Loading...
HomeMy WebLinkAboutSW3191101_SW Report_20200414 2 Table of Contents General Project Description ............................................................................................................... 3 General Project Overview and Existing Conditions ................................................................ 3 Stormwater Requirements Overview ....................................................................................... 3 SCM Systems Overview………...…………………………………………………………....3 Stormwater Management Analysis and BMP Calculations ............................................................ 3 Volume Control………………………………………………………………………………3 Pre vs. Post Analysis ................................................................................................................ 4 Appendix .............................................................................................................................................. 5 Detention Worksheets HydroCAD Models Storm Sewers Results Soils Report Rip Rap Apron Calculations Ballast Pad Calculations Erosion Calculations 3 General Project Description/Stormwater Management GENERAL PROJECT OVERVIEW AND EXISTING CONDITIONS The proposed development will be situated on approximately 10.6 acres, split between northern and southern sites by Cresset Dillinger Road. The development will include 9 multifamily residential buildings, a club house, several detached parking garages, and all associated traffic and utility infrastructure that is required. The site consists of wooded and grassed areas with a single-family home located on a portion of the parcel south of Cresset Dillinger Road. The site has a ridge line running north to south approximately through the middle of the development. The drainage area west of this ridge will ultimately flow to a low point on the property, through a proposed wet pond, and into a bypass system. This bypass system eventually discharges to Forney Creek. The point of discharge from the proposed wet pond to the bypass system will be point-of-interest 1, or POI 1. The drainage area east of the ridge line drains toward Pilot Knob Road, where drainage swales convey water to a culvert under Pilot Knob Road, to its ultimate destination of Mountain Island Lake. The culvert under Pilot Knob Road is considered to be point-of- interest 2, or POI 2. STORMWATER REQUIREMENTS OVERVIEW Please see below for the stormwater control requirements for this site: - The wet ponds have been designed to treat the first 1” of runoff with a drawdown time between 2- 5 days. - Wet ponds have been designed for 85% TSS removal. - Above the water quality volume, the 2-, 10-, and 25-year, 24-hour storm events have been controlled so that the post-development peak flows are less than their pre-development peak flows - Wet ponds have been designed to provide 1’ of free board during the 100-year storm event. SCM SYSTEM OVERVIEW To meet the requirements described above, 2 wet ponds will be used. Associated bypass facilities will be installed to divert offsite water around the proposed BMPs Stormwater Management and BMP Calculations Water Quality: The minimum required water quality volume to treat the first 1” of rainfall from the development has been calculated for Wet Pond #1 and #2 as 7,726 cubic feet and 15,950 cubic feet respectively. This volume is controlled in Wet Pond #1 and #2 using a water quality orifices of 1.50” and 2.00” in diameter respectively at the permanent pool elevations, with the next available outlet above the elevation required to meet the water quality volume. This orifice results in a drawdown of the water quality volume within 2-5 days. 4 BMP Sizing: The wet ponds are designed based on the impervious percentage draining to them, the average depth of the permanent pools as calculated by Option 2 from Figure 10-2b, and the resulting required surface areas to drainage areas ratio. These values and their calculations can be seen in the attached wet pond sizing and wet pond supplement spreadsheets. All drainage from impervious areas have been designed to be discharged into the forebays. The forebays has been designed to be 15-20% of the total permanent pool storage volumes. A water quality orifices are used at the base of the riser structures to draw down the water quality volumes within 2-5 days. The next available outlets on the riser structures are placed above the required water quality volumes. The elevations of this next available outlets are considered the temporary pool volumes, and these elevations (and resulting pressure head values used for the orifice equation) were used when determining the drawdown times through the water quality orifices. Pre/Post Analysis: A summary of the pre/post peak discharge rates for each point of interest within the development have been listed below. Support calculations have been included within the appendix section of this report. POI-1 Pre-Development Post-Development Total DA Total DA 2-year 9.90 cfs 3.76 cfs 10-year 19.99 cfs 10.09 cfs 25-year 26.73 cfs 13.15 cfs POI-2 Pre-Development Post-Development Total DA Total DA 2-year 9.82 cfs 5.02 cfs 10-year 20.55 cfs 8.83 cfs 25-year 27.73 cfs 21.43 cfs 5 Hydrologic Soil Group—Lincoln County, North Carolina (Cambridge Village - Soil Survey) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 10/11/2019 Page 1 of 4392256039226203922680392274039228003922860392292039229803923040392256039226203922680392274039228003922860392292039229803923040500550500610500670500730500790500850500910 500550 500610 500670 500730 500790 500850 500910 35° 27' 3'' N 80° 59' 38'' W35° 27' 3'' N80° 59' 22'' W35° 26' 46'' N 80° 59' 38'' W35° 26' 46'' N 80° 59' 22'' WN Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 17N WGS84 0 100 200 400 600 Feet 0 35 70 140 210 Meters Map Scale: 1:2,630 if printed on A portrait (8.5" x 11") sheet. Soil Map may not be valid at this scale. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons A A/D B B/D C C/D D Not rated or not available Soil Rating Lines A A/D B B/D C C/D D Not rated or not available Soil Rating Points A A/D B B/D C C/D D Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Lincoln County, North Carolina Survey Area Data: Version 23, Sep 16, 2019 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Apr 23, 2014—Nov 28, 2017 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Hydrologic Soil Group—Lincoln County, North Carolina (Cambridge Village - Soil Survey) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 10/11/2019 Page 2 of 4 Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI LdB2 Lloyd sandy clay loam, 2 to 8 percent slopes, moderately eroded B 12.0 87.7% LdC2 Lloyd sandy clay loam, 8 to 15 percent slopes, moderately eroded B 1.7 12.3% Totals for Area of Interest 13.7 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Hydrologic Soil Group—Lincoln County, North Carolina Cambridge Village - Soil Survey Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 10/11/2019 Page 3 of 4 Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified Tie-break Rule: Higher Hydrologic Soil Group—Lincoln County, North Carolina Cambridge Village - Soil Survey Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 10/11/2019 Page 4 of 4 DESIGN: GIVEN: 3.13 Ac. 70% 4.15 FEET 70% SA/DA = 2.05 % = 0.0205 SA REQUIRED = 3.13 Ac. X 0.0205 = 0.06 Ac. = 2,795 SF THE VOLUME FOR THE 1" STORM EVENT CAN BE CALCULATED AS: Design Rainfall = 1 Inch Drainage Area = 3.13 Acres Rv = 0.05 + 0.9(I) I = Percent Impervious = 70% Rv = 0.68 in./in. V1 =0.177 acre-feet = 7,726 ft3 Pond Height above Orifice = 788.50 feet Orifice Invert Elevation = 787.50 feet Orifice Diameter (D) = 1.50 inches = 0.13 feet Orifice Area (a) = 0.0123 square feet Gravitational Constant (g) = 32.2 ft/sec2 Head (H) = 0.94 feet Driving Head (HO) =0.313 feet Discharge Coefficient (CD) =0.6 Drawdown rate (Q) = 0.033 cfs Time (t) = 233,900 seconds = 2.71 days Note: The above calculation is based on the orifice equation where: WET POND #1 CAMBRIDGE VILLAGE (DENVER, NC) WATER QUALITY TO MEET 85% TSS REMOVAL DRAINAGE AREA TO FACILITY = LAND USE = Apartments ESTIMATED PERCENT IMPERVIOUS = PROVIDE VOLUME TO DETAIN THE 1" STORM EVENT ABOVE THE ELEVATION ALLOCATED AS A PERMANENT POOL 3) Pond Drawdown Time V1 = (Design Rainfall)(Rv)(Drainage Area) 1) SA/DA RATIO: AVERAGE POOL DEPTH = PERCENT IMPERVIOUS = 2) TEMPORARY WATER QUALITY POOL REQUIREMENTS 4/12/2020 8:11 PM Page 1 of 4 Elev Area (sf)Inc Storage (cf)Total Storage (cf) 787.50 7,516 0 0 788.00 8,588 4,026 4,026 789.00 9,858 9,223 13,249 790.00 11,185 10,522 23,771 791.00 12,569 11,877 35,648 792.00 14,008 13,289 48,936 Elev Area (sf) Inc Storage (cf) Total Storage (cf) 782.00 2,406 0 0 783.00 2,858 2,632 2,632 784.00 3,340 3,099 5,731 785.00 3,853 3,597 9,328 786.00 4,397 4,125 13,453 787.00 4,960 4,679 18,131 787.50 5,852 2,703 20,834 Elev Area (sf) Inc Storage (cf) Total Storage (cf) 784.00 469 0 0 785.00 753 611 611 786.00 1,080 917 1,528 787.00 1,456 1,268 2,796 787.50 1,663 780 3,575 Wet Pond 1 Permanent Pool - Forebay Wet Pond #1 Design Wet Pond 1 Treatment Volume Wet Pond 1 Permanent Pool Volume - Main Pool 4/12/2020 8:11 PM Page 2 of 4 DESIGN: GIVEN: 7.38 Ac. 61% 5.3 FEET 61% SA/DA = 1.44 % = 0.0144 SA REQUIRED = 7.38 Ac. X 0.0144 = 0.11 Ac. = 4,629 SF THE VOLUME FOR THE 1" STORM EVENT CAN BE CALCULATED AS: Design Rainfall = 1 Inch Drainage Area = 7.38 Acres Rv = 0.05 + 0.9(I) I = Percent Impervious = 61% Rv = 0.60 in./in. V1 =0.366 acre-feet = 15,950 ft3 Pond Height above Orifice = 778.30 feet Orifice Invert Elevation = 777.00 feet Orifice Diameter (D) = 2.00 inches = 0.17 feet Orifice Area (a) = 0.0218 square feet Gravitational Constant (g) = 32.2 ft/sec2 Head (H) = 1.22 feet Driving Head (HO) =0.406 feet Discharge Coefficient (CD) =0.6 Drawdown rate (Q) = 0.067 cfs Time (t) = 238,432 seconds = 2.76 days Note: The above calculation is based on the orifice equation where: 2) TEMPORARY WATER QUALITY POOL REQUIREMENTS PROVIDE VOLUME TO DETAIN THE 1" STORM EVENT ABOVE THE ELEVATION ALLOCATED AS A PERMANENT POOL V1 = (Design Rainfall)(Rv)(Drainage Area) 3) Pond Drawdown Time 1) SA/DA RATIO: AVERAGE POOL DEPTH = PERCENT IMPERVIOUS = WET POND #2 CAMBRIDGE VILLAGE (DENVER, NC) WATER QUALITY TO MEET 90% TSS REMOVAL DRAINAGE AREA TO FACILITY = LAND USE = Apartments ESTIMATED PERCENT IMPERVIOUS = 4/12/2020 8:11 PM Page 3 of 4 Elev Area (sf)Inc Storage (cf)Total Storage (cf) 776.50 0 0 0 777.00 11,638 2,910 2,910 778.00 13,738 12,688 15,598 779.00 15,894 14,816 30,414 780.00 18,107 17,001 47,414 781.00 20,376 19,242 66,656 782.00 21,898 21,137 87,793 783.00 24,177 23,038 110,830 Area (sf) Inc Storage (cf) Total Storage (cf) 770 2525 776 5630 24,465 24,465 776.5 6548 3,045 27,510 777 8292 3,710 31,220 Elev Area (sf) Inc Storage (cf) Total Storage (cf) 773.00 719 776.00 1,606 3,488 3,488 777.00 3,034 2,320 5,808 Wet Pond #2 Design Wet Pond 2 Treatment Volume Wet Pond 2 Permanent Pool Volume - Main Pool Wet Pond 2 Permanent Pool - Forebay 4/12/2020 8:11 PM Page 4 of 4 Project Name:Cambridge Village MF Pond #1 Ballast Pad Design for Detention Basin Wet Pond 1 792 ft. Top of Basin 1 ft. Spillway Height 791 ft. Spillway Elev. Box Width: 48.00 in Box Length 48.00 in Barrel Size: 24.00 in 48 in.BOX Top of Basin: 792.00 ft. Inv. Out of Pipe 787.50 ft. 3.00 4.5 ft. Spillway Height: 1.00 ft. Top of Riser Elev. 790.50 ft. 787.5 ft. Bottom of Basin Ballast Pad 24 in. RCP Uplift @ Peak Elevation: Peak Elevation =792 ft. Peak Elevation = 4.5 ft. Uplift Force= (62.4)(4.5 ft.)(4*4) Uplift Force= 4492.8 lbs 48 in.BOX Volume of Concrete Required to Stabilize Riser: 4492.8 lbs X 1/150 lbs/ft^3= 29.952 cubic feet Ballast Pad Ballast Pad Dimensions: 5 ft. 1.5 ft. Try Volume of: 5 ft. X 5 ft. X 1.5 ft. 5 ft. 37.5 cubic feet Ok 37.5 c.f. > or equal to 29.952 c.f. True Ballast Pad Dimensions:5 ft. X 5 ft. X 1.5 ft. Project Name:Cambridge Village MF Pond #2 Ballast Pad Design for Detention Basin Wet Pond 2 783 ft. Top of Basin 2.25 ft. Spillway Height 780.75 ft. Spillway Elev. Box Width: 48.00 in Box Length 48.00 in Barrel Size: 24.00 in 48 in.BOX Top of Basin: 783.00 ft. Inv. Out of Pipe 776.50 ft. 4.00 6.5 ft. Spillway Height: 2.25 ft. Top of Riser Elev. 780.50 ft. 776.5 ft. Bottom of Basin Ballast Pad 24 in. RCP Uplift @ Peak Elevation: Peak Elevation =783 ft. Peak Elevation = 6.5 ft. Uplift Force= (62.4)(6.5 ft.)(4*4) Uplift Force= 6489.6 lbs 48 in.BOX Volume of Concrete Required to Stabilize Riser: 6489.6 lbs X 1/150 lbs/ft^3= 43.264 cubic feet Ballast Pad Ballast Pad Dimensions: 5 ft. 2 ft. Try Volume of: 5 ft. X 5 ft. X 2 ft. 5 ft. 50 cubic feet Ok 50 c.f. > or equal to 43.264 c.f. True Ballast Pad Dimensions:5 ft. X 5 ft. X 2 ft. 1S Ex DA-1 2S Ex DA-2 4S Prop DA-1 5S Prop DA-2 6S Prop DA-3 10S DA-2 Bypass A 4P Wet Pond 1 5P Wet Pond 2 3L Ex Drainage Areas 7L POI-1 8L POI-2 9L Combined Routing Diagram for Cambridge Village - HydroCAD with ODA Prepared by {enter your company name here}, Printed 4/14/2020 HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Subcat Reach Pond Link Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 2HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Area Listing (all nodes) Area (acres) CN Description (subcatchment-numbers) 2.420 75 (10S) 12.115 69 50-75% Grass cover, Fair, HSG B (1S, 2S) 4.433 61 >75% Grass cover, Good, HSG B (4S, 5S, 6S) 5.982 98 Paved parking, HSG B (1S, 2S, 4S, 5S, 6S) 1.600 98 Roofs, HSG B (5S) 0.350 98 Water Surface, 0% imp, HSG B (5S) 26.900 77 TOTAL AREA Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 3HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Soil Listing (all nodes) Area (acres) Soil Group Subcatchment Numbers 0.000 HSG A 24.480 HSG B 1S, 2S, 4S, 5S, 6S 0.000 HSG C 0.000 HSG D 2.420 Other 10S 26.900 TOTAL AREA Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 4HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Ground Covers (all nodes) HSG-A (acres) HSG-B (acres) HSG-C (acres) HSG-D (acres) Other (acres) Total (acres) Ground Cover Subcatchment Numbers 0.000 0.000 0.000 0.000 2.420 2.420 10S 0.000 12.115 0.000 0.000 0.000 12.115 50-75% Grass cover, Fair 1S, 2S 0.000 4.433 0.000 0.000 0.000 4.433 >75% Grass cover, Good 4S, 5S, 6S 0.000 5.982 0.000 0.000 0.000 5.982 Paved parking 1S, 2S, 4S, 5S, 6S 0.000 1.600 0.000 0.000 0.000 1.600 Roofs 5S 0.000 0.350 0.000 0.000 0.000 0.350 Water Surface, 0% imp 5S 0.000 24.480 0.000 0.000 2.420 26.900 TOTAL AREA Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 5HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Pipe Listing (all nodes) Line# Node Number In-Invert (feet) Out-Invert (feet) Length (feet) Slope (ft/ft) n Diam/Width (inches) Height (inches) Inside-Fill (inches) 1 4P 787.50 787.38 23.7 0.0051 0.013 24.0 0.0 0.0 2 5P 776.50 775.72 77.6 0.0101 0.013 24.0 0.0 0.0 Charlotte 6-hr 2-yr Rainfall=3.37"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 6HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Time span=0.00-120.00 hrs, dt=0.05 hrs, 2401 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=6.010 ac 5.66% Impervious Runoff Depth=0.98"Subcatchment 1S: Ex DA-1 Flow Length=699' Tc=12.0 min CN=71 Runoff=9.90 cfs 0.492 af Runoff Area=6.650 ac 3.08% Impervious Runoff Depth=0.93"Subcatchment 2S: Ex DA-2 Flow Length=790' Tc=13.1 min CN=70 Runoff=9.82 cfs 0.515 af Runoff Area=3.130 ac 69.33% Impervious Runoff Depth=2.07"Subcatchment 4S: Prop DA-1 Tc=5.0 min CN=87 Runoff=14.43 cfs 0.539 af Runoff Area=7.380 ac 60.57% Impervious Runoff Depth=1.90"Subcatchment 5S: Prop DA-2 Tc=5.0 min CN=85 Runoff=31.55 cfs 1.171 af Runoff Area=1.310 ac 30.31% Impervious Runoff Depth=1.04"Subcatchment 6S: Prop DA-3 Tc=5.0 min CN=72 Runoff=2.98 cfs 0.113 af Runoff Area=2.420 ac 0.00% Impervious Runoff Depth=1.21"Subcatchment 10S: DA-2 Bypass A Tc=5.0 min CN=75 Runoff=6.53 cfs 0.244 af Peak Elev=789.07' Storage=13,702 cf Inflow=14.43 cfs 0.539 afPond 4P: Wet Pond 1 Primary=2.82 cfs 0.536 af Secondary=0.00 cfs 0.000 af Outflow=2.82 cfs 0.536 af Peak Elev=779.22' Storage=30,134 cf Inflow=31.55 cfs 1.171 afPond 5P: Wet Pond 2 Primary=5.02 cfs 1.164 af Secondary=0.00 cfs 0.000 af Outflow=5.02 cfs 1.164 af Inflow=19.72 cfs 1.007 afLink 3L: Ex Drainage Areas Primary=19.72 cfs 1.007 af Inflow=3.76 cfs 0.649 afLink 7L: POI-1 Primary=3.76 cfs 0.649 af Inflow=5.02 cfs 1.164 afLink 8L: POI-2 Primary=5.02 cfs 1.164 af Inflow=8.51 cfs 1.814 afLink 9L: Combined Primary=8.51 cfs 1.814 af Total Runoff Area = 26.900 ac Runoff Volume = 3.073 af Average Runoff Depth = 1.37" 71.81% Pervious = 19.318 ac 28.19% Impervious = 7.582 ac Charlotte 6-hr 2-yr Rainfall=3.37"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 7HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Summary for Subcatchment 1S: Ex DA-1 Runoff = 9.90 cfs @ 3.27 hrs, Volume= 0.492 af, Depth= 0.98" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr Rainfall=3.37" Area (ac) CN Description 5.670 69 50-75% Grass cover, Fair, HSG B 0.340 98 Paved parking, HSG B 6.010 71 Weighted Average 5.670 94.34% Pervious Area 0.340 5.66% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.0 75 0.0400 0.18 Sheet Flow, Sheet Flow Grass: Short n= 0.150 P2= 2.28" 4.6 387 0.0400 1.40 Shallow Concentrated Flow, Shallow Concentrated Flow Short Grass Pasture Kv= 7.0 fps 0.4 237 0.0100 10.72 64.33 Channel Flow, Roadside Swale Area= 6.0 sf Perim= 3.0' r= 2.00' n= 0.022 Earth, clean & straight 12.0 699 Total Subcatchment 1S: Ex DA-1 Runoff Hydrograph Time (hours) 12011511010510095908580757065605550454035302520151050Flow (cfs)11 10 9 8 7 6 5 4 3 2 1 0 Charlotte 6-hr 2-yr Rainfall=3.37" Runoff Area=6.010 ac Runoff Volume=0.492 af Runoff Depth=0.98" Flow Length=699' Tc=12.0 min CN=71 9.90 cfs Charlotte 6-hr 2-yr Rainfall=3.37"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 8HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 1S: Ex DA-1 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 2.50 0.58 0.00 0.00 5.00 3.22 0.89 0.70 7.50 3.37 0.98 0.00 10.00 3.37 0.98 0.00 12.50 3.37 0.98 0.00 15.00 3.37 0.98 0.00 17.50 3.37 0.98 0.00 20.00 3.37 0.98 0.00 22.50 3.37 0.98 0.00 25.00 3.37 0.98 0.00 27.50 3.37 0.98 0.00 30.00 3.37 0.98 0.00 32.50 3.37 0.98 0.00 35.00 3.37 0.98 0.00 37.50 3.37 0.98 0.00 40.00 3.37 0.98 0.00 42.50 3.37 0.98 0.00 45.00 3.37 0.98 0.00 47.50 3.37 0.98 0.00 50.00 3.37 0.98 0.00 52.50 3.37 0.98 0.00 55.00 3.37 0.98 0.00 57.50 3.37 0.98 0.00 60.00 3.37 0.98 0.00 62.50 3.37 0.98 0.00 65.00 3.37 0.98 0.00 67.50 3.37 0.98 0.00 70.00 3.37 0.98 0.00 72.50 3.37 0.98 0.00 75.00 3.37 0.98 0.00 77.50 3.37 0.98 0.00 80.00 3.37 0.98 0.00 82.50 3.37 0.98 0.00 85.00 3.37 0.98 0.00 87.50 3.37 0.98 0.00 90.00 3.37 0.98 0.00 92.50 3.37 0.98 0.00 95.00 3.37 0.98 0.00 97.50 3.37 0.98 0.00 100.00 3.37 0.98 0.00 102.50 3.37 0.98 0.00 105.00 3.37 0.98 0.00 107.50 3.37 0.98 0.00 110.00 3.37 0.98 0.00 112.50 3.37 0.98 0.00 115.00 3.37 0.98 0.00 117.50 3.37 0.98 0.00 120.00 3.37 0.98 0.00 Charlotte 6-hr 2-yr Rainfall=3.37"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 9HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Summary for Subcatchment 2S: Ex DA-2 Runoff = 9.82 cfs @ 3.29 hrs, Volume= 0.515 af, Depth= 0.93" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr Rainfall=3.37" Area (ac) CN Description 6.445 69 50-75% Grass cover, Fair, HSG B 0.205 98 Paved parking, HSG B 6.650 70 Weighted Average 6.445 96.92% Pervious Area 0.205 3.08% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.8 75 0.0300 0.16 Sheet Flow, Sheet Flow Grass: Short n= 0.150 P2= 2.28" 4.8 400 0.0400 1.40 Shallow Concentrated Flow, Shallow Concentrated Flow Short Grass Pasture Kv= 7.0 fps 0.5 315 0.0150 11.56 69.34 Channel Flow, Channel Flow Area= 6.0 sf Perim= 3.0' r= 2.00' n= 0.025 Earth, clean & winding 13.1 790 Total Subcatchment 2S: Ex DA-2 Runoff Hydrograph Time (hours) 12011511010510095908580757065605550454035302520151050Flow (cfs)10 9 8 7 6 5 4 3 2 1 0 Charlotte 6-hr 2-yr Rainfall=3.37" Runoff Area=6.650 ac Runoff Volume=0.515 af Runoff Depth=0.93" Flow Length=790' Tc=13.1 min CN=70 9.82 cfs Charlotte 6-hr 2-yr Rainfall=3.37"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 10HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 2S: Ex DA-2 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 2.50 0.58 0.00 0.00 5.00 3.22 0.84 0.76 7.50 3.37 0.93 0.00 10.00 3.37 0.93 0.00 12.50 3.37 0.93 0.00 15.00 3.37 0.93 0.00 17.50 3.37 0.93 0.00 20.00 3.37 0.93 0.00 22.50 3.37 0.93 0.00 25.00 3.37 0.93 0.00 27.50 3.37 0.93 0.00 30.00 3.37 0.93 0.00 32.50 3.37 0.93 0.00 35.00 3.37 0.93 0.00 37.50 3.37 0.93 0.00 40.00 3.37 0.93 0.00 42.50 3.37 0.93 0.00 45.00 3.37 0.93 0.00 47.50 3.37 0.93 0.00 50.00 3.37 0.93 0.00 52.50 3.37 0.93 0.00 55.00 3.37 0.93 0.00 57.50 3.37 0.93 0.00 60.00 3.37 0.93 0.00 62.50 3.37 0.93 0.00 65.00 3.37 0.93 0.00 67.50 3.37 0.93 0.00 70.00 3.37 0.93 0.00 72.50 3.37 0.93 0.00 75.00 3.37 0.93 0.00 77.50 3.37 0.93 0.00 80.00 3.37 0.93 0.00 82.50 3.37 0.93 0.00 85.00 3.37 0.93 0.00 87.50 3.37 0.93 0.00 90.00 3.37 0.93 0.00 92.50 3.37 0.93 0.00 95.00 3.37 0.93 0.00 97.50 3.37 0.93 0.00 100.00 3.37 0.93 0.00 102.50 3.37 0.93 0.00 105.00 3.37 0.93 0.00 107.50 3.37 0.93 0.00 110.00 3.37 0.93 0.00 112.50 3.37 0.93 0.00 115.00 3.37 0.93 0.00 117.50 3.37 0.93 0.00 120.00 3.37 0.93 0.00 Charlotte 6-hr 2-yr Rainfall=3.37"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 11HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Summary for Subcatchment 4S: Prop DA-1 [49] Hint: Tc<2dt may require smaller dt Runoff = 14.43 cfs @ 3.15 hrs, Volume= 0.539 af, Depth= 2.07" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr Rainfall=3.37" Area (ac) CN Description 2.170 98 Paved parking, HSG B 0.960 61 >75% Grass cover, Good, HSG B 3.130 87 Weighted Average 0.960 30.67% Pervious Area 2.170 69.33% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, ToC Subcatchment 4S: Prop DA-1 Runoff Hydrograph Time (hours) 12011511010510095908580757065605550454035302520151050Flow (cfs)16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Charlotte 6-hr 2-yr Rainfall=3.37" Runoff Area=3.130 ac Runoff Volume=0.539 af Runoff Depth=2.07" Tc=5.0 min CN=87 14.43 cfs Charlotte 6-hr 2-yr Rainfall=3.37"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 12HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 4S: Prop DA-1 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 2.50 0.58 0.05 0.42 5.00 3.22 1.93 0.50 7.50 3.37 2.07 0.00 10.00 3.37 2.07 0.00 12.50 3.37 2.07 0.00 15.00 3.37 2.07 0.00 17.50 3.37 2.07 0.00 20.00 3.37 2.07 0.00 22.50 3.37 2.07 0.00 25.00 3.37 2.07 0.00 27.50 3.37 2.07 0.00 30.00 3.37 2.07 0.00 32.50 3.37 2.07 0.00 35.00 3.37 2.07 0.00 37.50 3.37 2.07 0.00 40.00 3.37 2.07 0.00 42.50 3.37 2.07 0.00 45.00 3.37 2.07 0.00 47.50 3.37 2.07 0.00 50.00 3.37 2.07 0.00 52.50 3.37 2.07 0.00 55.00 3.37 2.07 0.00 57.50 3.37 2.07 0.00 60.00 3.37 2.07 0.00 62.50 3.37 2.07 0.00 65.00 3.37 2.07 0.00 67.50 3.37 2.07 0.00 70.00 3.37 2.07 0.00 72.50 3.37 2.07 0.00 75.00 3.37 2.07 0.00 77.50 3.37 2.07 0.00 80.00 3.37 2.07 0.00 82.50 3.37 2.07 0.00 85.00 3.37 2.07 0.00 87.50 3.37 2.07 0.00 90.00 3.37 2.07 0.00 92.50 3.37 2.07 0.00 95.00 3.37 2.07 0.00 97.50 3.37 2.07 0.00 100.00 3.37 2.07 0.00 102.50 3.37 2.07 0.00 105.00 3.37 2.07 0.00 107.50 3.37 2.07 0.00 110.00 3.37 2.07 0.00 112.50 3.37 2.07 0.00 115.00 3.37 2.07 0.00 117.50 3.37 2.07 0.00 120.00 3.37 2.07 0.00 Charlotte 6-hr 2-yr Rainfall=3.37"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 13HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Summary for Subcatchment 5S: Prop DA-2 [49] Hint: Tc<2dt may require smaller dt Runoff = 31.55 cfs @ 3.16 hrs, Volume= 1.171 af, Depth= 1.90" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr Rainfall=3.37" Area (ac) CN Description 2.560 61 >75% Grass cover, Good, HSG B 1.600 98 Roofs, HSG B 2.870 98 Paved parking, HSG B 0.350 98 Water Surface, 0% imp, HSG B 7.380 85 Weighted Average 2.910 39.43% Pervious Area 4.470 60.57% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Direct Entry Subcatchment 5S: Prop DA-2 Runoff Hydrograph Time (hours) 12011511010510095908580757065605550454035302520151050Flow (cfs)34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Charlotte 6-hr 2-yr Rainfall=3.37" Runoff Area=7.380 ac Runoff Volume=1.171 af Runoff Depth=1.90" Tc=5.0 min CN=85 31.55 cfs Charlotte 6-hr 2-yr Rainfall=3.37"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 14HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 5S: Prop DA-2 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 2.50 0.58 0.03 0.70 5.00 3.22 1.77 1.14 7.50 3.37 1.90 0.00 10.00 3.37 1.90 0.00 12.50 3.37 1.90 0.00 15.00 3.37 1.90 0.00 17.50 3.37 1.90 0.00 20.00 3.37 1.90 0.00 22.50 3.37 1.90 0.00 25.00 3.37 1.90 0.00 27.50 3.37 1.90 0.00 30.00 3.37 1.90 0.00 32.50 3.37 1.90 0.00 35.00 3.37 1.90 0.00 37.50 3.37 1.90 0.00 40.00 3.37 1.90 0.00 42.50 3.37 1.90 0.00 45.00 3.37 1.90 0.00 47.50 3.37 1.90 0.00 50.00 3.37 1.90 0.00 52.50 3.37 1.90 0.00 55.00 3.37 1.90 0.00 57.50 3.37 1.90 0.00 60.00 3.37 1.90 0.00 62.50 3.37 1.90 0.00 65.00 3.37 1.90 0.00 67.50 3.37 1.90 0.00 70.00 3.37 1.90 0.00 72.50 3.37 1.90 0.00 75.00 3.37 1.90 0.00 77.50 3.37 1.90 0.00 80.00 3.37 1.90 0.00 82.50 3.37 1.90 0.00 85.00 3.37 1.90 0.00 87.50 3.37 1.90 0.00 90.00 3.37 1.90 0.00 92.50 3.37 1.90 0.00 95.00 3.37 1.90 0.00 97.50 3.37 1.90 0.00 100.00 3.37 1.90 0.00 102.50 3.37 1.90 0.00 105.00 3.37 1.90 0.00 107.50 3.37 1.90 0.00 110.00 3.37 1.90 0.00 112.50 3.37 1.90 0.00 115.00 3.37 1.90 0.00 117.50 3.37 1.90 0.00 120.00 3.37 1.90 0.00 Charlotte 6-hr 2-yr Rainfall=3.37"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 15HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Summary for Subcatchment 6S: Prop DA-3 [49] Hint: Tc<2dt may require smaller dt Runoff = 2.98 cfs @ 3.17 hrs, Volume= 0.113 af, Depth= 1.04" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr Rainfall=3.37" Area (ac) CN Description 0.397 98 Paved parking, HSG B 0.913 61 >75% Grass cover, Good, HSG B 1.310 72 Weighted Average 0.913 69.69% Pervious Area 0.397 30.31% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Time of Concentration Subcatchment 6S: Prop DA-3 Runoff Hydrograph Time (hours) 12011511010510095908580757065605550454035302520151050Flow (cfs)3 2 1 0 Charlotte 6-hr 2-yr Rainfall=3.37" Runoff Area=1.310 ac Runoff Volume=0.113 af Runoff Depth=1.04" Tc=5.0 min CN=72 2.98 cfs Charlotte 6-hr 2-yr Rainfall=3.37"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 16HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 6S: Prop DA-3 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 2.50 0.58 0.00 0.00 5.00 3.22 0.94 0.15 7.50 3.37 1.04 0.00 10.00 3.37 1.04 0.00 12.50 3.37 1.04 0.00 15.00 3.37 1.04 0.00 17.50 3.37 1.04 0.00 20.00 3.37 1.04 0.00 22.50 3.37 1.04 0.00 25.00 3.37 1.04 0.00 27.50 3.37 1.04 0.00 30.00 3.37 1.04 0.00 32.50 3.37 1.04 0.00 35.00 3.37 1.04 0.00 37.50 3.37 1.04 0.00 40.00 3.37 1.04 0.00 42.50 3.37 1.04 0.00 45.00 3.37 1.04 0.00 47.50 3.37 1.04 0.00 50.00 3.37 1.04 0.00 52.50 3.37 1.04 0.00 55.00 3.37 1.04 0.00 57.50 3.37 1.04 0.00 60.00 3.37 1.04 0.00 62.50 3.37 1.04 0.00 65.00 3.37 1.04 0.00 67.50 3.37 1.04 0.00 70.00 3.37 1.04 0.00 72.50 3.37 1.04 0.00 75.00 3.37 1.04 0.00 77.50 3.37 1.04 0.00 80.00 3.37 1.04 0.00 82.50 3.37 1.04 0.00 85.00 3.37 1.04 0.00 87.50 3.37 1.04 0.00 90.00 3.37 1.04 0.00 92.50 3.37 1.04 0.00 95.00 3.37 1.04 0.00 97.50 3.37 1.04 0.00 100.00 3.37 1.04 0.00 102.50 3.37 1.04 0.00 105.00 3.37 1.04 0.00 107.50 3.37 1.04 0.00 110.00 3.37 1.04 0.00 112.50 3.37 1.04 0.00 115.00 3.37 1.04 0.00 117.50 3.37 1.04 0.00 120.00 3.37 1.04 0.00 Charlotte 6-hr 2-yr Rainfall=3.37"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 17HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Summary for Subcatchment 10S: DA-2 Bypass A [49] Hint: Tc<2dt may require smaller dt Runoff = 6.53 cfs @ 3.16 hrs, Volume= 0.244 af, Depth= 1.21" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr Rainfall=3.37" Area (ac) CN Description * 2.420 75 2.420 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 10S: DA-2 Bypass A Runoff Hydrograph Time (hours) 12011511010510095908580757065605550454035302520151050Flow (cfs)7 6 5 4 3 2 1 0 Charlotte 6-hr 2-yr Rainfall=3.37" Runoff Area=2.420 ac Runoff Volume=0.244 af Runoff Depth=1.21" Tc=5.0 min CN=75 6.53 cfs Charlotte 6-hr 2-yr Rainfall=3.37"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 18HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 10S: DA-2 Bypass A Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 2.50 0.58 0.00 0.00 5.00 3.22 1.11 0.30 7.50 3.37 1.21 0.00 10.00 3.37 1.21 0.00 12.50 3.37 1.21 0.00 15.00 3.37 1.21 0.00 17.50 3.37 1.21 0.00 20.00 3.37 1.21 0.00 22.50 3.37 1.21 0.00 25.00 3.37 1.21 0.00 27.50 3.37 1.21 0.00 30.00 3.37 1.21 0.00 32.50 3.37 1.21 0.00 35.00 3.37 1.21 0.00 37.50 3.37 1.21 0.00 40.00 3.37 1.21 0.00 42.50 3.37 1.21 0.00 45.00 3.37 1.21 0.00 47.50 3.37 1.21 0.00 50.00 3.37 1.21 0.00 52.50 3.37 1.21 0.00 55.00 3.37 1.21 0.00 57.50 3.37 1.21 0.00 60.00 3.37 1.21 0.00 62.50 3.37 1.21 0.00 65.00 3.37 1.21 0.00 67.50 3.37 1.21 0.00 70.00 3.37 1.21 0.00 72.50 3.37 1.21 0.00 75.00 3.37 1.21 0.00 77.50 3.37 1.21 0.00 80.00 3.37 1.21 0.00 82.50 3.37 1.21 0.00 85.00 3.37 1.21 0.00 87.50 3.37 1.21 0.00 90.00 3.37 1.21 0.00 92.50 3.37 1.21 0.00 95.00 3.37 1.21 0.00 97.50 3.37 1.21 0.00 100.00 3.37 1.21 0.00 102.50 3.37 1.21 0.00 105.00 3.37 1.21 0.00 107.50 3.37 1.21 0.00 110.00 3.37 1.21 0.00 112.50 3.37 1.21 0.00 115.00 3.37 1.21 0.00 117.50 3.37 1.21 0.00 120.00 3.37 1.21 0.00 Charlotte 6-hr 2-yr Rainfall=3.37"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 19HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Summary for Pond 4P: Wet Pond 1 Inflow Area = 3.130 ac, 69.33% Impervious, Inflow Depth = 2.07" for 2-yr event Inflow = 14.43 cfs @ 3.15 hrs, Volume= 0.539 af Outflow = 2.82 cfs @ 3.47 hrs, Volume= 0.536 af, Atten= 80%, Lag= 18.7 min Primary = 2.82 cfs @ 3.47 hrs, Volume= 0.536 af Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 789.07' @ 3.47 hrs Surf.Area= 9,948 sf Storage= 13,702 cf Plug-Flow detention time= 722.8 min calculated for 0.536 af (99% of inflow) Center-of-Mass det. time= 722.0 min ( 932.5 - 210.6 ) Volume Invert Avail.Storage Storage Description #1 787.50' 48,545 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 787.50 7,516 0 0 789.00 9,858 13,031 13,031 790.00 11,185 10,522 23,552 791.00 12,500 11,843 35,395 792.00 13,800 13,150 48,545 Device Routing Invert Outlet Devices #1 Primary 787.50'24.0" Round Culvert L= 23.7' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 787.50' / 787.38' S= 0.0051 '/' Cc= 0.900 n= 0.013, Flow Area= 3.14 sf #2 Device 1 787.50'1.5" Vert. Orifice/Grate C= 0.600 #3 Device 1 788.50'24.0" W x 8.0" H Vert. Orifice/Grate C= 0.600 #4 Device 1 790.50'16.0' long Sharp-Crested Vee/Trap Weir Cv= 2.62 (C= 3.28) #5 Secondary 791.00'20.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=2.81 cfs @ 3.47 hrs HW=789.07' (Free Discharge) 1=Culvert (Passes 2.81 cfs of 8.30 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.07 cfs @ 5.91 fps) 3=Orifice/Grate (Orifice Controls 2.74 cfs @ 2.42 fps) 4=Sharp-Crested Vee/Trap Weir ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=787.50' (Free Discharge) 5=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Charlotte 6-hr 2-yr Rainfall=3.37"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 20HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Pond 4P: Wet Pond 1 Inflow Outflow Primary Secondary Hydrograph Time (hours) 12011511010510095908580757065605550454035302520151050Flow (cfs)16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Inflow Area=3.130 ac Peak Elev=789.07' Storage=13,702 cf 14.43 cfs 2.82 cfs 2.82 cfs 0.00 cfs Pond 4P: Wet Pond 1 Total Primary Secondary Stage-Discharge Discharge (cfs) 80706050403020100Elevation (feet)792 791 790 789 788 Culvert + Orifice/Grate Orifice/Grate Sharp-Crested Vee/Trap Weir Broad-Crested Rectangular Weir Charlotte 6-hr 2-yr Rainfall=3.37"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 21HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Pond 4P: Wet Pond 1 Surface Storage Stage-Area-Storage Storage (cubic-feet) 45,00040,00035,00030,00025,00020,00015,00010,0005,0000 Surface/Horizontal/Wetted Area (sq-ft) 13,00012,00011,00010,0009,0008,0007,0006,0005,0004,0003,0002,0001,0000 Elevation (feet)792 791 790 789 788 Custom Stage Data Charlotte 6-hr 2-yr Rainfall=3.37"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 22HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Hydrograph for Pond 4P: Wet Pond 1 Time (hours) Inflow (cfs) Storage (cubic-feet) Elevation (feet) Outflow (cfs) Primary (cfs) Secondary (cfs) 0.00 0.00 0 787.50 0.00 0.00 0.00 2.50 0.42 392 787.55 0.00 0.00 0.00 5.00 0.50 10,504 788.74 0.81 0.81 0.00 7.50 0.00 8,622 788.54 0.10 0.10 0.00 10.00 0.00 8,025 788.47 0.06 0.06 0.00 12.50 0.00 7,527 788.41 0.05 0.05 0.00 15.00 0.00 7,044 788.36 0.05 0.05 0.00 17.50 0.00 6,577 788.31 0.05 0.05 0.00 20.00 0.00 6,126 788.26 0.05 0.05 0.00 22.50 0.00 5,691 788.21 0.05 0.05 0.00 25.00 0.00 5,273 788.16 0.05 0.05 0.00 27.50 0.00 4,872 788.11 0.04 0.04 0.00 30.00 0.00 4,487 788.06 0.04 0.04 0.00 32.50 0.00 4,119 788.02 0.04 0.04 0.00 35.00 0.00 3,768 787.98 0.04 0.04 0.00 37.50 0.00 3,434 787.94 0.04 0.04 0.00 40.00 0.00 3,117 787.90 0.03 0.03 0.00 42.50 0.00 2,818 787.86 0.03 0.03 0.00 45.00 0.00 2,536 787.83 0.03 0.03 0.00 47.50 0.00 2,272 787.79 0.03 0.03 0.00 50.00 0.00 2,025 787.76 0.03 0.03 0.00 52.50 0.00 1,797 787.73 0.02 0.02 0.00 55.00 0.00 1,586 787.71 0.02 0.02 0.00 57.50 0.00 1,394 787.68 0.02 0.02 0.00 60.00 0.00 1,220 787.66 0.02 0.02 0.00 62.50 0.00 1,064 787.64 0.02 0.02 0.00 65.00 0.00 927 787.62 0.01 0.01 0.00 67.50 0.00 810 787.61 0.01 0.01 0.00 70.00 0.00 711 787.59 0.01 0.01 0.00 72.50 0.00 627 787.58 0.01 0.01 0.00 75.00 0.00 556 787.57 0.01 0.01 0.00 77.50 0.00 497 787.57 0.01 0.01 0.00 80.00 0.00 448 787.56 0.01 0.01 0.00 82.50 0.00 406 787.55 0.00 0.00 0.00 85.00 0.00 372 787.55 0.00 0.00 0.00 87.50 0.00 343 787.55 0.00 0.00 0.00 90.00 0.00 318 787.54 0.00 0.00 0.00 92.50 0.00 295 787.54 0.00 0.00 0.00 95.00 0.00 273 787.54 0.00 0.00 0.00 97.50 0.00 253 787.53 0.00 0.00 0.00 100.00 0.00 234 787.53 0.00 0.00 0.00 102.50 0.00 217 787.53 0.00 0.00 0.00 105.00 0.00 201 787.53 0.00 0.00 0.00 107.50 0.00 187 787.52 0.00 0.00 0.00 110.00 0.00 173 787.52 0.00 0.00 0.00 112.50 0.00 160 787.52 0.00 0.00 0.00 115.00 0.00 149 787.52 0.00 0.00 0.00 117.50 0.00 138 787.52 0.00 0.00 0.00 120.00 0.00 128 787.52 0.00 0.00 0.00 Charlotte 6-hr 2-yr Rainfall=3.37"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 23HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Stage-Discharge for Pond 4P: Wet Pond 1 Elevation (feet) Discharge (cfs) Primary (cfs) Secondary (cfs) 787.50 0.00 0.00 0.00 787.55 0.00 0.00 0.00 787.60 0.01 0.01 0.00 787.65 0.02 0.02 0.00 787.70 0.02 0.02 0.00 787.75 0.03 0.03 0.00 787.80 0.03 0.03 0.00 787.85 0.03 0.03 0.00 787.90 0.03 0.03 0.00 787.95 0.04 0.04 0.00 788.00 0.04 0.04 0.00 788.05 0.04 0.04 0.00 788.10 0.04 0.04 0.00 788.15 0.05 0.05 0.00 788.20 0.05 0.05 0.00 788.25 0.05 0.05 0.00 788.30 0.05 0.05 0.00 788.35 0.05 0.05 0.00 788.40 0.05 0.05 0.00 788.45 0.06 0.06 0.00 788.50 0.06 0.06 0.00 788.55 0.13 0.13 0.00 788.60 0.26 0.26 0.00 788.65 0.43 0.43 0.00 788.70 0.64 0.64 0.00 788.75 0.87 0.87 0.00 788.80 1.12 1.12 0.00 788.85 1.40 1.40 0.00 788.90 1.69 1.69 0.00 788.95 2.01 2.01 0.00 789.00 2.34 2.34 0.00 789.05 2.69 2.69 0.00 789.10 3.06 3.06 0.00 789.15 3.44 3.44 0.00 789.20 3.80 3.80 0.00 789.25 4.09 4.09 0.00 789.30 4.36 4.36 0.00 789.35 4.61 4.61 0.00 789.40 4.84 4.84 0.00 789.45 5.06 5.06 0.00 789.50 5.27 5.27 0.00 789.55 5.47 5.47 0.00 789.60 5.66 5.66 0.00 789.65 5.85 5.85 0.00 789.70 6.03 6.03 0.00 789.75 6.20 6.20 0.00 789.80 6.37 6.37 0.00 789.85 6.53 6.53 0.00 789.90 6.69 6.69 0.00 789.95 6.85 6.85 0.00 790.00 7.00 7.00 0.00 790.05 7.15 7.15 0.00 Elevation (feet) Discharge (cfs) Primary (cfs) Secondary (cfs) 790.10 7.30 7.30 0.00 790.15 7.44 7.44 0.00 790.20 7.58 7.58 0.00 790.25 7.72 7.72 0.00 790.30 7.86 7.86 0.00 790.35 7.99 7.99 0.00 790.40 8.12 8.12 0.00 790.45 8.25 8.25 0.00 790.50 8.38 8.38 0.00 790.55 9.09 9.09 0.00 790.60 10.28 10.28 0.00 790.65 11.79 11.79 0.00 790.70 13.55 13.55 0.00 790.75 15.53 15.53 0.00 790.80 17.71 17.71 0.00 790.85 20.06 20.06 0.00 790.90 22.58 22.58 0.00 790.95 23.58 23.58 0.00 791.00 23.92 23.92 0.00 791.05 24.71 24.16 0.56 791.10 25.97 24.39 1.57 791.15 27.52 24.62 2.89 791.20 29.31 24.86 4.45 791.25 31.35 25.08 6.27 791.30 33.61 25.31 8.30 791.35 36.07 25.54 10.53 791.40 38.71 25.76 12.95 791.45 41.65 25.98 15.67 791.50 44.80 26.20 18.60 791.55 48.16 26.42 21.74 791.60 51.73 26.63 25.10 791.65 55.12 26.85 28.27 791.70 58.63 27.06 31.57 791.75 62.25 27.27 34.98 791.80 65.98 27.48 38.50 791.85 69.81 27.69 42.12 791.90 73.74 27.89 45.85 791.95 77.77 28.10 49.68 792.00 81.90 28.30 53.60 Charlotte 6-hr 2-yr Rainfall=3.37"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 24HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Stage-Area-Storage for Pond 4P: Wet Pond 1 Elevation (feet) Surface (sq-ft) Storage (cubic-feet) 787.50 7,516 0 787.55 7,594 378 787.60 7,672 759 787.65 7,750 1,145 787.70 7,828 1,534 787.75 7,906 1,928 787.80 7,984 2,325 787.85 8,062 2,726 787.90 8,141 3,131 787.95 8,219 3,540 788.00 8,297 3,953 788.05 8,375 4,370 788.10 8,453 4,791 788.15 8,531 5,215 788.20 8,609 5,644 788.25 8,687 6,076 788.30 8,765 6,512 788.35 8,843 6,953 788.40 8,921 7,397 788.45 8,999 7,845 788.50 9,077 8,297 788.55 9,155 8,752 788.60 9,233 9,212 788.65 9,312 9,676 788.70 9,390 10,143 788.75 9,468 10,615 788.80 9,546 11,090 788.85 9,624 11,569 788.90 9,702 12,053 788.95 9,780 12,540 789.00 9,858 13,031 789.05 9,924 13,525 789.10 9,991 14,023 789.15 10,057 14,524 789.20 10,123 15,029 789.25 10,190 15,536 789.30 10,256 16,048 789.35 10,322 16,562 789.40 10,389 17,080 789.45 10,455 17,601 789.50 10,522 18,125 789.55 10,588 18,653 789.60 10,654 19,184 789.65 10,721 19,719 789.70 10,787 20,256 789.75 10,853 20,797 789.80 10,920 21,342 789.85 10,986 21,889 789.90 11,052 22,440 789.95 11,119 22,994 790.00 11,185 23,552 790.05 11,251 24,113 Elevation (feet) Surface (sq-ft) Storage (cubic-feet) 790.10 11,317 24,677 790.15 11,382 25,245 790.20 11,448 25,815 790.25 11,514 26,389 790.30 11,579 26,967 790.35 11,645 27,547 790.40 11,711 28,131 790.45 11,777 28,718 790.50 11,843 29,309 790.55 11,908 29,903 790.60 11,974 30,500 790.65 12,040 31,100 790.70 12,106 31,704 790.75 12,171 32,311 790.80 12,237 32,921 790.85 12,303 33,534 790.90 12,368 34,151 790.95 12,434 34,771 791.00 12,500 35,395 791.05 12,565 36,021 791.10 12,630 36,651 791.15 12,695 37,284 791.20 12,760 37,921 791.25 12,825 38,560 791.30 12,890 39,203 791.35 12,955 39,849 791.40 13,020 40,498 791.45 13,085 41,151 791.50 13,150 41,807 791.55 13,215 42,466 791.60 13,280 43,129 791.65 13,345 43,794 791.70 13,410 44,463 791.75 13,475 45,135 791.80 13,540 45,810 791.85 13,605 46,489 791.90 13,670 47,171 791.95 13,735 47,856 792.00 13,800 48,545 Charlotte 6-hr 2-yr Rainfall=3.37"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 25HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Summary for Pond 5P: Wet Pond 2 Inflow Area = 7.380 ac, 60.57% Impervious, Inflow Depth = 1.90" for 2-yr event Inflow = 31.55 cfs @ 3.16 hrs, Volume= 1.171 af Outflow = 5.02 cfs @ 3.57 hrs, Volume= 1.164 af, Atten= 84%, Lag= 24.9 min Primary = 5.02 cfs @ 3.57 hrs, Volume= 1.164 af Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 779.22' @ 3.57 hrs Surf.Area= 15,834 sf Storage= 30,134 cf Plug-Flow detention time= 666.3 min calculated for 1.164 af (99% of inflow) Center-of-Mass det. time= 665.5 min ( 877.8 - 212.3 ) Volume Invert Avail.Storage Storage Description #1 777.00' 82,420 cf Custom Stage Data (Irregular) Listed below (Recalc) Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (feet) (cubic-feet) (cubic-feet) (sq-ft) 777.00 11,324 654.0 0 0 11,324 778.00 13,317 673.0 12,307 12,307 13,437 779.00 15,366 692.0 14,329 26,636 15,611 780.00 17,509 713.0 16,426 43,062 18,062 781.00 19,675 731.0 18,581 61,644 20,253 782.00 21,898 750.0 20,777 82,420 22,611 Device Routing Invert Outlet Devices #1 Primary 776.50'24.0" Round Culvert L= 77.6' Ke= 0.500 Inlet / Outlet Invert= 776.50' / 775.72' S= 0.0101 '/' Cc= 0.900 n= 0.013, Flow Area= 3.14 sf #2 Device 1 777.00'2.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 778.30'24.0" W x 8.0" H Vert. Orifice/Grate C= 0.600 #4 Primary 780.50'16.0' long Sharp-Crested Vee/Trap Weir Cv= 2.62 (C= 3.28) #5 Secondary 780.75'12.0' long Sharp-Crested Vee/Trap Weir Cv= 2.62 (C= 3.28) Primary OutFlow Max=5.02 cfs @ 3.57 hrs HW=779.22' (Free Discharge) 1=Culvert (Passes 5.02 cfs of 19.68 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.15 cfs @ 7.04 fps) 3=Orifice/Grate (Orifice Controls 4.86 cfs @ 3.65 fps) 4=Sharp-Crested Vee/Trap Weir ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=777.00' (Free Discharge) 5=Sharp-Crested Vee/Trap Weir ( Controls 0.00 cfs) Charlotte 6-hr 2-yr Rainfall=3.37"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 26HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Pond 5P: Wet Pond 2 Inflow Outflow Primary Secondary Hydrograph Time (hours) 12011511010510095908580757065605550454035302520151050Flow (cfs)34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Inflow Area=7.380 ac Peak Elev=779.22' Storage=30,134 cf 31.55 cfs 5.02 cfs 5.02 cfs 0.00 cfs Pond 5P: Wet Pond 2 Total Primary Secondary Stage-Discharge Discharge (cfs) 160140120100806040200Elevation (feet)782 781 780 779 778 777 Orifice/Grate Orifice/Grate Sharp-Crested Vee/Trap Weir Sharp-Crested Vee/Trap Weir Charlotte 6-hr 2-yr Rainfall=3.37"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 27HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Pond 5P: Wet Pond 2 Surface Storage Stage-Area-Storage Storage (cubic-feet) 80,00070,00060,00050,00040,00030,00020,00010,0000 Surface/Horizontal/Wetted Area (sq-ft) 20,00018,00016,00014,00012,00010,0008,0006,0004,0002,0000 Elevation (feet)782 781 780 779 778 777 Custom Stage Data Charlotte 6-hr 2-yr Rainfall=3.37"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 28HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Hydrograph for Pond 5P: Wet Pond 2 Time (hours) Inflow (cfs) Storage (cubic-feet) Elevation (feet) Outflow (cfs) Primary (cfs) Secondary (cfs) 0.00 0.00 0 777.00 0.00 0.00 0.00 2.50 0.70 502 777.04 0.00 0.00 0.00 5.00 1.14 22,808 778.75 2.05 2.05 0.00 7.50 0.00 17,609 778.39 0.29 0.29 0.00 10.00 0.00 16,144 778.28 0.12 0.12 0.00 12.50 0.00 15,126 778.21 0.11 0.11 0.00 15.00 0.00 14,139 778.14 0.11 0.11 0.00 17.50 0.00 13,186 778.07 0.10 0.10 0.00 20.00 0.00 12,265 778.00 0.10 0.10 0.00 22.50 0.00 11,379 777.93 0.10 0.10 0.00 25.00 0.00 10,526 777.86 0.09 0.09 0.00 27.50 0.00 9,707 777.80 0.09 0.09 0.00 30.00 0.00 8,924 777.74 0.09 0.09 0.00 32.50 0.00 8,175 777.68 0.08 0.08 0.00 35.00 0.00 7,461 777.63 0.08 0.08 0.00 37.50 0.00 6,783 777.57 0.07 0.07 0.00 40.00 0.00 6,141 777.52 0.07 0.07 0.00 42.50 0.00 5,535 777.47 0.07 0.07 0.00 45.00 0.00 4,966 777.42 0.06 0.06 0.00 47.50 0.00 4,433 777.38 0.06 0.06 0.00 50.00 0.00 3,938 777.34 0.05 0.05 0.00 52.50 0.00 3,480 777.30 0.05 0.05 0.00 55.00 0.00 3,060 777.26 0.04 0.04 0.00 57.50 0.00 2,677 777.23 0.04 0.04 0.00 60.00 0.00 2,333 777.20 0.04 0.04 0.00 62.50 0.00 2,027 777.18 0.03 0.03 0.00 65.00 0.00 1,759 777.15 0.03 0.03 0.00 67.50 0.00 1,529 777.13 0.02 0.02 0.00 70.00 0.00 1,340 777.12 0.02 0.02 0.00 72.50 0.00 1,185 777.10 0.02 0.02 0.00 75.00 0.00 1,056 777.09 0.01 0.01 0.00 77.50 0.00 947 777.08 0.01 0.01 0.00 80.00 0.00 855 777.07 0.01 0.01 0.00 82.50 0.00 776 777.07 0.01 0.01 0.00 85.00 0.00 710 777.06 0.01 0.01 0.00 87.50 0.00 654 777.06 0.01 0.01 0.00 90.00 0.00 606 777.05 0.00 0.00 0.00 92.50 0.00 565 777.05 0.00 0.00 0.00 95.00 0.00 529 777.05 0.00 0.00 0.00 97.50 0.00 495 777.04 0.00 0.00 0.00 100.00 0.00 463 777.04 0.00 0.00 0.00 102.50 0.00 434 777.04 0.00 0.00 0.00 105.00 0.00 406 777.04 0.00 0.00 0.00 107.50 0.00 380 777.03 0.00 0.00 0.00 110.00 0.00 355 777.03 0.00 0.00 0.00 112.50 0.00 333 777.03 0.00 0.00 0.00 115.00 0.00 311 777.03 0.00 0.00 0.00 117.50 0.00 291 777.03 0.00 0.00 0.00 120.00 0.00 273 777.02 0.00 0.00 0.00 Charlotte 6-hr 2-yr Rainfall=3.37"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 29HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Stage-Discharge for Pond 5P: Wet Pond 2 Elevation (feet) Discharge (cfs) Primary (cfs) Secondary (cfs) 777.00 0.00 0.00 0.00 777.05 0.00 0.00 0.00 777.10 0.01 0.01 0.00 777.15 0.03 0.03 0.00 777.20 0.04 0.04 0.00 777.25 0.04 0.04 0.00 777.30 0.05 0.05 0.00 777.35 0.05 0.05 0.00 777.40 0.06 0.06 0.00 777.45 0.06 0.06 0.00 777.50 0.07 0.07 0.00 777.55 0.07 0.07 0.00 777.60 0.08 0.08 0.00 777.65 0.08 0.08 0.00 777.70 0.08 0.08 0.00 777.75 0.09 0.09 0.00 777.80 0.09 0.09 0.00 777.85 0.09 0.09 0.00 777.90 0.09 0.09 0.00 777.95 0.10 0.10 0.00 778.00 0.10 0.10 0.00 778.05 0.10 0.10 0.00 778.10 0.11 0.11 0.00 778.15 0.11 0.11 0.00 778.20 0.11 0.11 0.00 778.25 0.11 0.11 0.00 778.30 0.12 0.12 0.00 778.35 0.19 0.19 0.00 778.40 0.32 0.32 0.00 778.45 0.50 0.50 0.00 778.50 0.70 0.70 0.00 778.55 0.93 0.93 0.00 778.60 1.18 1.18 0.00 778.65 1.46 1.46 0.00 778.70 1.76 1.76 0.00 778.75 2.07 2.07 0.00 778.80 2.41 2.41 0.00 778.85 2.76 2.76 0.00 778.90 3.13 3.13 0.00 778.95 3.51 3.51 0.00 779.00 3.87 3.87 0.00 779.05 4.16 4.16 0.00 779.10 4.43 4.43 0.00 779.15 4.68 4.68 0.00 779.20 4.91 4.91 0.00 779.25 5.13 5.13 0.00 779.30 5.34 5.34 0.00 779.35 5.54 5.54 0.00 779.40 5.74 5.74 0.00 779.45 5.92 5.92 0.00 779.50 6.10 6.10 0.00 779.55 6.28 6.28 0.00 Elevation (feet) Discharge (cfs) Primary (cfs) Secondary (cfs) 779.60 6.45 6.45 0.00 779.65 6.61 6.61 0.00 779.70 6.77 6.77 0.00 779.75 6.93 6.93 0.00 779.80 7.08 7.08 0.00 779.85 7.23 7.23 0.00 779.90 7.38 7.38 0.00 779.95 7.52 7.52 0.00 780.00 7.67 7.67 0.00 780.05 7.80 7.80 0.00 780.10 7.94 7.94 0.00 780.15 8.07 8.07 0.00 780.20 8.21 8.21 0.00 780.25 8.34 8.34 0.00 780.30 8.46 8.46 0.00 780.35 8.59 8.59 0.00 780.40 8.71 8.71 0.00 780.45 8.83 8.83 0.00 780.50 8.95 8.95 0.00 780.55 9.66 9.66 0.00 780.60 10.85 10.85 0.00 780.65 12.35 12.35 0.00 780.70 14.11 14.11 0.00 780.75 16.08 16.08 0.00 780.80 18.69 18.25 0.44 780.85 21.85 20.60 1.24 780.90 25.40 23.12 2.28 780.95 29.30 25.79 3.52 781.00 33.51 28.60 4.91 781.05 38.01 31.56 6.46 781.10 42.78 34.64 8.14 781.15 47.79 37.85 9.94 781.20 53.04 41.18 11.86 781.25 58.52 44.63 13.89 781.30 64.22 48.19 16.03 781.35 70.12 51.86 18.26 781.40 76.23 55.63 20.60 781.45 82.52 59.51 23.02 781.50 89.01 63.48 25.53 781.55 95.68 67.56 28.12 781.60 102.53 71.73 30.80 781.65 109.55 75.99 33.55 781.70 116.73 80.34 36.39 781.75 124.09 84.79 39.30 781.80 131.60 89.32 42.28 781.85 139.27 93.93 45.34 781.90 147.10 98.63 48.47 781.95 155.07 103.41 51.66 782.00 163.20 108.27 54.92 Charlotte 6-hr 2-yr Rainfall=3.37"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 30HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Stage-Area-Storage for Pond 5P: Wet Pond 2 Elevation (feet) Surface (sq-ft) Storage (cubic-feet) 777.00 11,324 0 777.05 11,420 569 777.10 11,516 1,142 777.15 11,613 1,720 777.20 11,710 2,303 777.25 11,807 2,891 777.30 11,905 3,484 777.35 12,003 4,082 777.40 12,102 4,684 777.45 12,201 5,292 777.50 12,300 5,904 777.55 12,400 6,522 777.60 12,500 7,144 777.65 12,601 7,772 777.70 12,702 8,405 777.75 12,804 9,042 777.80 12,905 9,685 777.85 13,008 10,333 777.90 13,110 10,986 777.95 13,214 11,644 778.00 13,317 12,307 778.05 13,416 12,975 778.10 13,515 13,649 778.15 13,615 14,327 778.20 13,715 15,010 778.25 13,816 15,698 778.30 13,916 16,392 778.35 14,017 17,090 778.40 14,119 17,793 778.45 14,221 18,502 778.50 14,323 19,216 778.55 14,426 19,934 778.60 14,529 20,658 778.65 14,632 21,387 778.70 14,736 22,121 778.75 14,840 22,861 778.80 14,944 23,605 778.85 15,049 24,355 778.90 15,155 25,110 778.95 15,260 25,871 779.00 15,366 26,636 779.05 15,470 27,407 779.10 15,574 28,183 779.15 15,679 28,965 779.20 15,783 29,751 779.25 15,889 30,543 779.30 15,994 31,340 779.35 16,100 32,142 779.40 16,206 32,950 779.45 16,313 33,763 779.50 16,420 34,581 779.55 16,527 35,405 Elevation (feet) Surface (sq-ft) Storage (cubic-feet) 779.60 16,635 36,234 779.65 16,743 37,069 779.70 16,851 37,908 779.75 16,960 38,754 779.80 17,069 39,604 779.85 17,179 40,461 779.90 17,288 41,322 779.95 17,399 42,189 780.00 17,509 43,062 780.05 17,614 43,940 780.10 17,720 44,824 780.15 17,826 45,712 780.20 17,932 46,606 780.25 18,039 47,505 780.30 18,146 48,410 780.35 18,253 49,320 780.40 18,360 50,235 780.45 18,468 51,156 780.50 18,576 52,082 780.55 18,685 53,014 780.60 18,793 53,951 780.65 18,903 54,893 780.70 19,012 55,841 780.75 19,122 56,794 780.80 19,232 57,753 780.85 19,342 58,717 780.90 19,453 59,687 780.95 19,564 60,663 781.00 19,675 61,644 781.05 19,783 62,630 781.10 19,892 63,622 781.15 20,001 64,619 781.20 20,110 65,622 781.25 20,220 66,630 781.30 20,329 67,644 781.35 20,440 68,663 781.40 20,550 69,688 781.45 20,661 70,718 781.50 20,772 71,754 781.55 20,883 72,795 781.60 20,995 73,842 781.65 21,106 74,895 781.70 21,219 75,953 781.75 21,331 77,017 781.80 21,444 78,086 781.85 21,557 79,161 781.90 21,670 80,242 781.95 21,784 81,328 782.00 21,898 82,420 Charlotte 6-hr 2-yr Rainfall=3.37"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 31HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Summary for Link 3L: Ex Drainage Areas Inflow Area = 12.660 ac, 4.30% Impervious, Inflow Depth = 0.95" for 2-yr event Inflow = 19.72 cfs @ 3.27 hrs, Volume= 1.007 af Primary = 19.72 cfs @ 3.27 hrs, Volume= 1.007 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Link 3L: Ex Drainage Areas Inflow Primary Hydrograph Time (hours) 12011511010510095908580757065605550454035302520151050Flow (cfs)22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Inflow Area=12.660 ac 19.72 cfs 19.72 cfs Charlotte 6-hr 2-yr Rainfall=3.37"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 32HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Hydrograph for Link 3L: Ex Drainage Areas Time (hours) Inflow (cfs) Elevation (feet) Primary (cfs) 0.00 0.00 0.00 0.00 2.50 0.00 0.00 0.00 5.00 1.46 0.00 1.46 7.50 0.00 0.00 0.00 10.00 0.00 0.00 0.00 12.50 0.00 0.00 0.00 15.00 0.00 0.00 0.00 17.50 0.00 0.00 0.00 20.00 0.00 0.00 0.00 22.50 0.00 0.00 0.00 25.00 0.00 0.00 0.00 27.50 0.00 0.00 0.00 30.00 0.00 0.00 0.00 32.50 0.00 0.00 0.00 35.00 0.00 0.00 0.00 37.50 0.00 0.00 0.00 40.00 0.00 0.00 0.00 42.50 0.00 0.00 0.00 45.00 0.00 0.00 0.00 47.50 0.00 0.00 0.00 50.00 0.00 0.00 0.00 52.50 0.00 0.00 0.00 55.00 0.00 0.00 0.00 57.50 0.00 0.00 0.00 60.00 0.00 0.00 0.00 62.50 0.00 0.00 0.00 65.00 0.00 0.00 0.00 67.50 0.00 0.00 0.00 70.00 0.00 0.00 0.00 72.50 0.00 0.00 0.00 75.00 0.00 0.00 0.00 77.50 0.00 0.00 0.00 80.00 0.00 0.00 0.00 82.50 0.00 0.00 0.00 85.00 0.00 0.00 0.00 87.50 0.00 0.00 0.00 90.00 0.00 0.00 0.00 92.50 0.00 0.00 0.00 95.00 0.00 0.00 0.00 97.50 0.00 0.00 0.00 100.00 0.00 0.00 0.00 102.50 0.00 0.00 0.00 105.00 0.00 0.00 0.00 107.50 0.00 0.00 0.00 110.00 0.00 0.00 0.00 112.50 0.00 0.00 0.00 115.00 0.00 0.00 0.00 117.50 0.00 0.00 0.00 120.00 0.00 0.00 0.00 Charlotte 6-hr 2-yr Rainfall=3.37"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 33HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Summary for Link 7L: POI-1 Inflow Area = 4.440 ac, 57.82% Impervious, Inflow Depth > 1.75" for 2-yr event Inflow = 3.76 cfs @ 3.32 hrs, Volume= 0.649 af Primary = 3.76 cfs @ 3.32 hrs, Volume= 0.649 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Link 7L: POI-1 Inflow Primary Hydrograph Time (hours) 12011511010510095908580757065605550454035302520151050Flow (cfs)4 3 2 1 0 Inflow Area=4.440 ac 3.76 cfs 3.76 cfs Charlotte 6-hr 2-yr Rainfall=3.37"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 34HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Hydrograph for Link 7L: POI-1 Time (hours) Inflow (cfs) Elevation (feet) Primary (cfs) 0.00 0.00 0.00 0.00 2.50 0.00 0.00 0.00 5.00 0.96 0.00 0.96 7.50 0.10 0.00 0.10 10.00 0.06 0.00 0.06 12.50 0.05 0.00 0.05 15.00 0.05 0.00 0.05 17.50 0.05 0.00 0.05 20.00 0.05 0.00 0.05 22.50 0.05 0.00 0.05 25.00 0.05 0.00 0.05 27.50 0.04 0.00 0.04 30.00 0.04 0.00 0.04 32.50 0.04 0.00 0.04 35.00 0.04 0.00 0.04 37.50 0.04 0.00 0.04 40.00 0.03 0.00 0.03 42.50 0.03 0.00 0.03 45.00 0.03 0.00 0.03 47.50 0.03 0.00 0.03 50.00 0.03 0.00 0.03 52.50 0.02 0.00 0.02 55.00 0.02 0.00 0.02 57.50 0.02 0.00 0.02 60.00 0.02 0.00 0.02 62.50 0.02 0.00 0.02 65.00 0.01 0.00 0.01 67.50 0.01 0.00 0.01 70.00 0.01 0.00 0.01 72.50 0.01 0.00 0.01 75.00 0.01 0.00 0.01 77.50 0.01 0.00 0.01 80.00 0.01 0.00 0.01 82.50 0.00 0.00 0.00 85.00 0.00 0.00 0.00 87.50 0.00 0.00 0.00 90.00 0.00 0.00 0.00 92.50 0.00 0.00 0.00 95.00 0.00 0.00 0.00 97.50 0.00 0.00 0.00 100.00 0.00 0.00 0.00 102.50 0.00 0.00 0.00 105.00 0.00 0.00 0.00 107.50 0.00 0.00 0.00 110.00 0.00 0.00 0.00 112.50 0.00 0.00 0.00 115.00 0.00 0.00 0.00 117.50 0.00 0.00 0.00 120.00 0.00 0.00 0.00 Charlotte 6-hr 2-yr Rainfall=3.37"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 35HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Summary for Link 8L: POI-2 Inflow Area = 7.380 ac, 60.57% Impervious, Inflow Depth > 1.89" for 2-yr event Inflow = 5.02 cfs @ 3.57 hrs, Volume= 1.164 af Primary = 5.02 cfs @ 3.57 hrs, Volume= 1.164 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Link 8L: POI-2 Inflow Primary Hydrograph Time (hours) 12011511010510095908580757065605550454035302520151050Flow (cfs)5 4 3 2 1 0 Inflow Area=7.380 ac 5.02 cfs 5.02 cfs Charlotte 6-hr 2-yr Rainfall=3.37"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 36HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Hydrograph for Link 8L: POI-2 Time (hours) Inflow (cfs) Elevation (feet) Primary (cfs) 0.00 0.00 0.00 0.00 2.50 0.00 0.00 0.00 5.00 2.05 0.00 2.05 7.50 0.29 0.00 0.29 10.00 0.12 0.00 0.12 12.50 0.11 0.00 0.11 15.00 0.11 0.00 0.11 17.50 0.10 0.00 0.10 20.00 0.10 0.00 0.10 22.50 0.10 0.00 0.10 25.00 0.09 0.00 0.09 27.50 0.09 0.00 0.09 30.00 0.09 0.00 0.09 32.50 0.08 0.00 0.08 35.00 0.08 0.00 0.08 37.50 0.07 0.00 0.07 40.00 0.07 0.00 0.07 42.50 0.07 0.00 0.07 45.00 0.06 0.00 0.06 47.50 0.06 0.00 0.06 50.00 0.05 0.00 0.05 52.50 0.05 0.00 0.05 55.00 0.04 0.00 0.04 57.50 0.04 0.00 0.04 60.00 0.04 0.00 0.04 62.50 0.03 0.00 0.03 65.00 0.03 0.00 0.03 67.50 0.02 0.00 0.02 70.00 0.02 0.00 0.02 72.50 0.02 0.00 0.02 75.00 0.01 0.00 0.01 77.50 0.01 0.00 0.01 80.00 0.01 0.00 0.01 82.50 0.01 0.00 0.01 85.00 0.01 0.00 0.01 87.50 0.01 0.00 0.01 90.00 0.00 0.00 0.00 92.50 0.00 0.00 0.00 95.00 0.00 0.00 0.00 97.50 0.00 0.00 0.00 100.00 0.00 0.00 0.00 102.50 0.00 0.00 0.00 105.00 0.00 0.00 0.00 107.50 0.00 0.00 0.00 110.00 0.00 0.00 0.00 112.50 0.00 0.00 0.00 115.00 0.00 0.00 0.00 117.50 0.00 0.00 0.00 120.00 0.00 0.00 0.00 Charlotte 6-hr 2-yr Rainfall=3.37"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 37HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Summary for Link 9L: Combined Inflow Area = 11.820 ac, 59.53% Impervious, Inflow Depth > 1.84" for 2-yr event Inflow = 8.51 cfs @ 3.45 hrs, Volume= 1.814 af Primary = 8.51 cfs @ 3.45 hrs, Volume= 1.814 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Link 9L: Combined Inflow Primary Hydrograph Time (hours) 12011511010510095908580757065605550454035302520151050Flow (cfs)9 8 7 6 5 4 3 2 1 0 Inflow Area=11.820 ac 8.51 cfs 8.51 cfs Charlotte 6-hr 2-yr Rainfall=3.37"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 38HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Hydrograph for Link 9L: Combined Time (hours) Inflow (cfs) Elevation (feet) Primary (cfs) 0.00 0.00 0.00 0.00 2.50 0.01 0.00 0.01 5.00 3.01 0.00 3.01 7.50 0.39 0.00 0.39 10.00 0.17 0.00 0.17 12.50 0.17 0.00 0.17 15.00 0.16 0.00 0.16 17.50 0.16 0.00 0.16 20.00 0.15 0.00 0.15 22.50 0.14 0.00 0.14 25.00 0.14 0.00 0.14 27.50 0.13 0.00 0.13 30.00 0.13 0.00 0.13 32.50 0.12 0.00 0.12 35.00 0.12 0.00 0.12 37.50 0.11 0.00 0.11 40.00 0.10 0.00 0.10 42.50 0.10 0.00 0.10 45.00 0.09 0.00 0.09 47.50 0.09 0.00 0.09 50.00 0.08 0.00 0.08 52.50 0.07 0.00 0.07 55.00 0.07 0.00 0.07 57.50 0.06 0.00 0.06 60.00 0.05 0.00 0.05 62.50 0.05 0.00 0.05 65.00 0.04 0.00 0.04 67.50 0.04 0.00 0.04 70.00 0.03 0.00 0.03 72.50 0.02 0.00 0.02 75.00 0.02 0.00 0.02 77.50 0.02 0.00 0.02 80.00 0.01 0.00 0.01 82.50 0.01 0.00 0.01 85.00 0.01 0.00 0.01 87.50 0.01 0.00 0.01 90.00 0.01 0.00 0.01 92.50 0.01 0.00 0.01 95.00 0.01 0.00 0.01 97.50 0.01 0.00 0.01 100.00 0.01 0.00 0.01 102.50 0.01 0.00 0.01 105.00 0.00 0.00 0.00 107.50 0.00 0.00 0.00 110.00 0.00 0.00 0.00 112.50 0.00 0.00 0.00 115.00 0.00 0.00 0.00 117.50 0.00 0.00 0.00 120.00 0.00 0.00 0.00 Charlotte 6-hr 10-yr Rainfall=4.93"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 39HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Time span=0.00-120.00 hrs, dt=0.05 hrs, 2401 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=6.010 ac 5.66% Impervious Runoff Depth=2.06"Subcatchment 1S: Ex DA-1 Flow Length=699' Tc=12.0 min CN=71 Runoff=19.99 cfs 1.034 af Runoff Area=6.650 ac 3.08% Impervious Runoff Depth=1.98"Subcatchment 2S: Ex DA-2 Flow Length=790' Tc=13.1 min CN=70 Runoff=20.55 cfs 1.100 af Runoff Area=3.130 ac 69.33% Impervious Runoff Depth=3.50"Subcatchment 4S: Prop DA-1 Tc=5.0 min CN=87 Runoff=21.32 cfs 0.913 af Runoff Area=7.380 ac 60.57% Impervious Runoff Depth=3.30"Subcatchment 5S: Prop DA-2 Tc=5.0 min CN=85 Runoff=47.92 cfs 2.032 af Runoff Area=1.310 ac 30.31% Impervious Runoff Depth=2.14"Subcatchment 6S: Prop DA-3 Tc=5.0 min CN=72 Runoff=5.64 cfs 0.234 af Runoff Area=2.420 ac 0.00% Impervious Runoff Depth=2.39"Subcatchment 10S: DA-2 Bypass A Tc=5.0 min CN=75 Runoff=11.65 cfs 0.483 af Peak Elev=789.76' Storage=20,887 cf Inflow=21.32 cfs 0.913 afPond 4P: Wet Pond 1 Primary=6.23 cfs 0.910 af Secondary=0.00 cfs 0.000 af Outflow=6.23 cfs 0.910 af Peak Elev=780.45' Storage=51,142 cf Inflow=47.92 cfs 2.032 afPond 5P: Wet Pond 2 Primary=8.83 cfs 2.025 af Secondary=0.00 cfs 0.000 af Outflow=8.83 cfs 2.025 af Inflow=40.47 cfs 2.133 afLink 3L: Ex Drainage Areas Primary=40.47 cfs 2.133 af Inflow=10.09 cfs 1.144 afLink 7L: POI-1 Primary=10.09 cfs 1.144 af Inflow=8.83 cfs 2.025 afLink 8L: POI-2 Primary=8.83 cfs 2.025 af Inflow=17.31 cfs 3.170 afLink 9L: Combined Primary=17.31 cfs 3.170 af Total Runoff Area = 26.900 ac Runoff Volume = 5.795 af Average Runoff Depth = 2.59" 71.81% Pervious = 19.318 ac 28.19% Impervious = 7.582 ac Charlotte 6-hr 10-yr Rainfall=4.93"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 40HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Summary for Subcatchment 1S: Ex DA-1 Runoff = 19.99 cfs @ 3.26 hrs, Volume= 1.034 af, Depth= 2.06" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Charlotte 6-hr 10-yr Rainfall=4.93" Area (ac) CN Description 5.670 69 50-75% Grass cover, Fair, HSG B 0.340 98 Paved parking, HSG B 6.010 71 Weighted Average 5.670 94.34% Pervious Area 0.340 5.66% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.0 75 0.0400 0.18 Sheet Flow, Sheet Flow Grass: Short n= 0.150 P2= 2.28" 4.6 387 0.0400 1.40 Shallow Concentrated Flow, Shallow Concentrated Flow Short Grass Pasture Kv= 7.0 fps 0.4 237 0.0100 10.72 64.33 Channel Flow, Roadside Swale Area= 6.0 sf Perim= 3.0' r= 2.00' n= 0.022 Earth, clean & straight 12.0 699 Total Subcatchment 1S: Ex DA-1 Runoff Hydrograph Time (hours) 12011511010510095908580757065605550454035302520151050Flow (cfs)22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Charlotte 6-hr 10-yr Rainfall=4.93" Runoff Area=6.010 ac Runoff Volume=1.034 af Runoff Depth=2.06" Flow Length=699' Tc=12.0 min CN=71 19.99 cfs Charlotte 6-hr 10-yr Rainfall=4.93"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 41HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 1S: Ex DA-1 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 2.50 0.85 0.00 0.00 5.00 4.72 1.91 1.20 7.50 4.93 2.06 0.00 10.00 4.93 2.06 0.00 12.50 4.93 2.06 0.00 15.00 4.93 2.06 0.00 17.50 4.93 2.06 0.00 20.00 4.93 2.06 0.00 22.50 4.93 2.06 0.00 25.00 4.93 2.06 0.00 27.50 4.93 2.06 0.00 30.00 4.93 2.06 0.00 32.50 4.93 2.06 0.00 35.00 4.93 2.06 0.00 37.50 4.93 2.06 0.00 40.00 4.93 2.06 0.00 42.50 4.93 2.06 0.00 45.00 4.93 2.06 0.00 47.50 4.93 2.06 0.00 50.00 4.93 2.06 0.00 52.50 4.93 2.06 0.00 55.00 4.93 2.06 0.00 57.50 4.93 2.06 0.00 60.00 4.93 2.06 0.00 62.50 4.93 2.06 0.00 65.00 4.93 2.06 0.00 67.50 4.93 2.06 0.00 70.00 4.93 2.06 0.00 72.50 4.93 2.06 0.00 75.00 4.93 2.06 0.00 77.50 4.93 2.06 0.00 80.00 4.93 2.06 0.00 82.50 4.93 2.06 0.00 85.00 4.93 2.06 0.00 87.50 4.93 2.06 0.00 90.00 4.93 2.06 0.00 92.50 4.93 2.06 0.00 95.00 4.93 2.06 0.00 97.50 4.93 2.06 0.00 100.00 4.93 2.06 0.00 102.50 4.93 2.06 0.00 105.00 4.93 2.06 0.00 107.50 4.93 2.06 0.00 110.00 4.93 2.06 0.00 112.50 4.93 2.06 0.00 115.00 4.93 2.06 0.00 117.50 4.93 2.06 0.00 120.00 4.93 2.06 0.00 Charlotte 6-hr 10-yr Rainfall=4.93"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 42HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Summary for Subcatchment 2S: Ex DA-2 Runoff = 20.55 cfs @ 3.27 hrs, Volume= 1.100 af, Depth= 1.98" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Charlotte 6-hr 10-yr Rainfall=4.93" Area (ac) CN Description 6.445 69 50-75% Grass cover, Fair, HSG B 0.205 98 Paved parking, HSG B 6.650 70 Weighted Average 6.445 96.92% Pervious Area 0.205 3.08% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.8 75 0.0300 0.16 Sheet Flow, Sheet Flow Grass: Short n= 0.150 P2= 2.28" 4.8 400 0.0400 1.40 Shallow Concentrated Flow, Shallow Concentrated Flow Short Grass Pasture Kv= 7.0 fps 0.5 315 0.0150 11.56 69.34 Channel Flow, Channel Flow Area= 6.0 sf Perim= 3.0' r= 2.00' n= 0.025 Earth, clean & winding 13.1 790 Total Subcatchment 2S: Ex DA-2 Runoff Hydrograph Time (hours) 12011511010510095908580757065605550454035302520151050Flow (cfs)23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Charlotte 6-hr 10-yr Rainfall=4.93" Runoff Area=6.650 ac Runoff Volume=1.100 af Runoff Depth=1.98" Flow Length=790' Tc=13.1 min CN=70 20.55 cfs Charlotte 6-hr 10-yr Rainfall=4.93"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 43HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 2S: Ex DA-2 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 2.50 0.85 0.00 0.00 5.00 4.72 1.83 1.31 7.50 4.93 1.98 0.00 10.00 4.93 1.98 0.00 12.50 4.93 1.98 0.00 15.00 4.93 1.98 0.00 17.50 4.93 1.98 0.00 20.00 4.93 1.98 0.00 22.50 4.93 1.98 0.00 25.00 4.93 1.98 0.00 27.50 4.93 1.98 0.00 30.00 4.93 1.98 0.00 32.50 4.93 1.98 0.00 35.00 4.93 1.98 0.00 37.50 4.93 1.98 0.00 40.00 4.93 1.98 0.00 42.50 4.93 1.98 0.00 45.00 4.93 1.98 0.00 47.50 4.93 1.98 0.00 50.00 4.93 1.98 0.00 52.50 4.93 1.98 0.00 55.00 4.93 1.98 0.00 57.50 4.93 1.98 0.00 60.00 4.93 1.98 0.00 62.50 4.93 1.98 0.00 65.00 4.93 1.98 0.00 67.50 4.93 1.98 0.00 70.00 4.93 1.98 0.00 72.50 4.93 1.98 0.00 75.00 4.93 1.98 0.00 77.50 4.93 1.98 0.00 80.00 4.93 1.98 0.00 82.50 4.93 1.98 0.00 85.00 4.93 1.98 0.00 87.50 4.93 1.98 0.00 90.00 4.93 1.98 0.00 92.50 4.93 1.98 0.00 95.00 4.93 1.98 0.00 97.50 4.93 1.98 0.00 100.00 4.93 1.98 0.00 102.50 4.93 1.98 0.00 105.00 4.93 1.98 0.00 107.50 4.93 1.98 0.00 110.00 4.93 1.98 0.00 112.50 4.93 1.98 0.00 115.00 4.93 1.98 0.00 117.50 4.93 1.98 0.00 120.00 4.93 1.98 0.00 Charlotte 6-hr 10-yr Rainfall=4.93"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 44HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Summary for Subcatchment 4S: Prop DA-1 [49] Hint: Tc<2dt may require smaller dt Runoff = 21.32 cfs @ 3.15 hrs, Volume= 0.913 af, Depth= 3.50" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Charlotte 6-hr 10-yr Rainfall=4.93" Area (ac) CN Description 2.170 98 Paved parking, HSG B 0.960 61 >75% Grass cover, Good, HSG B 3.130 87 Weighted Average 0.960 30.67% Pervious Area 2.170 69.33% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, ToC Subcatchment 4S: Prop DA-1 Runoff Hydrograph Time (hours) 12011511010510095908580757065605550454035302520151050Flow (cfs)23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Charlotte 6-hr 10-yr Rainfall=4.93" Runoff Area=3.130 ac Runoff Volume=0.913 af Runoff Depth=3.50" Tc=5.0 min CN=87 21.32 cfs Charlotte 6-hr 10-yr Rainfall=4.93"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 45HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 4S: Prop DA-1 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 2.50 0.85 0.15 1.08 5.00 4.72 3.31 0.76 7.50 4.93 3.50 0.00 10.00 4.93 3.50 0.00 12.50 4.93 3.50 0.00 15.00 4.93 3.50 0.00 17.50 4.93 3.50 0.00 20.00 4.93 3.50 0.00 22.50 4.93 3.50 0.00 25.00 4.93 3.50 0.00 27.50 4.93 3.50 0.00 30.00 4.93 3.50 0.00 32.50 4.93 3.50 0.00 35.00 4.93 3.50 0.00 37.50 4.93 3.50 0.00 40.00 4.93 3.50 0.00 42.50 4.93 3.50 0.00 45.00 4.93 3.50 0.00 47.50 4.93 3.50 0.00 50.00 4.93 3.50 0.00 52.50 4.93 3.50 0.00 55.00 4.93 3.50 0.00 57.50 4.93 3.50 0.00 60.00 4.93 3.50 0.00 62.50 4.93 3.50 0.00 65.00 4.93 3.50 0.00 67.50 4.93 3.50 0.00 70.00 4.93 3.50 0.00 72.50 4.93 3.50 0.00 75.00 4.93 3.50 0.00 77.50 4.93 3.50 0.00 80.00 4.93 3.50 0.00 82.50 4.93 3.50 0.00 85.00 4.93 3.50 0.00 87.50 4.93 3.50 0.00 90.00 4.93 3.50 0.00 92.50 4.93 3.50 0.00 95.00 4.93 3.50 0.00 97.50 4.93 3.50 0.00 100.00 4.93 3.50 0.00 102.50 4.93 3.50 0.00 105.00 4.93 3.50 0.00 107.50 4.93 3.50 0.00 110.00 4.93 3.50 0.00 112.50 4.93 3.50 0.00 115.00 4.93 3.50 0.00 117.50 4.93 3.50 0.00 120.00 4.93 3.50 0.00 Charlotte 6-hr 10-yr Rainfall=4.93"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 46HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Summary for Subcatchment 5S: Prop DA-2 [49] Hint: Tc<2dt may require smaller dt Runoff = 47.92 cfs @ 3.15 hrs, Volume= 2.032 af, Depth= 3.30" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Charlotte 6-hr 10-yr Rainfall=4.93" Area (ac) CN Description 2.560 61 >75% Grass cover, Good, HSG B 1.600 98 Roofs, HSG B 2.870 98 Paved parking, HSG B 0.350 98 Water Surface, 0% imp, HSG B 7.380 85 Weighted Average 2.910 39.43% Pervious Area 4.470 60.57% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Direct Entry Subcatchment 5S: Prop DA-2 Runoff Hydrograph Time (hours) 12011511010510095908580757065605550454035302520151050Flow (cfs)50 45 40 35 30 25 20 15 10 5 0 Charlotte 6-hr 10-yr Rainfall=4.93" Runoff Area=7.380 ac Runoff Volume=2.032 af Runoff Depth=3.30" Tc=5.0 min CN=85 47.92 cfs Charlotte 6-hr 10-yr Rainfall=4.93"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 47HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 5S: Prop DA-2 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 2.50 0.85 0.11 2.10 5.00 4.72 3.11 1.75 7.50 4.93 3.30 0.00 10.00 4.93 3.30 0.00 12.50 4.93 3.30 0.00 15.00 4.93 3.30 0.00 17.50 4.93 3.30 0.00 20.00 4.93 3.30 0.00 22.50 4.93 3.30 0.00 25.00 4.93 3.30 0.00 27.50 4.93 3.30 0.00 30.00 4.93 3.30 0.00 32.50 4.93 3.30 0.00 35.00 4.93 3.30 0.00 37.50 4.93 3.30 0.00 40.00 4.93 3.30 0.00 42.50 4.93 3.30 0.00 45.00 4.93 3.30 0.00 47.50 4.93 3.30 0.00 50.00 4.93 3.30 0.00 52.50 4.93 3.30 0.00 55.00 4.93 3.30 0.00 57.50 4.93 3.30 0.00 60.00 4.93 3.30 0.00 62.50 4.93 3.30 0.00 65.00 4.93 3.30 0.00 67.50 4.93 3.30 0.00 70.00 4.93 3.30 0.00 72.50 4.93 3.30 0.00 75.00 4.93 3.30 0.00 77.50 4.93 3.30 0.00 80.00 4.93 3.30 0.00 82.50 4.93 3.30 0.00 85.00 4.93 3.30 0.00 87.50 4.93 3.30 0.00 90.00 4.93 3.30 0.00 92.50 4.93 3.30 0.00 95.00 4.93 3.30 0.00 97.50 4.93 3.30 0.00 100.00 4.93 3.30 0.00 102.50 4.93 3.30 0.00 105.00 4.93 3.30 0.00 107.50 4.93 3.30 0.00 110.00 4.93 3.30 0.00 112.50 4.93 3.30 0.00 115.00 4.93 3.30 0.00 117.50 4.93 3.30 0.00 120.00 4.93 3.30 0.00 Charlotte 6-hr 10-yr Rainfall=4.93"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 48HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Summary for Subcatchment 6S: Prop DA-3 [49] Hint: Tc<2dt may require smaller dt Runoff = 5.64 cfs @ 3.16 hrs, Volume= 0.234 af, Depth= 2.14" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Charlotte 6-hr 10-yr Rainfall=4.93" Area (ac) CN Description 0.397 98 Paved parking, HSG B 0.913 61 >75% Grass cover, Good, HSG B 1.310 72 Weighted Average 0.913 69.69% Pervious Area 0.397 30.31% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Time of Concentration Subcatchment 6S: Prop DA-3 Runoff Hydrograph Time (hours) 12011511010510095908580757065605550454035302520151050Flow (cfs)6 5 4 3 2 1 0 Charlotte 6-hr 10-yr Rainfall=4.93" Runoff Area=1.310 ac Runoff Volume=0.234 af Runoff Depth=2.14" Tc=5.0 min CN=72 5.64 cfs Charlotte 6-hr 10-yr Rainfall=4.93"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 49HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 6S: Prop DA-3 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 2.50 0.85 0.00 0.01 5.00 4.72 1.99 0.26 7.50 4.93 2.14 0.00 10.00 4.93 2.14 0.00 12.50 4.93 2.14 0.00 15.00 4.93 2.14 0.00 17.50 4.93 2.14 0.00 20.00 4.93 2.14 0.00 22.50 4.93 2.14 0.00 25.00 4.93 2.14 0.00 27.50 4.93 2.14 0.00 30.00 4.93 2.14 0.00 32.50 4.93 2.14 0.00 35.00 4.93 2.14 0.00 37.50 4.93 2.14 0.00 40.00 4.93 2.14 0.00 42.50 4.93 2.14 0.00 45.00 4.93 2.14 0.00 47.50 4.93 2.14 0.00 50.00 4.93 2.14 0.00 52.50 4.93 2.14 0.00 55.00 4.93 2.14 0.00 57.50 4.93 2.14 0.00 60.00 4.93 2.14 0.00 62.50 4.93 2.14 0.00 65.00 4.93 2.14 0.00 67.50 4.93 2.14 0.00 70.00 4.93 2.14 0.00 72.50 4.93 2.14 0.00 75.00 4.93 2.14 0.00 77.50 4.93 2.14 0.00 80.00 4.93 2.14 0.00 82.50 4.93 2.14 0.00 85.00 4.93 2.14 0.00 87.50 4.93 2.14 0.00 90.00 4.93 2.14 0.00 92.50 4.93 2.14 0.00 95.00 4.93 2.14 0.00 97.50 4.93 2.14 0.00 100.00 4.93 2.14 0.00 102.50 4.93 2.14 0.00 105.00 4.93 2.14 0.00 107.50 4.93 2.14 0.00 110.00 4.93 2.14 0.00 112.50 4.93 2.14 0.00 115.00 4.93 2.14 0.00 117.50 4.93 2.14 0.00 120.00 4.93 2.14 0.00 Charlotte 6-hr 10-yr Rainfall=4.93"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 50HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Summary for Subcatchment 10S: DA-2 Bypass A [49] Hint: Tc<2dt may require smaller dt Runoff = 11.65 cfs @ 3.16 hrs, Volume= 0.483 af, Depth= 2.39" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Charlotte 6-hr 10-yr Rainfall=4.93" Area (ac) CN Description * 2.420 75 2.420 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 10S: DA-2 Bypass A Runoff Hydrograph Time (hours) 12011511010510095908580757065605550454035302520151050Flow (cfs)13 12 11 10 9 8 7 6 5 4 3 2 1 0 Charlotte 6-hr 10-yr Rainfall=4.93" Runoff Area=2.420 ac Runoff Volume=0.483 af Runoff Depth=2.39" Tc=5.0 min CN=75 11.65 cfs Charlotte 6-hr 10-yr Rainfall=4.93"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 51HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 10S: DA-2 Bypass A Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 2.50 0.85 0.01 0.14 5.00 4.72 2.23 0.50 7.50 4.93 2.39 0.00 10.00 4.93 2.39 0.00 12.50 4.93 2.39 0.00 15.00 4.93 2.39 0.00 17.50 4.93 2.39 0.00 20.00 4.93 2.39 0.00 22.50 4.93 2.39 0.00 25.00 4.93 2.39 0.00 27.50 4.93 2.39 0.00 30.00 4.93 2.39 0.00 32.50 4.93 2.39 0.00 35.00 4.93 2.39 0.00 37.50 4.93 2.39 0.00 40.00 4.93 2.39 0.00 42.50 4.93 2.39 0.00 45.00 4.93 2.39 0.00 47.50 4.93 2.39 0.00 50.00 4.93 2.39 0.00 52.50 4.93 2.39 0.00 55.00 4.93 2.39 0.00 57.50 4.93 2.39 0.00 60.00 4.93 2.39 0.00 62.50 4.93 2.39 0.00 65.00 4.93 2.39 0.00 67.50 4.93 2.39 0.00 70.00 4.93 2.39 0.00 72.50 4.93 2.39 0.00 75.00 4.93 2.39 0.00 77.50 4.93 2.39 0.00 80.00 4.93 2.39 0.00 82.50 4.93 2.39 0.00 85.00 4.93 2.39 0.00 87.50 4.93 2.39 0.00 90.00 4.93 2.39 0.00 92.50 4.93 2.39 0.00 95.00 4.93 2.39 0.00 97.50 4.93 2.39 0.00 100.00 4.93 2.39 0.00 102.50 4.93 2.39 0.00 105.00 4.93 2.39 0.00 107.50 4.93 2.39 0.00 110.00 4.93 2.39 0.00 112.50 4.93 2.39 0.00 115.00 4.93 2.39 0.00 117.50 4.93 2.39 0.00 120.00 4.93 2.39 0.00 Charlotte 6-hr 10-yr Rainfall=4.93"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 52HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Summary for Pond 4P: Wet Pond 1 Inflow Area = 3.130 ac, 69.33% Impervious, Inflow Depth = 3.50" for 10-yr event Inflow = 21.32 cfs @ 3.15 hrs, Volume= 0.913 af Outflow = 6.23 cfs @ 3.39 hrs, Volume= 0.910 af, Atten= 71%, Lag= 14.4 min Primary = 6.23 cfs @ 3.39 hrs, Volume= 0.910 af Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 789.76' @ 3.39 hrs Surf.Area= 10,864 sf Storage= 20,887 cf Plug-Flow detention time= 440.8 min calculated for 0.910 af (100% of inflow) Center-of-Mass det. time= 442.9 min ( 649.4 - 206.5 ) Volume Invert Avail.Storage Storage Description #1 787.50' 48,545 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 787.50 7,516 0 0 789.00 9,858 13,031 13,031 790.00 11,185 10,522 23,552 791.00 12,500 11,843 35,395 792.00 13,800 13,150 48,545 Device Routing Invert Outlet Devices #1 Primary 787.50'24.0" Round Culvert L= 23.7' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 787.50' / 787.38' S= 0.0051 '/' Cc= 0.900 n= 0.013, Flow Area= 3.14 sf #2 Device 1 787.50'1.5" Vert. Orifice/Grate C= 0.600 #3 Device 1 788.50'24.0" W x 8.0" H Vert. Orifice/Grate C= 0.600 #4 Device 1 790.50'16.0' long Sharp-Crested Vee/Trap Weir Cv= 2.62 (C= 3.28) #5 Secondary 791.00'20.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=6.22 cfs @ 3.39 hrs HW=789.76' (Free Discharge) 1=Culvert (Passes 6.22 cfs of 14.32 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.09 cfs @ 7.13 fps) 3=Orifice/Grate (Orifice Controls 6.13 cfs @ 4.60 fps) 4=Sharp-Crested Vee/Trap Weir ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=787.50' (Free Discharge) 5=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Charlotte 6-hr 10-yr Rainfall=4.93"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 53HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Pond 4P: Wet Pond 1 Inflow Outflow Primary Secondary Hydrograph Time (hours) 12011511010510095908580757065605550454035302520151050Flow (cfs)22 20 18 16 14 12 10 8 6 4 2 0 Inflow Area=3.130 ac Peak Elev=789.76' Storage=20,887 cf 21.32 cfs 6.23 cfs 6.23 cfs 0.00 cfs Pond 4P: Wet Pond 1 Total Primary Secondary Stage-Discharge Discharge (cfs) 80706050403020100Elevation (feet)792 791 790 789 788 Culvert + Orifice/Grate Orifice/Grate Sharp-Crested Vee/Trap Weir Broad-Crested Rectangular Weir Charlotte 6-hr 10-yr Rainfall=4.93"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 54HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Pond 4P: Wet Pond 1 Surface Storage Stage-Area-Storage Storage (cubic-feet) 45,00040,00035,00030,00025,00020,00015,00010,0005,0000 Surface/Horizontal/Wetted Area (sq-ft) 13,00012,00011,00010,0009,0008,0007,0006,0005,0004,0003,0002,0001,0000 Elevation (feet)792 791 790 789 788 Custom Stage Data Charlotte 6-hr 10-yr Rainfall=4.93"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 55HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Hydrograph for Pond 4P: Wet Pond 1 Time (hours) Inflow (cfs) Storage (cubic-feet) Elevation (feet) Outflow (cfs) Primary (cfs) Secondary (cfs) 0.00 0.00 0 787.50 0.00 0.00 0.00 2.50 1.08 1,373 787.68 0.02 0.02 0.00 5.00 0.76 11,369 788.83 1.28 1.28 0.00 7.50 0.00 8,714 788.55 0.13 0.13 0.00 10.00 0.00 8,071 788.48 0.06 0.06 0.00 12.50 0.00 7,571 788.42 0.05 0.05 0.00 15.00 0.00 7,087 788.37 0.05 0.05 0.00 17.50 0.00 6,618 788.31 0.05 0.05 0.00 20.00 0.00 6,166 788.26 0.05 0.05 0.00 22.50 0.00 5,730 788.21 0.05 0.05 0.00 25.00 0.00 5,310 788.16 0.05 0.05 0.00 27.50 0.00 4,907 788.11 0.04 0.04 0.00 30.00 0.00 4,521 788.07 0.04 0.04 0.00 32.50 0.00 4,151 788.02 0.04 0.04 0.00 35.00 0.00 3,799 787.98 0.04 0.04 0.00 37.50 0.00 3,463 787.94 0.04 0.04 0.00 40.00 0.00 3,145 787.90 0.03 0.03 0.00 42.50 0.00 2,844 787.86 0.03 0.03 0.00 45.00 0.00 2,561 787.83 0.03 0.03 0.00 47.50 0.00 2,295 787.80 0.03 0.03 0.00 50.00 0.00 2,047 787.77 0.03 0.03 0.00 52.50 0.00 1,817 787.74 0.02 0.02 0.00 55.00 0.00 1,605 787.71 0.02 0.02 0.00 57.50 0.00 1,411 787.68 0.02 0.02 0.00 60.00 0.00 1,235 787.66 0.02 0.02 0.00 62.50 0.00 1,078 787.64 0.02 0.02 0.00 65.00 0.00 938 787.62 0.01 0.01 0.00 67.50 0.00 820 787.61 0.01 0.01 0.00 70.00 0.00 719 787.59 0.01 0.01 0.00 72.50 0.00 634 787.58 0.01 0.01 0.00 75.00 0.00 562 787.57 0.01 0.01 0.00 77.50 0.00 502 787.57 0.01 0.01 0.00 80.00 0.00 452 787.56 0.01 0.01 0.00 82.50 0.00 410 787.55 0.00 0.00 0.00 85.00 0.00 375 787.55 0.00 0.00 0.00 87.50 0.00 345 787.55 0.00 0.00 0.00 90.00 0.00 320 787.54 0.00 0.00 0.00 92.50 0.00 297 787.54 0.00 0.00 0.00 95.00 0.00 275 787.54 0.00 0.00 0.00 97.50 0.00 255 787.53 0.00 0.00 0.00 100.00 0.00 236 787.53 0.00 0.00 0.00 102.50 0.00 219 787.53 0.00 0.00 0.00 105.00 0.00 203 787.53 0.00 0.00 0.00 107.50 0.00 188 787.52 0.00 0.00 0.00 110.00 0.00 174 787.52 0.00 0.00 0.00 112.50 0.00 161 787.52 0.00 0.00 0.00 115.00 0.00 150 787.52 0.00 0.00 0.00 117.50 0.00 139 787.52 0.00 0.00 0.00 120.00 0.00 128 787.52 0.00 0.00 0.00 Charlotte 6-hr 10-yr Rainfall=4.93"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 56HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Stage-Discharge for Pond 4P: Wet Pond 1 Elevation (feet) Discharge (cfs) Primary (cfs) Secondary (cfs) 787.50 0.00 0.00 0.00 787.55 0.00 0.00 0.00 787.60 0.01 0.01 0.00 787.65 0.02 0.02 0.00 787.70 0.02 0.02 0.00 787.75 0.03 0.03 0.00 787.80 0.03 0.03 0.00 787.85 0.03 0.03 0.00 787.90 0.03 0.03 0.00 787.95 0.04 0.04 0.00 788.00 0.04 0.04 0.00 788.05 0.04 0.04 0.00 788.10 0.04 0.04 0.00 788.15 0.05 0.05 0.00 788.20 0.05 0.05 0.00 788.25 0.05 0.05 0.00 788.30 0.05 0.05 0.00 788.35 0.05 0.05 0.00 788.40 0.05 0.05 0.00 788.45 0.06 0.06 0.00 788.50 0.06 0.06 0.00 788.55 0.13 0.13 0.00 788.60 0.26 0.26 0.00 788.65 0.43 0.43 0.00 788.70 0.64 0.64 0.00 788.75 0.87 0.87 0.00 788.80 1.12 1.12 0.00 788.85 1.40 1.40 0.00 788.90 1.69 1.69 0.00 788.95 2.01 2.01 0.00 789.00 2.34 2.34 0.00 789.05 2.69 2.69 0.00 789.10 3.06 3.06 0.00 789.15 3.44 3.44 0.00 789.20 3.80 3.80 0.00 789.25 4.09 4.09 0.00 789.30 4.36 4.36 0.00 789.35 4.61 4.61 0.00 789.40 4.84 4.84 0.00 789.45 5.06 5.06 0.00 789.50 5.27 5.27 0.00 789.55 5.47 5.47 0.00 789.60 5.66 5.66 0.00 789.65 5.85 5.85 0.00 789.70 6.03 6.03 0.00 789.75 6.20 6.20 0.00 789.80 6.37 6.37 0.00 789.85 6.53 6.53 0.00 789.90 6.69 6.69 0.00 789.95 6.85 6.85 0.00 790.00 7.00 7.00 0.00 790.05 7.15 7.15 0.00 Elevation (feet) Discharge (cfs) Primary (cfs) Secondary (cfs) 790.10 7.30 7.30 0.00 790.15 7.44 7.44 0.00 790.20 7.58 7.58 0.00 790.25 7.72 7.72 0.00 790.30 7.86 7.86 0.00 790.35 7.99 7.99 0.00 790.40 8.12 8.12 0.00 790.45 8.25 8.25 0.00 790.50 8.38 8.38 0.00 790.55 9.09 9.09 0.00 790.60 10.28 10.28 0.00 790.65 11.79 11.79 0.00 790.70 13.55 13.55 0.00 790.75 15.53 15.53 0.00 790.80 17.71 17.71 0.00 790.85 20.06 20.06 0.00 790.90 22.58 22.58 0.00 790.95 23.58 23.58 0.00 791.00 23.92 23.92 0.00 791.05 24.71 24.16 0.56 791.10 25.97 24.39 1.57 791.15 27.52 24.62 2.89 791.20 29.31 24.86 4.45 791.25 31.35 25.08 6.27 791.30 33.61 25.31 8.30 791.35 36.07 25.54 10.53 791.40 38.71 25.76 12.95 791.45 41.65 25.98 15.67 791.50 44.80 26.20 18.60 791.55 48.16 26.42 21.74 791.60 51.73 26.63 25.10 791.65 55.12 26.85 28.27 791.70 58.63 27.06 31.57 791.75 62.25 27.27 34.98 791.80 65.98 27.48 38.50 791.85 69.81 27.69 42.12 791.90 73.74 27.89 45.85 791.95 77.77 28.10 49.68 792.00 81.90 28.30 53.60 Charlotte 6-hr 10-yr Rainfall=4.93"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 57HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Stage-Area-Storage for Pond 4P: Wet Pond 1 Elevation (feet) Surface (sq-ft) Storage (cubic-feet) 787.50 7,516 0 787.55 7,594 378 787.60 7,672 759 787.65 7,750 1,145 787.70 7,828 1,534 787.75 7,906 1,928 787.80 7,984 2,325 787.85 8,062 2,726 787.90 8,141 3,131 787.95 8,219 3,540 788.00 8,297 3,953 788.05 8,375 4,370 788.10 8,453 4,791 788.15 8,531 5,215 788.20 8,609 5,644 788.25 8,687 6,076 788.30 8,765 6,512 788.35 8,843 6,953 788.40 8,921 7,397 788.45 8,999 7,845 788.50 9,077 8,297 788.55 9,155 8,752 788.60 9,233 9,212 788.65 9,312 9,676 788.70 9,390 10,143 788.75 9,468 10,615 788.80 9,546 11,090 788.85 9,624 11,569 788.90 9,702 12,053 788.95 9,780 12,540 789.00 9,858 13,031 789.05 9,924 13,525 789.10 9,991 14,023 789.15 10,057 14,524 789.20 10,123 15,029 789.25 10,190 15,536 789.30 10,256 16,048 789.35 10,322 16,562 789.40 10,389 17,080 789.45 10,455 17,601 789.50 10,522 18,125 789.55 10,588 18,653 789.60 10,654 19,184 789.65 10,721 19,719 789.70 10,787 20,256 789.75 10,853 20,797 789.80 10,920 21,342 789.85 10,986 21,889 789.90 11,052 22,440 789.95 11,119 22,994 790.00 11,185 23,552 790.05 11,251 24,113 Elevation (feet) Surface (sq-ft) Storage (cubic-feet) 790.10 11,317 24,677 790.15 11,382 25,245 790.20 11,448 25,815 790.25 11,514 26,389 790.30 11,579 26,967 790.35 11,645 27,547 790.40 11,711 28,131 790.45 11,777 28,718 790.50 11,843 29,309 790.55 11,908 29,903 790.60 11,974 30,500 790.65 12,040 31,100 790.70 12,106 31,704 790.75 12,171 32,311 790.80 12,237 32,921 790.85 12,303 33,534 790.90 12,368 34,151 790.95 12,434 34,771 791.00 12,500 35,395 791.05 12,565 36,021 791.10 12,630 36,651 791.15 12,695 37,284 791.20 12,760 37,921 791.25 12,825 38,560 791.30 12,890 39,203 791.35 12,955 39,849 791.40 13,020 40,498 791.45 13,085 41,151 791.50 13,150 41,807 791.55 13,215 42,466 791.60 13,280 43,129 791.65 13,345 43,794 791.70 13,410 44,463 791.75 13,475 45,135 791.80 13,540 45,810 791.85 13,605 46,489 791.90 13,670 47,171 791.95 13,735 47,856 792.00 13,800 48,545 Charlotte 6-hr 10-yr Rainfall=4.93"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 58HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Summary for Pond 5P: Wet Pond 2 Inflow Area = 7.380 ac, 60.57% Impervious, Inflow Depth = 3.30" for 10-yr event Inflow = 47.92 cfs @ 3.15 hrs, Volume= 2.032 af Outflow = 8.83 cfs @ 3.56 hrs, Volume= 2.025 af, Atten= 82%, Lag= 24.7 min Primary = 8.83 cfs @ 3.56 hrs, Volume= 2.025 af Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 780.45' @ 3.56 hrs Surf.Area= 18,466 sf Storage= 51,142 cf Plug-Flow detention time= 413.7 min calculated for 2.024 af (100% of inflow) Center-of-Mass det. time= 415.8 min ( 623.9 - 208.1 ) Volume Invert Avail.Storage Storage Description #1 777.00' 82,420 cf Custom Stage Data (Irregular) Listed below (Recalc) Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (feet) (cubic-feet) (cubic-feet) (sq-ft) 777.00 11,324 654.0 0 0 11,324 778.00 13,317 673.0 12,307 12,307 13,437 779.00 15,366 692.0 14,329 26,636 15,611 780.00 17,509 713.0 16,426 43,062 18,062 781.00 19,675 731.0 18,581 61,644 20,253 782.00 21,898 750.0 20,777 82,420 22,611 Device Routing Invert Outlet Devices #1 Primary 776.50'24.0" Round Culvert L= 77.6' Ke= 0.500 Inlet / Outlet Invert= 776.50' / 775.72' S= 0.0101 '/' Cc= 0.900 n= 0.013, Flow Area= 3.14 sf #2 Device 1 777.00'2.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 778.30'24.0" W x 8.0" H Vert. Orifice/Grate C= 0.600 #4 Primary 780.50'16.0' long Sharp-Crested Vee/Trap Weir Cv= 2.62 (C= 3.28) #5 Secondary 780.75'12.0' long Sharp-Crested Vee/Trap Weir Cv= 2.62 (C= 3.28) Primary OutFlow Max=8.83 cfs @ 3.56 hrs HW=780.45' (Free Discharge) 1=Culvert (Passes 8.83 cfs of 25.97 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.19 cfs @ 8.83 fps) 3=Orifice/Grate (Orifice Controls 8.64 cfs @ 6.48 fps) 4=Sharp-Crested Vee/Trap Weir ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=777.00' (Free Discharge) 5=Sharp-Crested Vee/Trap Weir ( Controls 0.00 cfs) Charlotte 6-hr 10-yr Rainfall=4.93"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 59HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Pond 5P: Wet Pond 2 Inflow Outflow Primary Secondary Hydrograph Time (hours) 12011511010510095908580757065605550454035302520151050Flow (cfs)50 45 40 35 30 25 20 15 10 5 0 Inflow Area=7.380 ac Peak Elev=780.45' Storage=51,142 cf 47.92 cfs 8.83 cfs 8.83 cfs 0.00 cfs Pond 5P: Wet Pond 2 Total Primary Secondary Stage-Discharge Discharge (cfs) 160140120100806040200Elevation (feet)782 781 780 779 778 777 Orifice/Grate Orifice/Grate Sharp-Crested Vee/Trap Weir Sharp-Crested Vee/Trap Weir Charlotte 6-hr 10-yr Rainfall=4.93"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 60HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Pond 5P: Wet Pond 2 Surface Storage Stage-Area-Storage Storage (cubic-feet) 80,00070,00060,00050,00040,00030,00020,00010,0000 Surface/Horizontal/Wetted Area (sq-ft) 20,00018,00016,00014,00012,00010,0008,0006,0004,0002,0000 Elevation (feet)782 781 780 779 778 777 Custom Stage Data Charlotte 6-hr 10-yr Rainfall=4.93"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 61HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Hydrograph for Pond 5P: Wet Pond 2 Time (hours) Inflow (cfs) Storage (cubic-feet) Elevation (feet) Outflow (cfs) Primary (cfs) Secondary (cfs) 0.00 0.00 0 777.00 0.00 0.00 0.00 2.50 2.10 2,321 777.20 0.04 0.04 0.00 5.00 1.75 31,306 779.30 5.33 5.33 0.00 7.50 0.00 18,125 778.42 0.40 0.40 0.00 10.00 0.00 16,320 778.29 0.12 0.12 0.00 12.50 0.00 15,295 778.22 0.11 0.11 0.00 15.00 0.00 14,303 778.15 0.11 0.11 0.00 17.50 0.00 13,344 778.08 0.10 0.10 0.00 20.00 0.00 12,418 778.01 0.10 0.10 0.00 22.50 0.00 11,526 777.94 0.10 0.10 0.00 25.00 0.00 10,667 777.88 0.09 0.09 0.00 27.50 0.00 9,843 777.81 0.09 0.09 0.00 30.00 0.00 9,053 777.75 0.09 0.09 0.00 32.50 0.00 8,298 777.69 0.08 0.08 0.00 35.00 0.00 7,579 777.63 0.08 0.08 0.00 37.50 0.00 6,895 777.58 0.07 0.07 0.00 40.00 0.00 6,247 777.53 0.07 0.07 0.00 42.50 0.00 5,635 777.48 0.07 0.07 0.00 45.00 0.00 5,059 777.43 0.06 0.06 0.00 47.50 0.00 4,521 777.39 0.06 0.06 0.00 50.00 0.00 4,019 777.34 0.05 0.05 0.00 52.50 0.00 3,555 777.31 0.05 0.05 0.00 55.00 0.00 3,128 777.27 0.05 0.05 0.00 57.50 0.00 2,739 777.24 0.04 0.04 0.00 60.00 0.00 2,389 777.21 0.04 0.04 0.00 62.50 0.00 2,076 777.18 0.03 0.03 0.00 65.00 0.00 1,802 777.16 0.03 0.03 0.00 67.50 0.00 1,565 777.14 0.02 0.02 0.00 70.00 0.00 1,370 777.12 0.02 0.02 0.00 72.50 0.00 1,209 777.11 0.02 0.02 0.00 75.00 0.00 1,076 777.09 0.01 0.01 0.00 77.50 0.00 964 777.08 0.01 0.01 0.00 80.00 0.00 869 777.08 0.01 0.01 0.00 82.50 0.00 789 777.07 0.01 0.01 0.00 85.00 0.00 720 777.06 0.01 0.01 0.00 87.50 0.00 662 777.06 0.01 0.01 0.00 90.00 0.00 613 777.05 0.01 0.01 0.00 92.50 0.00 572 777.05 0.00 0.00 0.00 95.00 0.00 535 777.05 0.00 0.00 0.00 97.50 0.00 501 777.04 0.00 0.00 0.00 100.00 0.00 469 777.04 0.00 0.00 0.00 102.50 0.00 439 777.04 0.00 0.00 0.00 105.00 0.00 410 777.04 0.00 0.00 0.00 107.50 0.00 384 777.03 0.00 0.00 0.00 110.00 0.00 359 777.03 0.00 0.00 0.00 112.50 0.00 336 777.03 0.00 0.00 0.00 115.00 0.00 315 777.03 0.00 0.00 0.00 117.50 0.00 295 777.03 0.00 0.00 0.00 120.00 0.00 276 777.02 0.00 0.00 0.00 Charlotte 6-hr 10-yr Rainfall=4.93"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 62HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Stage-Discharge for Pond 5P: Wet Pond 2 Elevation (feet) Discharge (cfs) Primary (cfs) Secondary (cfs) 777.00 0.00 0.00 0.00 777.05 0.00 0.00 0.00 777.10 0.01 0.01 0.00 777.15 0.03 0.03 0.00 777.20 0.04 0.04 0.00 777.25 0.04 0.04 0.00 777.30 0.05 0.05 0.00 777.35 0.05 0.05 0.00 777.40 0.06 0.06 0.00 777.45 0.06 0.06 0.00 777.50 0.07 0.07 0.00 777.55 0.07 0.07 0.00 777.60 0.08 0.08 0.00 777.65 0.08 0.08 0.00 777.70 0.08 0.08 0.00 777.75 0.09 0.09 0.00 777.80 0.09 0.09 0.00 777.85 0.09 0.09 0.00 777.90 0.09 0.09 0.00 777.95 0.10 0.10 0.00 778.00 0.10 0.10 0.00 778.05 0.10 0.10 0.00 778.10 0.11 0.11 0.00 778.15 0.11 0.11 0.00 778.20 0.11 0.11 0.00 778.25 0.11 0.11 0.00 778.30 0.12 0.12 0.00 778.35 0.19 0.19 0.00 778.40 0.32 0.32 0.00 778.45 0.50 0.50 0.00 778.50 0.70 0.70 0.00 778.55 0.93 0.93 0.00 778.60 1.18 1.18 0.00 778.65 1.46 1.46 0.00 778.70 1.76 1.76 0.00 778.75 2.07 2.07 0.00 778.80 2.41 2.41 0.00 778.85 2.76 2.76 0.00 778.90 3.13 3.13 0.00 778.95 3.51 3.51 0.00 779.00 3.87 3.87 0.00 779.05 4.16 4.16 0.00 779.10 4.43 4.43 0.00 779.15 4.68 4.68 0.00 779.20 4.91 4.91 0.00 779.25 5.13 5.13 0.00 779.30 5.34 5.34 0.00 779.35 5.54 5.54 0.00 779.40 5.74 5.74 0.00 779.45 5.92 5.92 0.00 779.50 6.10 6.10 0.00 779.55 6.28 6.28 0.00 Elevation (feet) Discharge (cfs) Primary (cfs) Secondary (cfs) 779.60 6.45 6.45 0.00 779.65 6.61 6.61 0.00 779.70 6.77 6.77 0.00 779.75 6.93 6.93 0.00 779.80 7.08 7.08 0.00 779.85 7.23 7.23 0.00 779.90 7.38 7.38 0.00 779.95 7.52 7.52 0.00 780.00 7.67 7.67 0.00 780.05 7.80 7.80 0.00 780.10 7.94 7.94 0.00 780.15 8.07 8.07 0.00 780.20 8.21 8.21 0.00 780.25 8.34 8.34 0.00 780.30 8.46 8.46 0.00 780.35 8.59 8.59 0.00 780.40 8.71 8.71 0.00 780.45 8.83 8.83 0.00 780.50 8.95 8.95 0.00 780.55 9.66 9.66 0.00 780.60 10.85 10.85 0.00 780.65 12.35 12.35 0.00 780.70 14.11 14.11 0.00 780.75 16.08 16.08 0.00 780.80 18.69 18.25 0.44 780.85 21.85 20.60 1.24 780.90 25.40 23.12 2.28 780.95 29.30 25.79 3.52 781.00 33.51 28.60 4.91 781.05 38.01 31.56 6.46 781.10 42.78 34.64 8.14 781.15 47.79 37.85 9.94 781.20 53.04 41.18 11.86 781.25 58.52 44.63 13.89 781.30 64.22 48.19 16.03 781.35 70.12 51.86 18.26 781.40 76.23 55.63 20.60 781.45 82.52 59.51 23.02 781.50 89.01 63.48 25.53 781.55 95.68 67.56 28.12 781.60 102.53 71.73 30.80 781.65 109.55 75.99 33.55 781.70 116.73 80.34 36.39 781.75 124.09 84.79 39.30 781.80 131.60 89.32 42.28 781.85 139.27 93.93 45.34 781.90 147.10 98.63 48.47 781.95 155.07 103.41 51.66 782.00 163.20 108.27 54.92 Charlotte 6-hr 10-yr Rainfall=4.93"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 63HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Stage-Area-Storage for Pond 5P: Wet Pond 2 Elevation (feet) Surface (sq-ft) Storage (cubic-feet) 777.00 11,324 0 777.05 11,420 569 777.10 11,516 1,142 777.15 11,613 1,720 777.20 11,710 2,303 777.25 11,807 2,891 777.30 11,905 3,484 777.35 12,003 4,082 777.40 12,102 4,684 777.45 12,201 5,292 777.50 12,300 5,904 777.55 12,400 6,522 777.60 12,500 7,144 777.65 12,601 7,772 777.70 12,702 8,405 777.75 12,804 9,042 777.80 12,905 9,685 777.85 13,008 10,333 777.90 13,110 10,986 777.95 13,214 11,644 778.00 13,317 12,307 778.05 13,416 12,975 778.10 13,515 13,649 778.15 13,615 14,327 778.20 13,715 15,010 778.25 13,816 15,698 778.30 13,916 16,392 778.35 14,017 17,090 778.40 14,119 17,793 778.45 14,221 18,502 778.50 14,323 19,216 778.55 14,426 19,934 778.60 14,529 20,658 778.65 14,632 21,387 778.70 14,736 22,121 778.75 14,840 22,861 778.80 14,944 23,605 778.85 15,049 24,355 778.90 15,155 25,110 778.95 15,260 25,871 779.00 15,366 26,636 779.05 15,470 27,407 779.10 15,574 28,183 779.15 15,679 28,965 779.20 15,783 29,751 779.25 15,889 30,543 779.30 15,994 31,340 779.35 16,100 32,142 779.40 16,206 32,950 779.45 16,313 33,763 779.50 16,420 34,581 779.55 16,527 35,405 Elevation (feet) Surface (sq-ft) Storage (cubic-feet) 779.60 16,635 36,234 779.65 16,743 37,069 779.70 16,851 37,908 779.75 16,960 38,754 779.80 17,069 39,604 779.85 17,179 40,461 779.90 17,288 41,322 779.95 17,399 42,189 780.00 17,509 43,062 780.05 17,614 43,940 780.10 17,720 44,824 780.15 17,826 45,712 780.20 17,932 46,606 780.25 18,039 47,505 780.30 18,146 48,410 780.35 18,253 49,320 780.40 18,360 50,235 780.45 18,468 51,156 780.50 18,576 52,082 780.55 18,685 53,014 780.60 18,793 53,951 780.65 18,903 54,893 780.70 19,012 55,841 780.75 19,122 56,794 780.80 19,232 57,753 780.85 19,342 58,717 780.90 19,453 59,687 780.95 19,564 60,663 781.00 19,675 61,644 781.05 19,783 62,630 781.10 19,892 63,622 781.15 20,001 64,619 781.20 20,110 65,622 781.25 20,220 66,630 781.30 20,329 67,644 781.35 20,440 68,663 781.40 20,550 69,688 781.45 20,661 70,718 781.50 20,772 71,754 781.55 20,883 72,795 781.60 20,995 73,842 781.65 21,106 74,895 781.70 21,219 75,953 781.75 21,331 77,017 781.80 21,444 78,086 781.85 21,557 79,161 781.90 21,670 80,242 781.95 21,784 81,328 782.00 21,898 82,420 Charlotte 6-hr 10-yr Rainfall=4.93"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 64HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Summary for Link 3L: Ex Drainage Areas Inflow Area = 12.660 ac, 4.30% Impervious, Inflow Depth = 2.02" for 10-yr event Inflow = 40.47 cfs @ 3.26 hrs, Volume= 2.133 af Primary = 40.47 cfs @ 3.26 hrs, Volume= 2.133 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Link 3L: Ex Drainage Areas Inflow Primary Hydrograph Time (hours) 12011511010510095908580757065605550454035302520151050Flow (cfs)44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Inflow Area=12.660 ac 40.47 cfs 40.47 cfs Charlotte 6-hr 10-yr Rainfall=4.93"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 65HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Hydrograph for Link 3L: Ex Drainage Areas Time (hours) Inflow (cfs) Elevation (feet) Primary (cfs) 0.00 0.00 0.00 0.00 2.50 0.00 0.00 0.00 5.00 2.52 0.00 2.52 7.50 0.00 0.00 0.00 10.00 0.00 0.00 0.00 12.50 0.00 0.00 0.00 15.00 0.00 0.00 0.00 17.50 0.00 0.00 0.00 20.00 0.00 0.00 0.00 22.50 0.00 0.00 0.00 25.00 0.00 0.00 0.00 27.50 0.00 0.00 0.00 30.00 0.00 0.00 0.00 32.50 0.00 0.00 0.00 35.00 0.00 0.00 0.00 37.50 0.00 0.00 0.00 40.00 0.00 0.00 0.00 42.50 0.00 0.00 0.00 45.00 0.00 0.00 0.00 47.50 0.00 0.00 0.00 50.00 0.00 0.00 0.00 52.50 0.00 0.00 0.00 55.00 0.00 0.00 0.00 57.50 0.00 0.00 0.00 60.00 0.00 0.00 0.00 62.50 0.00 0.00 0.00 65.00 0.00 0.00 0.00 67.50 0.00 0.00 0.00 70.00 0.00 0.00 0.00 72.50 0.00 0.00 0.00 75.00 0.00 0.00 0.00 77.50 0.00 0.00 0.00 80.00 0.00 0.00 0.00 82.50 0.00 0.00 0.00 85.00 0.00 0.00 0.00 87.50 0.00 0.00 0.00 90.00 0.00 0.00 0.00 92.50 0.00 0.00 0.00 95.00 0.00 0.00 0.00 97.50 0.00 0.00 0.00 100.00 0.00 0.00 0.00 102.50 0.00 0.00 0.00 105.00 0.00 0.00 0.00 107.50 0.00 0.00 0.00 110.00 0.00 0.00 0.00 112.50 0.00 0.00 0.00 115.00 0.00 0.00 0.00 117.50 0.00 0.00 0.00 120.00 0.00 0.00 0.00 Charlotte 6-hr 10-yr Rainfall=4.93"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 66HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Summary for Link 7L: POI-1 Inflow Area = 4.440 ac, 57.82% Impervious, Inflow Depth > 3.09" for 10-yr event Inflow = 10.09 cfs @ 3.21 hrs, Volume= 1.144 af Primary = 10.09 cfs @ 3.21 hrs, Volume= 1.144 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Link 7L: POI-1 Inflow Primary Hydrograph Time (hours) 12011511010510095908580757065605550454035302520151050Flow (cfs)11 10 9 8 7 6 5 4 3 2 1 0 Inflow Area=4.440 ac 10.09 cfs 10.09 cfs Charlotte 6-hr 10-yr Rainfall=4.93"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 67HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Hydrograph for Link 7L: POI-1 Time (hours) Inflow (cfs) Elevation (feet) Primary (cfs) 0.00 0.00 0.00 0.00 2.50 0.03 0.00 0.03 5.00 1.54 0.00 1.54 7.50 0.13 0.00 0.13 10.00 0.06 0.00 0.06 12.50 0.05 0.00 0.05 15.00 0.05 0.00 0.05 17.50 0.05 0.00 0.05 20.00 0.05 0.00 0.05 22.50 0.05 0.00 0.05 25.00 0.05 0.00 0.05 27.50 0.04 0.00 0.04 30.00 0.04 0.00 0.04 32.50 0.04 0.00 0.04 35.00 0.04 0.00 0.04 37.50 0.04 0.00 0.04 40.00 0.03 0.00 0.03 42.50 0.03 0.00 0.03 45.00 0.03 0.00 0.03 47.50 0.03 0.00 0.03 50.00 0.03 0.00 0.03 52.50 0.02 0.00 0.02 55.00 0.02 0.00 0.02 57.50 0.02 0.00 0.02 60.00 0.02 0.00 0.02 62.50 0.02 0.00 0.02 65.00 0.01 0.00 0.01 67.50 0.01 0.00 0.01 70.00 0.01 0.00 0.01 72.50 0.01 0.00 0.01 75.00 0.01 0.00 0.01 77.50 0.01 0.00 0.01 80.00 0.01 0.00 0.01 82.50 0.00 0.00 0.00 85.00 0.00 0.00 0.00 87.50 0.00 0.00 0.00 90.00 0.00 0.00 0.00 92.50 0.00 0.00 0.00 95.00 0.00 0.00 0.00 97.50 0.00 0.00 0.00 100.00 0.00 0.00 0.00 102.50 0.00 0.00 0.00 105.00 0.00 0.00 0.00 107.50 0.00 0.00 0.00 110.00 0.00 0.00 0.00 112.50 0.00 0.00 0.00 115.00 0.00 0.00 0.00 117.50 0.00 0.00 0.00 120.00 0.00 0.00 0.00 Charlotte 6-hr 10-yr Rainfall=4.93"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 68HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Summary for Link 8L: POI-2 Inflow Area = 7.380 ac, 60.57% Impervious, Inflow Depth > 3.29" for 10-yr event Inflow = 8.83 cfs @ 3.56 hrs, Volume= 2.025 af Primary = 8.83 cfs @ 3.56 hrs, Volume= 2.025 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Link 8L: POI-2 Inflow Primary Hydrograph Time (hours) 12011511010510095908580757065605550454035302520151050Flow (cfs)9 8 7 6 5 4 3 2 1 0 Inflow Area=7.380 ac 8.83 cfs 8.83 cfs Charlotte 6-hr 10-yr Rainfall=4.93"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 69HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Hydrograph for Link 8L: POI-2 Time (hours) Inflow (cfs) Elevation (feet) Primary (cfs) 0.00 0.00 0.00 0.00 2.50 0.04 0.00 0.04 5.00 5.33 0.00 5.33 7.50 0.40 0.00 0.40 10.00 0.12 0.00 0.12 12.50 0.11 0.00 0.11 15.00 0.11 0.00 0.11 17.50 0.10 0.00 0.10 20.00 0.10 0.00 0.10 22.50 0.10 0.00 0.10 25.00 0.09 0.00 0.09 27.50 0.09 0.00 0.09 30.00 0.09 0.00 0.09 32.50 0.08 0.00 0.08 35.00 0.08 0.00 0.08 37.50 0.07 0.00 0.07 40.00 0.07 0.00 0.07 42.50 0.07 0.00 0.07 45.00 0.06 0.00 0.06 47.50 0.06 0.00 0.06 50.00 0.05 0.00 0.05 52.50 0.05 0.00 0.05 55.00 0.05 0.00 0.05 57.50 0.04 0.00 0.04 60.00 0.04 0.00 0.04 62.50 0.03 0.00 0.03 65.00 0.03 0.00 0.03 67.50 0.02 0.00 0.02 70.00 0.02 0.00 0.02 72.50 0.02 0.00 0.02 75.00 0.01 0.00 0.01 77.50 0.01 0.00 0.01 80.00 0.01 0.00 0.01 82.50 0.01 0.00 0.01 85.00 0.01 0.00 0.01 87.50 0.01 0.00 0.01 90.00 0.01 0.00 0.01 92.50 0.00 0.00 0.00 95.00 0.00 0.00 0.00 97.50 0.00 0.00 0.00 100.00 0.00 0.00 0.00 102.50 0.00 0.00 0.00 105.00 0.00 0.00 0.00 107.50 0.00 0.00 0.00 110.00 0.00 0.00 0.00 112.50 0.00 0.00 0.00 115.00 0.00 0.00 0.00 117.50 0.00 0.00 0.00 120.00 0.00 0.00 0.00 Charlotte 6-hr 10-yr Rainfall=4.93"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 70HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Summary for Link 9L: Combined Inflow Area = 11.820 ac, 59.53% Impervious, Inflow Depth > 3.22" for 10-yr event Inflow = 17.31 cfs @ 3.27 hrs, Volume= 3.170 af Primary = 17.31 cfs @ 3.27 hrs, Volume= 3.170 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Link 9L: Combined Inflow Primary Hydrograph Time (hours) 12011511010510095908580757065605550454035302520151050Flow (cfs)19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Inflow Area=11.820 ac 17.31 cfs 17.31 cfs Charlotte 6-hr 10-yr Rainfall=4.93"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 71HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Hydrograph for Link 9L: Combined Time (hours) Inflow (cfs) Elevation (feet) Primary (cfs) 0.00 0.00 0.00 0.00 2.50 0.07 0.00 0.07 5.00 6.87 0.00 6.87 7.50 0.53 0.00 0.53 10.00 0.17 0.00 0.17 12.50 0.17 0.00 0.17 15.00 0.16 0.00 0.16 17.50 0.16 0.00 0.16 20.00 0.15 0.00 0.15 22.50 0.14 0.00 0.14 25.00 0.14 0.00 0.14 27.50 0.13 0.00 0.13 30.00 0.13 0.00 0.13 32.50 0.12 0.00 0.12 35.00 0.12 0.00 0.12 37.50 0.11 0.00 0.11 40.00 0.10 0.00 0.10 42.50 0.10 0.00 0.10 45.00 0.09 0.00 0.09 47.50 0.09 0.00 0.09 50.00 0.08 0.00 0.08 52.50 0.07 0.00 0.07 55.00 0.07 0.00 0.07 57.50 0.06 0.00 0.06 60.00 0.06 0.00 0.06 62.50 0.05 0.00 0.05 65.00 0.04 0.00 0.04 67.50 0.04 0.00 0.04 70.00 0.03 0.00 0.03 72.50 0.02 0.00 0.02 75.00 0.02 0.00 0.02 77.50 0.02 0.00 0.02 80.00 0.01 0.00 0.01 82.50 0.01 0.00 0.01 85.00 0.01 0.00 0.01 87.50 0.01 0.00 0.01 90.00 0.01 0.00 0.01 92.50 0.01 0.00 0.01 95.00 0.01 0.00 0.01 97.50 0.01 0.00 0.01 100.00 0.01 0.00 0.01 102.50 0.01 0.00 0.01 105.00 0.00 0.00 0.00 107.50 0.00 0.00 0.00 110.00 0.00 0.00 0.00 112.50 0.00 0.00 0.00 115.00 0.00 0.00 0.00 117.50 0.00 0.00 0.00 120.00 0.00 0.00 0.00 Charlotte 6-hr 25-yr Rainfall=5.86"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 72HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Time span=0.00-120.00 hrs, dt=0.05 hrs, 2401 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=6.010 ac 5.66% Impervious Runoff Depth=2.79"Subcatchment 1S: Ex DA-1 Flow Length=699' Tc=12.0 min CN=71 Runoff=26.73 cfs 1.396 af Runoff Area=6.650 ac 3.08% Impervious Runoff Depth=2.69"Subcatchment 2S: Ex DA-2 Flow Length=790' Tc=13.1 min CN=70 Runoff=27.73 cfs 1.493 af Runoff Area=3.130 ac 69.33% Impervious Runoff Depth=4.38"Subcatchment 4S: Prop DA-1 Tc=5.0 min CN=87 Runoff=25.92 cfs 1.143 af Runoff Area=7.380 ac 60.57% Impervious Runoff Depth=4.17"Subcatchment 5S: Prop DA-2 Tc=5.0 min CN=85 Runoff=58.81 cfs 2.565 af Runoff Area=1.310 ac 30.31% Impervious Runoff Depth=2.88"Subcatchment 6S: Prop DA-3 Tc=5.0 min CN=72 Runoff=7.46 cfs 0.314 af Runoff Area=2.420 ac 0.00% Impervious Runoff Depth=3.16"Subcatchment 10S: DA-2 Bypass A Tc=5.0 min CN=75 Runoff=15.09 cfs 0.638 af Peak Elev=790.19' Storage=25,727 cf Inflow=25.92 cfs 1.143 afPond 4P: Wet Pond 1 Primary=7.56 cfs 1.140 af Secondary=0.00 cfs 0.000 af Outflow=7.56 cfs 1.140 af Peak Elev=780.84' Storage=58,588 cf Inflow=58.81 cfs 2.565 afPond 5P: Wet Pond 2 Primary=20.29 cfs 2.547 af Secondary=1.14 cfs 0.012 af Outflow=21.43 cfs 2.559 af Inflow=54.37 cfs 2.889 afLink 3L: Ex Drainage Areas Primary=54.37 cfs 2.889 af Inflow=13.15 cfs 1.455 afLink 7L: POI-1 Primary=13.15 cfs 1.455 af Inflow=21.43 cfs 2.559 afLink 8L: POI-2 Primary=21.43 cfs 2.559 af Inflow=31.88 cfs 4.013 afLink 9L: Combined Primary=31.88 cfs 4.013 af Total Runoff Area = 26.900 ac Runoff Volume = 7.549 af Average Runoff Depth = 3.37" 71.81% Pervious = 19.318 ac 28.19% Impervious = 7.582 ac Charlotte 6-hr 25-yr Rainfall=5.86"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 73HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Summary for Subcatchment 1S: Ex DA-1 Runoff = 26.73 cfs @ 3.25 hrs, Volume= 1.396 af, Depth= 2.79" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Charlotte 6-hr 25-yr Rainfall=5.86" Area (ac) CN Description 5.670 69 50-75% Grass cover, Fair, HSG B 0.340 98 Paved parking, HSG B 6.010 71 Weighted Average 5.670 94.34% Pervious Area 0.340 5.66% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.0 75 0.0400 0.18 Sheet Flow, Sheet Flow Grass: Short n= 0.150 P2= 2.28" 4.6 387 0.0400 1.40 Shallow Concentrated Flow, Shallow Concentrated Flow Short Grass Pasture Kv= 7.0 fps 0.4 237 0.0100 10.72 64.33 Channel Flow, Roadside Swale Area= 6.0 sf Perim= 3.0' r= 2.00' n= 0.022 Earth, clean & straight 12.0 699 Total Subcatchment 1S: Ex DA-1 Runoff Hydrograph Time (hours) 12011511010510095908580757065605550454035302520151050Flow (cfs)28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Charlotte 6-hr 25-yr Rainfall=5.86" Runoff Area=6.010 ac Runoff Volume=1.396 af Runoff Depth=2.79" Flow Length=699' Tc=12.0 min CN=71 26.73 cfs Charlotte 6-hr 25-yr Rainfall=5.86"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 74HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 1S: Ex DA-1 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 2.50 1.04 0.01 0.16 5.00 5.60 2.58 1.60 7.50 5.86 2.79 0.00 10.00 5.86 2.79 0.00 12.50 5.86 2.79 0.00 15.00 5.86 2.79 0.00 17.50 5.86 2.79 0.00 20.00 5.86 2.79 0.00 22.50 5.86 2.79 0.00 25.00 5.86 2.79 0.00 27.50 5.86 2.79 0.00 30.00 5.86 2.79 0.00 32.50 5.86 2.79 0.00 35.00 5.86 2.79 0.00 37.50 5.86 2.79 0.00 40.00 5.86 2.79 0.00 42.50 5.86 2.79 0.00 45.00 5.86 2.79 0.00 47.50 5.86 2.79 0.00 50.00 5.86 2.79 0.00 52.50 5.86 2.79 0.00 55.00 5.86 2.79 0.00 57.50 5.86 2.79 0.00 60.00 5.86 2.79 0.00 62.50 5.86 2.79 0.00 65.00 5.86 2.79 0.00 67.50 5.86 2.79 0.00 70.00 5.86 2.79 0.00 72.50 5.86 2.79 0.00 75.00 5.86 2.79 0.00 77.50 5.86 2.79 0.00 80.00 5.86 2.79 0.00 82.50 5.86 2.79 0.00 85.00 5.86 2.79 0.00 87.50 5.86 2.79 0.00 90.00 5.86 2.79 0.00 92.50 5.86 2.79 0.00 95.00 5.86 2.79 0.00 97.50 5.86 2.79 0.00 100.00 5.86 2.79 0.00 102.50 5.86 2.79 0.00 105.00 5.86 2.79 0.00 107.50 5.86 2.79 0.00 110.00 5.86 2.79 0.00 112.50 5.86 2.79 0.00 115.00 5.86 2.79 0.00 117.50 5.86 2.79 0.00 120.00 5.86 2.79 0.00 Charlotte 6-hr 25-yr Rainfall=5.86"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 75HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Summary for Subcatchment 2S: Ex DA-2 Runoff = 27.73 cfs @ 3.27 hrs, Volume= 1.493 af, Depth= 2.69" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Charlotte 6-hr 25-yr Rainfall=5.86" Area (ac) CN Description 6.445 69 50-75% Grass cover, Fair, HSG B 0.205 98 Paved parking, HSG B 6.650 70 Weighted Average 6.445 96.92% Pervious Area 0.205 3.08% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.8 75 0.0300 0.16 Sheet Flow, Sheet Flow Grass: Short n= 0.150 P2= 2.28" 4.8 400 0.0400 1.40 Shallow Concentrated Flow, Shallow Concentrated Flow Short Grass Pasture Kv= 7.0 fps 0.5 315 0.0150 11.56 69.34 Channel Flow, Channel Flow Area= 6.0 sf Perim= 3.0' r= 2.00' n= 0.025 Earth, clean & winding 13.1 790 Total Subcatchment 2S: Ex DA-2 Runoff Hydrograph Time (hours) 12011511010510095908580757065605550454035302520151050Flow (cfs)30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Charlotte 6-hr 25-yr Rainfall=5.86" Runoff Area=6.650 ac Runoff Volume=1.493 af Runoff Depth=2.69" Flow Length=790' Tc=13.1 min CN=70 27.73 cfs Charlotte 6-hr 25-yr Rainfall=5.86"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 76HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 2S: Ex DA-2 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 2.50 1.04 0.01 0.08 5.00 5.60 2.49 1.75 7.50 5.86 2.69 0.00 10.00 5.86 2.69 0.00 12.50 5.86 2.69 0.00 15.00 5.86 2.69 0.00 17.50 5.86 2.69 0.00 20.00 5.86 2.69 0.00 22.50 5.86 2.69 0.00 25.00 5.86 2.69 0.00 27.50 5.86 2.69 0.00 30.00 5.86 2.69 0.00 32.50 5.86 2.69 0.00 35.00 5.86 2.69 0.00 37.50 5.86 2.69 0.00 40.00 5.86 2.69 0.00 42.50 5.86 2.69 0.00 45.00 5.86 2.69 0.00 47.50 5.86 2.69 0.00 50.00 5.86 2.69 0.00 52.50 5.86 2.69 0.00 55.00 5.86 2.69 0.00 57.50 5.86 2.69 0.00 60.00 5.86 2.69 0.00 62.50 5.86 2.69 0.00 65.00 5.86 2.69 0.00 67.50 5.86 2.69 0.00 70.00 5.86 2.69 0.00 72.50 5.86 2.69 0.00 75.00 5.86 2.69 0.00 77.50 5.86 2.69 0.00 80.00 5.86 2.69 0.00 82.50 5.86 2.69 0.00 85.00 5.86 2.69 0.00 87.50 5.86 2.69 0.00 90.00 5.86 2.69 0.00 92.50 5.86 2.69 0.00 95.00 5.86 2.69 0.00 97.50 5.86 2.69 0.00 100.00 5.86 2.69 0.00 102.50 5.86 2.69 0.00 105.00 5.86 2.69 0.00 107.50 5.86 2.69 0.00 110.00 5.86 2.69 0.00 112.50 5.86 2.69 0.00 115.00 5.86 2.69 0.00 117.50 5.86 2.69 0.00 120.00 5.86 2.69 0.00 Charlotte 6-hr 25-yr Rainfall=5.86"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 77HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Summary for Subcatchment 4S: Prop DA-1 [49] Hint: Tc<2dt may require smaller dt Runoff = 25.92 cfs @ 3.15 hrs, Volume= 1.143 af, Depth= 4.38" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Charlotte 6-hr 25-yr Rainfall=5.86" Area (ac) CN Description 2.170 98 Paved parking, HSG B 0.960 61 >75% Grass cover, Good, HSG B 3.130 87 Weighted Average 0.960 30.67% Pervious Area 2.170 69.33% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, ToC Subcatchment 4S: Prop DA-1 Runoff Hydrograph Time (hours) 12011511010510095908580757065605550454035302520151050Flow (cfs)28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Charlotte 6-hr 25-yr Rainfall=5.86" Runoff Area=3.130 ac Runoff Volume=1.143 af Runoff Depth=4.38" Tc=5.0 min CN=87 25.92 cfs Charlotte 6-hr 25-yr Rainfall=5.86"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 78HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 4S: Prop DA-1 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 2.50 1.04 0.24 1.55 5.00 5.60 4.13 0.96 7.50 5.86 4.38 0.00 10.00 5.86 4.38 0.00 12.50 5.86 4.38 0.00 15.00 5.86 4.38 0.00 17.50 5.86 4.38 0.00 20.00 5.86 4.38 0.00 22.50 5.86 4.38 0.00 25.00 5.86 4.38 0.00 27.50 5.86 4.38 0.00 30.00 5.86 4.38 0.00 32.50 5.86 4.38 0.00 35.00 5.86 4.38 0.00 37.50 5.86 4.38 0.00 40.00 5.86 4.38 0.00 42.50 5.86 4.38 0.00 45.00 5.86 4.38 0.00 47.50 5.86 4.38 0.00 50.00 5.86 4.38 0.00 52.50 5.86 4.38 0.00 55.00 5.86 4.38 0.00 57.50 5.86 4.38 0.00 60.00 5.86 4.38 0.00 62.50 5.86 4.38 0.00 65.00 5.86 4.38 0.00 67.50 5.86 4.38 0.00 70.00 5.86 4.38 0.00 72.50 5.86 4.38 0.00 75.00 5.86 4.38 0.00 77.50 5.86 4.38 0.00 80.00 5.86 4.38 0.00 82.50 5.86 4.38 0.00 85.00 5.86 4.38 0.00 87.50 5.86 4.38 0.00 90.00 5.86 4.38 0.00 92.50 5.86 4.38 0.00 95.00 5.86 4.38 0.00 97.50 5.86 4.38 0.00 100.00 5.86 4.38 0.00 102.50 5.86 4.38 0.00 105.00 5.86 4.38 0.00 107.50 5.86 4.38 0.00 110.00 5.86 4.38 0.00 112.50 5.86 4.38 0.00 115.00 5.86 4.38 0.00 117.50 5.86 4.38 0.00 120.00 5.86 4.38 0.00 Charlotte 6-hr 25-yr Rainfall=5.86"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 79HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Summary for Subcatchment 5S: Prop DA-2 [49] Hint: Tc<2dt may require smaller dt Runoff = 58.81 cfs @ 3.15 hrs, Volume= 2.565 af, Depth= 4.17" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Charlotte 6-hr 25-yr Rainfall=5.86" Area (ac) CN Description 2.560 61 >75% Grass cover, Good, HSG B 1.600 98 Roofs, HSG B 2.870 98 Paved parking, HSG B 0.350 98 Water Surface, 0% imp, HSG B 7.380 85 Weighted Average 2.910 39.43% Pervious Area 4.470 60.57% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Direct Entry Subcatchment 5S: Prop DA-2 Runoff Hydrograph Time (hours) 12011511010510095908580757065605550454035302520151050Flow (cfs)65 60 55 50 45 40 35 30 25 20 15 10 5 0 Charlotte 6-hr 25-yr Rainfall=5.86" Runoff Area=7.380 ac Runoff Volume=2.565 af Runoff Depth=4.17" Tc=5.0 min CN=85 58.81 cfs Charlotte 6-hr 25-yr Rainfall=5.86"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 80HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 5S: Prop DA-2 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 2.50 1.04 0.19 3.13 5.00 5.60 3.92 2.23 7.50 5.86 4.17 0.00 10.00 5.86 4.17 0.00 12.50 5.86 4.17 0.00 15.00 5.86 4.17 0.00 17.50 5.86 4.17 0.00 20.00 5.86 4.17 0.00 22.50 5.86 4.17 0.00 25.00 5.86 4.17 0.00 27.50 5.86 4.17 0.00 30.00 5.86 4.17 0.00 32.50 5.86 4.17 0.00 35.00 5.86 4.17 0.00 37.50 5.86 4.17 0.00 40.00 5.86 4.17 0.00 42.50 5.86 4.17 0.00 45.00 5.86 4.17 0.00 47.50 5.86 4.17 0.00 50.00 5.86 4.17 0.00 52.50 5.86 4.17 0.00 55.00 5.86 4.17 0.00 57.50 5.86 4.17 0.00 60.00 5.86 4.17 0.00 62.50 5.86 4.17 0.00 65.00 5.86 4.17 0.00 67.50 5.86 4.17 0.00 70.00 5.86 4.17 0.00 72.50 5.86 4.17 0.00 75.00 5.86 4.17 0.00 77.50 5.86 4.17 0.00 80.00 5.86 4.17 0.00 82.50 5.86 4.17 0.00 85.00 5.86 4.17 0.00 87.50 5.86 4.17 0.00 90.00 5.86 4.17 0.00 92.50 5.86 4.17 0.00 95.00 5.86 4.17 0.00 97.50 5.86 4.17 0.00 100.00 5.86 4.17 0.00 102.50 5.86 4.17 0.00 105.00 5.86 4.17 0.00 107.50 5.86 4.17 0.00 110.00 5.86 4.17 0.00 112.50 5.86 4.17 0.00 115.00 5.86 4.17 0.00 117.50 5.86 4.17 0.00 120.00 5.86 4.17 0.00 Charlotte 6-hr 25-yr Rainfall=5.86"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 81HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Summary for Subcatchment 6S: Prop DA-3 [49] Hint: Tc<2dt may require smaller dt Runoff = 7.46 cfs @ 3.16 hrs, Volume= 0.314 af, Depth= 2.88" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Charlotte 6-hr 25-yr Rainfall=5.86" Area (ac) CN Description 0.397 98 Paved parking, HSG B 0.913 61 >75% Grass cover, Good, HSG B 1.310 72 Weighted Average 0.913 69.69% Pervious Area 0.397 30.31% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Time of Concentration Subcatchment 6S: Prop DA-3 Runoff Hydrograph Time (hours) 12011511010510095908580757065605550454035302520151050Flow (cfs)8 7 6 5 4 3 2 1 0 Charlotte 6-hr 25-yr Rainfall=5.86" Runoff Area=1.310 ac Runoff Volume=0.314 af Runoff Depth=2.88" Tc=5.0 min CN=72 7.46 cfs Charlotte 6-hr 25-yr Rainfall=5.86"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 82HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 6S: Prop DA-3 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 2.50 1.04 0.02 0.11 5.00 5.60 2.67 0.34 7.50 5.86 2.88 0.00 10.00 5.86 2.88 0.00 12.50 5.86 2.88 0.00 15.00 5.86 2.88 0.00 17.50 5.86 2.88 0.00 20.00 5.86 2.88 0.00 22.50 5.86 2.88 0.00 25.00 5.86 2.88 0.00 27.50 5.86 2.88 0.00 30.00 5.86 2.88 0.00 32.50 5.86 2.88 0.00 35.00 5.86 2.88 0.00 37.50 5.86 2.88 0.00 40.00 5.86 2.88 0.00 42.50 5.86 2.88 0.00 45.00 5.86 2.88 0.00 47.50 5.86 2.88 0.00 50.00 5.86 2.88 0.00 52.50 5.86 2.88 0.00 55.00 5.86 2.88 0.00 57.50 5.86 2.88 0.00 60.00 5.86 2.88 0.00 62.50 5.86 2.88 0.00 65.00 5.86 2.88 0.00 67.50 5.86 2.88 0.00 70.00 5.86 2.88 0.00 72.50 5.86 2.88 0.00 75.00 5.86 2.88 0.00 77.50 5.86 2.88 0.00 80.00 5.86 2.88 0.00 82.50 5.86 2.88 0.00 85.00 5.86 2.88 0.00 87.50 5.86 2.88 0.00 90.00 5.86 2.88 0.00 92.50 5.86 2.88 0.00 95.00 5.86 2.88 0.00 97.50 5.86 2.88 0.00 100.00 5.86 2.88 0.00 102.50 5.86 2.88 0.00 105.00 5.86 2.88 0.00 107.50 5.86 2.88 0.00 110.00 5.86 2.88 0.00 112.50 5.86 2.88 0.00 115.00 5.86 2.88 0.00 117.50 5.86 2.88 0.00 120.00 5.86 2.88 0.00 Charlotte 6-hr 25-yr Rainfall=5.86"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 83HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Summary for Subcatchment 10S: DA-2 Bypass A [49] Hint: Tc<2dt may require smaller dt Runoff = 15.09 cfs @ 3.15 hrs, Volume= 0.638 af, Depth= 3.16" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Charlotte 6-hr 25-yr Rainfall=5.86" Area (ac) CN Description * 2.420 75 2.420 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 10S: DA-2 Bypass A Runoff Hydrograph Time (hours) 12011511010510095908580757065605550454035302520151050Flow (cfs)16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Charlotte 6-hr 25-yr Rainfall=5.86" Runoff Area=2.420 ac Runoff Volume=0.638 af Runoff Depth=3.16" Tc=5.0 min CN=75 15.09 cfs Charlotte 6-hr 25-yr Rainfall=5.86"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 84HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 10S: DA-2 Bypass A Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 2.50 1.04 0.04 0.36 5.00 5.60 2.94 0.65 7.50 5.86 3.16 0.00 10.00 5.86 3.16 0.00 12.50 5.86 3.16 0.00 15.00 5.86 3.16 0.00 17.50 5.86 3.16 0.00 20.00 5.86 3.16 0.00 22.50 5.86 3.16 0.00 25.00 5.86 3.16 0.00 27.50 5.86 3.16 0.00 30.00 5.86 3.16 0.00 32.50 5.86 3.16 0.00 35.00 5.86 3.16 0.00 37.50 5.86 3.16 0.00 40.00 5.86 3.16 0.00 42.50 5.86 3.16 0.00 45.00 5.86 3.16 0.00 47.50 5.86 3.16 0.00 50.00 5.86 3.16 0.00 52.50 5.86 3.16 0.00 55.00 5.86 3.16 0.00 57.50 5.86 3.16 0.00 60.00 5.86 3.16 0.00 62.50 5.86 3.16 0.00 65.00 5.86 3.16 0.00 67.50 5.86 3.16 0.00 70.00 5.86 3.16 0.00 72.50 5.86 3.16 0.00 75.00 5.86 3.16 0.00 77.50 5.86 3.16 0.00 80.00 5.86 3.16 0.00 82.50 5.86 3.16 0.00 85.00 5.86 3.16 0.00 87.50 5.86 3.16 0.00 90.00 5.86 3.16 0.00 92.50 5.86 3.16 0.00 95.00 5.86 3.16 0.00 97.50 5.86 3.16 0.00 100.00 5.86 3.16 0.00 102.50 5.86 3.16 0.00 105.00 5.86 3.16 0.00 107.50 5.86 3.16 0.00 110.00 5.86 3.16 0.00 112.50 5.86 3.16 0.00 115.00 5.86 3.16 0.00 117.50 5.86 3.16 0.00 120.00 5.86 3.16 0.00 Charlotte 6-hr 25-yr Rainfall=5.86"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 85HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Summary for Pond 4P: Wet Pond 1 Inflow Area = 3.130 ac, 69.33% Impervious, Inflow Depth = 4.38" for 25-yr event Inflow = 25.92 cfs @ 3.15 hrs, Volume= 1.143 af Outflow = 7.56 cfs @ 3.39 hrs, Volume= 1.140 af, Atten= 71%, Lag= 14.4 min Primary = 7.56 cfs @ 3.39 hrs, Volume= 1.140 af Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 790.19' @ 3.39 hrs Surf.Area= 11,438 sf Storage= 25,727 cf Plug-Flow detention time= 364.5 min calculated for 1.140 af (100% of inflow) Center-of-Mass det. time= 364.1 min ( 569.4 - 205.3 ) Volume Invert Avail.Storage Storage Description #1 787.50' 48,545 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 787.50 7,516 0 0 789.00 9,858 13,031 13,031 790.00 11,185 10,522 23,552 791.00 12,500 11,843 35,395 792.00 13,800 13,150 48,545 Device Routing Invert Outlet Devices #1 Primary 787.50'24.0" Round Culvert L= 23.7' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 787.50' / 787.38' S= 0.0051 '/' Cc= 0.900 n= 0.013, Flow Area= 3.14 sf #2 Device 1 787.50'1.5" Vert. Orifice/Grate C= 0.600 #3 Device 1 788.50'24.0" W x 8.0" H Vert. Orifice/Grate C= 0.600 #4 Device 1 790.50'16.0' long Sharp-Crested Vee/Trap Weir Cv= 2.62 (C= 3.28) #5 Secondary 791.00'20.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=7.56 cfs @ 3.39 hrs HW=790.19' (Free Discharge) 1=Culvert (Passes 7.56 cfs of 16.94 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.10 cfs @ 7.81 fps) 3=Orifice/Grate (Orifice Controls 7.46 cfs @ 5.59 fps) 4=Sharp-Crested Vee/Trap Weir ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=787.50' (Free Discharge) 5=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Charlotte 6-hr 25-yr Rainfall=5.86"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 86HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Pond 4P: Wet Pond 1 Inflow Outflow Primary Secondary Hydrograph Time (hours) 12011511010510095908580757065605550454035302520151050Flow (cfs)28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Inflow Area=3.130 ac Peak Elev=790.19' Storage=25,727 cf 25.92 cfs 7.56 cfs 7.56 cfs 0.00 cfs Pond 4P: Wet Pond 1 Total Primary Secondary Stage-Discharge Discharge (cfs) 80706050403020100Elevation (feet)792 791 790 789 788 Culvert + Orifice/Grate Orifice/Grate Sharp-Crested Vee/Trap Weir Broad-Crested Rectangular Weir Charlotte 6-hr 25-yr Rainfall=5.86"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 87HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Pond 4P: Wet Pond 1 Surface Storage Stage-Area-Storage Storage (cubic-feet) 45,00040,00035,00030,00025,00020,00015,00010,0005,0000 Surface/Horizontal/Wetted Area (sq-ft) 13,00012,00011,00010,0009,0008,0007,0006,0005,0004,0003,0002,0001,0000 Elevation (feet)792 791 790 789 788 Custom Stage Data Charlotte 6-hr 25-yr Rainfall=5.86"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 88HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Hydrograph for Pond 4P: Wet Pond 1 Time (hours) Inflow (cfs) Storage (cubic-feet) Elevation (feet) Outflow (cfs) Primary (cfs) Secondary (cfs) 0.00 0.00 0 787.50 0.00 0.00 0.00 2.50 1.55 2,277 787.79 0.03 0.03 0.00 5.00 0.96 12,010 788.90 1.67 1.67 0.00 7.50 0.00 8,777 788.55 0.14 0.14 0.00 10.00 0.00 8,098 788.48 0.06 0.06 0.00 12.50 0.00 7,597 788.42 0.05 0.05 0.00 15.00 0.00 7,112 788.37 0.05 0.05 0.00 17.50 0.00 6,642 788.31 0.05 0.05 0.00 20.00 0.00 6,189 788.26 0.05 0.05 0.00 22.50 0.00 5,752 788.21 0.05 0.05 0.00 25.00 0.00 5,332 788.16 0.05 0.05 0.00 27.50 0.00 4,928 788.12 0.04 0.04 0.00 30.00 0.00 4,541 788.07 0.04 0.04 0.00 32.50 0.00 4,170 788.03 0.04 0.04 0.00 35.00 0.00 3,817 787.98 0.04 0.04 0.00 37.50 0.00 3,480 787.94 0.04 0.04 0.00 40.00 0.00 3,161 787.90 0.03 0.03 0.00 42.50 0.00 2,859 787.87 0.03 0.03 0.00 45.00 0.00 2,575 787.83 0.03 0.03 0.00 47.50 0.00 2,308 787.80 0.03 0.03 0.00 50.00 0.00 2,059 787.77 0.03 0.03 0.00 52.50 0.00 1,828 787.74 0.02 0.02 0.00 55.00 0.00 1,615 787.71 0.02 0.02 0.00 57.50 0.00 1,420 787.69 0.02 0.02 0.00 60.00 0.00 1,244 787.66 0.02 0.02 0.00 62.50 0.00 1,085 787.64 0.02 0.02 0.00 65.00 0.00 945 787.62 0.01 0.01 0.00 67.50 0.00 826 787.61 0.01 0.01 0.00 70.00 0.00 724 787.60 0.01 0.01 0.00 72.50 0.00 638 787.58 0.01 0.01 0.00 75.00 0.00 565 787.57 0.01 0.01 0.00 77.50 0.00 505 787.57 0.01 0.01 0.00 80.00 0.00 454 787.56 0.01 0.01 0.00 82.50 0.00 412 787.55 0.00 0.00 0.00 85.00 0.00 376 787.55 0.00 0.00 0.00 87.50 0.00 347 787.55 0.00 0.00 0.00 90.00 0.00 321 787.54 0.00 0.00 0.00 92.50 0.00 298 787.54 0.00 0.00 0.00 95.00 0.00 276 787.54 0.00 0.00 0.00 97.50 0.00 256 787.53 0.00 0.00 0.00 100.00 0.00 237 787.53 0.00 0.00 0.00 102.50 0.00 220 787.53 0.00 0.00 0.00 105.00 0.00 204 787.53 0.00 0.00 0.00 107.50 0.00 189 787.52 0.00 0.00 0.00 110.00 0.00 175 787.52 0.00 0.00 0.00 112.50 0.00 162 787.52 0.00 0.00 0.00 115.00 0.00 150 787.52 0.00 0.00 0.00 117.50 0.00 139 787.52 0.00 0.00 0.00 120.00 0.00 129 787.52 0.00 0.00 0.00 Charlotte 6-hr 25-yr Rainfall=5.86"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 89HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Stage-Discharge for Pond 4P: Wet Pond 1 Elevation (feet) Discharge (cfs) Primary (cfs) Secondary (cfs) 787.50 0.00 0.00 0.00 787.55 0.00 0.00 0.00 787.60 0.01 0.01 0.00 787.65 0.02 0.02 0.00 787.70 0.02 0.02 0.00 787.75 0.03 0.03 0.00 787.80 0.03 0.03 0.00 787.85 0.03 0.03 0.00 787.90 0.03 0.03 0.00 787.95 0.04 0.04 0.00 788.00 0.04 0.04 0.00 788.05 0.04 0.04 0.00 788.10 0.04 0.04 0.00 788.15 0.05 0.05 0.00 788.20 0.05 0.05 0.00 788.25 0.05 0.05 0.00 788.30 0.05 0.05 0.00 788.35 0.05 0.05 0.00 788.40 0.05 0.05 0.00 788.45 0.06 0.06 0.00 788.50 0.06 0.06 0.00 788.55 0.13 0.13 0.00 788.60 0.26 0.26 0.00 788.65 0.43 0.43 0.00 788.70 0.64 0.64 0.00 788.75 0.87 0.87 0.00 788.80 1.12 1.12 0.00 788.85 1.40 1.40 0.00 788.90 1.69 1.69 0.00 788.95 2.01 2.01 0.00 789.00 2.34 2.34 0.00 789.05 2.69 2.69 0.00 789.10 3.06 3.06 0.00 789.15 3.44 3.44 0.00 789.20 3.80 3.80 0.00 789.25 4.09 4.09 0.00 789.30 4.36 4.36 0.00 789.35 4.61 4.61 0.00 789.40 4.84 4.84 0.00 789.45 5.06 5.06 0.00 789.50 5.27 5.27 0.00 789.55 5.47 5.47 0.00 789.60 5.66 5.66 0.00 789.65 5.85 5.85 0.00 789.70 6.03 6.03 0.00 789.75 6.20 6.20 0.00 789.80 6.37 6.37 0.00 789.85 6.53 6.53 0.00 789.90 6.69 6.69 0.00 789.95 6.85 6.85 0.00 790.00 7.00 7.00 0.00 790.05 7.15 7.15 0.00 Elevation (feet) Discharge (cfs) Primary (cfs) Secondary (cfs) 790.10 7.30 7.30 0.00 790.15 7.44 7.44 0.00 790.20 7.58 7.58 0.00 790.25 7.72 7.72 0.00 790.30 7.86 7.86 0.00 790.35 7.99 7.99 0.00 790.40 8.12 8.12 0.00 790.45 8.25 8.25 0.00 790.50 8.38 8.38 0.00 790.55 9.09 9.09 0.00 790.60 10.28 10.28 0.00 790.65 11.79 11.79 0.00 790.70 13.55 13.55 0.00 790.75 15.53 15.53 0.00 790.80 17.71 17.71 0.00 790.85 20.06 20.06 0.00 790.90 22.58 22.58 0.00 790.95 23.58 23.58 0.00 791.00 23.92 23.92 0.00 791.05 24.71 24.16 0.56 791.10 25.97 24.39 1.57 791.15 27.52 24.62 2.89 791.20 29.31 24.86 4.45 791.25 31.35 25.08 6.27 791.30 33.61 25.31 8.30 791.35 36.07 25.54 10.53 791.40 38.71 25.76 12.95 791.45 41.65 25.98 15.67 791.50 44.80 26.20 18.60 791.55 48.16 26.42 21.74 791.60 51.73 26.63 25.10 791.65 55.12 26.85 28.27 791.70 58.63 27.06 31.57 791.75 62.25 27.27 34.98 791.80 65.98 27.48 38.50 791.85 69.81 27.69 42.12 791.90 73.74 27.89 45.85 791.95 77.77 28.10 49.68 792.00 81.90 28.30 53.60 Charlotte 6-hr 25-yr Rainfall=5.86"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 90HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Stage-Area-Storage for Pond 4P: Wet Pond 1 Elevation (feet) Surface (sq-ft) Storage (cubic-feet) 787.50 7,516 0 787.55 7,594 378 787.60 7,672 759 787.65 7,750 1,145 787.70 7,828 1,534 787.75 7,906 1,928 787.80 7,984 2,325 787.85 8,062 2,726 787.90 8,141 3,131 787.95 8,219 3,540 788.00 8,297 3,953 788.05 8,375 4,370 788.10 8,453 4,791 788.15 8,531 5,215 788.20 8,609 5,644 788.25 8,687 6,076 788.30 8,765 6,512 788.35 8,843 6,953 788.40 8,921 7,397 788.45 8,999 7,845 788.50 9,077 8,297 788.55 9,155 8,752 788.60 9,233 9,212 788.65 9,312 9,676 788.70 9,390 10,143 788.75 9,468 10,615 788.80 9,546 11,090 788.85 9,624 11,569 788.90 9,702 12,053 788.95 9,780 12,540 789.00 9,858 13,031 789.05 9,924 13,525 789.10 9,991 14,023 789.15 10,057 14,524 789.20 10,123 15,029 789.25 10,190 15,536 789.30 10,256 16,048 789.35 10,322 16,562 789.40 10,389 17,080 789.45 10,455 17,601 789.50 10,522 18,125 789.55 10,588 18,653 789.60 10,654 19,184 789.65 10,721 19,719 789.70 10,787 20,256 789.75 10,853 20,797 789.80 10,920 21,342 789.85 10,986 21,889 789.90 11,052 22,440 789.95 11,119 22,994 790.00 11,185 23,552 790.05 11,251 24,113 Elevation (feet) Surface (sq-ft) Storage (cubic-feet) 790.10 11,317 24,677 790.15 11,382 25,245 790.20 11,448 25,815 790.25 11,514 26,389 790.30 11,579 26,967 790.35 11,645 27,547 790.40 11,711 28,131 790.45 11,777 28,718 790.50 11,843 29,309 790.55 11,908 29,903 790.60 11,974 30,500 790.65 12,040 31,100 790.70 12,106 31,704 790.75 12,171 32,311 790.80 12,237 32,921 790.85 12,303 33,534 790.90 12,368 34,151 790.95 12,434 34,771 791.00 12,500 35,395 791.05 12,565 36,021 791.10 12,630 36,651 791.15 12,695 37,284 791.20 12,760 37,921 791.25 12,825 38,560 791.30 12,890 39,203 791.35 12,955 39,849 791.40 13,020 40,498 791.45 13,085 41,151 791.50 13,150 41,807 791.55 13,215 42,466 791.60 13,280 43,129 791.65 13,345 43,794 791.70 13,410 44,463 791.75 13,475 45,135 791.80 13,540 45,810 791.85 13,605 46,489 791.90 13,670 47,171 791.95 13,735 47,856 792.00 13,800 48,545 Charlotte 6-hr 25-yr Rainfall=5.86"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 91HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Summary for Pond 5P: Wet Pond 2 Inflow Area = 7.380 ac, 60.57% Impervious, Inflow Depth = 4.17" for 25-yr event Inflow = 58.81 cfs @ 3.15 hrs, Volume= 2.565 af Outflow = 21.43 cfs @ 3.35 hrs, Volume= 2.559 af, Atten= 64%, Lag= 12.3 min Primary = 20.29 cfs @ 3.35 hrs, Volume= 2.547 af Secondary = 1.14 cfs @ 3.35 hrs, Volume= 0.012 af Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 780.84' @ 3.35 hrs Surf.Area= 19,327 sf Storage= 58,588 cf Plug-Flow detention time= 337.2 min calculated for 2.558 af (100% of inflow) Center-of-Mass det. time= 339.4 min ( 546.2 - 206.8 ) Volume Invert Avail.Storage Storage Description #1 777.00' 82,420 cf Custom Stage Data (Irregular) Listed below (Recalc) Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (feet) (cubic-feet) (cubic-feet) (sq-ft) 777.00 11,324 654.0 0 0 11,324 778.00 13,317 673.0 12,307 12,307 13,437 779.00 15,366 692.0 14,329 26,636 15,611 780.00 17,509 713.0 16,426 43,062 18,062 781.00 19,675 731.0 18,581 61,644 20,253 782.00 21,898 750.0 20,777 82,420 22,611 Device Routing Invert Outlet Devices #1 Primary 776.50'24.0" Round Culvert L= 77.6' Ke= 0.500 Inlet / Outlet Invert= 776.50' / 775.72' S= 0.0101 '/' Cc= 0.900 n= 0.013, Flow Area= 3.14 sf #2 Device 1 777.00'2.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 778.30'24.0" W x 8.0" H Vert. Orifice/Grate C= 0.600 #4 Primary 780.50'16.0' long Sharp-Crested Vee/Trap Weir Cv= 2.62 (C= 3.28) #5 Secondary 780.75'12.0' long Sharp-Crested Vee/Trap Weir Cv= 2.62 (C= 3.28) Primary OutFlow Max=20.17 cfs @ 3.35 hrs HW=780.84' (Free Discharge) 1=Culvert (Passes 9.73 cfs of 27.65 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.20 cfs @ 9.33 fps) 3=Orifice/Grate (Orifice Controls 9.53 cfs @ 7.15 fps) 4=Sharp-Crested Vee/Trap Weir (Weir Controls 10.44 cfs @ 1.91 fps) Secondary OutFlow Max=1.08 cfs @ 3.35 hrs HW=780.84' (Free Discharge) 5=Sharp-Crested Vee/Trap Weir (Weir Controls 1.08 cfs @ 0.99 fps) Charlotte 6-hr 25-yr Rainfall=5.86"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 92HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Pond 5P: Wet Pond 2 Inflow Outflow Primary Secondary Hydrograph Time (hours) 12011511010510095908580757065605550454035302520151050Flow (cfs)65 60 55 50 45 40 35 30 25 20 15 10 5 0 Inflow Area=7.380 ac Peak Elev=780.84' Storage=58,588 cf 58.81 cfs 21.43 cfs 20.29 cfs 1.14 cfs Pond 5P: Wet Pond 2 Total Primary Secondary Stage-Discharge Discharge (cfs) 160140120100806040200Elevation (feet)782 781 780 779 778 777 Orifice/Grate Orifice/Grate Sharp-Crested Vee/Trap Weir Sharp-Crested Vee/Trap Weir Charlotte 6-hr 25-yr Rainfall=5.86"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 93HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Pond 5P: Wet Pond 2 Surface Storage Stage-Area-Storage Storage (cubic-feet) 80,00070,00060,00050,00040,00030,00020,00010,0000 Surface/Horizontal/Wetted Area (sq-ft) 20,00018,00016,00014,00012,00010,0008,0006,0004,0002,0000 Elevation (feet)782 781 780 779 778 777 Custom Stage Data Charlotte 6-hr 25-yr Rainfall=5.86"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 94HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Hydrograph for Pond 5P: Wet Pond 2 Time (hours) Inflow (cfs) Storage (cubic-feet) Elevation (feet) Outflow (cfs) Primary (cfs) Secondary (cfs) 0.00 0.00 0 777.00 0.00 0.00 0.00 2.50 3.13 4,124 777.35 0.05 0.05 0.00 5.00 2.23 34,781 779.51 6.14 6.14 0.00 7.50 0.00 18,392 778.44 0.47 0.47 0.00 10.00 0.00 16,391 778.30 0.12 0.12 0.00 12.50 0.00 15,364 778.23 0.11 0.11 0.00 15.00 0.00 14,370 778.15 0.11 0.11 0.00 17.50 0.00 13,408 778.08 0.10 0.10 0.00 20.00 0.00 12,480 778.01 0.10 0.10 0.00 22.50 0.00 11,586 777.95 0.10 0.10 0.00 25.00 0.00 10,725 777.88 0.09 0.09 0.00 27.50 0.00 9,898 777.82 0.09 0.09 0.00 30.00 0.00 9,106 777.75 0.09 0.09 0.00 32.50 0.00 8,349 777.70 0.08 0.08 0.00 35.00 0.00 7,627 777.64 0.08 0.08 0.00 37.50 0.00 6,940 777.58 0.07 0.07 0.00 40.00 0.00 6,290 777.53 0.07 0.07 0.00 42.50 0.00 5,675 777.48 0.07 0.07 0.00 45.00 0.00 5,097 777.43 0.06 0.06 0.00 47.50 0.00 4,556 777.39 0.06 0.06 0.00 50.00 0.00 4,052 777.35 0.05 0.05 0.00 52.50 0.00 3,585 777.31 0.05 0.05 0.00 55.00 0.00 3,156 777.27 0.05 0.05 0.00 57.50 0.00 2,764 777.24 0.04 0.04 0.00 60.00 0.00 2,411 777.21 0.04 0.04 0.00 62.50 0.00 2,096 777.18 0.03 0.03 0.00 65.00 0.00 1,819 777.16 0.03 0.03 0.00 67.50 0.00 1,580 777.14 0.02 0.02 0.00 70.00 0.00 1,382 777.12 0.02 0.02 0.00 72.50 0.00 1,219 777.11 0.02 0.02 0.00 75.00 0.00 1,085 777.09 0.01 0.01 0.00 77.50 0.00 971 777.09 0.01 0.01 0.00 80.00 0.00 875 777.08 0.01 0.01 0.00 82.50 0.00 794 777.07 0.01 0.01 0.00 85.00 0.00 725 777.06 0.01 0.01 0.00 87.50 0.00 666 777.06 0.01 0.01 0.00 90.00 0.00 617 777.05 0.01 0.01 0.00 92.50 0.00 574 777.05 0.00 0.00 0.00 95.00 0.00 538 777.05 0.00 0.00 0.00 97.50 0.00 503 777.04 0.00 0.00 0.00 100.00 0.00 471 777.04 0.00 0.00 0.00 102.50 0.00 441 777.04 0.00 0.00 0.00 105.00 0.00 412 777.04 0.00 0.00 0.00 107.50 0.00 386 777.03 0.00 0.00 0.00 110.00 0.00 361 777.03 0.00 0.00 0.00 112.50 0.00 338 777.03 0.00 0.00 0.00 115.00 0.00 316 777.03 0.00 0.00 0.00 117.50 0.00 296 777.03 0.00 0.00 0.00 120.00 0.00 277 777.02 0.00 0.00 0.00 Charlotte 6-hr 25-yr Rainfall=5.86"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 95HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Stage-Discharge for Pond 5P: Wet Pond 2 Elevation (feet) Discharge (cfs) Primary (cfs) Secondary (cfs) 777.00 0.00 0.00 0.00 777.05 0.00 0.00 0.00 777.10 0.01 0.01 0.00 777.15 0.03 0.03 0.00 777.20 0.04 0.04 0.00 777.25 0.04 0.04 0.00 777.30 0.05 0.05 0.00 777.35 0.05 0.05 0.00 777.40 0.06 0.06 0.00 777.45 0.06 0.06 0.00 777.50 0.07 0.07 0.00 777.55 0.07 0.07 0.00 777.60 0.08 0.08 0.00 777.65 0.08 0.08 0.00 777.70 0.08 0.08 0.00 777.75 0.09 0.09 0.00 777.80 0.09 0.09 0.00 777.85 0.09 0.09 0.00 777.90 0.09 0.09 0.00 777.95 0.10 0.10 0.00 778.00 0.10 0.10 0.00 778.05 0.10 0.10 0.00 778.10 0.11 0.11 0.00 778.15 0.11 0.11 0.00 778.20 0.11 0.11 0.00 778.25 0.11 0.11 0.00 778.30 0.12 0.12 0.00 778.35 0.19 0.19 0.00 778.40 0.32 0.32 0.00 778.45 0.50 0.50 0.00 778.50 0.70 0.70 0.00 778.55 0.93 0.93 0.00 778.60 1.18 1.18 0.00 778.65 1.46 1.46 0.00 778.70 1.76 1.76 0.00 778.75 2.07 2.07 0.00 778.80 2.41 2.41 0.00 778.85 2.76 2.76 0.00 778.90 3.13 3.13 0.00 778.95 3.51 3.51 0.00 779.00 3.87 3.87 0.00 779.05 4.16 4.16 0.00 779.10 4.43 4.43 0.00 779.15 4.68 4.68 0.00 779.20 4.91 4.91 0.00 779.25 5.13 5.13 0.00 779.30 5.34 5.34 0.00 779.35 5.54 5.54 0.00 779.40 5.74 5.74 0.00 779.45 5.92 5.92 0.00 779.50 6.10 6.10 0.00 779.55 6.28 6.28 0.00 Elevation (feet) Discharge (cfs) Primary (cfs) Secondary (cfs) 779.60 6.45 6.45 0.00 779.65 6.61 6.61 0.00 779.70 6.77 6.77 0.00 779.75 6.93 6.93 0.00 779.80 7.08 7.08 0.00 779.85 7.23 7.23 0.00 779.90 7.38 7.38 0.00 779.95 7.52 7.52 0.00 780.00 7.67 7.67 0.00 780.05 7.80 7.80 0.00 780.10 7.94 7.94 0.00 780.15 8.07 8.07 0.00 780.20 8.21 8.21 0.00 780.25 8.34 8.34 0.00 780.30 8.46 8.46 0.00 780.35 8.59 8.59 0.00 780.40 8.71 8.71 0.00 780.45 8.83 8.83 0.00 780.50 8.95 8.95 0.00 780.55 9.66 9.66 0.00 780.60 10.85 10.85 0.00 780.65 12.35 12.35 0.00 780.70 14.11 14.11 0.00 780.75 16.08 16.08 0.00 780.80 18.69 18.25 0.44 780.85 21.85 20.60 1.24 780.90 25.40 23.12 2.28 780.95 29.30 25.79 3.52 781.00 33.51 28.60 4.91 781.05 38.01 31.56 6.46 781.10 42.78 34.64 8.14 781.15 47.79 37.85 9.94 781.20 53.04 41.18 11.86 781.25 58.52 44.63 13.89 781.30 64.22 48.19 16.03 781.35 70.12 51.86 18.26 781.40 76.23 55.63 20.60 781.45 82.52 59.51 23.02 781.50 89.01 63.48 25.53 781.55 95.68 67.56 28.12 781.60 102.53 71.73 30.80 781.65 109.55 75.99 33.55 781.70 116.73 80.34 36.39 781.75 124.09 84.79 39.30 781.80 131.60 89.32 42.28 781.85 139.27 93.93 45.34 781.90 147.10 98.63 48.47 781.95 155.07 103.41 51.66 782.00 163.20 108.27 54.92 Charlotte 6-hr 25-yr Rainfall=5.86"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 96HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Stage-Area-Storage for Pond 5P: Wet Pond 2 Elevation (feet) Surface (sq-ft) Storage (cubic-feet) 777.00 11,324 0 777.05 11,420 569 777.10 11,516 1,142 777.15 11,613 1,720 777.20 11,710 2,303 777.25 11,807 2,891 777.30 11,905 3,484 777.35 12,003 4,082 777.40 12,102 4,684 777.45 12,201 5,292 777.50 12,300 5,904 777.55 12,400 6,522 777.60 12,500 7,144 777.65 12,601 7,772 777.70 12,702 8,405 777.75 12,804 9,042 777.80 12,905 9,685 777.85 13,008 10,333 777.90 13,110 10,986 777.95 13,214 11,644 778.00 13,317 12,307 778.05 13,416 12,975 778.10 13,515 13,649 778.15 13,615 14,327 778.20 13,715 15,010 778.25 13,816 15,698 778.30 13,916 16,392 778.35 14,017 17,090 778.40 14,119 17,793 778.45 14,221 18,502 778.50 14,323 19,216 778.55 14,426 19,934 778.60 14,529 20,658 778.65 14,632 21,387 778.70 14,736 22,121 778.75 14,840 22,861 778.80 14,944 23,605 778.85 15,049 24,355 778.90 15,155 25,110 778.95 15,260 25,871 779.00 15,366 26,636 779.05 15,470 27,407 779.10 15,574 28,183 779.15 15,679 28,965 779.20 15,783 29,751 779.25 15,889 30,543 779.30 15,994 31,340 779.35 16,100 32,142 779.40 16,206 32,950 779.45 16,313 33,763 779.50 16,420 34,581 779.55 16,527 35,405 Elevation (feet) Surface (sq-ft) Storage (cubic-feet) 779.60 16,635 36,234 779.65 16,743 37,069 779.70 16,851 37,908 779.75 16,960 38,754 779.80 17,069 39,604 779.85 17,179 40,461 779.90 17,288 41,322 779.95 17,399 42,189 780.00 17,509 43,062 780.05 17,614 43,940 780.10 17,720 44,824 780.15 17,826 45,712 780.20 17,932 46,606 780.25 18,039 47,505 780.30 18,146 48,410 780.35 18,253 49,320 780.40 18,360 50,235 780.45 18,468 51,156 780.50 18,576 52,082 780.55 18,685 53,014 780.60 18,793 53,951 780.65 18,903 54,893 780.70 19,012 55,841 780.75 19,122 56,794 780.80 19,232 57,753 780.85 19,342 58,717 780.90 19,453 59,687 780.95 19,564 60,663 781.00 19,675 61,644 781.05 19,783 62,630 781.10 19,892 63,622 781.15 20,001 64,619 781.20 20,110 65,622 781.25 20,220 66,630 781.30 20,329 67,644 781.35 20,440 68,663 781.40 20,550 69,688 781.45 20,661 70,718 781.50 20,772 71,754 781.55 20,883 72,795 781.60 20,995 73,842 781.65 21,106 74,895 781.70 21,219 75,953 781.75 21,331 77,017 781.80 21,444 78,086 781.85 21,557 79,161 781.90 21,670 80,242 781.95 21,784 81,328 782.00 21,898 82,420 Charlotte 6-hr 25-yr Rainfall=5.86"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 97HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Summary for Link 3L: Ex Drainage Areas Inflow Area = 12.660 ac, 4.30% Impervious, Inflow Depth = 2.74" for 25-yr event Inflow = 54.37 cfs @ 3.26 hrs, Volume= 2.889 af Primary = 54.37 cfs @ 3.26 hrs, Volume= 2.889 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Link 3L: Ex Drainage Areas Inflow Primary Hydrograph Time (hours) 12011511010510095908580757065605550454035302520151050Flow (cfs)60 55 50 45 40 35 30 25 20 15 10 5 0 Inflow Area=12.660 ac 54.37 cfs 54.37 cfs Charlotte 6-hr 25-yr Rainfall=5.86"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 98HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Hydrograph for Link 3L: Ex Drainage Areas Time (hours) Inflow (cfs) Elevation (feet) Primary (cfs) 0.00 0.00 0.00 0.00 2.50 0.24 0.00 0.24 5.00 3.35 0.00 3.35 7.50 0.00 0.00 0.00 10.00 0.00 0.00 0.00 12.50 0.00 0.00 0.00 15.00 0.00 0.00 0.00 17.50 0.00 0.00 0.00 20.00 0.00 0.00 0.00 22.50 0.00 0.00 0.00 25.00 0.00 0.00 0.00 27.50 0.00 0.00 0.00 30.00 0.00 0.00 0.00 32.50 0.00 0.00 0.00 35.00 0.00 0.00 0.00 37.50 0.00 0.00 0.00 40.00 0.00 0.00 0.00 42.50 0.00 0.00 0.00 45.00 0.00 0.00 0.00 47.50 0.00 0.00 0.00 50.00 0.00 0.00 0.00 52.50 0.00 0.00 0.00 55.00 0.00 0.00 0.00 57.50 0.00 0.00 0.00 60.00 0.00 0.00 0.00 62.50 0.00 0.00 0.00 65.00 0.00 0.00 0.00 67.50 0.00 0.00 0.00 70.00 0.00 0.00 0.00 72.50 0.00 0.00 0.00 75.00 0.00 0.00 0.00 77.50 0.00 0.00 0.00 80.00 0.00 0.00 0.00 82.50 0.00 0.00 0.00 85.00 0.00 0.00 0.00 87.50 0.00 0.00 0.00 90.00 0.00 0.00 0.00 92.50 0.00 0.00 0.00 95.00 0.00 0.00 0.00 97.50 0.00 0.00 0.00 100.00 0.00 0.00 0.00 102.50 0.00 0.00 0.00 105.00 0.00 0.00 0.00 107.50 0.00 0.00 0.00 110.00 0.00 0.00 0.00 112.50 0.00 0.00 0.00 115.00 0.00 0.00 0.00 117.50 0.00 0.00 0.00 120.00 0.00 0.00 0.00 Charlotte 6-hr 25-yr Rainfall=5.86"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 99HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Summary for Link 7L: POI-1 Inflow Area = 4.440 ac, 57.82% Impervious, Inflow Depth = 3.93" for 25-yr event Inflow = 13.15 cfs @ 3.18 hrs, Volume= 1.455 af Primary = 13.15 cfs @ 3.18 hrs, Volume= 1.455 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Link 7L: POI-1 Inflow Primary Hydrograph Time (hours) 12011511010510095908580757065605550454035302520151050Flow (cfs)14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Inflow Area=4.440 ac 13.15 cfs 13.15 cfs Charlotte 6-hr 25-yr Rainfall=5.86"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 100HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Hydrograph for Link 7L: POI-1 Time (hours) Inflow (cfs) Elevation (feet) Primary (cfs) 0.00 0.00 0.00 0.00 2.50 0.14 0.00 0.14 5.00 2.00 0.00 2.00 7.50 0.14 0.00 0.14 10.00 0.06 0.00 0.06 12.50 0.05 0.00 0.05 15.00 0.05 0.00 0.05 17.50 0.05 0.00 0.05 20.00 0.05 0.00 0.05 22.50 0.05 0.00 0.05 25.00 0.05 0.00 0.05 27.50 0.04 0.00 0.04 30.00 0.04 0.00 0.04 32.50 0.04 0.00 0.04 35.00 0.04 0.00 0.04 37.50 0.04 0.00 0.04 40.00 0.03 0.00 0.03 42.50 0.03 0.00 0.03 45.00 0.03 0.00 0.03 47.50 0.03 0.00 0.03 50.00 0.03 0.00 0.03 52.50 0.02 0.00 0.02 55.00 0.02 0.00 0.02 57.50 0.02 0.00 0.02 60.00 0.02 0.00 0.02 62.50 0.02 0.00 0.02 65.00 0.01 0.00 0.01 67.50 0.01 0.00 0.01 70.00 0.01 0.00 0.01 72.50 0.01 0.00 0.01 75.00 0.01 0.00 0.01 77.50 0.01 0.00 0.01 80.00 0.01 0.00 0.01 82.50 0.00 0.00 0.00 85.00 0.00 0.00 0.00 87.50 0.00 0.00 0.00 90.00 0.00 0.00 0.00 92.50 0.00 0.00 0.00 95.00 0.00 0.00 0.00 97.50 0.00 0.00 0.00 100.00 0.00 0.00 0.00 102.50 0.00 0.00 0.00 105.00 0.00 0.00 0.00 107.50 0.00 0.00 0.00 110.00 0.00 0.00 0.00 112.50 0.00 0.00 0.00 115.00 0.00 0.00 0.00 117.50 0.00 0.00 0.00 120.00 0.00 0.00 0.00 Charlotte 6-hr 25-yr Rainfall=5.86"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 101HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Summary for Link 8L: POI-2 Inflow Area = 7.380 ac, 60.57% Impervious, Inflow Depth = 4.16" for 25-yr event Inflow = 21.43 cfs @ 3.35 hrs, Volume= 2.559 af Primary = 21.43 cfs @ 3.35 hrs, Volume= 2.559 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Link 8L: POI-2 Inflow Primary Hydrograph Time (hours) 12011511010510095908580757065605550454035302520151050Flow (cfs)23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Inflow Area=7.380 ac 21.43 cfs 21.43 cfs Charlotte 6-hr 25-yr Rainfall=5.86"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 102HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Hydrograph for Link 8L: POI-2 Time (hours) Inflow (cfs) Elevation (feet) Primary (cfs) 0.00 0.00 0.00 0.00 2.50 0.05 0.00 0.05 5.00 6.14 0.00 6.14 7.50 0.47 0.00 0.47 10.00 0.12 0.00 0.12 12.50 0.11 0.00 0.11 15.00 0.11 0.00 0.11 17.50 0.10 0.00 0.10 20.00 0.10 0.00 0.10 22.50 0.10 0.00 0.10 25.00 0.09 0.00 0.09 27.50 0.09 0.00 0.09 30.00 0.09 0.00 0.09 32.50 0.08 0.00 0.08 35.00 0.08 0.00 0.08 37.50 0.07 0.00 0.07 40.00 0.07 0.00 0.07 42.50 0.07 0.00 0.07 45.00 0.06 0.00 0.06 47.50 0.06 0.00 0.06 50.00 0.05 0.00 0.05 52.50 0.05 0.00 0.05 55.00 0.05 0.00 0.05 57.50 0.04 0.00 0.04 60.00 0.04 0.00 0.04 62.50 0.03 0.00 0.03 65.00 0.03 0.00 0.03 67.50 0.02 0.00 0.02 70.00 0.02 0.00 0.02 72.50 0.02 0.00 0.02 75.00 0.01 0.00 0.01 77.50 0.01 0.00 0.01 80.00 0.01 0.00 0.01 82.50 0.01 0.00 0.01 85.00 0.01 0.00 0.01 87.50 0.01 0.00 0.01 90.00 0.01 0.00 0.01 92.50 0.00 0.00 0.00 95.00 0.00 0.00 0.00 97.50 0.00 0.00 0.00 100.00 0.00 0.00 0.00 102.50 0.00 0.00 0.00 105.00 0.00 0.00 0.00 107.50 0.00 0.00 0.00 110.00 0.00 0.00 0.00 112.50 0.00 0.00 0.00 115.00 0.00 0.00 0.00 117.50 0.00 0.00 0.00 120.00 0.00 0.00 0.00 Charlotte 6-hr 25-yr Rainfall=5.86"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 103HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Summary for Link 9L: Combined Inflow Area = 11.820 ac, 59.53% Impervious, Inflow Depth = 4.07" for 25-yr event Inflow = 31.88 cfs @ 3.34 hrs, Volume= 4.013 af Primary = 31.88 cfs @ 3.34 hrs, Volume= 4.013 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Link 9L: Combined Inflow Primary Hydrograph Time (hours) 12011511010510095908580757065605550454035302520151050Flow (cfs)34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Inflow Area=11.820 ac 31.88 cfs 31.88 cfs Charlotte 6-hr 25-yr Rainfall=5.86"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 104HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Hydrograph for Link 9L: Combined Time (hours) Inflow (cfs) Elevation (feet) Primary (cfs) 0.00 0.00 0.00 0.00 2.50 0.19 0.00 0.19 5.00 8.15 0.00 8.15 7.50 0.61 0.00 0.61 10.00 0.17 0.00 0.17 12.50 0.17 0.00 0.17 15.00 0.16 0.00 0.16 17.50 0.16 0.00 0.16 20.00 0.15 0.00 0.15 22.50 0.15 0.00 0.15 25.00 0.14 0.00 0.14 27.50 0.13 0.00 0.13 30.00 0.13 0.00 0.13 32.50 0.12 0.00 0.12 35.00 0.12 0.00 0.12 37.50 0.11 0.00 0.11 40.00 0.10 0.00 0.10 42.50 0.10 0.00 0.10 45.00 0.09 0.00 0.09 47.50 0.09 0.00 0.09 50.00 0.08 0.00 0.08 52.50 0.07 0.00 0.07 55.00 0.07 0.00 0.07 57.50 0.06 0.00 0.06 60.00 0.06 0.00 0.06 62.50 0.05 0.00 0.05 65.00 0.04 0.00 0.04 67.50 0.04 0.00 0.04 70.00 0.03 0.00 0.03 72.50 0.03 0.00 0.03 75.00 0.02 0.00 0.02 77.50 0.02 0.00 0.02 80.00 0.01 0.00 0.01 82.50 0.01 0.00 0.01 85.00 0.01 0.00 0.01 87.50 0.01 0.00 0.01 90.00 0.01 0.00 0.01 92.50 0.01 0.00 0.01 95.00 0.01 0.00 0.01 97.50 0.01 0.00 0.01 100.00 0.01 0.00 0.01 102.50 0.01 0.00 0.01 105.00 0.00 0.00 0.00 107.50 0.00 0.00 0.00 110.00 0.00 0.00 0.00 112.50 0.00 0.00 0.00 115.00 0.00 0.00 0.00 117.50 0.00 0.00 0.00 120.00 0.00 0.00 0.00 Type II 24-hr 100-yr Rainfall=7.36"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 105HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Time span=0.00-120.00 hrs, dt=0.05 hrs, 2401 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=6.010 ac 5.66% Impervious Runoff Depth=4.03"Subcatchment 1S: Ex DA-1 Flow Length=699' Tc=12.0 min CN=71 Runoff=34.33 cfs 2.018 af Runoff Area=6.650 ac 3.08% Impervious Runoff Depth=3.92"Subcatchment 2S: Ex DA-2 Flow Length=790' Tc=13.1 min CN=70 Runoff=35.70 cfs 2.172 af Runoff Area=3.130 ac 69.33% Impervious Runoff Depth=5.83"Subcatchment 4S: Prop DA-1 Tc=5.0 min CN=87 Runoff=30.44 cfs 1.520 af Runoff Area=7.380 ac 60.57% Impervious Runoff Depth=5.60"Subcatchment 5S: Prop DA-2 Tc=5.0 min CN=85 Runoff=69.87 cfs 3.442 af Runoff Area=1.310 ac 30.31% Impervious Runoff Depth=4.14"Subcatchment 6S: Prop DA-3 Tc=5.0 min CN=72 Runoff=9.68 cfs 0.452 af Runoff Area=2.420 ac 0.00% Impervious Runoff Depth=4.47"Subcatchment 10S: DA-2 Bypass A Tc=5.0 min CN=75 Runoff=19.15 cfs 0.901 af Peak Elev=790.53' Storage=29,703 cf Inflow=30.44 cfs 1.520 afPond 4P: Wet Pond 1 Primary=8.81 cfs 1.515 af Secondary=0.00 cfs 0.000 af Outflow=8.81 cfs 1.515 af Peak Elev=781.09' Storage=63,332 cf Inflow=69.87 cfs 3.442 afPond 5P: Wet Pond 2 Primary=33.73 cfs 3.357 af Secondary=7.64 cfs 0.076 af Outflow=41.37 cfs 3.432 af Inflow=69.93 cfs 4.190 afLink 3L: Ex Drainage Areas Primary=69.93 cfs 4.190 af Inflow=16.97 cfs 1.967 afLink 7L: POI-1 Primary=16.97 cfs 1.967 af Inflow=41.37 cfs 3.432 afLink 8L: POI-2 Primary=41.37 cfs 3.432 af Inflow=55.02 cfs 5.399 afLink 9L: Combined Primary=55.02 cfs 5.399 af Total Runoff Area = 26.900 ac Runoff Volume = 10.505 af Average Runoff Depth = 4.69" 71.81% Pervious = 19.318 ac 28.19% Impervious = 7.582 ac Type II 24-hr 100-yr Rainfall=7.36"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 106HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Summary for Subcatchment 1S: Ex DA-1 Runoff = 34.33 cfs @ 12.04 hrs, Volume= 2.018 af, Depth= 4.03" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 100-yr Rainfall=7.36" Area (ac) CN Description 5.670 69 50-75% Grass cover, Fair, HSG B 0.340 98 Paved parking, HSG B 6.010 71 Weighted Average 5.670 94.34% Pervious Area 0.340 5.66% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.0 75 0.0400 0.18 Sheet Flow, Sheet Flow Grass: Short n= 0.150 P2= 2.28" 4.6 387 0.0400 1.40 Shallow Concentrated Flow, Shallow Concentrated Flow Short Grass Pasture Kv= 7.0 fps 0.4 237 0.0100 10.72 64.33 Channel Flow, Roadside Swale Area= 6.0 sf Perim= 3.0' r= 2.00' n= 0.022 Earth, clean & straight 12.0 699 Total Subcatchment 1S: Ex DA-1 Runoff Hydrograph Time (hours) 12011511010510095908580757065605550454035302520151050Flow (cfs)38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Type II 24-hr 100-yr Rainfall=7.36" Runoff Area=6.010 ac Runoff Volume=2.018 af Runoff Depth=4.03" Flow Length=699' Tc=12.0 min CN=71 34.33 cfs Type II 24-hr 100-yr Rainfall=7.36"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 107HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 1S: Ex DA-1 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 2.50 0.21 0.00 0.00 5.00 0.46 0.00 0.00 7.50 0.80 0.00 0.00 10.00 1.33 0.06 0.32 12.50 5.41 2.43 4.61 15.00 6.28 3.13 1.14 17.50 6.71 3.48 0.73 20.00 7.01 3.73 0.51 22.50 7.23 3.92 0.45 25.00 7.36 4.03 0.00 27.50 7.36 4.03 0.00 30.00 7.36 4.03 0.00 32.50 7.36 4.03 0.00 35.00 7.36 4.03 0.00 37.50 7.36 4.03 0.00 40.00 7.36 4.03 0.00 42.50 7.36 4.03 0.00 45.00 7.36 4.03 0.00 47.50 7.36 4.03 0.00 50.00 7.36 4.03 0.00 52.50 7.36 4.03 0.00 55.00 7.36 4.03 0.00 57.50 7.36 4.03 0.00 60.00 7.36 4.03 0.00 62.50 7.36 4.03 0.00 65.00 7.36 4.03 0.00 67.50 7.36 4.03 0.00 70.00 7.36 4.03 0.00 72.50 7.36 4.03 0.00 75.00 7.36 4.03 0.00 77.50 7.36 4.03 0.00 80.00 7.36 4.03 0.00 82.50 7.36 4.03 0.00 85.00 7.36 4.03 0.00 87.50 7.36 4.03 0.00 90.00 7.36 4.03 0.00 92.50 7.36 4.03 0.00 95.00 7.36 4.03 0.00 97.50 7.36 4.03 0.00 100.00 7.36 4.03 0.00 102.50 7.36 4.03 0.00 105.00 7.36 4.03 0.00 107.50 7.36 4.03 0.00 110.00 7.36 4.03 0.00 112.50 7.36 4.03 0.00 115.00 7.36 4.03 0.00 117.50 7.36 4.03 0.00 120.00 7.36 4.03 0.00 Type II 24-hr 100-yr Rainfall=7.36"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 108HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Summary for Subcatchment 2S: Ex DA-2 Runoff = 35.70 cfs @ 12.05 hrs, Volume= 2.172 af, Depth= 3.92" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 100-yr Rainfall=7.36" Area (ac) CN Description 6.445 69 50-75% Grass cover, Fair, HSG B 0.205 98 Paved parking, HSG B 6.650 70 Weighted Average 6.445 96.92% Pervious Area 0.205 3.08% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.8 75 0.0300 0.16 Sheet Flow, Sheet Flow Grass: Short n= 0.150 P2= 2.28" 4.8 400 0.0400 1.40 Shallow Concentrated Flow, Shallow Concentrated Flow Short Grass Pasture Kv= 7.0 fps 0.5 315 0.0150 11.56 69.34 Channel Flow, Channel Flow Area= 6.0 sf Perim= 3.0' r= 2.00' n= 0.025 Earth, clean & winding 13.1 790 Total Subcatchment 2S: Ex DA-2 Runoff Hydrograph Time (hours) 12011511010510095908580757065605550454035302520151050Flow (cfs)38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Type II 24-hr 100-yr Rainfall=7.36" Runoff Area=6.650 ac Runoff Volume=2.172 af Runoff Depth=3.92" Flow Length=790' Tc=13.1 min CN=70 35.70 cfs Type II 24-hr 100-yr Rainfall=7.36"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 109HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 2S: Ex DA-2 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 2.50 0.21 0.00 0.00 5.00 0.46 0.00 0.00 7.50 0.80 0.00 0.00 10.00 1.33 0.05 0.31 12.50 5.41 2.34 5.30 15.00 6.28 3.03 1.25 17.50 6.71 3.38 0.80 20.00 7.01 3.62 0.55 22.50 7.23 3.81 0.49 25.00 7.36 3.92 0.00 27.50 7.36 3.92 0.00 30.00 7.36 3.92 0.00 32.50 7.36 3.92 0.00 35.00 7.36 3.92 0.00 37.50 7.36 3.92 0.00 40.00 7.36 3.92 0.00 42.50 7.36 3.92 0.00 45.00 7.36 3.92 0.00 47.50 7.36 3.92 0.00 50.00 7.36 3.92 0.00 52.50 7.36 3.92 0.00 55.00 7.36 3.92 0.00 57.50 7.36 3.92 0.00 60.00 7.36 3.92 0.00 62.50 7.36 3.92 0.00 65.00 7.36 3.92 0.00 67.50 7.36 3.92 0.00 70.00 7.36 3.92 0.00 72.50 7.36 3.92 0.00 75.00 7.36 3.92 0.00 77.50 7.36 3.92 0.00 80.00 7.36 3.92 0.00 82.50 7.36 3.92 0.00 85.00 7.36 3.92 0.00 87.50 7.36 3.92 0.00 90.00 7.36 3.92 0.00 92.50 7.36 3.92 0.00 95.00 7.36 3.92 0.00 97.50 7.36 3.92 0.00 100.00 7.36 3.92 0.00 102.50 7.36 3.92 0.00 105.00 7.36 3.92 0.00 107.50 7.36 3.92 0.00 110.00 7.36 3.92 0.00 112.50 7.36 3.92 0.00 115.00 7.36 3.92 0.00 117.50 7.36 3.92 0.00 120.00 7.36 3.92 0.00 Type II 24-hr 100-yr Rainfall=7.36"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 110HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Summary for Subcatchment 4S: Prop DA-1 [49] Hint: Tc<2dt may require smaller dt Runoff = 30.44 cfs @ 11.95 hrs, Volume= 1.520 af, Depth= 5.83" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 100-yr Rainfall=7.36" Area (ac) CN Description 2.170 98 Paved parking, HSG B 0.960 61 >75% Grass cover, Good, HSG B 3.130 87 Weighted Average 0.960 30.67% Pervious Area 2.170 69.33% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, ToC Subcatchment 4S: Prop DA-1 Runoff Hydrograph Time (hours) 12011511010510095908580757065605550454035302520151050Flow (cfs)34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Type II 24-hr 100-yr Rainfall=7.36" Runoff Area=3.130 ac Runoff Volume=1.520 af Runoff Depth=5.83" Tc=5.0 min CN=87 30.44 cfs Type II 24-hr 100-yr Rainfall=7.36"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 111HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 4S: Prop DA-1 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 2.50 0.21 0.00 0.00 5.00 0.46 0.02 0.07 7.50 0.80 0.13 0.21 10.00 1.33 0.42 0.58 12.50 5.41 3.95 2.30 15.00 6.28 4.79 0.68 17.50 6.71 5.20 0.44 20.00 7.01 5.49 0.30 22.50 7.23 5.71 0.27 25.00 7.36 5.83 0.00 27.50 7.36 5.83 0.00 30.00 7.36 5.83 0.00 32.50 7.36 5.83 0.00 35.00 7.36 5.83 0.00 37.50 7.36 5.83 0.00 40.00 7.36 5.83 0.00 42.50 7.36 5.83 0.00 45.00 7.36 5.83 0.00 47.50 7.36 5.83 0.00 50.00 7.36 5.83 0.00 52.50 7.36 5.83 0.00 55.00 7.36 5.83 0.00 57.50 7.36 5.83 0.00 60.00 7.36 5.83 0.00 62.50 7.36 5.83 0.00 65.00 7.36 5.83 0.00 67.50 7.36 5.83 0.00 70.00 7.36 5.83 0.00 72.50 7.36 5.83 0.00 75.00 7.36 5.83 0.00 77.50 7.36 5.83 0.00 80.00 7.36 5.83 0.00 82.50 7.36 5.83 0.00 85.00 7.36 5.83 0.00 87.50 7.36 5.83 0.00 90.00 7.36 5.83 0.00 92.50 7.36 5.83 0.00 95.00 7.36 5.83 0.00 97.50 7.36 5.83 0.00 100.00 7.36 5.83 0.00 102.50 7.36 5.83 0.00 105.00 7.36 5.83 0.00 107.50 7.36 5.83 0.00 110.00 7.36 5.83 0.00 112.50 7.36 5.83 0.00 115.00 7.36 5.83 0.00 117.50 7.36 5.83 0.00 120.00 7.36 5.83 0.00 Type II 24-hr 100-yr Rainfall=7.36"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 112HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Summary for Subcatchment 5S: Prop DA-2 [49] Hint: Tc<2dt may require smaller dt Runoff = 69.87 cfs @ 11.95 hrs, Volume= 3.442 af, Depth= 5.60" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 100-yr Rainfall=7.36" Area (ac) CN Description 2.560 61 >75% Grass cover, Good, HSG B 1.600 98 Roofs, HSG B 2.870 98 Paved parking, HSG B 0.350 98 Water Surface, 0% imp, HSG B 7.380 85 Weighted Average 2.910 39.43% Pervious Area 4.470 60.57% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Direct Entry Subcatchment 5S: Prop DA-2 Runoff Hydrograph Time (hours) 12011511010510095908580757065605550454035302520151050Flow (cfs)75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Type II 24-hr 100-yr Rainfall=7.36" Runoff Area=7.380 ac Runoff Volume=3.442 af Runoff Depth=5.60" Tc=5.0 min CN=85 69.87 cfs Type II 24-hr 100-yr Rainfall=7.36"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 113HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 5S: Prop DA-2 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 2.50 0.21 0.00 0.00 5.00 0.46 0.01 0.09 7.50 0.80 0.09 0.41 10.00 1.33 0.35 1.23 12.50 5.41 3.75 5.34 15.00 6.28 4.57 1.58 17.50 6.71 4.98 1.01 20.00 7.01 5.26 0.69 22.50 7.23 5.48 0.62 25.00 7.36 5.60 0.00 27.50 7.36 5.60 0.00 30.00 7.36 5.60 0.00 32.50 7.36 5.60 0.00 35.00 7.36 5.60 0.00 37.50 7.36 5.60 0.00 40.00 7.36 5.60 0.00 42.50 7.36 5.60 0.00 45.00 7.36 5.60 0.00 47.50 7.36 5.60 0.00 50.00 7.36 5.60 0.00 52.50 7.36 5.60 0.00 55.00 7.36 5.60 0.00 57.50 7.36 5.60 0.00 60.00 7.36 5.60 0.00 62.50 7.36 5.60 0.00 65.00 7.36 5.60 0.00 67.50 7.36 5.60 0.00 70.00 7.36 5.60 0.00 72.50 7.36 5.60 0.00 75.00 7.36 5.60 0.00 77.50 7.36 5.60 0.00 80.00 7.36 5.60 0.00 82.50 7.36 5.60 0.00 85.00 7.36 5.60 0.00 87.50 7.36 5.60 0.00 90.00 7.36 5.60 0.00 92.50 7.36 5.60 0.00 95.00 7.36 5.60 0.00 97.50 7.36 5.60 0.00 100.00 7.36 5.60 0.00 102.50 7.36 5.60 0.00 105.00 7.36 5.60 0.00 107.50 7.36 5.60 0.00 110.00 7.36 5.60 0.00 112.50 7.36 5.60 0.00 115.00 7.36 5.60 0.00 117.50 7.36 5.60 0.00 120.00 7.36 5.60 0.00 Type II 24-hr 100-yr Rainfall=7.36"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 114HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Summary for Subcatchment 6S: Prop DA-3 [49] Hint: Tc<2dt may require smaller dt Runoff = 9.68 cfs @ 11.96 hrs, Volume= 0.452 af, Depth= 4.14" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 100-yr Rainfall=7.36" Area (ac) CN Description 0.397 98 Paved parking, HSG B 0.913 61 >75% Grass cover, Good, HSG B 1.310 72 Weighted Average 0.913 69.69% Pervious Area 0.397 30.31% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Time of Concentration Subcatchment 6S: Prop DA-3 Runoff Hydrograph Time (hours) 12011511010510095908580757065605550454035302520151050Flow (cfs)10 9 8 7 6 5 4 3 2 1 0 Type II 24-hr 100-yr Rainfall=7.36" Runoff Area=1.310 ac Runoff Volume=0.452 af Runoff Depth=4.14" Tc=5.0 min CN=72 9.68 cfs Type II 24-hr 100-yr Rainfall=7.36"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 115HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 6S: Prop DA-3 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 2.50 0.21 0.00 0.00 5.00 0.46 0.00 0.00 7.50 0.80 0.00 0.00 10.00 1.33 0.07 0.09 12.50 5.41 2.52 0.80 15.00 6.28 3.23 0.25 17.50 6.71 3.58 0.16 20.00 7.01 3.83 0.11 22.50 7.23 4.03 0.10 25.00 7.36 4.14 0.00 27.50 7.36 4.14 0.00 30.00 7.36 4.14 0.00 32.50 7.36 4.14 0.00 35.00 7.36 4.14 0.00 37.50 7.36 4.14 0.00 40.00 7.36 4.14 0.00 42.50 7.36 4.14 0.00 45.00 7.36 4.14 0.00 47.50 7.36 4.14 0.00 50.00 7.36 4.14 0.00 52.50 7.36 4.14 0.00 55.00 7.36 4.14 0.00 57.50 7.36 4.14 0.00 60.00 7.36 4.14 0.00 62.50 7.36 4.14 0.00 65.00 7.36 4.14 0.00 67.50 7.36 4.14 0.00 70.00 7.36 4.14 0.00 72.50 7.36 4.14 0.00 75.00 7.36 4.14 0.00 77.50 7.36 4.14 0.00 80.00 7.36 4.14 0.00 82.50 7.36 4.14 0.00 85.00 7.36 4.14 0.00 87.50 7.36 4.14 0.00 90.00 7.36 4.14 0.00 92.50 7.36 4.14 0.00 95.00 7.36 4.14 0.00 97.50 7.36 4.14 0.00 100.00 7.36 4.14 0.00 102.50 7.36 4.14 0.00 105.00 7.36 4.14 0.00 107.50 7.36 4.14 0.00 110.00 7.36 4.14 0.00 112.50 7.36 4.14 0.00 115.00 7.36 4.14 0.00 117.50 7.36 4.14 0.00 120.00 7.36 4.14 0.00 Type II 24-hr 100-yr Rainfall=7.36"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 116HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Summary for Subcatchment 10S: DA-2 Bypass A [49] Hint: Tc<2dt may require smaller dt Runoff = 19.15 cfs @ 11.96 hrs, Volume= 0.901 af, Depth= 4.47" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 100-yr Rainfall=7.36" Area (ac) CN Description * 2.420 75 2.420 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 10S: DA-2 Bypass A Runoff Hydrograph Time (hours) 12011511010510095908580757065605550454035302520151050Flow (cfs)21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Type II 24-hr 100-yr Rainfall=7.36" Runoff Area=2.420 ac Runoff Volume=0.901 af Runoff Depth=4.47" Tc=5.0 min CN=75 19.15 cfs Type II 24-hr 100-yr Rainfall=7.36"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 117HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 10S: DA-2 Bypass A Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 2.50 0.21 0.00 0.00 5.00 0.46 0.00 0.00 7.50 0.80 0.01 0.03 10.00 1.33 0.11 0.21 12.50 5.41 2.79 1.55 15.00 6.28 3.52 0.47 17.50 6.71 3.89 0.30 20.00 7.01 4.16 0.21 22.50 7.23 4.36 0.19 25.00 7.36 4.47 0.00 27.50 7.36 4.47 0.00 30.00 7.36 4.47 0.00 32.50 7.36 4.47 0.00 35.00 7.36 4.47 0.00 37.50 7.36 4.47 0.00 40.00 7.36 4.47 0.00 42.50 7.36 4.47 0.00 45.00 7.36 4.47 0.00 47.50 7.36 4.47 0.00 50.00 7.36 4.47 0.00 52.50 7.36 4.47 0.00 55.00 7.36 4.47 0.00 57.50 7.36 4.47 0.00 60.00 7.36 4.47 0.00 62.50 7.36 4.47 0.00 65.00 7.36 4.47 0.00 67.50 7.36 4.47 0.00 70.00 7.36 4.47 0.00 72.50 7.36 4.47 0.00 75.00 7.36 4.47 0.00 77.50 7.36 4.47 0.00 80.00 7.36 4.47 0.00 82.50 7.36 4.47 0.00 85.00 7.36 4.47 0.00 87.50 7.36 4.47 0.00 90.00 7.36 4.47 0.00 92.50 7.36 4.47 0.00 95.00 7.36 4.47 0.00 97.50 7.36 4.47 0.00 100.00 7.36 4.47 0.00 102.50 7.36 4.47 0.00 105.00 7.36 4.47 0.00 107.50 7.36 4.47 0.00 110.00 7.36 4.47 0.00 112.50 7.36 4.47 0.00 115.00 7.36 4.47 0.00 117.50 7.36 4.47 0.00 120.00 7.36 4.47 0.00 Type II 24-hr 100-yr Rainfall=7.36"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 118HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Summary for Pond 4P: Wet Pond 1 Inflow Area = 3.130 ac, 69.33% Impervious, Inflow Depth = 5.83" for 100-yr event Inflow = 30.44 cfs @ 11.95 hrs, Volume= 1.520 af Outflow = 8.81 cfs @ 12.10 hrs, Volume= 1.515 af, Atten= 71%, Lag= 8.7 min Primary = 8.81 cfs @ 12.10 hrs, Volume= 1.515 af Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 790.53' @ 12.09 hrs Surf.Area= 11,886 sf Storage= 29,703 cf Plug-Flow detention time= 357.0 min calculated for 1.515 af (100% of inflow) Center-of-Mass det. time= 354.9 min ( 1,138.4 - 783.5 ) Volume Invert Avail.Storage Storage Description #1 787.50' 48,545 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 787.50 7,516 0 0 789.00 9,858 13,031 13,031 790.00 11,185 10,522 23,552 791.00 12,500 11,843 35,395 792.00 13,800 13,150 48,545 Device Routing Invert Outlet Devices #1 Primary 787.50'24.0" Round Culvert L= 23.7' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 787.50' / 787.38' S= 0.0051 '/' Cc= 0.900 n= 0.013, Flow Area= 3.14 sf #2 Device 1 787.50'1.5" Vert. Orifice/Grate C= 0.600 #3 Device 1 788.50'24.0" W x 8.0" H Vert. Orifice/Grate C= 0.600 #4 Device 1 790.50'16.0' long Sharp-Crested Vee/Trap Weir Cv= 2.62 (C= 3.28) #5 Secondary 791.00'20.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=8.73 cfs @ 12.10 hrs HW=790.53' (Free Discharge) 1=Culvert (Passes 8.73 cfs of 20.18 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.10 cfs @ 8.30 fps) 3=Orifice/Grate (Orifice Controls 8.35 cfs @ 6.26 fps) 4=Sharp-Crested Vee/Trap Weir (Weir Controls 0.28 cfs @ 0.57 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=787.50' (Free Discharge) 5=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Type II 24-hr 100-yr Rainfall=7.36"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 119HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Pond 4P: Wet Pond 1 Inflow Outflow Primary Secondary Hydrograph Time (hours) 12011511010510095908580757065605550454035302520151050Flow (cfs)34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Inflow Area=3.130 ac Peak Elev=790.53' Storage=29,703 cf 30.44 cfs 8.81 cfs 8.81 cfs 0.00 cfs Pond 4P: Wet Pond 1 Total Primary Secondary Stage-Discharge Discharge (cfs) 80706050403020100Elevation (feet)792 791 790 789 788 Culvert + Orifice/Grate Orifice/Grate Sharp-Crested Vee/Trap Weir Broad-Crested Rectangular Weir Type II 24-hr 100-yr Rainfall=7.36"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 120HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Pond 4P: Wet Pond 1 Surface Storage Stage-Area-Storage Storage (cubic-feet) 45,00040,00035,00030,00025,00020,00015,00010,0005,0000 Surface/Horizontal/Wetted Area (sq-ft) 13,00012,00011,00010,0009,0008,0007,0006,0005,0004,0003,0002,0001,0000 Elevation (feet)792 791 790 789 788 Custom Stage Data Type II 24-hr 100-yr Rainfall=7.36"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 121HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Hydrograph for Pond 4P: Wet Pond 1 Time (hours) Inflow (cfs) Storage (cubic-feet) Elevation (feet) Outflow (cfs) Primary (cfs) Secondary (cfs) 0.00 0.00 0 787.50 0.00 0.00 0.00 2.50 0.00 0 787.50 0.00 0.00 0.00 5.00 0.07 165 787.52 0.00 0.00 0.00 7.50 0.21 1,310 787.67 0.02 0.02 0.00 10.00 0.58 4,287 788.04 0.04 0.04 0.00 12.50 2.30 23,502 790.00 6.99 6.99 0.00 15.00 0.68 10,528 788.74 0.83 0.83 0.00 17.50 0.44 9,779 788.66 0.48 0.48 0.00 20.00 0.30 9,419 788.62 0.34 0.34 0.00 22.50 0.27 9,240 788.60 0.28 0.28 0.00 25.00 0.00 8,633 788.54 0.10 0.10 0.00 27.50 0.00 8,031 788.47 0.06 0.06 0.00 30.00 0.00 7,533 788.42 0.05 0.05 0.00 32.50 0.00 7,049 788.36 0.05 0.05 0.00 35.00 0.00 6,582 788.31 0.05 0.05 0.00 37.50 0.00 6,131 788.26 0.05 0.05 0.00 40.00 0.00 5,696 788.21 0.05 0.05 0.00 42.50 0.00 5,278 788.16 0.05 0.05 0.00 45.00 0.00 4,876 788.11 0.04 0.04 0.00 47.50 0.00 4,491 788.06 0.04 0.04 0.00 50.00 0.00 4,123 788.02 0.04 0.04 0.00 52.50 0.00 3,772 787.98 0.04 0.04 0.00 55.00 0.00 3,438 787.94 0.04 0.04 0.00 57.50 0.00 3,121 787.90 0.03 0.03 0.00 60.00 0.00 2,821 787.86 0.03 0.03 0.00 62.50 0.00 2,539 787.83 0.03 0.03 0.00 65.00 0.00 2,275 787.79 0.03 0.03 0.00 67.50 0.00 2,028 787.76 0.03 0.03 0.00 70.00 0.00 1,800 787.73 0.02 0.02 0.00 72.50 0.00 1,589 787.71 0.02 0.02 0.00 75.00 0.00 1,396 787.68 0.02 0.02 0.00 77.50 0.00 1,222 787.66 0.02 0.02 0.00 80.00 0.00 1,066 787.64 0.02 0.02 0.00 82.50 0.00 928 787.62 0.01 0.01 0.00 85.00 0.00 811 787.61 0.01 0.01 0.00 87.50 0.00 712 787.59 0.01 0.01 0.00 90.00 0.00 627 787.58 0.01 0.01 0.00 92.50 0.00 557 787.57 0.01 0.01 0.00 95.00 0.00 498 787.57 0.01 0.01 0.00 97.50 0.00 448 787.56 0.01 0.01 0.00 100.00 0.00 407 787.55 0.00 0.00 0.00 102.50 0.00 372 787.55 0.00 0.00 0.00 105.00 0.00 343 787.55 0.00 0.00 0.00 107.50 0.00 318 787.54 0.00 0.00 0.00 110.00 0.00 295 787.54 0.00 0.00 0.00 112.50 0.00 273 787.54 0.00 0.00 0.00 115.00 0.00 253 787.53 0.00 0.00 0.00 117.50 0.00 235 787.53 0.00 0.00 0.00 120.00 0.00 217 787.53 0.00 0.00 0.00 Type II 24-hr 100-yr Rainfall=7.36"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 122HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Stage-Discharge for Pond 4P: Wet Pond 1 Elevation (feet) Discharge (cfs) Primary (cfs) Secondary (cfs) 787.50 0.00 0.00 0.00 787.55 0.00 0.00 0.00 787.60 0.01 0.01 0.00 787.65 0.02 0.02 0.00 787.70 0.02 0.02 0.00 787.75 0.03 0.03 0.00 787.80 0.03 0.03 0.00 787.85 0.03 0.03 0.00 787.90 0.03 0.03 0.00 787.95 0.04 0.04 0.00 788.00 0.04 0.04 0.00 788.05 0.04 0.04 0.00 788.10 0.04 0.04 0.00 788.15 0.05 0.05 0.00 788.20 0.05 0.05 0.00 788.25 0.05 0.05 0.00 788.30 0.05 0.05 0.00 788.35 0.05 0.05 0.00 788.40 0.05 0.05 0.00 788.45 0.06 0.06 0.00 788.50 0.06 0.06 0.00 788.55 0.13 0.13 0.00 788.60 0.26 0.26 0.00 788.65 0.43 0.43 0.00 788.70 0.64 0.64 0.00 788.75 0.87 0.87 0.00 788.80 1.12 1.12 0.00 788.85 1.40 1.40 0.00 788.90 1.69 1.69 0.00 788.95 2.01 2.01 0.00 789.00 2.34 2.34 0.00 789.05 2.69 2.69 0.00 789.10 3.06 3.06 0.00 789.15 3.44 3.44 0.00 789.20 3.80 3.80 0.00 789.25 4.09 4.09 0.00 789.30 4.36 4.36 0.00 789.35 4.61 4.61 0.00 789.40 4.84 4.84 0.00 789.45 5.06 5.06 0.00 789.50 5.27 5.27 0.00 789.55 5.47 5.47 0.00 789.60 5.66 5.66 0.00 789.65 5.85 5.85 0.00 789.70 6.03 6.03 0.00 789.75 6.20 6.20 0.00 789.80 6.37 6.37 0.00 789.85 6.53 6.53 0.00 789.90 6.69 6.69 0.00 789.95 6.85 6.85 0.00 790.00 7.00 7.00 0.00 790.05 7.15 7.15 0.00 Elevation (feet) Discharge (cfs) Primary (cfs) Secondary (cfs) 790.10 7.30 7.30 0.00 790.15 7.44 7.44 0.00 790.20 7.58 7.58 0.00 790.25 7.72 7.72 0.00 790.30 7.86 7.86 0.00 790.35 7.99 7.99 0.00 790.40 8.12 8.12 0.00 790.45 8.25 8.25 0.00 790.50 8.38 8.38 0.00 790.55 9.09 9.09 0.00 790.60 10.28 10.28 0.00 790.65 11.79 11.79 0.00 790.70 13.55 13.55 0.00 790.75 15.53 15.53 0.00 790.80 17.71 17.71 0.00 790.85 20.06 20.06 0.00 790.90 22.58 22.58 0.00 790.95 23.58 23.58 0.00 791.00 23.92 23.92 0.00 791.05 24.71 24.16 0.56 791.10 25.97 24.39 1.57 791.15 27.52 24.62 2.89 791.20 29.31 24.86 4.45 791.25 31.35 25.08 6.27 791.30 33.61 25.31 8.30 791.35 36.07 25.54 10.53 791.40 38.71 25.76 12.95 791.45 41.65 25.98 15.67 791.50 44.80 26.20 18.60 791.55 48.16 26.42 21.74 791.60 51.73 26.63 25.10 791.65 55.12 26.85 28.27 791.70 58.63 27.06 31.57 791.75 62.25 27.27 34.98 791.80 65.98 27.48 38.50 791.85 69.81 27.69 42.12 791.90 73.74 27.89 45.85 791.95 77.77 28.10 49.68 792.00 81.90 28.30 53.60 Type II 24-hr 100-yr Rainfall=7.36"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 123HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Stage-Area-Storage for Pond 4P: Wet Pond 1 Elevation (feet) Surface (sq-ft) Storage (cubic-feet) 787.50 7,516 0 787.55 7,594 378 787.60 7,672 759 787.65 7,750 1,145 787.70 7,828 1,534 787.75 7,906 1,928 787.80 7,984 2,325 787.85 8,062 2,726 787.90 8,141 3,131 787.95 8,219 3,540 788.00 8,297 3,953 788.05 8,375 4,370 788.10 8,453 4,791 788.15 8,531 5,215 788.20 8,609 5,644 788.25 8,687 6,076 788.30 8,765 6,512 788.35 8,843 6,953 788.40 8,921 7,397 788.45 8,999 7,845 788.50 9,077 8,297 788.55 9,155 8,752 788.60 9,233 9,212 788.65 9,312 9,676 788.70 9,390 10,143 788.75 9,468 10,615 788.80 9,546 11,090 788.85 9,624 11,569 788.90 9,702 12,053 788.95 9,780 12,540 789.00 9,858 13,031 789.05 9,924 13,525 789.10 9,991 14,023 789.15 10,057 14,524 789.20 10,123 15,029 789.25 10,190 15,536 789.30 10,256 16,048 789.35 10,322 16,562 789.40 10,389 17,080 789.45 10,455 17,601 789.50 10,522 18,125 789.55 10,588 18,653 789.60 10,654 19,184 789.65 10,721 19,719 789.70 10,787 20,256 789.75 10,853 20,797 789.80 10,920 21,342 789.85 10,986 21,889 789.90 11,052 22,440 789.95 11,119 22,994 790.00 11,185 23,552 790.05 11,251 24,113 Elevation (feet) Surface (sq-ft) Storage (cubic-feet) 790.10 11,317 24,677 790.15 11,382 25,245 790.20 11,448 25,815 790.25 11,514 26,389 790.30 11,579 26,967 790.35 11,645 27,547 790.40 11,711 28,131 790.45 11,777 28,718 790.50 11,843 29,309 790.55 11,908 29,903 790.60 11,974 30,500 790.65 12,040 31,100 790.70 12,106 31,704 790.75 12,171 32,311 790.80 12,237 32,921 790.85 12,303 33,534 790.90 12,368 34,151 790.95 12,434 34,771 791.00 12,500 35,395 791.05 12,565 36,021 791.10 12,630 36,651 791.15 12,695 37,284 791.20 12,760 37,921 791.25 12,825 38,560 791.30 12,890 39,203 791.35 12,955 39,849 791.40 13,020 40,498 791.45 13,085 41,151 791.50 13,150 41,807 791.55 13,215 42,466 791.60 13,280 43,129 791.65 13,345 43,794 791.70 13,410 44,463 791.75 13,475 45,135 791.80 13,540 45,810 791.85 13,605 46,489 791.90 13,670 47,171 791.95 13,735 47,856 792.00 13,800 48,545 Type II 24-hr 100-yr Rainfall=7.36"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 124HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Summary for Pond 5P: Wet Pond 2 Inflow Area = 7.380 ac, 60.57% Impervious, Inflow Depth = 5.60" for 100-yr event Inflow = 69.87 cfs @ 11.95 hrs, Volume= 3.442 af Outflow = 41.37 cfs @ 12.04 hrs, Volume= 3.432 af, Atten= 41%, Lag= 5.5 min Primary = 33.73 cfs @ 12.04 hrs, Volume= 3.357 af Secondary = 7.64 cfs @ 12.04 hrs, Volume= 0.076 af Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 781.09' @ 12.04 hrs Surf.Area= 19,860 sf Storage= 63,332 cf Plug-Flow detention time= 322.3 min calculated for 3.431 af (100% of inflow) Center-of-Mass det. time= 322.6 min ( 1,111.8 - 789.2 ) Volume Invert Avail.Storage Storage Description #1 777.00' 82,420 cf Custom Stage Data (Irregular) Listed below (Recalc) Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (feet) (cubic-feet) (cubic-feet) (sq-ft) 777.00 11,324 654.0 0 0 11,324 778.00 13,317 673.0 12,307 12,307 13,437 779.00 15,366 692.0 14,329 26,636 15,611 780.00 17,509 713.0 16,426 43,062 18,062 781.00 19,675 731.0 18,581 61,644 20,253 782.00 21,898 750.0 20,777 82,420 22,611 Device Routing Invert Outlet Devices #1 Primary 776.50'24.0" Round Culvert L= 77.6' Ke= 0.500 Inlet / Outlet Invert= 776.50' / 775.72' S= 0.0101 '/' Cc= 0.900 n= 0.013, Flow Area= 3.14 sf #2 Device 1 777.00'2.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 778.30'24.0" W x 8.0" H Vert. Orifice/Grate C= 0.600 #4 Primary 780.50'16.0' long Sharp-Crested Vee/Trap Weir Cv= 2.62 (C= 3.28) #5 Secondary 780.75'12.0' long Sharp-Crested Vee/Trap Weir Cv= 2.62 (C= 3.28) Primary OutFlow Max=33.09 cfs @ 12.04 hrs HW=781.08' (Free Discharge) 1=Culvert (Passes 10.23 cfs of 28.60 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.21 cfs @ 9.62 fps) 3=Orifice/Grate (Orifice Controls 10.02 cfs @ 7.52 fps) 4=Sharp-Crested Vee/Trap Weir (Weir Controls 22.86 cfs @ 2.48 fps) Secondary OutFlow Max=7.30 cfs @ 12.04 hrs HW=781.08' (Free Discharge) 5=Sharp-Crested Vee/Trap Weir (Weir Controls 7.30 cfs @ 1.87 fps) Type II 24-hr 100-yr Rainfall=7.36"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 125HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Pond 5P: Wet Pond 2 Inflow Outflow Primary Secondary Hydrograph Time (hours) 12011511010510095908580757065605550454035302520151050Flow (cfs)75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Inflow Area=7.380 ac Peak Elev=781.09' Storage=63,332 cf 69.87 cfs 41.37 cfs 33.73 cfs 7.64 cfs Pond 5P: Wet Pond 2 Total Primary Secondary Stage-Discharge Discharge (cfs) 160140120100806040200Elevation (feet)782 781 780 779 778 777 Orifice/Grate Orifice/Grate Sharp-Crested Vee/Trap Weir Sharp-Crested Vee/Trap Weir Type II 24-hr 100-yr Rainfall=7.36"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 126HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Pond 5P: Wet Pond 2 Surface Storage Stage-Area-Storage Storage (cubic-feet) 80,00070,00060,00050,00040,00030,00020,00010,0000 Surface/Horizontal/Wetted Area (sq-ft) 20,00018,00016,00014,00012,00010,0008,0006,0004,0002,0000 Elevation (feet)782 781 780 779 778 777 Custom Stage Data Type II 24-hr 100-yr Rainfall=7.36"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 127HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Hydrograph for Pond 5P: Wet Pond 2 Time (hours) Inflow (cfs) Storage (cubic-feet) Elevation (feet) Outflow (cfs) Primary (cfs) Secondary (cfs) 0.00 0.00 0 777.00 0.00 0.00 0.00 2.50 0.00 0 777.00 0.00 0.00 0.00 5.00 0.09 148 777.01 0.00 0.00 0.00 7.50 0.41 2,228 777.19 0.03 0.03 0.00 10.00 1.23 8,377 777.70 0.08 0.08 0.00 12.50 5.34 52,089 780.50 8.96 8.96 0.00 15.00 1.58 23,651 778.80 2.43 2.43 0.00 17.50 1.01 20,553 778.59 1.15 1.15 0.00 20.00 0.69 19,535 778.52 0.80 0.80 0.00 22.50 0.62 19,041 778.49 0.65 0.65 0.00 25.00 0.00 17,534 778.38 0.27 0.27 0.00 27.50 0.00 16,114 778.28 0.11 0.11 0.00 30.00 0.00 15,096 778.21 0.11 0.11 0.00 32.50 0.00 14,111 778.13 0.11 0.11 0.00 35.00 0.00 13,158 778.06 0.10 0.10 0.00 37.50 0.00 12,239 777.99 0.10 0.10 0.00 40.00 0.00 11,353 777.93 0.10 0.10 0.00 42.50 0.00 10,501 777.86 0.09 0.09 0.00 45.00 0.00 9,684 777.80 0.09 0.09 0.00 47.50 0.00 8,901 777.74 0.09 0.09 0.00 50.00 0.00 8,153 777.68 0.08 0.08 0.00 52.50 0.00 7,441 777.62 0.08 0.08 0.00 55.00 0.00 6,764 777.57 0.07 0.07 0.00 57.50 0.00 6,123 777.52 0.07 0.07 0.00 60.00 0.00 5,518 777.47 0.07 0.07 0.00 62.50 0.00 4,950 777.42 0.06 0.06 0.00 65.00 0.00 4,418 777.38 0.06 0.06 0.00 67.50 0.00 3,924 777.34 0.05 0.05 0.00 70.00 0.00 3,467 777.30 0.05 0.05 0.00 72.50 0.00 3,048 777.26 0.04 0.04 0.00 75.00 0.00 2,667 777.23 0.04 0.04 0.00 77.50 0.00 2,323 777.20 0.04 0.04 0.00 80.00 0.00 2,019 777.18 0.03 0.03 0.00 82.50 0.00 1,752 777.15 0.03 0.03 0.00 85.00 0.00 1,523 777.13 0.02 0.02 0.00 87.50 0.00 1,335 777.12 0.02 0.02 0.00 90.00 0.00 1,181 777.10 0.02 0.02 0.00 92.50 0.00 1,053 777.09 0.01 0.01 0.00 95.00 0.00 944 777.08 0.01 0.01 0.00 97.50 0.00 852 777.07 0.01 0.01 0.00 100.00 0.00 774 777.07 0.01 0.01 0.00 102.50 0.00 708 777.06 0.01 0.01 0.00 105.00 0.00 652 777.06 0.01 0.01 0.00 107.50 0.00 605 777.05 0.00 0.00 0.00 110.00 0.00 564 777.05 0.00 0.00 0.00 112.50 0.00 528 777.05 0.00 0.00 0.00 115.00 0.00 494 777.04 0.00 0.00 0.00 117.50 0.00 463 777.04 0.00 0.00 0.00 120.00 0.00 433 777.04 0.00 0.00 0.00 Type II 24-hr 100-yr Rainfall=7.36"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 128HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Stage-Discharge for Pond 5P: Wet Pond 2 Elevation (feet) Discharge (cfs) Primary (cfs) Secondary (cfs) 777.00 0.00 0.00 0.00 777.05 0.00 0.00 0.00 777.10 0.01 0.01 0.00 777.15 0.03 0.03 0.00 777.20 0.04 0.04 0.00 777.25 0.04 0.04 0.00 777.30 0.05 0.05 0.00 777.35 0.05 0.05 0.00 777.40 0.06 0.06 0.00 777.45 0.06 0.06 0.00 777.50 0.07 0.07 0.00 777.55 0.07 0.07 0.00 777.60 0.08 0.08 0.00 777.65 0.08 0.08 0.00 777.70 0.08 0.08 0.00 777.75 0.09 0.09 0.00 777.80 0.09 0.09 0.00 777.85 0.09 0.09 0.00 777.90 0.09 0.09 0.00 777.95 0.10 0.10 0.00 778.00 0.10 0.10 0.00 778.05 0.10 0.10 0.00 778.10 0.11 0.11 0.00 778.15 0.11 0.11 0.00 778.20 0.11 0.11 0.00 778.25 0.11 0.11 0.00 778.30 0.12 0.12 0.00 778.35 0.19 0.19 0.00 778.40 0.32 0.32 0.00 778.45 0.50 0.50 0.00 778.50 0.70 0.70 0.00 778.55 0.93 0.93 0.00 778.60 1.18 1.18 0.00 778.65 1.46 1.46 0.00 778.70 1.76 1.76 0.00 778.75 2.07 2.07 0.00 778.80 2.41 2.41 0.00 778.85 2.76 2.76 0.00 778.90 3.13 3.13 0.00 778.95 3.51 3.51 0.00 779.00 3.87 3.87 0.00 779.05 4.16 4.16 0.00 779.10 4.43 4.43 0.00 779.15 4.68 4.68 0.00 779.20 4.91 4.91 0.00 779.25 5.13 5.13 0.00 779.30 5.34 5.34 0.00 779.35 5.54 5.54 0.00 779.40 5.74 5.74 0.00 779.45 5.92 5.92 0.00 779.50 6.10 6.10 0.00 779.55 6.28 6.28 0.00 Elevation (feet) Discharge (cfs) Primary (cfs) Secondary (cfs) 779.60 6.45 6.45 0.00 779.65 6.61 6.61 0.00 779.70 6.77 6.77 0.00 779.75 6.93 6.93 0.00 779.80 7.08 7.08 0.00 779.85 7.23 7.23 0.00 779.90 7.38 7.38 0.00 779.95 7.52 7.52 0.00 780.00 7.67 7.67 0.00 780.05 7.80 7.80 0.00 780.10 7.94 7.94 0.00 780.15 8.07 8.07 0.00 780.20 8.21 8.21 0.00 780.25 8.34 8.34 0.00 780.30 8.46 8.46 0.00 780.35 8.59 8.59 0.00 780.40 8.71 8.71 0.00 780.45 8.83 8.83 0.00 780.50 8.95 8.95 0.00 780.55 9.66 9.66 0.00 780.60 10.85 10.85 0.00 780.65 12.35 12.35 0.00 780.70 14.11 14.11 0.00 780.75 16.08 16.08 0.00 780.80 18.69 18.25 0.44 780.85 21.85 20.60 1.24 780.90 25.40 23.12 2.28 780.95 29.30 25.79 3.52 781.00 33.51 28.60 4.91 781.05 38.01 31.56 6.46 781.10 42.78 34.64 8.14 781.15 47.79 37.85 9.94 781.20 53.04 41.18 11.86 781.25 58.52 44.63 13.89 781.30 64.22 48.19 16.03 781.35 70.12 51.86 18.26 781.40 76.23 55.63 20.60 781.45 82.52 59.51 23.02 781.50 89.01 63.48 25.53 781.55 95.68 67.56 28.12 781.60 102.53 71.73 30.80 781.65 109.55 75.99 33.55 781.70 116.73 80.34 36.39 781.75 124.09 84.79 39.30 781.80 131.60 89.32 42.28 781.85 139.27 93.93 45.34 781.90 147.10 98.63 48.47 781.95 155.07 103.41 51.66 782.00 163.20 108.27 54.92 Type II 24-hr 100-yr Rainfall=7.36"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 129HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Stage-Area-Storage for Pond 5P: Wet Pond 2 Elevation (feet) Surface (sq-ft) Storage (cubic-feet) 777.00 11,324 0 777.05 11,420 569 777.10 11,516 1,142 777.15 11,613 1,720 777.20 11,710 2,303 777.25 11,807 2,891 777.30 11,905 3,484 777.35 12,003 4,082 777.40 12,102 4,684 777.45 12,201 5,292 777.50 12,300 5,904 777.55 12,400 6,522 777.60 12,500 7,144 777.65 12,601 7,772 777.70 12,702 8,405 777.75 12,804 9,042 777.80 12,905 9,685 777.85 13,008 10,333 777.90 13,110 10,986 777.95 13,214 11,644 778.00 13,317 12,307 778.05 13,416 12,975 778.10 13,515 13,649 778.15 13,615 14,327 778.20 13,715 15,010 778.25 13,816 15,698 778.30 13,916 16,392 778.35 14,017 17,090 778.40 14,119 17,793 778.45 14,221 18,502 778.50 14,323 19,216 778.55 14,426 19,934 778.60 14,529 20,658 778.65 14,632 21,387 778.70 14,736 22,121 778.75 14,840 22,861 778.80 14,944 23,605 778.85 15,049 24,355 778.90 15,155 25,110 778.95 15,260 25,871 779.00 15,366 26,636 779.05 15,470 27,407 779.10 15,574 28,183 779.15 15,679 28,965 779.20 15,783 29,751 779.25 15,889 30,543 779.30 15,994 31,340 779.35 16,100 32,142 779.40 16,206 32,950 779.45 16,313 33,763 779.50 16,420 34,581 779.55 16,527 35,405 Elevation (feet) Surface (sq-ft) Storage (cubic-feet) 779.60 16,635 36,234 779.65 16,743 37,069 779.70 16,851 37,908 779.75 16,960 38,754 779.80 17,069 39,604 779.85 17,179 40,461 779.90 17,288 41,322 779.95 17,399 42,189 780.00 17,509 43,062 780.05 17,614 43,940 780.10 17,720 44,824 780.15 17,826 45,712 780.20 17,932 46,606 780.25 18,039 47,505 780.30 18,146 48,410 780.35 18,253 49,320 780.40 18,360 50,235 780.45 18,468 51,156 780.50 18,576 52,082 780.55 18,685 53,014 780.60 18,793 53,951 780.65 18,903 54,893 780.70 19,012 55,841 780.75 19,122 56,794 780.80 19,232 57,753 780.85 19,342 58,717 780.90 19,453 59,687 780.95 19,564 60,663 781.00 19,675 61,644 781.05 19,783 62,630 781.10 19,892 63,622 781.15 20,001 64,619 781.20 20,110 65,622 781.25 20,220 66,630 781.30 20,329 67,644 781.35 20,440 68,663 781.40 20,550 69,688 781.45 20,661 70,718 781.50 20,772 71,754 781.55 20,883 72,795 781.60 20,995 73,842 781.65 21,106 74,895 781.70 21,219 75,953 781.75 21,331 77,017 781.80 21,444 78,086 781.85 21,557 79,161 781.90 21,670 80,242 781.95 21,784 81,328 782.00 21,898 82,420 Type II 24-hr 100-yr Rainfall=7.36"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 130HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Summary for Link 3L: Ex Drainage Areas Inflow Area = 12.660 ac, 4.30% Impervious, Inflow Depth = 3.97" for 100-yr event Inflow = 69.93 cfs @ 12.05 hrs, Volume= 4.190 af Primary = 69.93 cfs @ 12.05 hrs, Volume= 4.190 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Link 3L: Ex Drainage Areas Inflow Primary Hydrograph Time (hours) 12011511010510095908580757065605550454035302520151050Flow (cfs)75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Inflow Area=12.660 ac 69.93 cfs 69.93 cfs Type II 24-hr 100-yr Rainfall=7.36"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 131HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Hydrograph for Link 3L: Ex Drainage Areas Time (hours) Inflow (cfs) Elevation (feet) Primary (cfs) 0.00 0.00 0.00 0.00 2.50 0.00 0.00 0.00 5.00 0.00 0.00 0.00 7.50 0.00 0.00 0.00 10.00 0.63 0.00 0.63 12.50 9.92 0.00 9.92 15.00 2.38 0.00 2.38 17.50 1.53 0.00 1.53 20.00 1.06 0.00 1.06 22.50 0.94 0.00 0.94 25.00 0.00 0.00 0.00 27.50 0.00 0.00 0.00 30.00 0.00 0.00 0.00 32.50 0.00 0.00 0.00 35.00 0.00 0.00 0.00 37.50 0.00 0.00 0.00 40.00 0.00 0.00 0.00 42.50 0.00 0.00 0.00 45.00 0.00 0.00 0.00 47.50 0.00 0.00 0.00 50.00 0.00 0.00 0.00 52.50 0.00 0.00 0.00 55.00 0.00 0.00 0.00 57.50 0.00 0.00 0.00 60.00 0.00 0.00 0.00 62.50 0.00 0.00 0.00 65.00 0.00 0.00 0.00 67.50 0.00 0.00 0.00 70.00 0.00 0.00 0.00 72.50 0.00 0.00 0.00 75.00 0.00 0.00 0.00 77.50 0.00 0.00 0.00 80.00 0.00 0.00 0.00 82.50 0.00 0.00 0.00 85.00 0.00 0.00 0.00 87.50 0.00 0.00 0.00 90.00 0.00 0.00 0.00 92.50 0.00 0.00 0.00 95.00 0.00 0.00 0.00 97.50 0.00 0.00 0.00 100.00 0.00 0.00 0.00 102.50 0.00 0.00 0.00 105.00 0.00 0.00 0.00 107.50 0.00 0.00 0.00 110.00 0.00 0.00 0.00 112.50 0.00 0.00 0.00 115.00 0.00 0.00 0.00 117.50 0.00 0.00 0.00 120.00 0.00 0.00 0.00 Type II 24-hr 100-yr Rainfall=7.36"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 132HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Summary for Link 7L: POI-1 Inflow Area = 4.440 ac, 57.82% Impervious, Inflow Depth > 5.32" for 100-yr event Inflow = 16.97 cfs @ 11.97 hrs, Volume= 1.967 af Primary = 16.97 cfs @ 11.97 hrs, Volume= 1.967 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Link 7L: POI-1 Inflow Primary Hydrograph Time (hours) 12011511010510095908580757065605550454035302520151050Flow (cfs)19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Inflow Area=4.440 ac 16.97 cfs 16.97 cfs Type II 24-hr 100-yr Rainfall=7.36"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 133HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Hydrograph for Link 7L: POI-1 Time (hours) Inflow (cfs) Elevation (feet) Primary (cfs) 0.00 0.00 0.00 0.00 2.50 0.00 0.00 0.00 5.00 0.00 0.00 0.00 7.50 0.02 0.00 0.02 10.00 0.13 0.00 0.13 12.50 7.79 0.00 7.79 15.00 1.07 0.00 1.07 17.50 0.64 0.00 0.64 20.00 0.45 0.00 0.45 22.50 0.37 0.00 0.37 25.00 0.10 0.00 0.10 27.50 0.06 0.00 0.06 30.00 0.05 0.00 0.05 32.50 0.05 0.00 0.05 35.00 0.05 0.00 0.05 37.50 0.05 0.00 0.05 40.00 0.05 0.00 0.05 42.50 0.05 0.00 0.05 45.00 0.04 0.00 0.04 47.50 0.04 0.00 0.04 50.00 0.04 0.00 0.04 52.50 0.04 0.00 0.04 55.00 0.04 0.00 0.04 57.50 0.03 0.00 0.03 60.00 0.03 0.00 0.03 62.50 0.03 0.00 0.03 65.00 0.03 0.00 0.03 67.50 0.03 0.00 0.03 70.00 0.02 0.00 0.02 72.50 0.02 0.00 0.02 75.00 0.02 0.00 0.02 77.50 0.02 0.00 0.02 80.00 0.02 0.00 0.02 82.50 0.01 0.00 0.01 85.00 0.01 0.00 0.01 87.50 0.01 0.00 0.01 90.00 0.01 0.00 0.01 92.50 0.01 0.00 0.01 95.00 0.01 0.00 0.01 97.50 0.01 0.00 0.01 100.00 0.00 0.00 0.00 102.50 0.00 0.00 0.00 105.00 0.00 0.00 0.00 107.50 0.00 0.00 0.00 110.00 0.00 0.00 0.00 112.50 0.00 0.00 0.00 115.00 0.00 0.00 0.00 117.50 0.00 0.00 0.00 120.00 0.00 0.00 0.00 Type II 24-hr 100-yr Rainfall=7.36"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 134HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Summary for Link 8L: POI-2 Inflow Area = 7.380 ac, 60.57% Impervious, Inflow Depth = 5.58" for 100-yr event Inflow = 41.37 cfs @ 12.04 hrs, Volume= 3.432 af Primary = 41.37 cfs @ 12.04 hrs, Volume= 3.432 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Link 8L: POI-2 Inflow Primary Hydrograph Time (hours) 12011511010510095908580757065605550454035302520151050Flow (cfs)46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Inflow Area=7.380 ac 41.37 cfs 41.37 cfs Type II 24-hr 100-yr Rainfall=7.36"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 135HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Hydrograph for Link 8L: POI-2 Time (hours) Inflow (cfs) Elevation (feet) Primary (cfs) 0.00 0.00 0.00 0.00 2.50 0.00 0.00 0.00 5.00 0.00 0.00 0.00 7.50 0.03 0.00 0.03 10.00 0.08 0.00 0.08 12.50 8.96 0.00 8.96 15.00 2.43 0.00 2.43 17.50 1.15 0.00 1.15 20.00 0.80 0.00 0.80 22.50 0.65 0.00 0.65 25.00 0.27 0.00 0.27 27.50 0.11 0.00 0.11 30.00 0.11 0.00 0.11 32.50 0.11 0.00 0.11 35.00 0.10 0.00 0.10 37.50 0.10 0.00 0.10 40.00 0.10 0.00 0.10 42.50 0.09 0.00 0.09 45.00 0.09 0.00 0.09 47.50 0.09 0.00 0.09 50.00 0.08 0.00 0.08 52.50 0.08 0.00 0.08 55.00 0.07 0.00 0.07 57.50 0.07 0.00 0.07 60.00 0.07 0.00 0.07 62.50 0.06 0.00 0.06 65.00 0.06 0.00 0.06 67.50 0.05 0.00 0.05 70.00 0.05 0.00 0.05 72.50 0.04 0.00 0.04 75.00 0.04 0.00 0.04 77.50 0.04 0.00 0.04 80.00 0.03 0.00 0.03 82.50 0.03 0.00 0.03 85.00 0.02 0.00 0.02 87.50 0.02 0.00 0.02 90.00 0.02 0.00 0.02 92.50 0.01 0.00 0.01 95.00 0.01 0.00 0.01 97.50 0.01 0.00 0.01 100.00 0.01 0.00 0.01 102.50 0.01 0.00 0.01 105.00 0.01 0.00 0.01 107.50 0.00 0.00 0.00 110.00 0.00 0.00 0.00 112.50 0.00 0.00 0.00 115.00 0.00 0.00 0.00 117.50 0.00 0.00 0.00 120.00 0.00 0.00 0.00 Type II 24-hr 100-yr Rainfall=7.36"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 136HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Summary for Link 9L: Combined Inflow Area = 11.820 ac, 59.53% Impervious, Inflow Depth = 5.48" for 100-yr event Inflow = 55.02 cfs @ 12.03 hrs, Volume= 5.399 af Primary = 55.02 cfs @ 12.03 hrs, Volume= 5.399 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Link 9L: Combined Inflow Primary Hydrograph Time (hours) 12011511010510095908580757065605550454035302520151050Flow (cfs)60 55 50 45 40 35 30 25 20 15 10 5 0 Inflow Area=11.820 ac 55.02 cfs 55.02 cfs Type II 24-hr 100-yr Rainfall=7.36"Cambridge Village - HydroCAD with ODA Printed 4/14/2020Prepared by {enter your company name here} Page 137HydroCAD® 10.00-24 s/n 08311 © 2018 HydroCAD Software Solutions LLC Hydrograph for Link 9L: Combined Time (hours) Inflow (cfs) Elevation (feet) Primary (cfs) 0.00 0.00 0.00 0.00 2.50 0.00 0.00 0.00 5.00 0.00 0.00 0.00 7.50 0.06 0.00 0.06 10.00 0.21 0.00 0.21 12.50 16.75 0.00 16.75 15.00 3.50 0.00 3.50 17.50 1.79 0.00 1.79 20.00 1.25 0.00 1.25 22.50 1.02 0.00 1.02 25.00 0.38 0.00 0.38 27.50 0.17 0.00 0.17 30.00 0.17 0.00 0.17 32.50 0.16 0.00 0.16 35.00 0.16 0.00 0.16 37.50 0.15 0.00 0.15 40.00 0.14 0.00 0.14 42.50 0.14 0.00 0.14 45.00 0.13 0.00 0.13 47.50 0.13 0.00 0.13 50.00 0.12 0.00 0.12 52.50 0.12 0.00 0.12 55.00 0.11 0.00 0.11 57.50 0.10 0.00 0.10 60.00 0.10 0.00 0.10 62.50 0.09 0.00 0.09 65.00 0.09 0.00 0.09 67.50 0.08 0.00 0.08 70.00 0.07 0.00 0.07 72.50 0.07 0.00 0.07 75.00 0.06 0.00 0.06 77.50 0.05 0.00 0.05 80.00 0.05 0.00 0.05 82.50 0.04 0.00 0.04 85.00 0.03 0.00 0.03 87.50 0.03 0.00 0.03 90.00 0.02 0.00 0.02 92.50 0.02 0.00 0.02 95.00 0.02 0.00 0.02 97.50 0.01 0.00 0.01 100.00 0.01 0.00 0.01 102.50 0.01 0.00 0.01 105.00 0.01 0.00 0.01 107.50 0.01 0.00 0.01 110.00 0.01 0.00 0.01 112.50 0.01 0.00 0.01 115.00 0.01 0.00 0.01 117.50 0.01 0.00 0.01 120.00 0.01 0.00 0.01 Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Monday, Apr 13 2020 Wet Pond 1 Bypass Ditch Triangular Side Slopes (z:1) = 2.00, 3.00 Total Depth (ft) = 1.50 Invert Elev (ft) = 783.00 Slope (%) = 1.00 N-Value = 0.030 Calculations Compute by: Known Q Known Q (cfs) = 11.65 Highlighted Depth (ft) = 1.19 Q (cfs) = 11.65 Area (sqft) = 3.54 Velocity (ft/s) = 3.29 Wetted Perim (ft) = 6.42 Crit Depth, Yc (ft) = 1.07 Top Width (ft) = 5.95 EGL (ft) = 1.36 0 1 2 3 4 5 6 7 8 9 10 Elev (ft)Depth (ft)Section 782.50 -0.50 783.00 0.00 783.50 0.50 784.00 1.00 784.50 1.50 785.00 2.00 Reach (ft) Okay 14.01 Drainage Area (Acres; C=0.3) 7.06 Disturbed Area (Acres; C=0.6) 0.45 C (weighted) 7.1 i (10-Year) 44.88 Peak Flow from 10-year Storm (cfs) 12708 Required Volume ft3 19522 Required Surface Area ft2 98.8 Suggested Width ft 197.6 Suggested Length ft N/A Trial Top Width at Spillway Invert ft N/A Trial Top Length at Spillway Invert ft N/A Trial Side Slope Ratio Z:1 N/A Trial Depth ft (2 to 3.5 feet above grade) N/A Bottom Width ft N/A Bottom Length ft N/A Bottom Area ft2 49587 Actual Volume ft3 Okay 19675 Actual Surface Area ft2 Okay 16 Trial Weir Length ft 1 Trial Depth of Flow ft 48.0 Spillway Capacity cfs Okay 6 Skimmer Size (inches)Skimmer Size 0.417 Head on Skimmer (feet)(Inches) 1.75 Orifice Size (1/4 inch increments)1.5 2.78 Dewatering Time (days)2 Suggest about 3 days 2.5 3 4 5 6 8 Sediment Basin #1 Okay 1.19 Disturbed Area (Acres) 0.6 C 7.1 i (10-Year) 5.07 Peak Flow from 10-year Storm (cfs) 2142 Required Volume ft3 1648 Required Surface Area ft2 28.7 Suggested Width ft 57.4 Suggested Length ft 37 Trial Top Width at Spillway Invert ft 66 Trial Top Length at Spillway Invert ft 3 Trial Side Slope Ratio Z:1 3 Trial Depth ft (2 to 3.5 feet above grade) 19 Bottom Width ft 48 Bottom Length ft 912 Bottom Area ft2 4869 Actual Volume ft3 Okay 2442 Actual Surface Area ft2 Okay 5 Trial Weir Length ft 0.5 Trial Depth of Flow ft 5.3 Spillway Capacity cfs Okay 1.5 Skimmer Size (inches) Skimmer Size 0.125 Head on Skimmer (feet) (Inches) 1 Orifice Size (1/4 inch increments) 1.5 2.62 Dewatering Time (days) 2 Suggest about 3 days 2.5 3 4 5 6 8 Skimmer Basin #2 Okay 4.06 Disturbed Area (Acres) 0.6 C 7.1 i (10-Year) 17.30 Peak Flow from 10-year Storm (cfs) 7308 Required Volume ft3 5621 Required Surface Area ft2 53.0 Suggested Width ft 106.0 Suggested Length ft N/A Trial Top Width at Spillway Invert ft N/A Trial Top Length at Spillway Invert ft N/A Trial Side Slope Ratio Z:1 N/A Trial Depth ft (2 to 3.5 feet above grade) N/A Bottom Width ft N/A Bottom Length ft N/A Bottom Area ft2 35429 Actual Volume ft3 Okay 12569 Actual Surface Area ft2 Okay 20 Trial Weir Length ft 1 Trial Depth of Flow ft 60.0 Spillway Capacity cfs Okay 3 Skimmer Size (inches)Skimmer Size 0.25 Head on Skimmer (feet)(Inches) 1.5 Orifice Size (1/4 inch increments)1.5 2.81 Dewatering Time (days)2 Suggest about 3 days 2.5 3 4 5 6 8 Skimmer Basin #3 Structure Name: A10Diameter 24 in 2 ftClass MidrangeQ 19.04 cfsA4d500.4 feet 4.8 in B 8dmax7.20 inches110La12 feet214W 14 feetThickness 18 inchesW@outlet 6 feetClass B6.0 FT 14.0 FT12.0 FT Structure Name: B10Diameter 24 in 2 ftClass MidrangeQ9.66cfsA4d500.4 feet 4.8 in B 8dmax7.20 inches110La12 feet214W 14 feetThickness 18 inchesW@outlet 6 feetClass B6.0 FT 14.0 FT12.0 FT