Loading...
HomeMy WebLinkAboutNCG200481_COMPLETE FILE - HISTORICAL_20120511 (2)in & (-, ke �17170 STORMWATER DIVISION CODING SHEET RESCISSIONS PERMIT NO. NC.V 0 DOC TYPE �' COMPLETE FILE - HISTORICAL DATE OF RESCISSION O o 5 YYYYMMDD r MC®ENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charles Wakild, P. E. Dee.Freeman _ Governor Director Secretary _ May 11, 2012 I �� ZIOZ l A9YV Mr. Charlie Wright, Vice President Hayes Iron and Metal 883 Wellaway Lane Siler City, North Carolina 27344 Subject: General Permit No. NCG200000 Hayes Iron and Metal COC No. NCG200481 Dear Mr. Wright: Chatham County In accordance with your application for a discharge permit received on February 10, 2012, we are forwarding herewith the subject certificate of coverage (COC) to discharge under the subject state — NPDES general permit. This permit is issued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between North Carolina and the US Environmental Protection Agency dated October 15, 2007 (or as subsequently amended). If any parts, measurement frequencies, or sampling requirements contained in this permit are unacceptable to you, you have the right to request an individual permit by submitting an individual permit application. Unless such demand is made, this certificate of coverage shall be final and binding. Please take notice that this certificate of coverage is not transferable except after notice to the Division of Water Quality. The Division of Water Quality may require modification or revocation and reissuance of the certificate of coverage. This permit does not affect the legal requirements to obtain other permits which may be required by the Division of Water Quality or permits required by the Division of Land Resources, Coastal Area Management Act or any other federal or local govemmental permit that may be required. If you have any questions concerning this permit, please contact Bill Diuguid, Stormwater Staff Planner at telephone number (919) 807-6369. Sincerely, cc: Raleigh Regional Office Central Files Stormwater Permitting Unit Files Attachments 1617 Mail Service Center, Ralegh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807 63001 FAX: 919-807-64921 Customer Service: 1-877 623-6748 Internet: v.�::v.ravatemua!iN.c� ORIGINAL SIGNED 8) KEN PICKLE Charles Wakild, P.E. G " /7' P7 �r t —� 'Q �ti �fAY 14 2012 r.r.,.. r:-.—�, NorthCarolina vVatmallrY An Eqval Donnaunily 1 AFrmOve Ammn Employer STATE OF NORTH CAROLINA ^vEFARTP9Eiv"C OF EN Iv AIN NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG200000 CERTIFICATE OF COVERAGE No. NCG200481 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.I, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Hayes Iron and Metal is hereby authorized to discharge stormwater from a facility located at Hayes Iron and Metal 101 Viven Betty Place Siler City Chatham County to receiving waters designated as Lacy Creek, a Class WS-I II creek, Cape Fear River Basin; in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts 1, 11, 111, IV, V and VI of General Permit No. NCG200000, as attached. This Certificate of Coverage shall become effective May 11, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day May 11, 2012. ORIGINAL SIGNED B) KEN PICKLE Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission Hayes Iron and Metal Siler City IlV 35045'12.88"N 79029'42.05"% V 'v I I f J YW Ll -7 0 4r:- f V. '7C 0 7, c", 41" N r "iio If ch'/ P.O. Box 1509 Architects Figure 1- USGS Topographic Map: 101 Viven Betty Place Dewberry Danville VA. 24549-1509 Engineers Chatham County, NC 551 Piney Forest Rd. Planners PA5004917MAdm\Reporfs\Maps. pptx Danville VA 24540 Surveyors (434) 797-4497 (voice) rrr_r NCDENR Division of Water Quality National Pollutant Discharge Elimination System NCG200000 FOR AefN[:r USr:ONLY nma R«;.aa 1'car M=h Da Cmifrtvte nfCnan D D [],eh • Amminl 4 aos toe. Pcinur Ax+i m NOTICE OF INTENT National Pollutant Discharge Elimination System application for coverage under General Permit NCG200000: STORMWATER DISCHARGES associated with activities classified as: SIC 5093 Scrap Metal Recycling (except as specified below) SIC' N/A Like activities deemed by DWO to be similar in the process and/or the exposure of raw materials, products, by-products, or waste materials The following activities are specifically excluded from coverage under this General Permit: Automobile Wrecking for Scrap (SIC 5093) Non -Metal Scrap Recycling (SIC 5093) Used Motor Vehicle Parts (SIC 5015) Standard Industrial Classification Code 1) Melling address of owner/operator: (address to which all permit correspondence will be mailed): Name Street Address City Telephone No. E-mail Address Hayes iron & Metal cwn;ht ayesu'onan meta .com 2) Location of facility producing discharge: Facility Name Facility Contact Contact E-mail Street Address City County Telephone No. 3) Physical Location Information: State Nu. ZIPCode /1.51:) Fax: 336-38R-5988 Fax: Narrative description of how to get to the facility (use street names, state road numbers, and distance and direction from a roadway intersection). From Siler City NC travel approximately 3 miles on Old Siler City, travel approximately miles on Old Highway 421 Turn Left on Vivcn Bcttv Place. (proprty is Old 84 Lumber site) (A copy of a county map or USGS quad sheet with facility clearly located on the map is required to be submitted with this application) 4) Latitude 35d 45' 12.88" Longitude 79d 29' 42.05" (degrees, minutes, seconds)R �� (teRa 5) This NPDES Permit Application applies to which of the following : �l m New or Proposed Facility Date operation is to begin February 2012 FEB 1 0 2012 ❑ Existing DEW- WATER OWIITY 6) Standard Industrial Classification: 'AnA170SARDSTOR6IWATERBRANCH Provide the 4 digit Standard Industrial Classification Code (SIC Code) that describes the primary industrial activity at this facility: SIC Code: 5093 7) Provide a brief description of the types of industrial activities and products produced at this facility: Flandline scraD metal, cars and batteries; Storage of materials in stock piles or inside buildings; Page 1 of 3 SWU-235-11.16.09 NCG200000 N.O.I: 8) Discharge points: How many discharge points (ditches, pipes, channels, etc.) convey stormwater from the property? Receiving water classification (if known): 9) Receiving waters: What is the name of the body or bodies of water (creek, stream, river, lake, etc.) that the facility stormwater discharges end up in? Lac Creek c Ss Zs-= . FF-s% Receiving water classificatio (if known): If the site stormwater discharges to a separate storm sewer system, name the operator of the separate storm sewer system (e.g. City of Raleigh municipal storm sewer). On site detention ponds 10) Does this facility have any other NPDES permits? fd No (I Yes If yes, list the permit numbers for all current NPDES permits for this facility: 11) Does this facility have any Non -Discharge permits (ex: recycle permits)? ® No ❑ Yes If yes, list the permit numbers for all current Non -Discharge permits for this facility: _ 12) Does this facility employ any best management practices for stormwater control? In No Q Yes If yes, please briefly describe: 13) Does this facility have a Stormwater Pollution Prevention Plan? ❑ No tv Yes If yes, when was it implemented? January 2012 14) Are vehicle maintenance activities occurring at this facility? (i No IN Yes 15) Hazardous Waste: a) Is this facility a Hazardous Waste Treatment, Storage, or Disposal Facility? (j No ❑ Yes b) Is this facility a Small Quantity Generator (less than 1000 kg. of hazardous waste generated per month) of hazardous waste? ® No ❑ Yes c) Is this facility a Large Quantity Generator (1000 kg. or more of hazardous waste generated per month) of hazardous waste? w No ❑ Yes d) If you answered yes to questions b. or c., please provide the following information: Page 2 of 3 SWII-235-11.16.0e NCG200000 N.O.I. Type(s) of waste: How is material stored: Where is material stored: How many disposal shipments per year: Name of transport / disposal vendor: _ Vendor address: 16) Certification: North Carolina General Statute 143-215.6 b (i) provides that: Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a talso statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the [Environmental Management] Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). I hereby request coverage under the referenced General Permit. I understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. I certify that I am familiar with the information contained in this application and that to the best of my knowledge and belief such information is true, complete, and accurate. Signing: Ctl&';Zy V Final Checklist This application will be returned as incomplete unless all of the following items have been included: ❑ Check for $100 made payable to NC DENR ❑ This completed application and all supporting documents ❑ Copy of county map or USGS quad sheet with location of facility clearly marked on map Mall the entire package to: Stormwater Permitting Unit Division of Water Quality 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Note The submission of this document does not guarantee the issuance of an NPDES permit. For questions, please contact the DWO Central office or Regional Office for your area. DWO Ronional Office Contact Information: Asheville Office ...... (628) 296-4500 Fayetteville Office ... (910) 433-3300 Mooresville Office ... (704) 663.1699 Raleigh Office ........ (919) 791-4200 Washington Office ...(252) 946-6481 Wilmington Office ... (910) 796-7215 Winston-Salem ...... (336) 771-5000 Central Office .........(919) 807-6300 Page 3 of 3 SWU-235-11.16.09 MI 11V I K I- Z If l, 1 itA - -1 2j. �i'V N)" Hayes Iron and Metal k Siler City IF" 35-45:12.88:N N 792942.05 W t -7 TKe. W .—U-Pif W1 P.O. Box 1509 Architects Figure 1- USGS Topographic Map: 101 Viven Betty Place Danville VA. 24549-1509 Engineers Chatham County, NCDewberry" 551 Piney Forest Rd. Planners P:\50049178\Adm\ReportsWaps.ppLx Danville VA 24540 Surveyors (434) 797-4497 (voice) Hayes Iron and Metal Siler City 35045'12.88"N 79029'42.05"W ft Dewberry' . ,.tee.. P.O. Box 1509 Architects Figure 2- USGS Topographic Map: 101 Viven Betty Place Danville VA. 24549-1509 Engineers Chatham County, NC 551 Piney Forest Rd. Planners P:\50049178\AdmNReponsmeaps.pptx Danville VA 24540 Surveyors (434) 797-4497 (voice) may,' Hayes Iron and Metal 'cr r �i`''r ` ` Y n a. .-t '1+ J ( F SilerCity k� 'p"s a J rrt a 35°45'12.88"N�e.a!t'7`�Atr7�`.y ` `sue •..7j� 79°29'42.05"w 4v. �_r ii.E...-..'� r� a: ` i rit1I,.'.G . `°.til4i '�'-'+ j o;•d - P.O. Box 1509 Architects DeWberr Danville VA. 24549-1509 y 551 Piney Forest Rd. Engineers Planners Danville VA 24540 Surveyors (434) 797-4497 (voice) b -LVlit-1 .t %A, �*N— - dAl� -LL/JI Figure 3- USGS Topographic Map (Large Scale): 101 Viven Betty Place Chatham County, NC P:\50049178\AdmNReports\Maps.pptx r Storm Water Pollution Prevention Plan Hayes Iron and Metal 101 Viven Betty Place Siler City, NC 27344 January 27, 2012 Prepared for: Mr. Charlie Wright Hayes Iron and Metal 2508 Walter's Mill Road Providence, NC 27315 Prepared by: Dewberry & Davis, Inc. 551 Piney Forest road Danville, VA 24540 434-797-4497 FEB 1 0 2012 DENR • WATER OUALITY WEnANDSAND STORMWATER WMCH ■ THI. SE DOCUMENTS. INCLUDING DRAWINGS. SPECIFICATIONS. REPORTS. AND STUDIES WERE PREPARED BY DEWBERRY. PURSUANT TO A CONTRACr BY AND BII-EN DEWBERRY AND HAYES IRON & METAL WORKS, WITH RESPECT TO THE PROJECr DESCRIBED IN SAID CONTRACT. ANY REUSE OF SAID DOCUMENTS WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY DEWBERRY FOR THE SPECIFIC PURPOSE: INTENDED WILL BE AT THE SOLE RISK OP THE INDIVIDUAL OR ENTITY UTILMNG SAID DOCUMENTS. DRAWINGS, SPECIFICATIONS, REPORTS. AND STUDIES AND SUCH USE IS W UOUTTHF. AUTHOR[]IYDON OF DEWBERRY. DEWBERRY SHALL HAVE NO LEGAL LIABILITY RESULTING FROM ANY AND ALL CLAIMS. DAMAGES. LOSSES. AND EXPENSES. INCLUDING ATTORNEYS FEES ARISING OUT OFTHE UNAUTHORIZED USE OFTHESE DOCUMENTS. DRAWINGS, SPECIFICATIONS. REPORTS. AND STUDIES PREPARED AS A RESULT OF THE. AFORESAID CONTRACT. THIS DOCUMENT WAS PREPARED BY DEWBERRY IN ACCORDANCE WITH GENERALLY ACCEPTED STANDARDS OF ENVIRONMENTAL PRAC tCF, FOR THE EXCLUSIVE USE Of THE HAYES IRON & METAL WORKS FOR SPECIFIC APPLICATION TO THE RISFERENCED SITE. NO OTHER WARRANTY IS EITHER EXPRESSED OR IMPLIED. CONCLUSIONS PRESENTED IN THIS REPORT ARE BASED UPON A REVIEW OF AVAILABLE INFORMATION. THE RESULTS OF DEWBERRY FIELD STUDIES. THE. RESULTS OF CHEMICAL ANALYSES. AND PROFESSIONAL JUDGMENT, CONCLUSIONS PRESENTED BY DEWBERRY DO NOT REFLECT VARIATIONS IN SUBSURFACE GROUNDWATER QUALITY THAT MIGHT EXIST BETWEEN OR B17YOND SAMPLING POINTS OR BETWEEN SPECIFIC SAMPLE COLLEMON EVENTS. DEWBERRY SHALL INCUR NO LIABILITY RESULTING FROM INFORMATION PROVIDED BY OTHERS, P:\50049178\Adm\Reports\2012 SWPPP\2012.1.16 TOC Hayes SWPPP.doc Hayes Iron & Metal January 27, 2012 TABLE OF CONTENTS EXECUTIVE SUMMARY 1 1. INTRODUCTION..................................................................................................2 2. 3. C! 5. 1.1 Purpose.........................................................................................................2 1.2 Implementation............................................................................................2 1.3 Regulatory Requirement............................................................................... STORM WATER POLLUTION PREVENTION TEAM ............. FACILITY DESCRIPTION AND OPERATIONS 3. t General Description..................................................................... 3.2 Industrial Activities and Materials Inventory ............................... 3.2.1 Industrial Activities.......................................................... 3.2.2 Significant Materials Inventory and Handling Practices.. 3.3 Significant Spills and Leaks ....................................................... 3.4 Receiving Water and Outfall Descriptions .................................. 3.4.1 Run -On Points and Receiving Waters ............................. 3.4.2 Drainage Area and Outfall Descriptions .......................... 3.4.3 Non -Storm Water Discharges .......................................... 3.5 Sampling Data.............................................................................. ...3 Im ................4 ................4 ................4 ................5 ................6 ..........6 ................6 ................6 ................7 ................7 STORM WATER MANAGEMENT CONTROLS............................................8 4.1 Baseline Best Management Practices...........................................................8 4.1.1 Good Housekeeping.........................................................................8 4.1.2 Preventative Maintenance................................................................9 4.1.3 Spill Prevention and Response Procedures......................................9 4.1.4 inspections.....................................................................................10 4.1.5 Employee Training.........................................................................11 4.1.6 Recordkeeping and Internal Reporting Procedures ........................11 4.1.7 Sediment and Erosion Prevention.................................................12 4.1.8 General Material Management Practices.......................................12 STORM WATER MONITORING ..........................................14 5.1 General Storm Water Monitoring Requirements.......................................14 5.2 Visual Storm Water Monitoring................................................................14 5.3 Storm Water Sampling and Analysis.........................................................15 PA50049178Wdm\Reports\2012 SWPPP\2012.1.16 TOC Hayes SWPPP.doe Hayes Iron & Metal January 27, 2012 0 ■1 ■ 6. COMPREHENSIVE SITE COMPLIANCE EVALUATION .........................17 6.1 Semiannual Site Compliance Inspection...............:....................................17 6.2 Semiannual Site Compliance Report........................................................17 6.3 Plan Revision/Correction of Deficiencies.................................................. Is LIST OF FIGURES Figure l Topography Map Figure 2 Aerial Map Figure 3 Site Plan Figure 4 NWI Map LIST OF TABLES Table 1 Storm Water Pollution Prevention Team Members Table 2 Material Inventory and Management Practices Table 3 Significant Spills & Leaks Table 4 Outfall & Drainage Area Information Table 5 Semiannual Site Compliance Evaluation LIST OF APPENDICES Appendix A Forms • Monthly Facility Inspection Report • Visual Storm Water Monitoring Report • Post Spill Discharge Review Form P:\50049178\Adm\Reports\2012 SWPPP\2012.1.16 TOC Hayes SWPPP.doe Hayes Iron & Metal January 27, 2012 ■ EXECUTIVE SUMMARY Storm water discharge from Hayes Iron & Metal is regulated under General Permit NO. NCG200000 issued pursuant to the requirements of North Carolina General Statute 143- 215.1 and the Memorandum of Agreement between North Carolina and the US Environmental Protection Agency. This Storm Water Pollution Prevention Plan (SWPPP) was prepared for Hayes Iron & Metal in order to identify operations at the facility that may impact storm water runoff and to establish procedures to minimize any such impacts. The practices and procedures outlined in the SWPPP are designed to be implemented on a continuous basis to minimize potential impacts to storm water runoff at the facility. The plan is designed to be reviewed and updated in response to changes in operations at the facility. Refer to the following sections of the Plan for detailed information on the storm water monitoring program. Section 2.0 Pollution prevention team Section 3.0 Facility and outfall description Section 4.0 Storm Water Management Controls Section 5.0 Storm water monitoring Section 6.0 Comprehensive Site Compliance Evaluation Pi5004917"dm\Repons\2012 SWPPP\2012.1.16 Siler City Hayes SWPPP.doc Hayes Iron & Metal January 2012 1 1. INTRODUCTION 1.1 Purpose This Storm Water Pollution Prevention Plan (SWPPP) was prepared for Hayes Iron & Metal. The purpose of the SWPPP is to identify operations at the facility that may impact storm water runoff and to establish procedures to minimize any such impacts. 1.2 Implementation The practices and procedures outlined in the SWPPP are designed to be implemented on a continuous basis to minimize potential impacts to storm water runoff at the facility. The plan is designed to be reviewed and updated in response to changes in operations at the facility. 1.3 Regulatory Requirements Amendments to the Clean Water Act in 1987 required EPA to develop regulations to control storm water discharges under the National Pollution Discharge Elimination System NPDES). EPA published regulations on November 16, 1990, which incorporated the permitting of certain storm water discharges associated with industrial activity into existing NPDES regulations. These regulations are generally incorporated into the North Carolina Department of Environment and Natural Resources (DENR) Division of Water Quality (DWQ) regulations. The discharge from Hayes Iron & Metal is regulated under General Permit No. NCG200000 for discharges of storm water associated with scrap metal recycling. PA50049178\Adm\Reports\2012 SWPPP\2012.1.16 Siler City Hayes SWPPP.doc Hayes Iron & Metal January 27, 2012 2 ■ 2. STORM WATER POLLUTION PREVENTION TEAM Hayes Iron & Metal has a Storm Water Pollution Prevention Team to ensure that the SWPPP is implemented and maintained in accordance with good engineering and management practices. The Team is comprised of various facility personnel as noted on Table I including the team member names and phone numbers. The team will meet to evaluate and discuss the status of storm water control efforts and address any deficiencies or additional requirements in the SWPPP. Specific issues for the team to address include the following: • Provide assistance for developing and maintaining the SWPPP • Update significant materials list • Review potential spill sources • Update SWPPP incident reporting, inspection, and record keeping procedures • Review environmental incidents • Continue and improve SWPPP training for facility personne; • Review new construction and changes in processes and procedures • Evaluate the overall effectiveness of the SWPPP Plan As discussed further in Section 6.0, the Storm Water Pollution Prevention Team shall meet at least once a year to perform a comprehensive review of the SWPPP and facility operations. Pa50049178\Adm\Repons\2012 S WPPP\2012.1.16 Siler City Hayes SWPPP.doc Hayes Iron & Metal January 27, 2012 3. FACILITY DESCRIPTION AND OPERATIONS This section provides general background information on the facility operations, an inventory of significant materials, a list of significant spills, an identification of outfalls and receiving waters, and a non -storm water discharge certification. 3.1 General Description Hayes Iron & Metal is located at 35°45' 12.88" N Latitude, 79°29'42.05" W Longitude (North West of Siler City, North Carolina). The Facility is located on 21.524 acres. The site is bound by timber, and has Southern Railroad located on the south side of the property. Elevations at the site range from 658 feet above mean sea level on the south western boundary to 655 feet above mean sea level on the north western boundary. 3.2 Industrial Activities and Materials Inventory The industrial activities conducted at the facility are described below and an inventory of significant materials potentially exposed to storm water is discussed. 3.2.1 Industrial Activities The industrial activities performed at the facility are related to the recycling of metals. These activities include the following specific items: 1. Handling of scrap metal, cars, and batteries 2. Storage of materials in stock piles or inside buildings 3. Maintenance of facility equipment 4. Storage of fuel, hydraulic fluid, and other materials used for facility operations A site plan of the facility property is shown in The Site Plan -Figure 3 including areas of materials management and support activities. The following list identifies significant materials potentially handled and/or stored at the Facility. The DEQ General Permit defines significant materials as including, but not limited to: • Raw materials • Fuels • Materials such as solvents, detergents, and plastic pellets • Finished materials, such as metallic products • Raw materials used in food processing or production • Hazardous substances designated under Section 101(14) of CERCLA • Any chemical the facility is required to report pursuant to Section 313 of Title M of SARA • Fertilizers • Pesticides PA50049178\Adm\Repons\2012 S WPPP\2012.1.16 Siler City Hayes SWPPP.dm Hayes Iron & Metal January 27, 2012 4 • Waste products such as ashes, slag, and sludge When these significant materials are exposed to storm water runoff they may be carried to a receiving stream or other surface water with the storm water flow. Therefore, identification of these materials helps to determine where the potential for impact to storm water runoff exists. 3.2.2 Significant Materials Inventory and Handling Practices Table 2 provides a general list of the significant materials handled at the facility. The table identifies the materials as either raw materials, or by-products and wastes. The table then lists the container or packaging for the materials; the means of delivery, shipment, and/or storage; the potential for exposure to storm water, and the potential risk associated with exposure. The probability of a material being exposed to storm water is a function of how it is handled. Typically, those materials that are stored and used indoors can only be exposed to storm water during transport. This represents a low potential for the material to be exposed to storm water. Conversely, those materials stored or handled outdoors represent a high to moderate potential for exposure to storm water. A low potential risk of exposure means that if the material is exposed, it is unlikely to have a significant impact on storm water quality. High potential risk of exposure indicates that if the material is exposed, it may have a significant impact on storm water quality. The principal material handled at the facility is scrap metal brought to the facility for temporary storage. Scrap metal enters the facility on haul trucks that are weighed upon entry. The trucks then move to an unloading station where the contents are removed using claw or magnet equipped material handlers. The scrap metal is temporarily stored in piles on the site. Haul trucks are then reweighed upon exit. Scrap metal exits the facility in a similar fashion. The goal is for complete inventory turnover in IS days. Other materials handled at the facility include the following: • Lubricating oil, hydraulic fluid, coolants and other materials used for equipment maintenance • Waste oils generated from equipment maintenance • Fuel and oil for equipment operations • Solvents and washers for equipment repairs • Lead -acid batteries Welding operations are performed undercover to minimize exposure of materials to storm water. Some potential for exposure exists when equipment maintenance is performed at the facility. Likewise, oils and other materials may be exposed to storm water during material transport to and from the storage areas. PA50049178\Ndm\Reports\2012 S WPPP\2012.1.16 Siler City Hayes S WPPPAd Hayes Iron & Metal January 27, 2012 5 Currently the property does not have any above ground storage tanks (AST) located on site. However, after they move into the facility, there will be an AST located on the property which will contain fuel for Hayes Iron and Metals equipment. The exact size and contents have not been determined at the time this report was written. 3.3 Significant Spills and Leaks No reportable spills have occurred at the facility. In accordance with the General Permit, the SWPPP must describe any reportable spills that have occurred in the last three years. A reportable spill is a release that requires reporting under Section 311 of the CWA (40 CFR Part 110 and Part l 17) or Section 102 of CERCLA (40 CFR Part 302). Table 3 is provided in the SWPPP for use in describing any reportable spills that may occur at the facility upon implementation of this Plan. 3.4 Receiving Waters and Outfall Descriptions W 3.4.1 Run -On Points and Receiving Waters ■ Storm water that exits the property will drain into a Palustrine Forest Wetland (PFO) located on the eastern side of the property (see NWI Map -Figure 4). The land around the property is forested (see Aerial Map -Figure 2). Storm water run-on to the property is unlikely to occur. The facility sits at a higher elevation than its surrounding properties. 3.4.2 Drainage Area and Outfall Descriptions A description of the primary operations drainage area, the established outfall monitoring points, and associated best management practices to minimize runoff to _ drainages, is provided below. The majority of the property is a pervious surface of dirt and gravel. Run-off will occur during high intensity rain events, but during light events storm water will permeate the soil. The few impervious surfaces consist of an office building, weighing station, storage buildings, and two large buildings. The property boundary of Hayes Iron and Metal is approximately 21.524 acres. The operations area is fenced in. The site is mostly gravel and contains only a small amount of concrete around the buildings. The outfalls selected for monitoring are located just outside of the fenced -in area, but within the property boundaries. Table 4 summarizes information for Outfalls 001, 002, 003 and 004. Outfall locations could potentially change as a result of operations at the facility. PA50049178\Adm\Reports\2012 SWPPP\2012.1.16 Siler City Hayes SWPPP.doe Hayes Iron & Metal January 27, 2012 6 ■ Outfall 001 Stone water runoff from the area of the gravel yard and gravel parking lot reaches Outfall 001. The outfall is on the northern side of the property located prior to the sediment detention Pond #1 and is outside of the privacy fence. Monitoring for Outfall 001 shall be performed at the concrete pipe located on the outside of the fenced in area. Outfall 002 Outfall 002 is located on the northern side of the property. Storm water runoff at Outfall 002 is from the roof drains at the existing 11,100 s.f. assembly plant and office building. Monitoring for Outfall 002 shall be done at the end of the drain pipe located on the outside of the fenced in area. Outfall 003 Outfall 003 is located in the northern side of the property at the sediment detention pond. Storm water runoff for this outfall will be from a swale on the western side of the property and from Outfalls 001 and 002. Monitoring for Outfall 003 shall be done at the 24" concrete pipe which is located after the detention pond #1 located outside of the fenced in area. Outfall 004 Outfall 004 is located in the southern side of the property at the sediment detention pond. Storm water runoff for Outfall 004 is from the southern portion of the gravel yard. Monitoring for Outfall 004 shall be done at the 24" concrete pipe which is located after the detention Pond #2 located outside of the fenced in area. Drainages other than those leading to the described outfalls are natural features. These and other best management practices implemented by the facility will prevent impact to storm water runoff through these drainages. Therefore, at this time, no additional outfall monitoring locations are established. 3.4.3 Non -Storm Water Discharges According to the site plan, it appears there is no non -storm water discharges connected to the storm drainage system. 3.5 Existing Monitoring Data Storm water monitoring has not been performed at the Hayes Iron and Metal- Siler City prior to implementing this SWPPP at Hayes Iron & Metal. PA50049178\Adm\Reports\2012 S WPPP\2012.1.16 Siler City Hayes SWPPP.dm Hayes Iron & Metal January 27, 2012 7 4. STORM WATER MANAGEMENT CONTROLS Best management practices (BMPs) are currently employed and are recommended for future implementation at the Hayes Iron & Metal Facility. BMPs are implemented to minimize the exposure of significant materials to storm water runoff. Section 4.1 describes baseline BMPs. 4.1 Baseline Best Management Practices Baseline BMPs are the minimum storm water management controls. These BMPs are used to reduce the likelihood of storm water pollution and are listed as follows: • Good Housekeeping • Preventive Maintenance • Spill Prevention and Response Procedures • Inspections • Employee Training • Record Keeping and Internal Reporting Procedures • Vegetative Filter Strips • General Material Management Practices These baseline BMPs are described in detail in the following sections of this Plan. 4.1.1 Good Housekeeping Good housekeeping practices are an effective first step towards preventing the accidental exposure of materials that may have an adverse impact on storm water quality. Clean and orderly work areas reduce the possibility of accidental spills caused by mishandling of materials and equipment, and reduce safety hazards to facility personnel. Good housekeeping practices are described below. General Material Storage Practices: Storage areas are maintained in accordance with the following storage techniques: • Containers, drums, and bags are stored away from direct traffic routes to prevent accidental spills • Containers are stacked according to manufacturer's instructions to avoid damaging the containers from improper weight distribution • Containers are stored on pallets or similar devices to prevent corrosion of the containers due to contact with moisture • Batteries are stored on pallets inside a building with concrete floor, metal walls, and roof. Pallets are shrink wrapped prior to shipment offsite for battery recycling Pi500491MAdm\Reports\2012 S WPPP\2012.1.16 Siler City Hayes SWPPP.doe Hayes Iron & Metal January 27, 2012 8 ■ Outdoor Material Storage: The most important aspect of good housekeeping with regard to storm water pollution prevention is the outdoor storage of materials. The following outdoor storage practices are conducted where applicable: • Materials deemed significant will be stored outdoors for as short a period as possible or relocated to the inside of existing structures when possible • Materials deemed significant remaining outdoors for extended periods are placed on racks or pallets, and under cover when possible to minimize contact with rain water and runoff • Materials are stored in an organized manner • Waste material is properly disposed of in a timely manner Cleanup for Work and Storage Areas: Floor and ground surfaces at all storage, shop, and work areas are maintained as appropriate. Floors should be swept clean, garbage and waste material disposed of on a regular basis. Drip Pans: Drip pans are often used as a preventive measure in the event of an ■ equipment leak to allow time for repairs to be completed. Temporary or permanent drip pans are used to catch drips from equipment so that the materials or chemicals can be easily cleaned up or recycled before they can impact storm water quality. 4.1.2 Preventative Maintenance Preventative maintenance includes the regular inspection and testing of facility ■ equipment, storage containers, and operating systems. Routine inspections are conducted on equipment to identify conditions that could cause breakdowns or failures that may result in a material spill. Storage containers such as bags, drums, etc. should be checked for holes, signs of corrosion, or other evidence suggesting that a spill or leak could occur. The general preventative maintenance program includes the following elements: • Schedule for periodic inspections or tests of identified equipment and storage containers • Appropriate adjustment, repair, or replacement of equipment when needed • Keeping of complete preventative maintenance records on this equipment • Proper maintenance of outdoor waste and chemical containers 4.1.3 Spill Prevention and Response Procedures Spills will be cleaned up immediately, using necessary and appropriate equipment. If deemed necessary, contaminated soil should be excavated and disposed of properly. In the event of a spill, notify a member of the responsible party (Storm Water Pollution Prevention Team Members -Table 1) who will investigate and assess the PA50049198Wdm\Reports\2012 SWPPP\2012.1.16 Siler City Hayes SWPPP.doc Hayes Iron & Metal January 27, 2012 9 spill. An evaluation should be conducted to determine the cause of the spill, if it could have been prevented, and how to prevent a similar spill in the future. If the spill volume exceeds 25 gallons, the North Carolina Division of Water Quality (336-771- 5000) should be notified of the release. Internal records should be kept for any spill that occurs at the facility. Please refer to Significant Spills and Leaks -Table 3 and the Post Spill Discharge Review Form in Appendix A. In the event of a spill in excess of 100 gallons or if a release reaches a surface water body or otherwise exceeds a reportable quantity, the North Carolina Division of Water Quality should be notified within 24 hours. The information to be reported to the regulatory agency must include the following: W • The date and time of the spill • An estimate of the quantity of material released and the time or duration of the event ■ • The exact location of the spill, including the name of the waters involved or threatened and/or other medium or media affected by the release or spill • The source of the release • The name, address, and telephone number of the party in charge of, or responsible for, the facility or activity associated with the release • The extent of actual and potential water pollution • The party at the release site who is in charge of operations at the site and the telephone number of this party • The steps being taken or proposed to contain and clean up the spill and any precautions taken to minimize impacts Local Police and Fire Department Notification The local sheriff and fire departments should be notified at 911 if any of the following criteria are met: • Fire, smoke, violent ruptures, and/or explosions • Leaks (hazardous or not) which enter or threaten to enter watercourses • Any incident where oil crosses property lines or threatens to do so • A situation exists of such a nature (i.e., a continuing danger to life and health exists at the scene of the incident) that, in the judgment of the Responsible — Person should be reported even though it does not meet the above criteria 4.1.4 Inspections Visual inspections of the facility are routinely conducted to assure compliance with the SWPPP and other facility programs. These inspections should occur monthly and PA5004917MAdm\Reports\2012 SWPPP\2012.1.16 Siler City Hayes SWPPP.doc Hayes Iron & Metal January 27, 2012 10 will include material storage areas, waste transfer/handling areas, secondary containment structures, and storm water outfalls. Each of these areas is inspected for the following: • Presence of waste material outside transfer and handling areas • Proper storage of all significant materials, especially batteries • Excessive buildup of waste materials at transfer/handling areas • Visible signs of corrosion or pitting on tanks/containers • Noticeable spills at containers or in the secondary containment system • Integrity of the secondary containment system • Operation of manual flow controls and cut-off valves As part of this monthly inspection storm water outfalls will be inspected for signs of sediment buildup or the presence of significant materials. These inspections will be documented on the Monthly Inspection Form included in Appendix A. In the event of an identified deficiency, it will be noted on the inspection form and reported for correction. 4.1.5 Employee Training All personnel at the facility shall receive annual training as part of the SWPPP implementation. This training will be incorporated as a part of periodic environmental and safety meetings held at the facility. This training will consist of an overview of the SWPPP with an emphasis placed on spill response, good housekeeping and other storm water management controls. Specific areas to be addressed in this training include: • Identification of significant materials • Good housekeeping • Spill response and reporting • Inspection procedures • Sediment and erosion prevention • General material management practices 4.1.6 Record keeping and Internal Reporting Procedures Records of all spills, inspections, and information describing storm water quality and quantity shall be documented and filed as described below. All records shall be maintained for a minimum period of five years. Spills: All spills are recorded on the Post Spill Discharge Review Form included in Appendix A. In addition, a summary of the spill event is included in Significant Spills and Leaks -Table 3. P15004917KAdm\Repons\2012 SWPPP\2012.1.16 Siler City Hayes SWPPPAd Hayes Iron & Metal January 27, 2012 11 Inspections: All monthly inspection forms shall be filed as part of the SWPPP. Storm Water Ouality and Quantity: Any records of storm water quality and quantity, including analytical data, that may be collected as part of the general permit or other operations will be filed as part of the SWPPP. M 4.1.7 Sediment and Erosion Prevention The heavily vegetated area on the property surrounding the operations area will serve to protect receiving waters for sediment runoff. Gravel can be placed in high traffic areas to reduce soil erosion. 4.1.8 General Material Management Practices Care is taken in the handling of materials at the facility to prevent spills that may ■ impact storm water quality. The main concerns with material handling related to storm water pollution prevention include the handling of drums, material transfer operations, battery handling and storage, and control of materials received at the facility. Drums are used at the facility to contain lube oil, solvents, and wastes. Proper procedures for drum storage and handling should be observed. It is best to store drums in a covered area to prevent storm water contact with the drums. Drums should be periodically checked for corrosion and replaced if needed. All drums should be clearly labeled to indicate the container contents in accordance with DOT and RCRA requirements. Bulk material transfer occurs during refilling of the above ground storage tanks. The liquids are transported to and from the facility by tanker truck. In general the _ following steps are used during fuel transfer operations: ■I • Tank level is checked prior to filling • The tanker equipment is checked prior to beginning transfer • Valves and pipes and tank level are monitored during transfer • Tanker is checked before leaving Securely closed containers or pumps will be used for the transfer of small quantities of liquids. When pumps are used the pump will be placed in a drip pan to catch any leaks from fittings. All batteries received on site should be immediately taken to the battery storage building and placed on a pallet. Pallets should be shrink-wrapped before shipping offsite for recycling. PA50049178\Adm\Reports\2012 SWPPP\2012.1.16 Siler City Hayes SWPPP.doe Hayes Iron & Metal January 27, 2012 12 ■ The facility has the practice of only accepting on site scrap vehicles with a visible hole in the gas tank. This practice should be continued and reinforced through employee training. Likewise, the facility should try to limit the receiving of potential storm water contaminants on site. PA50049178\Adm\Reports\2012 SWPPP\2012.1.16 Siler City Hayes SWPPP.dm Hayes Iron & Metal January 27, 2012 13 5. STORM WATER MONITORING This section describes both visual and chemical monitoring of storm water discharges that must be performed in accordance with the general permit. 5.1 General Storm Water Monitoring Requirements Under this general permit, storm water runoff monitoring will be conducted at Outfalls 001, 002, 003 and 004. All storm water monitoring must be performed during a representative storm event. That is a storm that generates at least 0.1 inches of precipitation and has been preceded by 72-hours without a measurable precipitation event (0.01 inches). A single storm event may contain up to 10 consecutive hours of no precipitation. For example, if it rains for 2 hours without producing any collectable discharge, and then stops, a sample may be collected if a rain producing a discharge begins again within the next 10 hours. 5.2 Visual Storm Water Monitoring Visual (qualitative) monitoring of storm water must be performed on a biannual basis for Outfalls 001, 002, 003 and 004. The permittee shall report the analytical results from the first — sample with valid results within the monitoring period. Monitoring must be performed in accordance to the monitoring schedule below: Tublr 2_ \Innitnrim. 5rhrrluL� Monitoring li\'entt" Start End I January 1. 2010 June 30. 2010 1 July I.2010 IJecemlxr11.1010 3 January 1, 201I June 30.2011 4 July 1.2011 Decemtxr31.2011 5 January 1. 2012 June 30, 2012 6 July 1. 2012 December:,I. 1012 7 Januan I. 2013 June 30. 2013 S July 1, 2013 Ikceintvr 31. 1013 9 January 1, 20f4 June 30, 2014 10 Juh• 1, 2014 December 31. 1014 Footnotes. I Maintain semi-annual monitoring durin_• twinit rene"'al process. 11 at the expiration of the General Permit. the ficriumee has submitted an application for renewal of cm'craee hek,re the suhmival kkadfittx•. the fermiuce• trill be considmil I rerw"H d coreraec. The applicant must continue semi-annual monitoring until the re neuc•d Certificate of Cot'enwe is issued. 2 If no discharge o> curs durin_• the samplin_• rvriod the fx•rmiuee trust submit a monitoring repon indicating -Nn Flow" within 30 dars of the end of Ov six-month sampling fxriod. � I P150049178\Adm\Reports\2012 SWPPP\2012.1.16 Siler City Hayes SWPPP.doc Hayes Iron & Metal January 27, 2012 14 Visual monitoring does not need to be performed during a representative storm event except for the first monitoring event. The first qualitative monitoring event during the coverage of the permit must coincide with the initial analytical monitoring event. Qualitative monitoring shall be done at each stormwater discharge outfall (SDO) regardless of representative outfall status. The grab sample must be visually observed for the following: • Color • Odor • Clarity • Floating solids • Suspended solids • Foam • Oil sheen • Erosion or deposition at the Outfatl • Other obvious indictors of storm water pollution A record of these observations will be recorded on the Visual Storm Water Monitoring Form in Appendix A. 5.3 Storm Water Sampling and Analysis Storm water sampling and analysis shall be performed for each outfall and is required semiannual during the permit coverage. The permittee shall compare the results to the benchmark values in the Benchmark Values for Analytical Monitoring Requirements chart. Exceedences of benchmark values require permittee to increase monitoring, increase management actions, increase record keeping, and/or install stormwater Best Management Practices (BPM's) in a tiered program. The permittee shall complete the analytical samplings in accordance with the schedule specified in the monitoring schedule. A minimum of 60 days must separate each monitoring event unless monthly monitoring has been instituted under a Tier Two response In accordance with the general permit, a grab sample of the storm water runoff must be collected at each outfall during the first 30 minutes of a representative storm event. The grab samples shall be analyzed for the following constituents at the following Benchmark Values: P150049178\Wdm\Reports\2012 S WPPP\2012.1.16 Siler City Hayes. SWPPP.doe Hayes Iron & Metal January 27, 2012 15 Analytical Monitoring Requirements '(able 1. :11:dnical \loniinine ltrttnlr'ellll'ntp IlkOwl'_e c.' I:rat ten>lics Units lilva,urenu•nt Frvtl agree S:uliple '1'en•' Sample a Location pH atandard SeIII i-annual Grub SDO Chemical Oxs Den Demand nl_dL semi :nnu:l CIab SDO Toed Sus vended Solids ruo/L .cmi-annual Crab SDO Oil & Greax• nro/L Semi-annual Grab SDO Cadltlltlin- Toed Recave•rahle nw/L Semi-UnnUal Grab SDO Colxr. Total Recoverable nw/L Semi-annual Grab SDO Iron. Total Kcawerahle meii- Semi-annual Grab SDO Lead. Total Recoverable nadL Srnri-annual Grab SDO Lint. Total Rccovectble nniL semi-annual Grab SDO (ntal Rainldtl14 inclve•s :cmi-annual Rain Lau_e 14nanolcs: Nlea*umnent Prequence: Tice per year durine a re press ntaI ive Strain eve m. '- Grab samples Shall Ix• eelk•eted Ir Allin tlu firm Jn ntinulcs of discharge Iran an SDO or deiention pond. o S:mtple 1 �ttation: S:unples shell h• collected at each slornwaler di. har^, oun:ul!SD111 univ, reprei:m:u ive outlall icnus ha, hen granted. Par each SamplL-d rrprcc•nl: inc• Storm even Ilk• lot:d precipitation mint b; recorded. An on -site rain _auge or local rain g:nge Nadine nma ha Table �. Ilenrllnnu k N'alog> prat' Analctic:d \lonitorinI- Rguuit'enn•nls D lscllar't�'e Characteristic's flenclltnark Value pH Within range 6.0-9.0 Chemical ON c een Demand 1 _10 nw/L Total Sus ended Solids I W mJL Oil S. Gneasc 30 mJL Cadmium. Total Recoverable 0.001 mJL Co xr. Total Re o%orlble 0.007 nw/L Iron. Total Recoverable N/A Lead. Toad Recoverable 0.03 nw/L Zinc. Total Recoverable O.Oo7 m&L P:\50049178Wdm\neports\2012 SWPPP\2012.1.16 Siler City Hayes SWPPP.doc Hayes Iron & Metal January 27, 2012 16 w M ■ 6. COMPREHENSIVE SITE COMPLIANCE EVALUATION As part of the SWPPP requirements, the facility will conduct semiannual Comprehensive Site Compliance Evaluations. These evaluations will assure that the facility is complying with the requirements and guidelines prescribed in the SWPPP and that the SWPPP reflects current conditions and operations at the facility. The site compliance evaluation consists of three main tasks: a semiannual inspection, correction of any deficiencies, and preparation of a summary report. Inspections are to be done once in the first half of the year (January -June) and once during the second half of the year (July -December). 6.1 Semiannual Site Compliance Inspection The Pollution Prevention Team (Table 1) shall designate an individual to conduct a semiannual inspection to assure the effectiveness of the SWPPP. Semi Annual Site Compliance Evaluation -Table 5 summarizes the actions to be taken as part of this inspection and may be used as a checklist to complete the evaluation activities including the following: • The description of potential pollutant sources is up to date and accurate; • Areas of industrial activity are inspected for signs of pollutants entering the storm drainage system. • The drainage map reflects current conditions • The storm water management BMPs and structural controls listed in the SWPPP are implemented and effective Any changes to the list of potential pollution sources or to pollution prevention measures shall be incorporated into the SWPPP within 2 weeks of the evaluation. Any required changes shall be implemented within 12 weeks of the compliance evaluation. a6.2 Semiannual Site Compliance Report A semiannual site compliance report shall be prepared summarizing the results of the compliance evaluation. The information to be contained in the report should contain at least the following: • Personnel making the inspection • Date(s) of the inspection • Outline of inspection procedures (from Table 5); • Major observations relating to the implementation of the SWPPP; • Any non-compliance items • Actions taken This report shall be retained as a portion of the SWPPP for a period of at least three years. If the report finds there are no non-compliance issues, the report shall contain a certification that the facility is in compliance with the SWPPP and the report shall be signed by a member of the Stormwater Pollution Prevention Team. Pa50049178\Adm\Reports\2012 SWPPP\2012.1.16 Siler City Hayes SWPPP.dm Hayes Iron & Metal January 27, 2012 17 6.3 Plan Revision/Correction of Deficiencies The SWPPP will be reviewed and revised by the Pollution Prevention Committee on a continuous basis, at a minimum annually following a site compliance evaluation. Additional reviews will be conducted under any of the following conditions: • A major change in operations • Notification from the state to perform a review of the SWPPP • A significant spill has escaped containment • Construction activities have or will affect storm water flows and/or discharges • Circumstances (i.e., malfunctioning storm water pollution prevention controls) arise that might impact storm water quality The SWPPP shall be revised immediately upon recommendations in the semiannual compliance report or under other circumstances listed above. The plan will be updated to incorporate the above activities, and any changes in management practices will be implemented within 12 weeks of completion of a construction project or identification of a spill or other problem. P150049178V+dm\Repons%2012.S WPPPt2012.1.16 Siler City Hayes S WPPP.dm Hayes Iron & Metal January 27, 2012 18 s Hayes Iron and Metal Siler City ` 35045'12.88"N S 79029'42.05"W l l t 'y Dewberry` P.O. Box 1509 Danville VA. 24549-1509 551 Piney Forest Rd. Danville VA 24540 (434) 797-4497 (voice) rchitects Figure 2- USGS Topographic Map: 101 Viven Betty Place Engineers Chatham County, NC Planners P:\50049178�Adm\Reports\Maps.pptx Surveyors ■ i e 01 I ��a WL4.k A� 0 o"' C Hayes Iron and Metal Siler City 35045'12.88"N 79029'42.05"W P.O. Box 1509 Architects Topographic Map: 101 Viven Betty Place lli Dewberry" Danville VA. 24549-1509 Engineers y, NC 551 Piney Forest Rd. Planners P:\50049178\1dm\Reports\Maps.pptx Danville VA 24540 Surveyors (434) 797-4497 (voice) OUTFALL NUMBER DESCRIPTION OUTFALL 001 STORM WATER RUNOFF IS FROM THE WEST SIDE OF THE PROPERTY CONSISTING OF THE GRAVEL YARD AND PARKING LOT. OUTFALL 002 STORM WATER RUNOFF IS FROM ROOF DRAINS AT 11,100 S.F. BUILDING. OUTFALL 003 STORM WATER RUNOFF IS FROM THE SWALE LOCATED ON THE WESTERN SIDE OF THE PROPERTY AND OUTFALLS 001 AND 002. OUTFALL 004 STORM WATER RUNOFF IS FROM THE SOUTHERN S1DE OF THE PROPERTY WHICH IS MAINLY A GRAVEL YARD. t �llllliT��, Percentage of Impervious Drainage Areas Detention Pond e1 45% Detention Pond g2 22% J♦}PROPOSED LOCATION OF OFFICE BUILDING / AND TRUCK SCALE v 12' ROOF DRAIN I . PROPOSED >r meeA ew . 5.124 eom Y E%STING o ' t HEo EX. 11, 100 S.F. P w +I SAW FLEUiV- � gg X ASSEMBLY PLANT > wxc •'^ >- h � m2°' p eSe.aD aooR EIkV. ss9.o . yl..j C aY¢ J➢ QAi P/O ' N IN O S,F. (� I 1 p EX. 19.980 'A55'Y PLANT mec. ra o ° !n v •0�-v coNc ru ra7> --- --- Haar-_- __- -- -W ""�."°J° '9 I !fi. �IkA4. �• — 5 34'53'I4'W 880.00' m — �mw�aw DETENTION POND ae> 24" CPP DRAINAGE AREA 1 �J bI /mom =. 2.7 ACRES OUTFALL 003 24' CPP 1-1 DETENTION POND 81 DRAINAGE AREA 5.9 ACRES OUTFALL 002 MWINTE rg OUTFALL 001 III- ' I^` 15' CPP I O ss 4't'• .i W 421 N 7 SITE Om pB 64 I SILER CITY VICINITY MAP SITE DATA PROPERTY ONO'(R.' (MNTFR PARTNERSHM '�•1019 519 1419 R X 51 F0 lX.D1X Pd/q, PA 15JJ0 (Tzp-ne-9.m APFC.Y.'AN]` P/FM'L-NAfi•DY LIAHT£D PARTNERSYP 1019 ROWS 519 fNY/n' R. PA 15JJ0 (Z 4)-228-5420 MrA2 AREA' 21.524 AC ZPWAC psI r.. 2-1 /AX PA NQ' C.-IJ1RB LEGEND • $ rw.mn m`0�eav e/ uww _�_ uvecx umma urrc -� rry.__ oanp uoe.uow mw a'.a nm s,g VIfOVAdM t1OIW IIM1 /M SH --fW— YCUCIIW% WN(IPI' SIeEP Il0 9S Y![GUGIMD S.VRIrt/ SnTA I!L ffi —.1r- IMIeRYMI WRP IIE IM ffi afLiWC� IaID111M[ V[ (bTMC1Y1 anNM[ wswc M P.W W. mee R[D a w+ro sox Nartaax islea"xCeran lumx Wva Cat °anw rnnoe uo nor ror wsvvs D - Il000OM2D /ZY�.zos RECEIVED JAN 1 0 2005 ® 84 LUMBER 1019 ROUTE 519 DCHTY NUR. PA im (724) 228-3838 EROHRIDISING REVISONS BUILDING RMS10NS NEW OFFICE ADDITION 101 VNEN BETTY PUCE SILER CITY TRUSS CiLIT COUNTY, NC Y7J PROJECT INFORMAP N tort D"R0 AiS A aD"�',%' s xE: 5o Joe N0. 11924 STORE N0. 2300 SHEET N0. DEs1cN er: Tuc DRAWN BY: CK DATE: 12 23 Oa IIIN•M11JLYk 101 Viven Betty U.S. Fish and Wildlife Place National Wetlands Inventory Jan 23, 2012 Wetlands - Freshwater Emergent - Freshwater FOreSled/Shmb - Estuarine and Marine Deepwater - Estuarine and Marine - Freshwater Pond - Lake f Rivenne Other toa m J `•� soo f Thle mep le br ge W , e,q aNy. TUe US FIM xM WIdIMe SeMce Is nm ropomlMe br IM e[cu,Ky sr & i M. Nte eh— — We map. M xvlMMe n1eME Este aMUIE G useE In ecC..ce wits U. Iryal malsNla fourW on IM WeftM Mapper,seb site. User Remarks: Figure 4 ■ TABLE 1 STORM WATER POLLUTION PREVENTION TEAM MEMBERS TABLE 1 STORM WATER POLLUTION PREVENTION TEAM MEMBERS Hayes Iron & Metal Siler City North Carolina Name Phone Number Charlie Wright 434-251-9233 D.J. Alderson 434-251-9574 Joel White * 434-334-6685 *Individual designated to conduct a semiannual inspection. ■ TABLE 2 MATERIAL INVENTORY AND MANAGEMENT PRACTICES 0 TABLE 2 MATERIAL INVENTORY AND MANAGEMENT PRACTICES Hayes Iron & Metal Siler City, North Carolina Material Container or Means of Shipment, Potential Potential Packaging Delivery, and Storage for Risk of Exposure 1 Exposure Raw Materials Diesel Fuel AST Tanker Truck Low Moderate Containment Lubricating Oils Drums Delivered by truck and stored Low Moderate in maintenance building Hydraulic Fluid Drums Delivered by truck and stored Low Moderate in maintenance building Batteries None Normally in vehicles when Low Moderate brought to site. Stored indoors on pallets. Shrink- wrapped prior to shipment off site. Wastes and Byproducts Waste Motor Oil Drums Stored in maintenance Low Moderate building and picked up by contractor Waste Hydraulic Drums Stored in maintenance Low Moderate Fluid building and picked up by contractor TABLE 3 SIGNIFICANT SPILLS AND LEAKS Hayes Iron & Metal Siler City, North Carolina Date Material and Quantity Released Description of Release Circumstances Leading to Release SIGNATURE: DATE: ■ TABLE 4 OUTFALL AND DRAINAGE AREA INFORMATION TABLE 4 OUTFALL AND DRAIANGE AREA INFORMATION Hayes Iron & Metal Siler City, North Carolina Outfall Outfall Description Industrial Activities Number 001 Runoff from the area of the Handling and storage of scrap metal. gravel yard and gravel parking lot. 002 Runoff from the roof drains Handling and storage of scrap metal. of the 11,000 s.f. building. 003 Runoff from the swal located Handling and storage of scrap metal. on the western side of the property and Outfalls 001 &002. 004 Runoff from the southern Handling and storage of scrap metal. portion of the gravel yard. ■ ■ TABLE 5 SEMIANNUAL SITE COMPLIANCE EVALUATION m ■ ■ TABLE 5 Semiannual Site Compliance Evaluation Hayes Iron & Metal Siler City, North Carolina Semiannual Site Compliance Evaluation Summary of Activities 1. Update list of Pollution Prevention Team members, phone numbers, etc. 2. Inspect areas of activities. a. Update lists of materials and management practices used at the facility (Table 2). b. Note any changes in material handling practices. C. Update outfall information as necessary (Table 4). d. Inspect storm water outfalls for sign of pollutants. 3. Evaluate existing BMPs to assure that they are adequate and properly implemented. 4. Review records to assure all required inspections have been completed and recorded. 5. Evaluate any storm water monitoring data for elevated levels of pollutants. 6. Update the facility spill list (Table 3). 7. Review the above information and note any non-compliance and determine if additional BMPs or structural controls are needed. SIGNATURE: DATE: MONTHLY FACILITY INSPECTION REPORT Hayes Iron & Metal Siler City, North Carolina Check the appropriate box for each item. Comment on any response that needs explanation. Further description or comments should be attached on a separate sheet of paper if necessary. Yes No Comments Materials properly stored to minimize impact to storm water runoff Material storage containers, piping, valves, etc. in good condition (no corrosion, etc.) Containment area free of spilled material or excess standing water Noticeable signs of spills or leakage from containers Leachate collection system operating properly with no release to storm drains Waste containers and temporary staging areas in good condition Yard surface in good condition (ie check for presence of washouts, gullies, etc.) Additional Comments/Problems Identified: Date: a M Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report For guidance on filling out this form, please visit: http://h2o.enr.state.nc.us/sti/Forms Docunrents.him#miscforms Permit No.: Facility Name: County: Inspector: Date of Inspection: Time of Inspection: Total Event Precipitation (inches): or Certificate of Coverage No.: N/C/G/_/_/_/_/_/_/ No. Was this a Representative Storm Event? (See information below) ❑ Yes ❑ No Please check your permit to verify if Qualitative Monitoring must be performed during a representative storm event (requirements vary). . '-------------------------------------------- ---- _----------__-.---- ---- --- -------------- ---__...----. A "Representative Storm Event' is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. j By this signature, I certify that this report is accurate and complete to the best of my knowledge: M (Signature of Permittee or Designee) 1. Outfall Description: Outfall No. Structure (pipe, ditch, etc.) Receiving Stream: Describe the industrial activities that occur within the outfall drainage area: 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): Page 1 of 2 SVX-242-112608 4. Clarity: Choose the number which best describes the clarity of the discharge, where I is clear and 5 is very cloudy: 1 2 3 4 5 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: 1 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where I is no solids and 5 is extremely muddy: 1 2 3 4 5 7. Is there any foam in the stormwater discharge? Yes No 8. Is there an oil sheen in the stormwater discharge? Yes No 9. Is there evidence of erosion or deposition at the outfall? Yes No 10. Other Obvious Indicators of Stormwater Pollution: List and describe Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWO-242-1I2608 POST SPILL DISCHARGE REVIEW FORM Hayes Iron & Metal Siler City, North Carolina Date: Reported By: Time: Reported To: Substance Spilled: Estimated Quantity Spilled: Sketch Spill Location and Flow in the box below. How Spill Occurred: Response Actions Taken: Adequacy of Response Actions: Revisions to Response Procedures Required: Yes _ No If "Yes" Describe: Date Procedures Revised and Incorporated in Plan: Signature: Date: w D00yu; rry I www.dewberry.com