Loading...
HomeMy WebLinkAboutNC0004626_AUTHORIZATION To Construct_20060217 AASA P% Pw FF� ENVIRONMENTAL ° I n ■ t l� February 17, 2006 Mr. David Segers PPG Industries Fiberglass Products PO Box 949 Lexington,NC 27293 Re: NPDES Permit No. NCO004626 ATC No. 004626AI Engineer's Certification Back-up Clarifiers AEI Job No. N258-24 Dear Mr. Segers: AWARE Environmental© Inc. (AEI) has conducted under my supervision periodic observations and a final inspection of the subject W WTP Modifications to determine if the construction of the system has proceeded within substantial compliance and intent of the approved plans and specifications. Based on these observations, my Certification of Construction for this project is attached below. Sincerely, AWARE Environmental Inc. e g P. Tyrian, P.E. Project anager Engineer's Certification 1, George P. Tyrian, as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe periodically the construction of the project, wastewater treatment plant modifications, back-up clarifiers, PPG Industries, Inc., Lexington, NC, for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that t nstruction was observed to be built within substantial compliance and intent the ppr ed plans and specifications. a Signature Registration No. 16421 aaBtr�aAessresiov,,'s Date o `a*•%�g�►ri•G+�Rpes .end cc: FileA y tifn M. Hubard, P.E.,NCDWQ Con. Grants & Loans Section $E Al. B. Tinsley, PPG 16421 y,� a N. Fiss, AEI < ��I►�Et�'t' 25924IW4 a ���i•�:�irr�r►rr� 9305 MONROE ROAD • SUITE J . CHARLOTTE,N.C.28270.1490 • TELEPHONE(7D4)845-1697 FAX(704)B45.1759 �QF W A TF�O Michael F.Easley,Governor O6 William G. Ross Jr.,Secretary r- North Carolina Department of-Env'arunrnenl and Natural Resources Alan W. Klimek,P.E.Director Qy Division of Water Quality July 7, 2005 Mr. David Weber PPG Industries Fiber Glass Products, Inc. 473 New Jersey Church Road Lexington, North Carolina 27293 SUBJECT: Authorization to Construct A to C No. 004626AOI PPG Industries Fiber Glass Products, Inc. Lexington Manufacturing Facility WWTP Davidson County Dear Mr. Weber: A letter of request for Authorization to Construct was received on June I, 2005 by the Division, and final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for the construction of modifications to the existing 0.6 MGD PPG Industries Lexington Manufacturing Facility Wastewater Treatment Plant, with discharge of treated wastewater into North Potts creek in the Yadkin-Pee Dee River Basin. This authorization results in no increase in design or permitted capacity, and is awarded for the construction of the following specific modifications: Installation of a new clarifier mechanism, splitter box, return sludge pumps, associated piping and electrical work, and demolition of existing piping and equipment to allow back-up capabilities for either the primary or secondary clarifier in conformity with the project plan, specifications, and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources. This Authorization to Construct is issued in accordance with Part III, Paragraph A of NPDES Permit No. NC0004626, issued July 28, 2004, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NC0004626. The sludge generated from these treatment facilities must be disposed of in accordance with G.S. 143-215.1 and in a manner approved by the North Carolina Division of Water Quality. N r hCaroiina Natwally Norih Carolina Division of Water Quality 1617'vlail Service Center Raleigh,NC 27609-1617 Phone(919J 733-70 1 5; Cumom i Service nternel: h2o.enr.state.nc.us 512 N.5alishun,St. Raleigh. NC 27o04 FAX (419)733-249(, 1-877-623-6748 An Equal OpportunitylAffirmative Action Employer—50%Recyctedh096 Post consumer Paper Mr. David Weber July 7, 2005 Page 2 In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. The Winston-Salem Regional Office, telephone number (336) 771-4600, shall be notified at least forty-eight (48) hours in advance of operation of the installed facilities so that an on-site inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m, until 5:00 p.m. on Monday through Friday, excluding State Holidays. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a professional engineer, certifying that the permitted facility has been installed in accordance with the NPDES Pennit, this Authorization to Construct, and the approved plans and specifications. Mail the Certification to Cecil G. Madden, Jr., P.E., Construction Grants & Loans, DWQ/DENR, 1633 Mail Service Center, Raleigh, NC 27699-1633. Upon classification of the facility by the Certification Commission, the Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate ofthe type and gradc at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission.. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of T15A:8G.0202. The ORC of the facility must visit each Class I facility at least weekly and each Class II, I11, and IV facility at least daily, excluding weekends and holidays, must properly manage the facility, must document daily operation and maintenance of the facility, and must comply with all other conditions of T l 5A:8G.0202. A copy of the approved plans and specifications shall be maintained on file by the Permittee for the life of the facility. During the construction of the proposed additions/modifications, the permittee shall continue to properly maintain and operate the existing wastewater treatment facilities at all times, and in such a manner, as necessary, to comply with the effluent limits specified in the NPDES Permit. You are reminded that it is mandatory for the project to be constructed in accordance with the North Carolina Sedimentation Pollution Control Act, and, when applicable, the North Carolina Darn Safety Act. In addition, the specifications must clearly state what the contractor's responsibilities shall be in complying with these Acts. Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division of Water Quality, in accordance with North Carolina General Statutes 143-215.6A to 143-215.6C. Mr. David Weber July 7, 2005 Page 3 The issuance of this Authorization to Construct does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. One (1) set of approved plans and specifications is being forwarded to you. If you have any questions or need additional information, please contact Cecil G. Madden, Jr., P.E. at telephone number (919) 715.6203. Sincerel , Ian W. Klimek, P.E. M H:cgm cc: AWARE Environmental, Inc. - George Tyrian, P.E. Davidson County Health Department Winston-Salem Regional Office, Surface Water Protection Technical Assistance and Certification Unit Daniel Blaisdell, P.E. Point Source Branch, NPDES Program Cecil G. Madden, Jr., P.E. Mark Hubbard, P.E. A to C File