDIX C NORTH N-3 ©IGLESIA DE DIOSPRIMEROS FRUTOSPRE DEVELOPMENTNUTRIENT AREAS MAP REF.DWUPUPUPNORTH N-4 ©IGLESIA DE DIOSPRIMEROS FRUTOSPOST DEVELOPMENTNUTRIENT AREAS MAP 6/19/2017 Updated:4/23/2019 DS By:DMH Checked By:WJB For Quantifying TN Export from Residential / Industrial / Commercial Developments when Footprints of all Impervious Surfaces are Shown 0.78 16.54 0.71 0.85 1.49 17.39 Predevelopment Postdevelopment Bypass Postdevelopment Treatment (2)(3)(4) Area (acres) TN export coeff. (lbs/ac/yr) Column (2) * (3) * 0.35 (Sand Filter) 0.33 1.20 0.14 0.69 21.20 5.12 1.49 12.13 0.52 8.14 New Impervious Area (acres) = Open Space (acres) = 0.38 Type of Land Cover 0.00 (2) (1) Type of Land Cover TN from Open Space (lbs) = Pervious Surfaces Nitrogen Loading Calculation Worksheet Project Name:Iglesia de Dios Primeros Frutos Date: TN from new Impervious Area (lbs) = Imp% of Total Area: Impervious Surfaces (1) TN Loading After Treatment (lb/yr) TN before Treatment - Column (4) = TN Export Coef (lb/ac/yr) = Type of Land Cover Total Area (acres) = Impervious Surfaces (Sand Filter) By: Area (acres) Impervious Surfaces Area (acres) Pervious Surfaces (Sand Filter) 0.09 (2) Total Area (acres) =TN from development before treatment (lb) = (1) Refer to Nitrogen exhibits N-3 and N-4 for impervious and pervious surface areas. kimley-horn.com 421 Fayetteville Street, Suite 600, Raleigh, North Carolina 27601 919.677.2000 APPENDIX D REF.DWUPUPUP INLET DRAINAGEAREA MAPDA-5©IGLESIA DE DIOSPRIMEROS FRUTOSNORTH STORMCAD NETWORK DIAGRAM Active Scenario: 10-Year FlexTable: Conduit Table Hydraulic Grade Line (Out) (ft) Hydraulic Grade Line (In) (ft) Manning's nMaterialDiameter (in) Length (Unified) (ft) Slope (Calculated) (ft/ft) Velocity (ft/s) Capacity (Full Flow) (cfs) Flow (cfs) System Flow Time (min) System Intensity (in/h) Upstream Inlet Tc (min) Invert (Stop) (ft) Invert (Start) (ft) Stop NodeStart NodeLabel 298.32298.590.013Concrete15.0121.00.0064.285.192.7214.2486.22214.248297.15297.93CB-02CB-01PIPE-1 297.38298.030.013Concrete15.088.00.0064.825.204.9614.7206.1485.000296.48297.05 CB- 03/DETENTI ON CB-02PIPE-2 294.55295.000.013Concrete18.076.00.0054.657.435.8315.0246.1005.000293.62294.00FES-01 CB- 03/DETENTI ON PIPE-3 Page 1 of 127 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-16664/14/2019 Bentley StormCAD CONNECT Edition [10.00.00.40]Bentley Systems, Inc. Haestad Methods Solution CenterIglesia_De_Dios.stsw Active Scenario: 25-Year FlexTable: Conduit Table Hydraulic Grade Line (Out) (ft) Hydraulic Grade Line (In) (ft) Manning's nMaterialDiameter (in) Length (Unified) (ft) Slope (Calculated) (ft/ft) Velocity (ft/s) Capacity (Full Flow) (cfs) Flow (cfs) System Flow Time (min) System Intensity (in/h) Upstream Inlet Tc (min) Invert (Stop) (ft) Invert (Start) (ft) Stop NodeStart NodeLabel 298.44298.630.013Concrete15.0121.00.0064.395.193.0414.2486.94414.248297.15297.93CB-02CB-01PIPE-1 297.43298.150.013Concrete15.088.00.0064.765.205.5414.7086.8665.000296.48297.05 CB- 03/DETENTI ON CB-02PIPE-2 294.61295.090.013Concrete18.076.00.0054.747.436.5215.0156.8135.000293.62294.00FES-01 CB- 03/DETENTI ON PIPE-3 Page 1 of 127 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-16664/14/2019 Bentley StormCAD CONNECT Edition [10.00.00.40]Bentley Systems, Inc. Haestad Methods Solution CenterIglesia_De_Dios.stsw Active Scenario: 10-Year Profile Report Engineering Profile - Profile - 1 (Iglesia_De_Dios.stsw) Page 1 of 127 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-16664/14/2019 Bentley StormCAD CONNECT Edition [10.00.00.40]Bentley Systems, Inc. Haestad Methods Solution CenterIglesia_De_Dios.stsw Active Scenario: 25-Year Profile Report Engineering Profile - Profile - 1 (Iglesia_De_Dios.stsw) Page 1 of 127 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-16664/14/2019 Bentley StormCAD CONNECT Edition [10.00.00.40]Bentley Systems, Inc. Haestad Methods Solution CenterIglesia_De_Dios.stsw kimley-horn.com 421 Fayetteville Street, Suite 600, Raleigh, North Carolina 27601 919.677.2000 APPENDIX E 1.93 Total Drainage Area (Acres) 1.285 Disturbed Area (Acres) 5.93 Peak Flow from 10-year Storm (cfs)Q10 = C*I*A (Rational)= 0.4*10yr5minIntensity*DrainageArea 2,313.0 Required Volume ft3 1800 ft3 / acre disturbed area (NC E&SC Manual) 2,579.1 Required Surface Area ft2 435 SF / CFS of Q10 peak flow 35.9 Suggested Width ft Min length to width ration: 2:1 71.8 Suggested Length ft Elevation (ft) Spillway Elevation:296.00 sq ft cu ft cu ft ft 294.00 1,123 0 0 0.00 295.00 1,848 1,486 1,486 1.00 296.00 2,598 2,223 3,709 2.00 297.00 3,372 2,985 6,694 3.00 Dimensions WxL (ft)Elevation (ft) 2 Trial Side Slope Ratio Z:1 2.00 Trial Depth ft (2 to 3.5 feet above grade) 1,123.0 Bottom Area ft2 3,708.5 Actual Volume ft3 Okay 2,598.0 Actual Surface Area ft2 Okay Skimmer Size Head on Skimmer (Inches)(Feet) 6 Trial Weir Length* ft (4' min.)1.5 0.125 6 Trial Depth of Flow in (6" max.)2 0.167 6.4 Spillway Capacity cfs Okay 2.5 0.208 6.2 Embankment Width ft 3 0.250 1.00 Freeboard ft (1' min.)4 0.333 5 0.417 2 Skimmer Size (inches)6 0.500 0.167 Head on Skimmer (feet)8 0.667 1 Orifice Size (1/4 inch increments) 3.93 Dewatering Time (days)Okay Suggest about 3 days Okay NOTES: 1) Trial depth = difference between spillway and bottom elev 2) Minimum depth = 2' 3) Disturbed area based on drainage area within construction limit 4) Total Drainage Area includes offsite area draining through site 5) Sediment storage is halfway between spillway and bottom Skimmer Design Sediment Storage:295.00 Bottom Elevation:294.00 Top of Dam 297.50 Skimmer Basin Sizing Calculations Weir Design Top of Dam: Project Information Project Name: KHA Project #: Designed by:Date:6/29/2017 Revised by:Date:6/29/2017 Revised by:Date: Checked by:Date: FES-01 Pipe Diameter d=18 in Number of Pipes #=1 total Pipe Slope s=0.50 % Manning's number n=0.013 Flow Q=7.45 cfs Velocity V=4.21 ft/s Dissipator Dimensions *Zone =1 Stone Filling Class =A D0 =1.5 ft Entry Width ( 3 X D0 ) =4.5 ft Length ( 4 X D0 ) =6.0 ft Width (La + D0) =7.5 ft Min. Thickness =12 inches Min. Stone Diameter=3 inches RIP-RAP SIZING CALCULATIONS Iglesia de Dios Primeros Frutos Daniel Suarez Jordan Brewer RipRapCalcsParcelE.xls 6/29/2017 Page 1 of 1 4.5 7.5 * All units are in feet ** Dissipator pad designed for full flow of pipe 6.0 kimley-horn.com 421 Fayetteville Street, Suite 600, Raleigh, North Carolina 27601 919.677.2000 APPENDIX F September 7, 2016 Ben Proutey, PROUTEY CONSTRUCTION, LLC 57 Ferndale Court Clayton, North Carolina 27520 Re: Subsurface Investigation Report Iglesia de Dios Primeros Frutos Clayton, North Carolina GeoTechnologies Project No. 1-16-0731-EA Gentlemen: GeoTechnologies, Inc. has completed the authorized subsurface investigation at the site of the proposed church at the intersection of Dairy Road and Barber Mill Road in Clayton, North Carolina. Subsurface conditions on the site were investigated by completing five soil test borings at the approximate locations indicated on the attached site plan, Figure 1. The borings were located in the field using a Trimble hand held GPS unit with NC grid coordinates and elevations estimated from the Johnston County GIS website. As such, the locations and elevations should be considered approximate. The boring coordinates and elevations are indicated on the attached Table 1. The borings were completed utilizing an all-terrain vehicle mounted drill rig turning large diameter hollow stem augers. Soils were sampled at selected intervals using standard penetration test procedures designated in ASTM D-1586. The borings extended to depths of about 20 feet below existing grade. This report presents the findings of the investigation and our recommendations regarding foundation design and development of the site. SITE AND PROJECT DESCRIPTION The project site is located at the southeast corner of the intersection of Barber Mill Road and Dairy Road in Clayton, North Carolina. The site is partially wooded and partially cleared. The site is comprised of 1.45 acres. Based on a review of the Johnston County GIS website a pond once existed on the western half of the site that has been filled in the past. Based on our review of the topographic information on the Johnston County GIS website, the site appears to slope from the northeast to the southwest with elevations of 310 to 296 feet. The new project will include construction of a new church. We understand that the building will comprise 7,500 square feet and will be a single story metal building. We are assuming that the structure will be supported on a slab on grade. The building will be situated on the southwestern portion of the site with parking areas on the north and west side of the site. Based on our experience with similar type structures, we expect that maximum column loads will be around 40 kips with wall loads of about 2 to 4 kips per linear foot (klf). No site grading plan has been developed; however, we are assuming that the building will be constructed relatively near existing grade. Proutey Construction, LLC Re: Iglesia de Dios Primeros Frutos September 7, 2016 Page: 2 SUBSURFACE CONDITIONS A generalized subsurface profile prepared from the test boring data is attached to this report as Figure 2 to graphically illustrate subsurface conditions encountered at this site. More detailed descriptions of the conditions encountered at the individual test boring locations are then presented on the attached test boring records. Subsurface conditions on the site were characterized by the presence of about 4 to 7 inches of topsoil. Underlying the topsoil, most of the borings (B-1, B-3, B-4 and B-5) encountered fill material comprised of very stiff clays and silts with some traces of topsoil. Penetration resistances in the fill varied from 20 to 30 blows per foot (bpf). Boring B-2 did not encounter any fill. The fill extended to depths of 2.5 to 5 feet below existing grade. Underlying the topsoil and fill, the borings encountered firm to very stiff clays and silts with penetration resistances of 4 to 16 bpf. Below depths of 12 to 17 feet the majority of the boring encountered loose to medium dense silty clay with penetration resistances of 7 to 22 bpf. The sands extended to the 20 foot boring termination depth. An exception was boring B-3 which encountered stiff silts to the 20 foot boring termination depth. Groundwater was generally encountered at about 7 to 15.5 feet below existing grade at the time of boring completion. However, the near surface soils are fine grain materials which are conducive to the development of a temporarily higher perched groundwater condition during periods of the year. Additionally, regional groundwater levels will fluctuate with seasonal and climatic changes and may be different at other times. RECOMMENDATIONS The following recommendations are made based upon a review of the attached test boring data, our understanding of the proposed construction, and past experience with similar projects and subsurface conditions. Should site grading or structural plans change significantly from those now under consideration, we would appreciate being provided with that information so that these recommendations may be confirmed, extended, or modified as necessary. Additionally, should subsurface conditions adverse to those indicated by this report be encountered during construction, those differences should be reported to us for review and comment. Site Preparation: The soils encountered on the site are moisture sensitive and will be difficult to compact during periods of wet weather and during the cooler winter months when higher moisture contents typically exist. As such, we advise that the site be graded during the warmer summer months of the year when higher ambient air temperatures generally result in lower near surface moisture contents. Grading the site during the cooler winter months or during periods of extended rainfall will significantly increase the need for subgrade repairs on the site. The first step in site preparation should involve removal of all vegetation and topsoil from building and parking lot areas. Following stripping operations, we recommend that the site be proofrolled with a partially loaded dump truck or similar piece of rubber tired equipment to identify areas necessitating repair. Any areas which rut and pump during the proofrolling operations should be repaired as directed by the engineer. The soil borings generally indicated very stiff near surface soils indicating minimal repairs. However, the site has been filled in the past and there may be some variability outside boring location areas. The need for repairs will need to be determined at the time that grading occurs. Proutey Construction, LLC Re: Iglesia de Dios Primeros Frutos September 7, 2016 Page: 3 Even though the test borings indicate well compacted near surface soils, the need for, magnitude and type of repairs will be highly dependent of the time of the year and weather conditions at the time that site grading begins. If grading proceeds during the warmer months of the year, the near surface soils can possibly be moisture conditioned, disced and re-compacted to stabilize subgrades. However, if wet weather and/or cooler months grading is attempted it may be necessary to perform some limited undercut followed by placement of select fill. The majority of the soils, excluding topsoil, which exists on site can be reutilized as structural fill. If off-site borrow is needed, we recommend this material consist of silty and clayey sands or low plasticity silts and clays having Unified Soil Classifications of SM, SC, ML, or CL. We recommend that all fill materials utilized on the site be compacted to a minimum of 95% of the standard proctor maximum dry density except in the final foot beneath pavements and floor slabs where this requirement should be increased to 98% of the standard proctor maximum dry density. All fill materials should be moisture conditioned to within 2% of optimum moisture content in order to facilitate compaction and to maintain stability of the fill section. Foundation Support Considerations: The proposed structure can be supported on shallow foundations designed for a maximum allowable bearing pressure of 2,000 psf for bearing on the near surface firm to very stiff near surface soils. We recommend that all column and wall footings have minimum dimensions of 24 and 16 inches, respectively, and all foundations should bear a minimum of 18 inches below finished grade for frost protection. We recommend that all foundation subgrades be carefully inspected by the geotechnical engineer prior to concrete placement to verify that adequate bearing exists. As previously discussed a pond once existed on the site in the past that has been filled and although the borings indicate that the fill materials are very stiff, it is possible that some soft zones could exist intermediate of the test boring locations. If any softer areas are encountered they should be undercut neatline to stiffer soils and the trenches backfilled with uniformly graded washed stone. Careful inspection of the foundations subgrades, including hand auger borings and dynamic cone penetrometer testing should be performed to verify adequate bearing conditions. In order to evaluate potential settlements for the structure, GeoTechnologies utilized the FHA settlement estimation procedure which correlates material types and penetration resistances to estimated settlements. The results of our analysis are presented on the attached Figure 3. In summary, it appears that column loads of 55 kips will exhibit total settlements of less than 1 inch. Differential settlements are expected to be approximately one half the magnitude of the total settlement. We recommend that slab-on-grades for the project be designed for an assumed subgrade modulus of 100 pci. This assumes that all subgrades will be recompacted to a minimum of 98% of the standard Proctor maximum dry density. If the slab will not be placed shortly after subgrade preparation, we recommend that consideration be given to placement of 4 inches of compacted CABC base course stone on the subgrade to provide protection against saturation of the subgrade during periods of inclement weather. All slabs should be properly jointed in accordance with ACI guidelines to help control shrinkage cracking. General Pavement Design Considerations: We expect that the new parking lot will be limited to automobiles with the exception of a garbage truck and possible a light bus once a week. No laboratory testing was completed at this time; however, based on our experience with similar soils we expect that the soils will likely exhibit a CBR value of about 5 percent. A typical pavement section for this type of facility would consist Proutey Construction, LLC Re: Iglesia de Dios Primeros Frutos September 7, 2016 Page: 4 of 2 inches of asphalt over 6 inches of stone in parking stalls and a section consisting of 2.5 inches of asphalt over 8 inches of stone in primary drive areas. All pavement materials should meet NCDOT specifications with respect of both gradation and placement. The most important factors affecting pavement life in the area of the site are the condition of the subgrade immediately prior to base course stone placement and post-construction drainage. Since the parking lot will be constructed where the existing office building will be torn down it will be very important that subgrades disturbed by the demolition (such as where foundations are removed) be properly repaired during site grading operations. As previously discussed, all subgrades should be compacted to a minimum of 98% of the standard Proctor maximum dry density immediately prior to base course stone placement. All subgrades should be proofrolled and any areas of instability repaired prior to stone placement. Additionally, all pavements should be properly sloped to prevent ponding of water on the pavement surface which can lead to the eventual saturation of base course stone and subgrade which will lead to premature pavement failures. Seismic Design Considerations: Based on our review of the soil test borings completed on the site, as well as our understanding of the North Carolina Building Code, we recommend that a site class definition of “D” be utilized with regard to on-site soils for seismic design considerations. SUMMARY In summary, subsurface conditions on the site appear suitable for construction of the proposed development. As the on-site soils are moisture sensitive, we recommend that grading be completed during periods of extended warmer and drier weather when the moisture contents will be somewhat lower and the soils will be easier to compact. Based upon the information obtained during our investigation, the subsurface soils encountered on the site will be suitable for support of the structure on shallow spread foundations designed for a maximum allowable bearing pressure of 2,000 psf with total estimated settlements of of less than one inch. GeoTechnologies, Inc. appreciates the opportunity to be of service on this phase of the project. Please contact us if you have any questions concerning this letter or if we may be of additional service on this or other projects. Sincerely, GeoTechnologies, Inc. David L Israel, PE NC Registration No. 14319 DLI/pr-els Attachments 1160731ea Proutey Construction, LLC Re: Iglesia de Dios Primeros Frutos September 7, 2016 Page: 5 TABLE 1 Summary of Test Boring Locations Boring # Northing (ft) Easting (ft) Elevation (ft) B-1 687349 2156480 300 B-2 687333 2156618 306 B-3 677303 2156475 300 B-4 687290 2156619 308 B-5 687399 2156395 299 VANACCESIBLEPARKINGRESERVED$250PENALTYMAXIMUMB-5B-1B-2B-3B-4FIGURE 1 275 280 285 290 295 300 305 310 26 23 5 10 11 B- 1 18 12 4 16 18 B- 2 30 12 6 9 9 B- 3 28 13 5 10 22 B- 4 20 6 8 8 7 B- 5 GENERALIZED SUBSURFACE PROFILE PROJECT: Iglesia de Dios Primeros Frutos Clayton, North Carolina JOB No:1-16-0731-EA SCALE: As Shown FIGURE No:2 Elevation (Feet) Fill w/Topsoil Fill LEGEND Groundwater at Time of Boring 8 Standard Penetration Resistance Topsoil Low Plasticity Clay Low Plasticity Silt Silty Sand Estimated settlement for a spread footing foundation designed for a contact pressure of 2,000 psf, bearing at 1.5 feet Figure 3 0 0.2 0.4 0.6 0.8 1 1.2 1.4 0 20 40 60 80 100 120Estimated Settlement (Inches) Load (Kips) SETTLEMENT vs LOAD Topsoil Fill - Very Stiff Orangish Brown Sandy Silty CLAY Firm Gray & Orangish Brown FIne Sandy Clayey Micaceous SILT Medium Dense Orangish Tan Silty Fine to Medium SAND Boring terminated at 20.5' 10-13-13 15-9-14 2-2-3 3-4-6 4-5-6 0.5 5.0 12.0 20.5 CL ML SM 300.0 PENETRATION (BLOWS/FT.) BLOWS PER SIX INCHES ELEVATION (FT.) 100 20 40 60 100 DESCRIPTION Groundwater encountered at 10' at time of boring. DEPTH (FT.) 0.0 TEST BORING RECORD 295.0 290.0 285.0 280.0 1 OF 1PAGE JOB NUMBER BORING NUMBER DATE 1-16-0731-EA B- 1 9-1-16 GTI_MAIN 160731.GPJ GTI.GDT 9/7/163200 Wellington Court, Ste 108 Raleigh, NC 27615 Topsoil Very Stiff Reddish Orange & Brown Fine Sandy SIlty CLAY Stiff Orange & Tan Fine Sandy Clayey SILT Soft Tan & Brown Fine Sandy Clayey SILT Very Stiff Pink & White Clayey SIL T Medium Dense Orangish Tan Silty Fine SAND Boring terminated at 20.5' 6-8-10 3-5-7 3-2-2 4-6-10 4-7-11 0.5 3.0 7.5 14.0 17.0 20.5 CL ML ML ML SM 306.0 PENETRATION (BLOWS/FT.) BLOWS PER SIX INCHES ELEVATION (FT.) 100 20 40 60 100 DESCRIPTION Groundwater encountered at 15.5' at time of boring. DEPTH (FT.) 0.0 TEST BORING RECORD 301.0 296.0 291.0 286.0 1 OF 1PAGE JOB NUMBER BORING NUMBER DATE 1-16-0731-EA B- 2 9-1-16 GTI_MAIN 160731.GPJ GTI.GDT 9/7/163200 Wellington Court, Ste 108 Raleigh, NC 27615 Topsoil Fill - Very Stiff Brown & Tan Fine Sandy SILT w/Traces of Topsoil Stiff Gray, Orangish Tan & Brown Fine Sandy Clayey SILT Firm Tan Fine Sandy SILT Stiff Tan & Orange FIne to Medium Sandy SILT Boring terminated at 20.5' 11-14-16 5-5-7 2-3-3 2-4-5 2-3-6 0.6 3.0 9.0 13.0 20.5 ML ML ML ML 300.0 PENETRATION (BLOWS/FT.) BLOWS PER SIX INCHES ELEVATION (FT.) 100 20 40 60 100 DESCRIPTION Groundwater encountered at 12' at time of boring. DEPTH (FT.) 0.0 TEST BORING RECORD 295.0 290.0 285.0 280.0 1 OF 1PAGE JOB NUMBER BORING NUMBER DATE 1-16-0731-EA B- 3 9-1-16 GTI_MAIN 160731.GPJ GTI.GDT 9/7/163200 Wellington Court, Ste 108 Raleigh, NC 27615 Topsoil Fill - Very Stiff Orange & Brown Sandy Clayey SILT w/Rocks & Traces of Topsoil Stiff Orange & Tan Fine Sandy Clayey SILT Firm Orange & Tan Fine Sandy Clayey SILT Medium Dense Orange & Tan Silty Fine to Medium SAND Boring terminated at 15' 17-15-13 4-6-7 2-2-3 3-5-5 5-6-16 0.5 3.0 7.0 12.5 20.5 ML ML ML SM 308.0 PENETRATION (BLOWS/FT.) BLOWS PER SIX INCHES ELEVATION (FT.) 100 20 40 60 100 DESCRIPTION Groundwater encountered at 15' at time of boring. DEPTH (FT.) 0.0 TEST BORING RECORD 303.0 298.0 293.0 288.0 1 OF 1PAGE JOB NUMBER BORING NUMBER DATE 1-16-0731-EA B- 4 9-1-16 GTI_MAIN 160731.GPJ GTI.GDT 9/7/163200 Wellington Court, Ste 108 Raleigh, NC 27615 Topsoil Fill - Very Stiff Brown Sandy Silty CLAY Firm Gray Fine to Medium Sandy CLAY w/Pea Gravel Firm Yellowish Brown to Pink Fine Sandy Clayey SILT Loose Orangish Tan Silty Fine to Medium SAND Boring terminated at 20.5' 11-10-10 3-3-3 1-3-6 2-3-5 2-4-3 0.7 2.5 7.0 17.0 20.5 CL CL ML SM 299.0 PENETRATION (BLOWS/FT.) BLOWS PER SIX INCHES ELEVATION (FT.) 100 20 40 60 100 DESCRIPTION Groundwater encountered at 7' at time of boring. DEPTH (FT.) 0.0 TEST BORING RECORD 294.0 289.0 284.0 279.0 1 OF 1PAGE JOB NUMBER BORING NUMBER DATE 1-16-0731-EA B- 5 9-1-16 GTI_MAIN 160731.GPJ GTI.GDT 9/7/163200 Wellington Court, Ste 108 Raleigh, NC 27615 ROY COOPER Governor MICHAEL S. REGAN Secretary LINDA CULPEPPER Director IgIesia Primeros Frutos, Inc. Attn: Orlando Rivera 500 Ohara St. Clayton, NC 27520 NORTH CAROLINA Environmental Quality March 20, 2019 Subject: Buffer Determination Letter Determination Date: 3/19/2019 Staff. Zach Thomas & Erin Deck RRO #19-077 Johnston County Determination Type: Buffer I Intermittent/Perennial ® Neuse (15A NCAC 2B .0233) I ❑ Tar -Pamlico 05A NCAC 2B .0259) ❑ Intermittent/Perennial Determination (where local buffer ordinances apply) ❑ Jordan (15A NCAC 2B .0267) (governmental and/or interjurisdictional projects) Project Name: Barber Mill Road Site Address/Location: 2210 Dairy Road, Clayton, NC 27520 Stream(s): Little Creek Feature E l/ P Not (z) Subject Subject Start@ Stop@ Soil Survey USGS To 0 Stream A I X Throughout X X Pond A NP X X (i) E - Epnsmerai, i , Intermittent, P Perennial, NY Not Present, NA; Not Applicable (2) Refers to riparian buffer rules only Stream, wetland, or pond impacts are still subject to applicable water quality standards and permitting requirements North Carolina Department of Environmental Quality I Division of Water Resources _l _'•�lj Raleigh Regional Office ` 3800 Barrett Drive 1 Raleigh, North Carolina 27609 --_ b\ 919-791-4200 Explanation: The stream(s)/pond(s) listed above has been located on the most recent published NRCS Soil Survey of Johnston County, North Carolina and/or the most recent copy of the USGS Topographic map at a 1.24,000 scale. Each feature that is checked "Not Subject" has been determined to not be an intermittent stream, perennial stream, a pond connected to a stream feature, or the feature is determined not to be present. Stream features that are checked "Subject" have been located on the property and possess characteristics that qualify it to be subject to the buffer rules. There may be other streams located on the property that do not show up on the maps referenced above and are therefore not subject to the buffer rules. However, if the stream features are present on the tract they are subject to all other applicable North Carolina stream standards and permitting requirements as outlined in 15A NCAC 02B, and may be considered jurisdictional according to the US Army Corps of Engineers. This on -site determination shall expire five (5) years from the date of this letter. Landowners or affected parties that dispute a determination made by the DWR may request a determination by the Director. An appeal request must be made within sixty (60) days of date of this letter. A request for a determination by the Director shall be referred to the Director in writing. If sending via US Postal Service: c/o Karen Higgins; DWR — 401 & Buffer Permitting Unit, 1617 Mail Service Center, Raleigh, NC 2 7699-1617. If sending via delivery service (UPS, FedEx, etc.): Karen Higgins; DWR — 401 & Buffer Permitting Unit, 512 N. Salisbury Street, Raleigh, NC 27604. This determination is final and binding unless, as detailed above, an appeal is requested within sixty (60) days. This project may require a Section 404/401 Permit for the oroaosed activity. Any inquiries should be directed to the US Army Corpof Engineers (Raleigh Regulatory Field Office at 919-554-4884. If you have questions regarding this determination, please feel free to contact: Zachary Thomas at (919) 791-4247. Sin c rely, R' Bolich, LG Assistant Supervisor, Water Quality Regional Operations Center cc: RRO DWR File Copy Jason Hartshorn (via email: jason.hartsharn Lz`kimlev-horn.com) Barber Mill Road Site Johnston County, NC-DWR Project # 19-077 ti NRCS Soil Survey Sheet 1 Johnston Co., NC 1994 Locations are approximate Legend: and are provided for refer- ence only:: -project boundary Barber Mill Road Site Johnston County, NC-DWR Project # 19-077 �� V V F:E Pond A Not Present - n I `Ct ! X .Q C) OOD teenson 1� 1 ,-{ Bern DR . Stream A SUBJECT a N` C LISGS Topographical Mapo Clayton Quadrangle 2016 d Locations are approximate Legend: and are provided for refer- ence only:: nn -project boundary ra4�r ILJA'`JI