Loading...
HomeMy WebLinkAbout20200502 Ver 1_PCN Form Submission_20200413DWR mrlslon of Water Resources Pre -Construction Notification (PCN) Form April 11, 2020 Ver 3.1 Initial Review Has this project met the requirements for acceptance in to the review process?* r Yes r No Is this project a public transportation project?* C Yes r No Change only if needed. BIMS # Assigned 20200502 Is a payment required for this project?* r No payment required r Fee received r Fee needed - send electronic notification Reviewing Office * Mooresville Regional Office - (704) 663-1699 Information for Initial Review 1a. Name of project: Farmington CIP Sewer Trunk Line 1a. Who is the Primary Contact?* Daniel Kuefer 1b. Primary Contact Email:* d a n ie I. kuefle r@wetl ands-epg. co m Date Submitted 4/13/2020 Nearest Body of Water Fuda Creek Basin Yadkin-PeeDee Water Classification C Site Coordinates Latitude: 35.2877 A. Processing Information County (or Counties) where the project is located: Cabarrus Mecklenburg Longitude: -80.6799 Is this a NCDMS Project r Yes r No Is this project a public transportation project?* r Yes r No 1a. Type(s) of approval sought from the Corps: * Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) Version#* 1 What amout is owed?* IT $240.00 r $570.00 Select Project Reviewer* Alan Johnson:eads\adjohnson1 1c. Primary Contact Phone:* (336)554-2728 1b. What type(s) of permit(s) do you wish to seek authorization? W Nationwide Permit (NWP) r Regional General Permit (RGP) r Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? r Yes r No Nationwide Permit (NWP) Number: NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: W 401 Water Quality Certification - Regular r Non-404 Jurisdictional General Permit r Individual Permit 12 - Utility Lines le. Is this notification solely for the record because written approval is not required? For the record only for DWR401 Certification: For the record only for Corps Permit: r 401 Water Quality Certification - Express r Riparian Buffer Authorization 1f. Is this an after -the -fact permit application?* r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No Acceptance Letter Attachment 1h. Is the project located in any of NC's twenty coastal counties? r Yes r No 1j. Is the project located in a designated trout watershed? 0 Yes r No B. Applicant Information 1d. Who is applying for the permit? r Owner W Applicant (other than owner) le. Is there an Agent/Consultant for this project?* r Yes r No 2. Owner Information 2a. Name(s) on recorded deed: APS Investments, Stafford Caldwell HOA 2b. Deed book and page no.: please see attached parcel map 2c. Responsible party: John Faulk 2d.Address Street Address PO Box11906 Address Lim 2 City Charlotte Fostal / Zip Code 28220 2e. Telephone Number: (704)999-5279 2g. Email Address:* daniel.kuefier@v,etlands-epg.com State / Province / Region NC Country USA 2f. Fax Number: r Yes r No r Yes r No 3. Applicant Information (if different from owner) 3a. Name: Charles Bliss 3b. Business Name: Charlotte Water 3c.Address Street Address 5100 Brookshire Blvd Address tine 2 CKY Charlotte Postal / Zip Code 28216 3d. Telephone Number: (704)995-7518 3f. Email Address:* d a n ie I. kuefle r@wetlands-epg.com 4. Agent/Consultant (if applicable) 4a. Name: Daniel Kuefler 4b. Business Name: Wetlands & Environmental Planning Group 4c.Address Street Address 10612-D Providence Road Address tine 2 Cfty Charlotte Postal / Zip (ode 28227 4d. Telephone Number: (336)554-2728 4f. Email Address:* heath.caldwell@vvetlands-epg.com Agent Authorization Letter* Agent Authorization _duplicate.pdf State / Province / Region NC Country USA 3e. Fax Number: State / Province / Region NC Country USA 4e. Fax Number: 265.07KB C. Project Information and Prior Project History 1. Project Information 1b. Subdivision name: (if appropriate) 1c. Nearest municipality/ town: Charlotte 2. Project Identification 2a. Property Identification Number: 2b. Property size: 3.23 2c. Project Address Street Address North of Rocky River Rd & Adjacent to 1-485. Address tine 2 CKY State / Province / Region Charlotte NC Postal / Zip (ode Country 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Fuda Creek 3b. Water Resources Classification of nearest receiving water:* C 3c. What river basin(s) is your project located in?* Yadkin-PeeDee 3d. Please provide the 12-digit HUC in which the project is located. 030401050301 4. Project Description and History 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* The project consists of sewer installation for a residential development. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* r Yes r No r Unknown 4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) USGS _ duplicate.pdf 362.99KB 4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) soils _duplicate.pdf 523.04KB 4f. List the total estimated acreage of all existing wetlands on the property: 0.55 4g. List the total estimated linear feet of all existing streams on the property: 80 4h. Explain the purpose of the proposed project:* The project consists of sewer installation for a residential development. 41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* Excavation of the site Will use standard equipment - excavator, dump trucks, track hoe, etc. 4j. Please upload project drawings for the proposed project. plans _duplicate.pdf 7.05MB 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* C Yes r No C Unknown Comments: A Preliminary Jurisdictional Determination for the additional sewerline easement is requested as part of this PCN package. A PJD was previously approved for the primary development area under SAW- 2014-01152. 5b. If the Corps made a jurisdictional determination, what type of determination was made?* r Preliminary r Approved r Not Verified r Unknown r N/A Corps AID Number: 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Nic Nelson Agency/Consultant Company: WEPG Other: 5d. List the dates of the Corp jurisdiction determination or State determination if a determination was made bythe Corps or DWR 5dl. Jurisdictional determination upload delineation _duplicate.pdf 193.95KB 6. Future Project Plans 6a. Is this a phased project?* r Yes C No 7b. If yes, explain. Phase 1 includes the impacts associated rough grading, BMP construction and utility installation. Phase 2 will include impacts associated with road crossings. This additional PCN is being submitted for an extended sewer connection. Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? hlo. D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): W Wetlands W Streams -tributaries r Open Waters F Pond Construction 2. Wetland Impacts r Buffers 2a1 Reason (?) 2b. Impact type * (?) 2c. Type of W. * 2d. W. name* 2e. Forested* 2C Type of Jurisdicition*(?) 2g. Impact area W1 Excavation T Bottomland Hardwood Forest Wetland D Yes Corps 0.003 (acres) W2 Excavation T Bottomland Hardwood Forest Wetland C Yes Corps 0.008 (acres) W3 Excavation T mland Hardwood Forest Wetland AAA Yes Corps 0.001 (acres) W4 Excavation T Bottomland Hardwood Forest Wetland B Yes Corps 0.001 (acres) WS Excavation T Bottomland Hardwood Forest Wetland T Yes Corps 0.004 (acres) W6 Excavation T Bottomland Hardwood Forest Wetland DID Yes Corps 0.023 (acres) W7 Excavation T Bottomland Hardwood Forest Wetland L Yes Corps 1�1 2g. Total Temporary Wetland Impact 0.055 2g. Total Wetland Impact 0.055 2g. Total Permanent Wetland Impact 0.000 2h. Comments: All proposed impacts are temporary and will be restored to pre-existing conditions as described on the exhibits. 3. Stream Impacts F 3a. Reason for impact (?) 3b.lmpact type * 3c. Type of impact* 3d. S. name * 3e. Stream Type * 3f. Type of 3g. S. width* 3h. Impact (?) Jurisdiction* length* S1 Sewer Temporary Excavation Stream H Perennial Corps Average (feet) 40 (lirxearfeet) 3Y Sewer Temporary Excavation Stream K Perennial Corps Average (feet) 40 (lirearfeet) 31. Total jurisdictional ditch impact in square feet: 31. Total permanent stream impacts: 31. Total stream and ditch impacts: 80 31. Total temporary stream impacts: 80 3j. Comments: All proposed impacts are temporary and will be restored to pre-existing conditions as described on the exhibits. E. Impact Justification and Mitigation U 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: Due to the location of the on site streams and wetland, opportunities to avoid these areas were limited. Impacts to site surface waters associated with the proposed development were limited through location/orientation of the proposed trunk line and minimizing the temporary and permanent access widths of the proposed working corridors. Temporary stream impacts will be restored as indicated in the included Stream Bank Stabilization Detail. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Construction techniques Will implement approved erosion control methods to avoid/minimize impacts to onsite/adjacent offsite receiving conveyances. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? r Yes r No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? r Yes r No If no, explain why: 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* r Yes r No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? r Yes r No 2c. Does this project have a stormwater management plan (SMP) reviewed and approved under a state stormwater program or state -approved local government stormwater program? r Yes r No r N/A - project disturbs < 1 acre 2d. Which of the following stormwater management program(s) apply: W Local Government r State Local Government Stormwater Programs W Phase II r NSW r USMP r Water Supply Please identifywhich local government stormwater program you are using. Mecklenburg County Comments: A Stormwater plan Will be submitted to Mecklenburg County for the development that this sewerline supports, but no additional stormwater plan is specifically associated With the sewerline as there are no permanent impacts / impervious surfaces associated. G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* r Yes r No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)?* r Yes r No Comments:* No NEPA/SEPA required 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 21-1.0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * r Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* r Yes r No 3b. If you answered "no," provide a short narrative description. As noted above, additional phases will involve impacts associated with road crossings, grading and BMPs associated with a commercial development (previously permitted). 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR forth is project?* r Yes r Nor WA 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* r Yes r No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* r Yes r No 5d. Is another Federal agency involved?* r Yes r No 5e. Is this a DOT project located within Division's 1-8? r Yes r No 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? r Yes r No 5g. Does this project involve bridge maintenance or removal? r Yes r No 5h. Does this project involve the construction/installation of a wind turbine(s)?* r Yes r No r Unknown 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? r Yes r No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? A threatened/Endangered species assessment was conducted in which no species were identified. Habitat does exist for the Northern Long Eared Bat but the project is exempt as noted in the included T&E report. Consultation Documentation Upload T&E _duplicate.pdf 236.27KB 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* r Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* No essential fish habitat in this region 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* r Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* SHPO's website: http://gis.ncdcr.gov/hpoweb/ 7c. Historic or Prehistoric Information Upload 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain?* r Yes r No 8c. What source(s) did you use to make the floodplain determination?* polaris 3G; www.fema.gov Miscellaneous Comments A full compiled PCN package is attached, including ORM, Cover letter, signature pages, and associated support documentation pages. Miscellaneous attachments not previously requested. Farmington Sewerline PCN 040920 _compiled.pdf 11.19MB Signature * R By checking the box and signing below, I certify that: • I have given true, accurate, and complete information on this form; I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: Daniel Kuefler Signature �a�ieG��r�y�e Date 4/13/2020  3PDLZ3JWFS3PBEBU"MEFSXPPE-BOF NRCS Soil Survey Manuscript Mecklenburg (1980) FIGURE NO. 4 FARMINGTON CIP SEWER TRUNK LINE Mecklenburg, NC PARCEL MAP -WATERS OF THE U.S.- EXISTING CONDITIONS STUDY SUBJECT TO USACE/NCDEQ VERIFICATION DATE: 04/09/20 Drawn By: DCK BLK Reviewed By: PROJECT BOUNDARY STUDY LIMITS Aerial Imagery Source: Bing Maps 2020 FIGURE NO. 3 FARMINGTON CIP SEWER TRUNK LINE Mecklenburg, NC USGS MAP -WATERS OF THE U.S.- EXISTING CONDITIONS STUDY SUBJECT TO USACE/NCDEQ VERIFICATION DATE: 04/09/20 Drawn By: DCK BLK Reviewed By: PROJECT BOUNDARY STUDY LIMITS FUDA CREEK LOCATION Lat: 35.2888 N Long: -80.6774 W HUC: 03040105 ROCKY SCALE 1:24,000 ACRES 3.23 USGS QUAD Harrisburg, NC 1993 Reviewed By: DCK 12/20/19 FIGURE 18 Drawn By: NRN Prepared for: Charlotte Water FARMINGTON – SEWER LINE TRUNK Mecklenburg Co., NC DELINEATION MAP For study purposes only -Subject to USACE/NCDEQ verificationPROJECT BOUNDARY (Limits of Disturbance for Sewerline Installation) WETLAND A/AA -0.001 ac WETLAND B -0.001 ac WETLAND C -0.008 ac WETLAND D -0.003 ac 1 2 3 4 USACE WETLAND FORM A/AA USACE UPLAND DP1 Figure 6 Figure 7 Figure 8 Figure 8 Figure 8 Figure 10 Figure 11 Figure 12 Figure 13 Figure 15 Figure 13 Figure 14 Figure 15 Figure 16 Figure 17 Threatened / Endangered / Protected Species Evaluation Farmington Sewer Line Farmington CIP Sewer Trunk Line Farmington Sewer Line - Threatened / Endangered / Protected Species Evaluation 222 GENERAL LANDSCAPE DESCRIPTION: Figure 1: Farmington Sewer Line - Threatened / Endangered / Protected Species Evaluation 3333 METHODOLOGY: Table 1: Threatened / Endangered / Protected Species listed for Mecklenburg County County: Mecklenburg, NC *Source: US Fish & Wildlife Service **Data search on March 30, 2020 Group Name Status Record Status Lasmigona decorata Bombus affinis Echinacea laevigata Helianthus schweinitzii Rhus michauxii Myotis septentrionalis Haliaeetus leucocephalus Farmington Sewer Line - Threatened / Endangered / Protected Species Evaluation 444 SPECIES DESCRIPTIONS: Helianthus schweinitzii Echinacea laevigata Rhus michauxii Haliaeetus leucocephalus Lasmigona decorata Myotis septentrionalis Bombus affinis Farmington Sewer Line - Threatened / Endangered / Protected Species Evaluation 5555 RESULTS: Pinus virginiana Pechinata Liquidambar styraciflua Liriodendron tulipifera Ulmus americana Quercus alba Q.rubra Q. phellos Carya tomentosa Celtis laevigata Fraxinus americana Cornus florida Ilex opaca Prunus serotina Juniperus virginiana Nyssa sylvatica Viburnum prunifolium Ligustrum sinense Vaccinium Elaeagnus angustifolia Lonicera japonica Parthenocissus quinquefolia Vitis rotundifolia Smilax Toxicodendron radicans Polystichum acrostichoides Asplenium platyneuron Chimaphila maculata Lycopodium flabelliforme Erythronium americanum Goodyera pubescens Microstegium vimineum Lespedeza cuneata Solidago Rubus Andropogon virginicus Senicio Sorghum halepense Gnapthalium obtusifolium A. ternarius Eupatorium Threatened & Endangered/Protected Species Results Farmington Sewer Line - Threatened / Endangered / Protected Species Evaluation 6666 RECOMMENDATIONS: Farmington Sewer Line - Threatened / Endangered / Protected Species Evaluation 7777 Curriculum Vitae for: Lisa R. Gaffney Biologist / Botanist Helianthus schweinitzii Hexastylis naniflora