Loading...
HomeMy WebLinkAboutNC0004626_AUTHORIZATION To Construct_19970404 State of North Carolina Department of Environment, Health and Natural Resources 4 • Division of Water Quality James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary p E H N F 1 A. Preston Howard, Jr., P.E., Director April 4, 1997 Mr. J.W. Buchanan Senior Engineering Associate PPG Industries, Inc. Post Office Box 949 Lexington, North Carolina 27293 Subject: Permit No. NCO004626 Authorization to Construct PPG Industries, Inc. Davidson County Dear Mr. Buchanan: A letter of request for an Authorization to Construct was received December 3, 1996 by the Division and final plans and specifications for the proposed project have been reviewed and found to be satisfactory. Authorization is hereby granted for the construction of the following units with final discharge of treated wastewater into North Potts Creek which is classified Class C waters in the Yadkin - Pee Dee River Basin: • Twin granular activated carbon adsorption units; • pH adjustment units at the inlet and the outlet; • Conversion of two existing effluent pumps to accommodate variable speed drives; • Use of an existing effluent pump to force backwash water into the GAC vessels; • Conversion of an existing 62,000 gallon clarifier to an equalization basin; • Sump pump to control the flow rate of the backwash into the aeration basin; • 600,000 gallon sludge holding tank. This Authorization to Construct is issued in accordance with Part III, Paragraph A of NPDES Permit No. NCO004626 issued August 1, 1995, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NC0004626. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Pernuttee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. The Winston-Salem Regional Office, telephone number (910) 771-4600, shall be notified at least forty-eight (48) hours in advance of operation of the installed facilities so that an in-place inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 FAX 919-733-0719 An Equal Opportunity Affirmative Action Employer 50%recycled/10%post-consumer paper Permit No. NC0004626 Authorization to Construct , PPG Industries, Inc. April 4, 1997 ' Page 2 Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct and the approved plans and specifications. Mail the Certification to the Permits and Engineering Unit, P.O. Box 29535, Raleigh, NC 27626-0535. A copy of the approved plans and specifications shall be maintained on file by the Permittee for the life of the facility. The Operational Agreement between the Permittee and the Environmental Management- Commission is incorporated herein by reference and is a condition of this Permit. Noncompliance with the terms.of the Operational Agreement shall subject the Permittee to all sanctions provided by G. S. 143- 215.6 for violation of or failure to act in accordance with the terms and conditions of this Permit. Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division of Water Quality in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. The issuance of this Authorization to Construct does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. One (1) set of approved plans and specifications is being forwarded to you. If you have any questions or need additional information, please contact Mr. Jeff Myhra, telephone number (919) 733- 5083, extension 597. Sincerely, A. Preston Howard, r., P.E. cc: Central Files Permits:&-Engineering_(,ATC-files), Winston-Salem Regional Office,Water Quality Training and Certification Unit cc: Permits and Engineering `Te�linical'Support Branch County Health Department Central Files WSRO SOC PRIORITY PROJECT: YES X NO R IF Yes, SOC No. EMC WQ 95-18 To: Permits and Engineering Unit Water Quality Section Attention: (Jeff Myrha) AUTHORIZATION TO CONSTRUCT NPDES PERMIT REPORT AND RECOMMENDATIONS Date: January 29, 1997 County: Davidson Permit No. NCO004626 PART I GENERAL INFORMATION 1. Facility Name and Current Address: P.P.G. Industries, inc. P. O. Box 949 Lexington, N.C. 27293 2. Date of most recent NPDES Staff Report: (attach copy) February 7, 1994 (attached) 3. Changes since previous action on NPDES Permit: None 4. Verify Discharge Point(s) on plans with current NPDES Permit. List for all discharge points. Latitude: 35° 44' 18" Longitude: 80' 19' 32" Attach a USGS map extract and indicate treatment facility site and discharge point on map. U.S.G.S. Quad No. U.S.G.S. Name T Dischage Point: E17NE Southmont Plant Site: D17SE Lexington West 5. Treatment plant classification: (attach completed rating sheet) 4 PART II - DESCRIPTION OF DISCHARGE AND TREATMENT WORKS (PROVIDE THE FOLLOWING INFORMATION IF IT IS NOT ON THE PREVIOUS NPDES STAFF REPORT) 1. Existing treatment facility: a. What is the current permitted capacity of the facility? b. Date(s) and construction activities allowed by previous Authorizations to Construct issued in the previous two (2) years: c: What is the actual treatment capacity of the current facility (design volume)? d. Please provide a description of existing or substantially constructed wastewater treatment facilities. 2. Please provide a description of proposed wastewater treatment facilities: Installation of vendor-supplied twin granular activated carbon adsorption units, operated in series, which will replace the existing mixed media filters; pH adjustment units at the inlet (acid) and outlet (caustic) of the unit; modification of two existing effluent pumps to accommodate variable speed drives; use of an existing spare effluent pump to force backwash water into the GAC vessels; conversion of an existing 62,000 gallon clarifier (not currently in use) to an equalization basin for receipt of the backwash water, with a sump pump to control flow rate of the backwash into the aeration basin; installation of a new 600,000 gallon sludge holding tank adjacent to the existing concrete sludge storage basin. 3. Residuals handling and utilization/disposal scheme: a. If residuals are being land applied, please specify DEM permit no. Residual Contractor: Telephone No. b. Residuals stabilization: PSRP PFRP Other C. Landfill: d. Other disposal/utilization scheme (Specify): 4. Important SCC, JGC or Compliance Schedule dates, if applicable: (Please indicate) Submission of Plans and Specifications December 1, 1996 Begin Construction March 1 1997 Complete Construction June 1, 1997 PART III - EVALUATION AND RECOMMENDATIONS P.P.G. intends to install the granular activated carbon unit to remove one or more toxicants believed to be contributing to the facility's periodic failures of the chronic toxicity test. The Company has run bench-scale tests which indicate the technology should work. The new. sludge storage tank, while not a part of the toxicity issue, will give the Company more flexibility with respect to sludge management issues. The Region recommends the A. to C. be issued. Signature of report prelzarer / Water Quality Section Su ervisor Date