Loading...
HomeMy WebLinkAboutNC0004626_AUTHORIZATION TO CONSTRUCT_20061205 NPDES DOCUWENT SCANXIMS COVER SNEET NPDES Permit: NC0004626 Document Type: Permit Issuance Wasteload Allocation " Authorization to Construct (AtC) Permit Modification Speculative Limits Staff Report Instream Assessment (67B) Environmental Assessment (EA) Permit History Document Date: December 5, 2006 This ciocumeat IS printed on reuMe pape --ig►aore any conte]Mt tsar,the W-e-w-ertse aide ATF9QG Michael F.Easley,Governor William G.Ross Jr.,Secretary _ r North Carolina DepaiY tile III of Environment and Natural€tczourccs Alan W.Klimek.P.E.Director Division of Water Quality December 5, 2006 Brigette Tinsley PPG Industries, Inc. 473 New Jersey Church Road Lexington, North Carolina 27293 SUBJECT: Authorization to Construct A to C No. 004626A03 PPG Lexington Facility Davidson County Dear Ms. Tinsley: A letter of request for Authorization to Construct was received September 22, 2006, by the Division, and final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for the construction of modifications to the existing 0.6 MGD Wastewater Treatment Plant, with discharge of treated wastewater into North Potts Creek in the Yadkin-Pee Dee River Basin. This authorization results in no increase in design or permitted capacity and is awarded for the construction of the following specific Modifications: The addition of a new 1.6 meter belt filter press, two 5,000 gallon polymer mixing tanks and appurtenances with 9.6 dry tons/day of solids processing capacity in conformity with the project plans, specifications, and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources. This Authorization to Construct is issued in accordance with Part III, Paragraph A of NPDES Permit No. NCO004626 issued July 28, 2004, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NC0004626I The sludge generated from these treatment facilities must be disposed of in accordance with G.S. 143-215.1 and in a manner approved by the North Carolina Division of Water Quality. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. One NprthCarofina . aftindy North Carolina Division of Water Quality 1017 Nlail Service Ccnter Raleigh,NC 27699-16€7 Phone(919)733-7015 Customer Servicu Internet:vvrn:. ant rru3lit .prr: 512 N.Salishury St. Raleigh,NC 27(A)4 FAX (919)733-2490 1-877-023-6748 An Equal OppodunitylAlfirtnative Action Employer—50%Recycledl10%Post Consumer Paper I Ms. Tinsley December 5, 2006 Page 2 The Winston Salem Regional Office, telephone number (336) 771-5000, shall be notilied at least forty-eight (48) hours in advance of operation of the installed facilities so that an on site inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct and the approved plans and specifications. Mail the Certification to Cecil G. Madden, Jr., P.E., Construction Grants & Loans, DWQ / DENR, 1633 Mail Service Center, Raleigh, NC 27699- 1633. Upon classification of the wastewater treatment facilities by the Water Pollution Control System Operators Certification Commission (WPCSOCC), the Permittee shall designate and j employ it certified operator to be in responsible charge (ORC) and one or more certified operator(s) to be back-up ORC(s) of the facilities in accordance with 15A NCAC 8G .0201. The ORC shall visit the facilities in accordance with 15A NCAC 8G .0204 or as specified in this permit and shall comply with all other conditions specified in these rules. A copy of the approved plans and specifications shall be maintained on file by the Permittee for the life of the facility. During the construction of the proposed additions/modifications, the permittee shall continue to properly maintain and operate the existing wastewater treatment facilities at all times, and in such a manner, as necessary to comply with the effluent limits specified in the NPDES Permit. You are reminded that it is mandatory for the project to be constructed in accordance with the North Carolina Sedimentation Pollution Control Act, and, when applicable, the North Carolina Dam Safety Act. In addition, the Specifications must clearly state what the contractor's responsibilities shall be in complying with these Acts. Prior to entering into any contract(s) for construction, the recipient must have obtained all applicable permits from the State. Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division of Water Quality in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. The issuance of this Authorization to Construct does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. Ms. Tinsley December 5, 2006 Page 3 One (1) set of approved plans and specifications is being forwarded to you. Ili you have any questions or need additional information, please contact Cecil G. Madden, Jr., P.E. at telephone number (919) 715-6203. Sincerely, Alan W. Klimek, P.E. MM:cgm cc: Charles R. Funk, P.E. ---CH2M - Hill Davidson County Health Department DWQ Winston Salem Regional Office, Surface Water Protection Technical Assistance and Certification Unit Daniel Blaisdell, P.E. Point Source Branch, NPDES Program Cecil G. Madden, Jr., P.E. Michelle McKay, E.I. ATC File October 3, 2006 MEMORANDUM TO: Anita Reed, E.I., Design Management Unit, CG&L Section THROUGH: Steve W. Tedder, Water Quality Regional Supervisor, WSRO FROM: Steve Mauney, Environ. Engineer, WSRO SUBJECT: ATC- PPG Industries Fiber Glass Products, Inc. NCO004626 Davidson County This request for construction approval has been reviewed that will include a belt filter press, two (2) 500 gallon polymer mixing tanks and appurtenances with 9.6 dry tons/day of solids processing capacity. This equipment will allow PPG to process solids 3 days/week on one shift (24 hours/week) and dispose of all the generated solids at current production levels. If necessary the equipment could be operated 140 hours per week. PPG will retain their land application permit which gives them maximum operating flexibility. We fully support their attempt to initiate this upgrade at the earliest possible time. This upgrade will not require any modification of the NPDES permit. Should you have any questions, please call me at 336-771-4969. CC'Charles We va er _ SWP-WSRO SWP-Central Files jIj D 1 OCT - 6 2006 I I j DENR - WATER QUALITY POINT SOURCE BRANCH A T`O? Michael F.Easley,Governor, y William G.Ross Jr.,Secretary r North Carolina Department of Environment and Natural Resources Q ^� Alan W.Klimek,P.E.Director Division of Water Quality September 22, 2006 MEMORANDUM TO: Steve Tedder, Regional Water Quality Supervisor ---- -- RECEIVED Winston-Salem Regional Office, Division of Water Quality N.0 SFr: �r�•:Q FROM: M- Anita Reed, E.I., Project Review Engineer SEP 2 6 20M Design Management Unit """s•-° SUBJECT: Request for an Authorization to Construct PPG Industries Addition of Belt Filter Press NPDES Permii No. NCO004626 Plans, specifications and supporting documents have been received for the subject project. It is requested that comments and recommendations, including the items listed below, be received by October 22, 2006 from the Regional Office Staff: Procedure No. 4 Comments Schedule for Issuance of the NPDES Permit SOC, or Other Schedules Which Must be Met Status of Stormwater Permit, if applicable. Confirm if the Proposed Method and Sequence for Construction of Additions/New Facilities is Acceptable. Groundwater Comments Standby Power Needs Compliance With N.C. Well Construction Standards CAMA X Recommendations for inclusion in the Authorization to Construct For your referdnce, review and comments on the above items, plan documents are submitted as follows: X Plans and Specifications Subsurface/Soils Report. Power Outage Information Other If you have any questions,please do not hesitate.to contact Michelle McKay at (919)715-6217. Attachment AR cc: ATC Files Anita Reed, E.I. Construction Grants and Loans Section One Mail Service Center Raleigh NC 27699-1633 NorthCarolina Phone:919-733-69001 FAX:919-715-6229/Intemet:www.nocgl.net An Equal Opportunity/Affirmative Action Employer—50%Recycled110%Post Consumer Paper ;Vaturallff