Loading...
HomeMy WebLinkAboutNC0005185_Authorization to Construct_19940722 State of North Carolina Department of Environment, Health and Natural Resources 74 • • Division of Environmental Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary p E H N F1 A. Preston Howard, Jr., P.E., Director July 22, 1994 Steve S. Innes Amoco Oil Company 375 Northridge Road, Suite 350 Atlanta, GA 30350-3296 Subject: Permit No. ACA005185 Authorization to Construct Amoco Oil/Paw Creek Facility Groundwater Treatment Facility Mecklenburg County Dear Mr. Innes: A letter of request for an Authorization to Construct was received March 8, 1994 by the Division and final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for the construction of the addition of six granular activated carbon units consisting of 165 pounds per canister (two by two in series) onto the tail end of the pre-approved groundwater remediation system and all the necessary" piping,valves, electrical fixtures and appurtenances for proper operation with discharge of treated wastewater into an unnamed tributary to Long Creek. This Authorization to Construct is issued in accordance with Part III, Paragraph A of NPDES Permit No. NCO005185 issued February 1, 1994, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NC0005185. A sludge Management Plan should be submitted within 30 days from the issuance of this authorization to construct. The sludge generated from these treatment facilities must be disposed of in accordance with G.S. 143-215.1 and in a manner approved by the North Carolina Division of Environmental Management In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by-this Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. The Mooresville Regional Office, telephone number 704-663-1699, shall be notified at least forty- eight (48) hours in advance of operation of the installed facilities so that an in-place inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 FAX 919-733-9919 An Equal Opportunity Affirmative Action Employer 50%recycled/10%post-consumer paper Permit No. NCO005185 , Authorization to Construct Amoco Oil Company July 22, 1994 Page 2 Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct and the approved plans and specifications. Mail the Certification to'the Permits and Engineering Unit, P.O. Box 29535, Raleigh, NC 27626-0535. Upon classification of the facility by the Certification Commission, the Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of Title 15A,Chapter 8A, .0202. The ORC of the facility must visit each Class I facility at least weekly and each Class 11, 111, and IV facility at least daily, excluding weekends and holidays, and must properly manage and document daily operation and maintenance of the facility and must comply with all other conditions of Title 15A, Chapter 8A, .0202. Once the facility is classified, the Permittee must submit-a letter to the Certification Commission which designates the operator in responsible charge within thirty days after the wastewater treatment facilities are 50% complete. A copy of the approved plans and specifications shall be maintained on file by the Permittee for the life of the facility. Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division of Environmental Management in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. The issuance of this Authorization to Construct does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. One (1) set of approved plans and specifications is being forwarded to you. If you have any questions or need additional information, please contact Mr. Randy Kepler, telephone number 919/733- 5083. I Sincerely, rest ard, Jr., P.E. cc: Mecklenburg County Health Department Mooresville Regional Office,Water Quality Training and Certification Unit Permits and Engineering Unit Law Environmental, Inc.,Charlotte