NPDES Permit: NC0004626
Document Type: Permit Issuance
Wasteload Allocation
" Authorization to Construct
(AtC)
Permit Modification
Speculative Limits
Staff Report
Instream Assessment (67B)
Environmental Assessment (EA)
Permit
History
Document Date: December 5, 2006
This ciocumeat IS printed on reuMe pape --ig►aore any
conte]Mt tsar,the W-e-w-ertse aide
ATF9QG Michael F.Easley,Governor
William G.Ross Jr.,Secretary
_ r North Carolina DepaiY tile III of Environment and Natural€tczourccs
Alan W.Klimek.P.E.Director
Division of Water Quality
December 5, 2006
Brigette Tinsley
PPG Industries, Inc.
473 New Jersey Church Road
Lexington, North Carolina 27293
SUBJECT: Authorization to Construct
A to C No. 004626A03
PPG Lexington Facility
Davidson County
Dear Ms. Tinsley:
A letter of request for Authorization to Construct was received September 22, 2006, by
the Division, and final plans and specifications for the subject project have been reviewed and
found to be satisfactory. Authorization is hereby granted for the construction of modifications to
the existing 0.6 MGD Wastewater Treatment Plant, with discharge of treated wastewater into
North Potts Creek in the Yadkin-Pee Dee River Basin.
This authorization results in no increase in design or permitted capacity and is awarded
for the construction of the following specific Modifications:
The addition of a new 1.6 meter belt filter press, two 5,000 gallon polymer mixing
tanks and appurtenances with 9.6 dry tons/day of solids processing capacity in
conformity with the project plans, specifications, and other supporting data
subsequently filed and approved by the Department of Environment and Natural
Resources.
This Authorization to Construct is issued in accordance with Part III, Paragraph A of
NPDES Permit No. NCO004626 issued July 28, 2004, and shall be subject to revocation unless
the wastewater treatment facilities are constructed in accordance with the conditions and
limitations specified in Permit No. NC0004626I
The sludge generated from these treatment facilities must be disposed of in accordance
with G.S. 143-215.1 and in a manner approved by the North Carolina Division of Water Quality.
In the event that the facilities fail to perform satisfactorily, including the creation of
nuisance conditions, the Permittee shall take immediate corrective action, including those as may
be required by this Division, such as the construction of additional or replacement wastewater
treatment or disposal facilities.
One
NprthCarofina
. aftindy
North Carolina Division of Water Quality 1017 Nlail Service Ccnter Raleigh,NC 27699-16€7 Phone(919)733-7015 Customer Servicu
Internet:vvrn:. ant rru3lit .prr: 512 N.Salishury St. Raleigh,NC 27(A)4 FAX (919)733-2490 1-877-023-6748
An Equal OppodunitylAlfirtnative Action Employer—50%Recycledl10%Post Consumer Paper
I
Ms. Tinsley
December 5, 2006
Page 2
The Winston Salem Regional Office, telephone number (336) 771-5000, shall be notilied
at least forty-eight (48) hours in advance of operation of the installed facilities so that an on site
inspection can be made. Such notification to the regional supervisor shall be made during the
normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State
Holidays.
Upon completion of construction and prior to operation of this permitted facility, a
certification must be received from a professional engineer certifying that the permitted facility
has been installed in accordance with the NPDES Permit, this Authorization to Construct and the
approved plans and specifications. Mail the Certification to Cecil G. Madden, Jr., P.E.,
Construction Grants & Loans, DWQ / DENR, 1633 Mail Service Center, Raleigh, NC 27699-
1633.
Upon classification of the wastewater treatment facilities by the Water Pollution Control
System Operators Certification Commission (WPCSOCC), the Permittee shall designate and j
employ it certified operator to be in responsible charge (ORC) and one or more certified
operator(s) to be back-up ORC(s) of the facilities in accordance with 15A NCAC 8G .0201. The
ORC shall visit the facilities in accordance with 15A NCAC 8G .0204 or as specified in this
permit and shall comply with all other conditions specified in these rules.
A copy of the approved plans and specifications shall be maintained on file by the
Permittee for the life of the facility.
During the construction of the proposed additions/modifications, the permittee shall
continue to properly maintain and operate the existing wastewater treatment facilities at all times,
and in such a manner, as necessary to comply with the effluent limits specified in the NPDES
Permit.
You are reminded that it is mandatory for the project to be constructed in accordance
with the North Carolina Sedimentation Pollution Control Act, and, when applicable, the North
Carolina Dam Safety Act. In addition, the Specifications must clearly state what the contractor's
responsibilities shall be in complying with these Acts.
Prior to entering into any contract(s) for construction, the recipient must have obtained all
applicable permits from the State.
Failure to abide by the requirements contained in this Authorization to Construct may
subject the Permittee to an enforcement action by the Division of Water Quality in accordance
with North Carolina General Statute 143-215.6A to 143-215.6C.
The issuance of this Authorization to Construct does not preclude the Permittee from
complying with any and all statutes, rules, regulations, or ordinances which may be imposed by
other government agencies (local, state, and federal) which have jurisdiction.
Ms. Tinsley
December 5, 2006
Page 3
One (1) set of approved plans and specifications is being forwarded to you. Ili you have
any questions or need additional information, please contact Cecil G. Madden, Jr., P.E. at
telephone number (919) 715-6203.
Sincerely,
Alan W. Klimek, P.E.
MM:cgm
cc: Charles R. Funk, P.E. ---CH2M - Hill
Davidson County Health Department
DWQ Winston Salem Regional Office, Surface Water Protection
Technical Assistance and Certification Unit
Daniel Blaisdell, P.E.
Point Source Branch, NPDES Program
Cecil G. Madden, Jr., P.E.
Michelle McKay, E.I.
ATC File
October 3, 2006
MEMORANDUM
TO: Anita Reed, E.I., Design Management Unit, CG&L Section
THROUGH: Steve W. Tedder, Water Quality Regional Supervisor, WSRO
FROM: Steve Mauney, Environ. Engineer, WSRO
SUBJECT: ATC- PPG Industries Fiber Glass Products, Inc.
NCO004626
Davidson County
This request for construction approval has been reviewed that will include a belt
filter press, two (2) 500 gallon polymer mixing tanks and appurtenances with 9.6 dry
tons/day of solids processing capacity.
This equipment will allow PPG to process solids 3 days/week on one shift (24
hours/week) and dispose of all the generated solids at current production levels. If
necessary the equipment could be operated 140 hours per week. PPG will retain their
land application permit which gives them maximum operating flexibility. We fully
support their attempt to initiate this upgrade at the earliest possible time. This upgrade
will not require any modification of the NPDES permit. Should you have any questions,
please call me at 336-771-4969.
CC'Charles We va er _
SWP-WSRO
SWP-Central Files jIj D 1
OCT - 6 2006
I
I
j DENR - WATER QUALITY
POINT SOURCE BRANCH
A T`O? Michael F.Easley,Governor,
y William G.Ross Jr.,Secretary
r North Carolina Department of Environment and Natural Resources
Q ^� Alan W.Klimek,P.E.Director
Division of Water Quality
September 22, 2006
MEMORANDUM
TO: Steve Tedder, Regional Water Quality Supervisor ---- --
RECEIVED
Winston-Salem Regional Office, Division of Water Quality N.0 SFr: �r�•:Q
FROM: M- Anita Reed, E.I., Project Review Engineer SEP 2 6 20M
Design Management Unit """s•-°
SUBJECT: Request for an Authorization to Construct
PPG Industries Addition of Belt Filter Press
NPDES Permii No. NCO004626
Plans, specifications and supporting documents have been received for the subject
project. It is requested that comments and recommendations, including the items listed below,
be received by October 22, 2006 from the Regional Office Staff:
Procedure No. 4 Comments
Schedule for Issuance of the NPDES Permit
SOC, or Other Schedules Which Must be Met
Status of Stormwater Permit, if applicable.
Confirm if the Proposed Method and Sequence for Construction of
Additions/New Facilities is Acceptable.
Groundwater Comments
Standby Power Needs
Compliance With N.C. Well Construction Standards
CAMA
X Recommendations for inclusion in the Authorization to Construct
For your referdnce, review and comments on the above items, plan documents are submitted as follows:
X Plans and Specifications
Subsurface/Soils Report.
Power Outage Information
Other
If you have any questions,please do not hesitate.to contact Michelle McKay at (919)715-6217.
Attachment
AR
cc: ATC Files
Anita Reed, E.I.
Construction Grants and Loans Section One
Mail Service Center Raleigh NC 27699-1633 NorthCarolina
Phone:919-733-69001 FAX:919-715-6229/Intemet:www.nocgl.net
An Equal Opportunity/Affirmative Action Employer—50%Recycled110%Post Consumer Paper ;Vaturallff