Loading...
HomeMy WebLinkAboutSW3191101_Supplement-EZ Form_20200414SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name 2 1Projecl Area (ac) 3 `Coastal Wetland Area (ac) 4 Surface Water Area (ac) 5 41s this project Hlgh or Low Densily? 6 Does this project use an off -site SCM7 WITH 02H A-1011i 7 Width of vegetated setbacks provided (feet) 8 Will the vegetated setback remain vegetated? 9 _ is BLIA dharthat as listed in .1003(4)(c-d) out of the setback? 10 Is streambank stabilization proposed on this project? t AND TYPE OF SCMa: 11 Infiltration System___ 12 19ioretant1on Call 13 Wet Pond _ 14 Stormwaler Welland _ 15 Permeable Pavement 16 Sand Filler _ 1.7 Harvesling (RWH) _ 18 �Rainwalef Green Roof 19 Level Spreader-Fi ter Strip (LS•FS) 20 Disconnected imp ervlous Surface (DIS) , 21 Treatment Swale — 4 _ dry Pond _ 23 StormFliter 24 Silva Call 25 Beylilter 26 Filterra FORMS LOADED Cambridge Village Multifamily 10.6 0 High No 0 0 0 iDr=S14NER CERTIFICATION 27 Name and Title: Stave Farmanino, Project Manager _ 28 Organizallory _ ^�8ohter Engineering 29 Street address 1927_South tlyan_st Suite 310 30 City, State, Zip; — Charlotte, NC 28204 31 IPhone number(s). _ (9e0} 272-3400 32 :Email; sfarmartino@bohlereng.com flien. ns 1 certify, under penalty of law that this Supplement-EZ form and all supporting Information were prepared under my dlrectlon or supervision; that the informstlon provided In the form Is. to the beet of my knowledge and belief, true, soourate, and complete; and that the engineering plans, speolflcatlons, operatlon and maintenance agreements and other supporting Information are oonaletent with the Information provided here, ,`��`a'`�, 11t1C1,11� it�'I Q'��. s' 4-1 SEAL 5 0473% x Date DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so, number of drainage areas/SCMs 3 3 Is all/part of this project subject to previous rule versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 2 3 4 Type of SCM N/A Wet Pond Wet Pond N/A 5 Total BUA in project (sq ft 306887 sf 94530 sf 194933 sf 17424 sf 6permitting) New BUA on subdivided lots (subject to s ft N/A N/A N/A N/A 7permitting) New BUA outside of subdivided lots (subject to s Offsite - total area (sq ft Offsite BUA (sq ft 289463 sf 94530 sf 194933 sf sf 8 75376 sf sf 39722 sf 35654 sf 9 17424 sf sf sf 17424 sf 10 Breakdown of new BUA outside subdivided lots: N/A Parking (sq ft 158317 sf 51905 sf 106412 sf Sidewalk (sq ft 25381 sf 8045 sf 17336 sf Roof (sq ft 104465 sf 34580 sf 69885 sf Roadway s ft sf sf sf sf Future (sq ft sf sf sf sf Other, please specify in the comment box below (sq ft 1300 sf sf 1300 sf sf 11 New infiltrating permeable pavement on subdivided lots (sq ft sf sf sf sf 12 New infiltrating permeable pavement outside of subdivided lots (sq ft sf sf sf sf 13permitting) Exisitng BUA that will remain (not subject to s ft 17424 sf sf 17424 sf 14 Existing BUA that is already permitted (sq ft 17424 sf sf 17424 sf 15 Existing BUA that will be removed (sq ft 17276 sf sf 17276 sf 16 Percent BUA 62% 69% 61 % 30% 17 Design storm inches 1 in 1 in N/A 18 Design volume of SCM cu ft Calculation method for design volume 7726 cf 15950 cf N/A 19 Simple Method Simple Method N/A DDITIONAL INFORMATION Please use this space to provide any additional information about the 20 drainage area(s): 1300 sf "other" BUA is ammenity area at clubhouse Drainage Area 2 offsite total area is portion of BMP on adjacent lot. WET POND 1 Drainage area number Prop DA-1 Prop DA-2 21 Design volume of SCM (cu ft) 7726 cf 15950 cf GENERAL MDC FROM 02H .1050 3 Is the SCM sized to treat the SW from all surfaces at build -out? Yes Yes 4 Is the SCM located away from contaminated soils? Yes Yes 5 What are the side slopes of the SCM (H:V)? 3:1 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No No 7 Are the inlets, outlets, and receiving stream protected from erosion (10-year storm)? Yes Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? Yes Yes 9 What is the method for dewatering the SCM for maintenance? Pump (preferred) Pump (preferred) 10 If applicable, will the SCM be cleaned out after construction? Yes Yes 11 Does the maintenance access comply with General MDC (8)? Yes Yes 12 Does the drainage easement comply with General MDC (9)? Yes Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC (10)? No No 14 Is there an O&M Agreement that complies with General MDC (11)? Yes Yes 15 Is there an O&M Plan that complies with General MDC (12)? Yes Yes 16 Does the SCM follow the device speck MDC? Yes Yes 17 Was the SCM designed by an NC licensed professional? MDC FROM 02H .1053 Yes SA/DA Yes SA/DA WET POND 18 Method used 19 Has a stage/storage table been provided in the calculations? Yes Yes 20 Elevation of the excavated main pool depth (bottom of sediment removal) (fmsl) 781.00 769.00 21 Elevation of the main pool bottom -(top of sediment removal) (fmsl) 782.00 770.00 22 Elevation of the bottom of the vegetated shelf (fmsl) 787.00 776.00 23 Elevation of the permanent pool (fmsl) 787.50 777.00 24 Elevation of the top of the vegetated shelf (fmsl) 788.00 777.00 25 Elevation of the temporary pool (fmsl) 788.50 778.30 26 Surface area of the main permanent pool (square feet) 5852:1 8292:1 27 Volume of the main permanent pool (cubic feet) 20834 cf 31220 cf 28 Average depth of the main pool (feet) 4.15 ft 5.30 ft 29 Average depth equation used Equation 3 Equation 3 30 If using equation 3, main pool perimeter (feet) 306.0 ft 407.0 ft 31 If using equation 3, width of submerged veg. shelf (feet) 3.0 ft 6.0 ft 32 Volume of the forebay (cubic feet) 3575 cf 5808 Gf 33 Is this 15-20 % of the volume in the main pool? Yes Yes 34 Clean -out depth for forebay (inches) 42 in 48 in 35 Design volume of SCM (cu ft) 7726 cf 15950 cf 36 Is the outlet an orifice or a weir? Orifice Orifice 37 If orifice, orifice diameter (inches) 1.5 in 2.0 in 38 If weir, weir height (inches) 39 If weir, weir length (inches) 40 Drawdown time for the temporary pool (days) 2.71 2.76 41 Are the inlet(s) and outlet located in a manner that avoids short- circuiting? No Yes 42 Are berms or baffles provided to improve the flow path? Yes No 43 Depth of forebay at entrance (inches) 60 in 66 in 44 Depth of forebay at exit (inches) 48 in 54 in 45 Does water flow out of the forebay in a non -erosive manner? Yes Yes 46 Width of the vegetated shelf (feet) 6 ft 6 ft 47 Slope of vegetated shelf (H:V) 6:1 6:1 48 Does the orifice drawdown from below the top surface of the permanent pool? Yes Yes 49 Does the pond minimize impacts to the receiving channel from the 1 yr, 24-hr storm? Yes Yes 50 Are fountains proposed? (If Y, please provide documentation that MDC(9) is met.) No No 51 Is a trash rack or other device provided to protect the outlet system? Yes Yes 52 Are the dam and embankment planted in non -clumping turf grass? Yes Yes 53 Species of turf that will be used on the dam and embankment Bermuda Bermuda 54 Has a planting plan been provided or the vegetated she Yes Yes ADDITIONAL INFORMATION 55 Please use this space to provide any additional information about the wet pond(s): Wet Pond 3 11:14 AM 4/14/2020