HomeMy WebLinkAboutWS0701145_Permit (Issuance)_20200414P,OY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. DANIEL SMITH
Director
Mr. Joey Byrum
2244 Virginia Road
Edenton, North Carolina 27932
NORTH CAROLINA
Environmental Quality
April 14, 2020
SUBJECT: Well Construction Permit No. WS0701145
Byrum Farm Irrigation Well
2244 Virginia Road
Edenton, Chowan County, North Carolina
Dear Mr. Byrum:
In accordance with your application received April 7, 2020, we are forwarding herewith
Well Construction Permit No. WS0701145 dated April 14, 2020, issued to Joey Byrum for the
construction of one water supply (irrigation) well located as indicated on the application and/or
figures accompanying the application, in Chowan County, North Carolina.
This Permit will be effective from the date of its issuance until April 14, 2021 and shall be
subject to the conditions and limitations as specified therein. If any parts, requirements, or
limitations contained in this Permit are unacceptable to you, you have the right to an adjudicatory
hearing before a hearing officer upon written demand to the Director within 30 days following
receipt of this Permit, identifying the specified issues to be contended. Unless such demand is made,
this Permit shall be final and binding.
A Well Construction Record (GW-1) must be filled out by the driller and submitted to
Department of Environmental Quality, Attn: Information Management, 1617 Mail Service Center,
Raleigh, NC 27699-1636, within 30 days upon completion of the well construction. If additional
information or clarification is required, please contact David May at 252-948-3939.
Sincerely,
um—i "
David May, L.G., Supervisor
Water Quality Regional Operations Section
Division of Water Resources
Washington Regional Office
cc: David Lewis — 794 Alligood Rd, Creswell, NC 27928
LaserFiche
D E Q�� North Carolina Department of Environmental Quality I Division of Water Resources
Washington Regional office ( 943 Washington Square Mall I Washington, North Carolina 27889
NORTH CAAOLINA �^
n.p,�..l 9o�:uZN 252.946.6481
NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF WATER RESOURCES
WATER QUALITY REGIONAL OPERATIONS SECTION
PERMIT FOR THE CONSTRUCTION OF A
WATER SUPPLY WELL OR WELL SYSTEM
(Wells or Well Systems with a Design Capacity of 100,000 Gallons Per Day or Greater)
In accordance with the provisions of Article 7, Chapter 87, North Carolina General Statutes, and
other applicable Laws, Rules and Regulations:
PERMISSION IS HEREBY GRANTED TO
Joey Byrum
FOR THE CONSTRUCTION OF A WATER SUPPLY WELL SYSTEM consisting of one well
(for use as an irrigation well) on property owned by and/or associated with Joey Byrum at the
farming operation at 2244 Virginia Rd, as indicated on the figures accompanying the application,
near Edenton, North Carolina in Chowan County. This Permit is issued in accordance with the
application received on April 7, 2020 in conformity with specifications and supporting data, all
of which are filed with the Department of Environmental Quality and are considered integral parts
of this Permit.
This Permit is for well construction only and does not waive any provision or requirement or
any other applicable law or regulation.
Construction of any well under this Permit shall be in strict compliance with the North Carolina
Well Construction Regulations and Standards (15A NCAC 02C .0100), and other State and Local
Laws and regulations pertaining to water supply well construction.
If any requirements or limitations specified in this Permit are unacceptable, you have a right to
an adjudicatory hearing upon written request within 30 days of receipt of this Permit. The request
must be in the form of a written petition conforming to Chapter 150B of the North Carolina
General Statutes and filed with the Office of Administrative Hearings, 6714 Mail Service Center,
Raleigh, North Carolina 27699-6714. Unless such a demand is made, this Permit is final and
binding.
This Permit will be effective for one year from the date of its issuance and shall be subject to
other specified conditions, limitations, or exceptions as follows:
1. Each well shall be constructed by a North Carolina Certified Well Construction
Contractor.
2. Each well shall have a Well Contractor Identification Plate and a Pump Installation
Information Plate in accordance with 15A NCAC 02C .01070)(2) and (3).
3. Well construction records (GW-1) for each well shall be submitted to the Division of
Water Resources Information Processing Unit within 30 days of the well completion.
4. When the well is discontinued or abandoned, it shall be abandoned in accordance with
15A NCAC 02C .0113 and a well abandonment record (GW-30) shall be submitted to the
Division of Water Resources Information Processing Unit within 30 days of the well
abandonment.
Permit issued the Fourteenth day of April, 2020
FOR THE NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
VMj"-a"
David May, Regional Supervisor
Division of Water Resources
Water Quality Regional Operations Section
Washington Regional Office
By Authority of the Environmental Management Commission
Permit No. # WS0701145