Loading...
HomeMy WebLinkAboutNCC201509_ESC Approval Submitted_20200415ROY'COOPEP. RHO MICHAEL S. RECAN S. WOWNN. AcrOg. Ckr' BCC of Edenton, LLC Attn: Andrew Bergeron, Member Manager P.O. Box 827 Edenton, NC 27932 NORTH CAPOLINA: ,Eravirw ntet1QWW' February 20, 2020 LETTER OF APPROVAL Express Option RE: Project Name: Colony Tire Building Expansion Acres Approved: 3 Project ID: CUMBE-2020-115 County: Cumberland, City: Fayetteville, Address: Gillespie Street River Basin: Cape Fear Stream Classification: Other Submitted By: Gradient Date Received by LQS: February 17, 2020 Plan Type: Express Dear Mr. Bergeron This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan shall expire three (3) years following the date of approval, if no land disturbing activity has been undertaken, as required by Title 15A NCAC 413.0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. This form MUST be submitted and COC issued prior to the commencement of any land disturbing activity on the above -named project. The NOI form may be accessed at deq.nc.gov/NCGO I. Please direct questions about the NOI form to Annette Lucas at Annette.lucas ncdcnr. ov or Paul Clark at Paul.clark ncdenr. ov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. A $100 fee will be charged annually until a Notice of Termination is issued. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Title 15A NCAC 413 .0118(a) and the NCGOI permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. North Caroltna Department: of environmental flual" l Uf oon of energy, MtneraC and i and 11,psources FWWeotei ReglorW office { zzs Green street, smite TIa l Fayetteville, t�Iarth Caroh a 28301 910.433:3300 Letter of Approval BCC of Edenton, LLC February 17, 2020 This letter gives the notice required by G.S. 113A-61. l(a) of our right of periodic inspection to ensure compliance with the approved plan. Title 15A NCAC 413 .0118(a) requires that a copy of the approved erosion control plan be on file at the job site. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. In addition, it would be helpful if you notify this office of the proposed starting date for this project. PIease notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely,, Jodi Pace, EI Regional Engineering Associate DEMLR Enclosures: Certificate of Approval NPDES NCGO1 pact Sheet cc: Gordon Rose, Gradient (electronic copy) David Steinmetz, Building Inspector (electronic copy) David Winstead, City of Fayetteville Permits (electronic copy) DEMLR - Fayetteville Regional Office File